80GRC023PA013 RFQ.pdf

PDF 5 MB Posted

Attached to
Vacuum Facility 3 Cold Wall & LN2 Supply Lines Request for Quote (RFQ) Federal contract opportunity
Solicitation number
80GRC023PA013
Issued by
National Aeronautics and Space Administration Glenn Research Center

About this file

This is a request for quote (RFQ) from the National Aeronautics and Space Administration Glenn Research Center for the supply of a liquid nitrogen thermal shroud, liquid nitrogen supply and vent piping, control valves, and associated installation services. Offerors are requested to provide pricing and a schedule by July 6, 2023 for the fabrication of a thermal shroud meeting extensive technical requirements, the supply of vacuum jacketed liquid nitrogen and mechanically insulated vent piping, and control valves. The contractor must also install the vacuum jacketed piping. Delivery is required by March 1, 2024 with installation by March 29, 2024. The solicitation includes extensive technical requirements and drawings for offerors to consider in developing their proposals.

View the file

Other files for this federal contract opportunity

Other files attached to Vacuum Facility 3 Cold Wall & LN2 Supply Lines Request for Quote (RFQ), newest first.
File Type Posted
Amendment 1 80GRC023PA013.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

80GRC023PA013 Page 2 of 71

Vacuum Facility 3 Cold Wall & LN2 Supply Lines Request for Quote (RFQ)

Combined Synopsis/Solicitation

This notice is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; offers are being requested and a written solicitation will not be issued.

This notice is being issued as a [Request for Quotations (RFQ)] under solicitation number 80GRC023PA013 for Vacuum Facility 3 Cold Wall & LN2 Supply Lines.

The provisions and clauses in the RFQ are those in effect through FAC 2023-04.

The NAICS Code and Size Standard are 332999 and 750, respectively. The offeror shall state in their offer their size status for this acquisition.

All responsible sources may submit an offer which shall be considered by the agency.

Delivery to NASA Glenn Research Center, 21000 Brookpark Road, Cleveland, Ohio 44135 is required within 30 weeks after receipt of order. Delivery shall be free on board (FOB) Destination.

Offers for the items(s) described above are due by 5:00PM ET, July 6, 2023 to linda.m.nabors@nasa.gov and must include, solicitation number, FOB destination to this Center, proposed delivery schedule, discount/payment terms, warranty duration (if applicable), taxpayer identification number (TIN), identification of any special commercial terms, and be signed by an authorized company representative. Offerors are encouraged to use the Standard Form 1449, Solicitation/Contract/Order for Commercial Items form found at

URL:https://www.gsa.gov/forms-library/solicitationcontractorder-commercial-items

The following clauses and provisions are incorporated; full text of the clauses and provisions may be accessed electronically at:

FAR - https://www.acquisition.gov/browse/index/far

NFS - https://www.hq.nasa.gov/office/procurement/regs/NFS.pdf

Offerors shall provide the information required by FAR 52.212-1, Instructions to Offerors- Commercial Items,(MAR 2023) which is incorporated by reference.

80GRC023PA013 Page 3 of 71

FAR 52.212-2, Evaluation -- Commercial Items, (NOV 2021). The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors are in descending order of importance and shall be used to evaluate offers: technical capability, schedule, price, and past performance.

All offerors shall include a completed copy of FAR 52.212-3, Offeror Representations and Certifications -- Commercial Items, (DEC 2022) Alt (OCT 2014), or complete electronic annual representations and certifications at SAM.gov with its offer.

FAR 52.212-4, Contract Terms and Conditions-Commercial Items, (DEC 2022), is applicable.

FAR 52.212-5, Contract Terms and Conditions Required To Implement Statutes or Executive Orders-Commercial Items, (JUN 2023)is applicable.

NASA Clause 1852.215-84, Ombudsman, is applicable. The Center Ombudsman for this acquisition can be found at : https://www.hq.nasa.gov/office/procurement/regs/Procurement- Ombuds-Comp-Advocate-Listing.pdf

This posting, in addition to any attached documents, will be available on www.Sam.gov.

Potential offerors will be responsible for downloading their own copy of this combination synopsis/solicitation and amendments (if any).

Prospective offerors are encouraged to notify this office of their intent to submit an offer.

All contractual and technical questions must be submitted electronically via email to linda.m.nabors@nasa.gov not later than 5:00PM ET, on June 28 2023. Telephone questions will not be accepted.

Responses to this combined synopsis/solicitation must be received via email to linda.m.nabors@nasa.gov no later than 5:00PM ET, on July 6, 2023.

The Government is not responsible for any failure attributable to the transmission or receipt of documents submitted using electronic means, including the missing of any established deadlines.

80GRC023PA013 Page 4 of 71

Failure to submit a complete electronic proposal by the due date and time specified for this RFQ shall result in the proposal being considered late, and shall be handled in accordance with FAR 52.212-1 Instructions to Offerors - Commercial Items (MAR 2023).

80GRC023PA013 Page 5 of 71

REQUEST FOR QUOTATION (RFQ) 80GRC023PA013

SECTION A—INFORMATION TO OFFEROR

Solicitation Title: Vacuum Facility 3 Cold Wall & LN2 Supply Lines

Issuing Office: NASA/Glenn Research Center Procurement Division, MS 60-1 21000 Brookpark Road Cleveland, OH 44135-3127

Agency Contact: Linda M. Nabors, Contract Specialist, Phone- 216-433-2407 Email linda.m.nabors@nasa.gov

RFQ Issue Date: 21 June 2023

Question Due Date: 28 June 2023, 5:00pm Eastern Time, email the Agency Contact, Linda Nabors, as stated above.

Quotation Due Date: 06 July 2023, 5:00pm Eastern Time, via electronic submittal to the Agency Contact, Linda Nabors, as stated above. The preferred software for proposal submission is searchable, unlocked Adobe PDF file.

[End of Section A]

80GRC023PA013 Page 6 of 71

SECTION B—SUPPLIES/SERVICES

B.1 1852.216-78 FIRM FIXED PRICE. (DEC 1988)

The total firm fixed price of this contract is $ [Insert the appropriate]

(End of clause)

B.2 Contract Line Item Number (CLIN) Structure The CLIN structure is anticipated to encompass one (1) CLIN. See below:

CLIN 0001 (Firm Fixed-Price) - Supplies

CLIN 0002 (Firm Fixed-Price) - Service (Installation) This CLIN captures all of the parts listed in the Statement of Work in Section C.

B.3 SUPPLIES AND/OR SERVICES TO BE PROVIDED

The Contractor shall provide all resources (except as may be expressly stated in the contract as furnished by the Government) necessary to deliver and/or perform the items in accordance with the Description/Specifications/Statement of Work incorporated entitled Vacuum Facility 3 Cold Wall & LN2 Supply Lines SOW which is found in Section C.

(End of clause)

B.4 Payment Schedule

No Partial Payment allowed. Do not submit invoice until completion of contract.

[End of Section B]

80GRC023PA013 Page 7 of 71

SECTION C—DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

STATEMENT OF WORK

Vacuum Facility 3 Cold Wall & LN2 Supply Lines

PART 1: GENERAL

1.01 DESCRIPTION

The Space Simulation test facilities at NASA Glenn simulate space pressures and temperatures for space exploration related hardware testing. To accomplish this, a cryogenically cooled shroud, Ln2 control valve, manual isolation valve, and associated Vacuum Jacketed (VJ) supply and mechanically insulated vent piping are required.

1.02 SCOPE

NASA is purchasing a liquid nitrogen (LN2) thermal shroud, LN2 control valve and vacuum insulated supply and mechanically insulated vent piping for Vacuum Facility 3 (VF-3). Previous relevant experience is required.

1.03 GOVERNMENT FURNISHED INFORMATION (GFI)

1. The following relevant drawings

a. VF-3 Facilities drawings

b. 0016-W1451488-M-801 Redline (LN2 system)

c. Facility/LN2 system photographs

d. VF-3 Facility Model (reference only, subject to change)

Provided drawings are for quotation purposes only.

NASA requires that vendors take field measurements of the test facility prior to fabrication of the thermal shroud.

1.04 TRAVEL AND INSPECTION

NASA reserves the right to inspect the fabrication and witness testing of the thermal shroud and associated equipment at the vendor location.

Visitation by the awarded company to take field measurements prior to fabrication is required. Proper mating of thermal shroud passthroughs shall be the vendor’s responsibility.

80GRC023PA013 Page 8 of 71

PART 2: QUOTATION

2.01 COST AND SCHEDULE

The contractor shall provide a cost and schedule estimate in response to this solicitation for the products described in Part 3. The quotation shall include fabrication of the thermal shroud, supply and vent LN2 VJ piping, control valves, cold wall to facility interface connections, and the cost of shipping.

PART 3: PRODUCTS

3.01 DRAWINGS

Contractor shall provide drawings of the thermal shroud, supply and vent piping, and all mechanical and electrical interfaces.

3.02 DESIGN REPORT

Contractor shall provide a design report that, at a minimum, contains the following items.

The final design shall be reviewed and approved by NASA prior to fabrication.

• Design Calculations o Thermal analysis o Conductance estimates o Baffle design and design basis o Maximum Allowable Working Pressure (MAWP) at design temperatures o Weight o Structural o Relief valve sizing calculations, which include backpressure due to vent lines o Thermal shroud vent line sizing calculations

• Manuals

• Cut/Spec sheets

• Results of pneumatic leak test o Pneumatic leak test to be conducted with inert gas and in accordance with ASME B31.3 Normal Fluid Service

• Results of helium leak test

• Material list, mill test reports, and material certifications/specifications

• Welder’s Qualification Documentation (WPS, PQR, and WPQ)

• Non-Destructive Examination Reports (Visual, Radiography)

• Lift plan for moving cold wall into and around facility.

3.03 THERMAL SHROUD

80GRC023PA013 Page 9 of 71

The contractor shall provide one (1) thermal shroud assembly

Thermal Shroud Design Requirements

Design the thermal shroud for installation within the existing vacuum chamber required features of this element are as follows.

i. The VF-3 chamber is nominally 5’ diameter and 15’ long. The nominal outer dimensions of the thermal shroud shall be 50” x 146”. The thermal shroud and all associated hardware and insulation shall fit inside this facility. Multi-layer insulation to be provided and installed by NASA.

ii. The thermal shroud shall be actively cooled by ½” minimum “D”-tube in a parallel flow configuration and spaced such that there shall be no more than a 10K gradient across the shroud during flooded operation in high vacuum.

iii. The thermal shroud shall consist of an open end with a passive, removable cover and a closed end with active cooling via LN2 piping. The open end shall be located at the main chamber opening (hinged end) and the closed end shall be positioned in the non-hinged, rear end of the chamber. The main chamber opening will be referred to as the “Open End” of the chamber for the remainder of this document.

iv. The removable end cover shall have 2 handles for easy removal. It shall have a 3” hemispherical “notch” in the bottom dead center to allow cables to pass through. The cover shall also be thermally synched to the cold wall with a thermally conductive gasket, and tightened down with ¼”-20 bolts, spaced evenly around the circumference of the cover and thermal shroud, spaced approximately every 6 inches.

v. The thermal shroud shall be removable and shall be installed and removed via the Open End of VF-3.

vi. The thermal shroud shall employ optically dense chevrons or baffles in the location of the turbomolecular pump. The thermal shroud shall also employ (3) 4” pass through holes, with detachable covers. Contractor shall verify placement with NASA PoC prior to construction.

vii. The thermal shroud design shall include inlet, outlet, and fin temperature instrumentation. Instrumentation shall consist of roughly 14 Type T thermocouples, 10 spaced evenly across the shroud and 2 on the inlet and 2 on the outlet. Thermocouple locations shall be approved by NASA engineers. Thermocouple leads shall extend one foot beyond the leading

80GRC023PA013 Page 10 of 71 edge of the shroud while bundled. The thermocouples shall be terminated with Mini style plugs with flat conductors.

viii. The thermal shroud design shall allow for instrumentation maintenance and replacement. Bolt on thermocouples shall be used where appropriate.

Rationale: Easy maintenance and replacement (e.g. without requiring shroud removal or significant disassembly) are requested where feasible to minimize potential facility downtime due to instrumentation failure.

ix. The thermal shroud shall have ease of maintenance, easily replaceable piece parts and designed for ease of inspection.

Rationale: Inspection and repair of the shroud without removal or significant disassembly minimizes potential facility downtime. For cases where removal is required, accessible hard points make maintenance easier to perform. The thermal shroud assembly should be removable as a unit utilizing the existing chamber rail system.

x. The thermal shroud shall be supported by thermally isolated casters/rollers that fit the existing chamber mounting rails, one of which is flat and one of which is round. Caster/rollers shall be thermally isolated from cold wall via insulating blocks or mounts. Caster/roller selection shall be discussed and approved by NASA engineer/POC.

xi. The thermal shroud connections shall be easily accessible from the Open End. The contractor shall provide flex lines of sufficient length to connect the LN2 feed throughs to the thermal shroud supply and vent connections.

These flex lines shall utilize DN40CF (2.75” OD) 304L SS Rotatable Conflat fittings to connect to the facility feed throughs (feed throughs provided by NASA). Proper mating of thermal shroud passthroughs shall be the vendor’s responsibility.

Rationale: The locations of the thermal shroud supply and vent feedthroughs are a couple feet into the chamber and will not be accessible with the cold wall in place. For this reason, flex lines must be provided to bring the connection points into reach from the chamber opening.

xii. The thermal shroud shall have 2 internal mounting rails, located 12” vertically from the bottom-dead-center of the shroud, spanning the length of the shroud. These rails shall be designed to support 1000lbs over their length. Rail placement and design to be approved by NASA prior to fabrication.

Rationale: Thermal Shroud needs to adequately support various test articles.

xiii. Surface finishes, coatings, and augmentations shall be consistent with the

80GRC023PA013 Page 11 of 71 use of the thermal shrouds in high vacuum facilities. The interior shall be coated with a high emissivity coating suitable for high vacuum use, such as Cat-A-Lac Black (or equivalent), as delivered (applied and cured).

xiv. The thermal shroud shall be designed, fabricated, tested, and inspected in accordance with ASME B31.3 Normal Fluid Service at a design pressure of 35 psig from -320 F to 120 F.

xv. The thermal shroud shall be designed to operate properly with a nominal liquid nitrogen supply pressure of 35 psig. After fabrication of the thermal shroud, the contractor shall perform a pneumatic leak test in accordance with ASME B31.3 Normal Fluid Service at 40 psig. Pneumatic leak test shall be performed with inert gas. The thermal shroud shall also be vacuum leak tested using a helium mass spectrometer, calibrated to a sensitivity of 5x10^-9 std cc/sec helium. Any leaks shall be fixed prior to delivery. No detectable leaks shall be permitted. A certificate of compliance shall be provided to NASA as part of the documentation package.

xvi. Upon completion of fabrication, the thermal shroud shall be examined in accordance with ASME B31.3 for Normal Fluid Service. Per Section

341.4.1 (b) (1), “Not less than 5% of circumferential butt and miter groove welds shall be examined fully by random radiography. The welds to be examined in each designation lot shall be include the work product of each welder or welding operator whose welds are part of the lot.”. 100% of all completed welds shall be visually examined. Welds shall be accepted in accordance with ASME B31.3 and acceptance documentation shall be submitted to NASA.

xvii. Contractor shall be qualified to design the thermal shroud in accordance with ASME B31.3 Section 301.1.

xviii. Non-Destructive Examination (NDE) technicians shall be qualified in accordance with ASNT SNT-TC-1A.

Thermal shroud fluid interfaces

Nitrogen inlet DN40CF (2.75” OD) 304L SS Rotatable ConFlat Nitrogen outlet DN40CF (2.75” OD) 304L SS Rotatable ConFlat NASA supplied feedthroughs shall be DN40CF (2.75” OD) 304L SS ConFlat

80GRC023PA013 Page 12 of 71

3.04 LN2 SUPPLY AND VENT PIPING

The contractor shall provide Liquid Nitrogen supply line to tie into existing facility systems and GN2 vent line to vent the cold wall outside of the building and into the overflow bucket on the roof. The contractor shall determine layout and design of piping and support structure, with NASA approval.

Piping Requirements

i. The contractor shall supply static vacuum jacketed LN2 supply piping that shall mate to the existing supply manifold near VF-3, which utilizes a 1” NPT connection. The contractor shall verify proper fitment to the existing fittings. The supply shall be designed in accordance accordance with ASME B31.3 Normal Fluid Service at a MAWP of 150 psig from -320 F to 120 F. All inner line parts shall be designed in accordance with ASME B31.3, current edition.

ii. Expansion joints shall be installed, where necessary, to allow thermal expansion of different materials and/or sections.

iii. The contractor shall provide a pneumatically controlled vacuum jacketed cryogenic control valve to maintain the LN2 level in the thermal shroud.

The contractor shall also provide a vacuum jacketed manual supply valve.

Valves shall be in accordance with ASME B16.34 and meet the system design conditions of 150 psig from -320 to 120F.

iv. The contractor shall provide mechanically insulated vent line that is adequately sized to prevent backpressure from LN2 supply or vaporization. The vent line shall be vented outside of the building and into the existing overflow bucket installed on the building roof. The insulation shall be compatible with cryogenic fluids and have an R-value of 8 or more. Vent line layout and design shall be verified with NASA POC before construction.

v. Contractor shall install cryogenic thermal relief protection for the LN2 supply line wherever trapped liquid is possible. Relief valves shall be ASME Code Stamped and sized and set in accordance with ASME B31.3, API 520 and API 521. Relief valves shall have a set pressure of 150 psig to protect the piping at the system design pressure. The relief valve(s) shall be vented to the outside of the building in non-vacuum jacketed pipe or tubing and vent lines shall be sized to prevent backpressure on the relief devices that affect their set pressure and flow rate.

vi. All welding shall be done in accordance with Section IX, ASME B31.3 for piping. All welds and procedures shall be qualified for low temperature

80GRC023PA013 Page 13 of 71 service.

vii. The contractor shall mechanically insulate any non-vacuum jacketed joints or areas as necessary, excluding relief valves and relief valve vents.

viii. Upon completion of piping fabrication, the contractor shall perform a pneumatic leak test in accordance with ASME B31.3 Normal Fluid Service at 165 psig. Also, a leak test, using a helium mass spectrometer, calibrated to a sensitivity of 5x10^-9 std cc/sec helium, shall be performed on the interior pipe and in the annular space between the inner pipe and outer jacket . Any leaks shall be fixed prior to delivery.

No detectable leaks shall be permitted. A certificate of compliance shall be provided to NASA as part of the documentation package.

ix. Upon completion of fabrication, the piping shall be examined in accordance with ASME B31.3 for Normal Fluid Service. Per Section

341.4.1 (b) (1), “Not less than 5% of circumferential butt and miter groove welds shall be examined fully by random radiography. The welds to be examined in each designation lot shall be include the work product of each welder or welding operator whose welds are part of the lot.”. 100% of all completed welds shall be visually examined. Welds shall be accepted in accordance with ASME B31.3 and acceptance documentation shall be submitted to NASA.

x. Contractor shall be qualified to design cryogenic systems in accordance with ASME B31.3 Section 301.1

3.05 INSTALLATION

Installation of the LN2 supply line and vent line shall be completed by the contractor.

Employees must be United States citizens. The contractor is responsible for all associated mounting, support, and related hardware. The contractor shall coordinate the installation schedule with NASA.

The thermal shroud and piping shall be delivered to the following.

NASA Glenn Research Center Building 16 21000 Brookpark Road Cleveland, Ohio 44135

(End of Statement of Work)

80GRC023PA013 Page 14 of 71

C1. PLACE OF PERFORMANCE: Contractor Site and NASA Glenn Research Center Building 16 (for installation)

C2. PERIOD OF PERFORMANCE: The period of performance for this effort shall be ____ months from date of award.

Contractor shall deliver the items no later than March 1, 2024. The Vacuum Jacket pipping for the LN2 Supply shall be installed no later than March 29, 2024.

C3. CONTRACT TYPE: Firm-Fixed Price (FFP)

C4. POINTS OF CONTACT:

Contracting Officer’s Representative (COR) Name: Nick Lalli Phone: 216-433-8127 Email: nick.m.lalli@nasa.gov

Contracting Officer (CO) Name: Linda M. Nabors Phone:216-433-2407 Email: linda.m.nabors@nasa.gov

(End of Section C)

80GRC023PA013 Page 15 of 71

SECTION D—PACKAGING AND MARKING

D.1 1852.211-70 PACKAGING, HANDLING, AND TRANSPORTATION (SEP 2005)

D2. 1852.245-74 IDENTIFICATION AND MARKING OF GOVERNMENT

EQUIPMENT (JAN 2011)

(a) The Contractor shall identify all equipment to be delivered to the Government using NASA Technical Handbook (NASA-HDBK) 6003, Application of Data Matrix Identification Symbols to Aerospace Parts Using Direct Part Marking Methods/Techniques, and NASA Standard (NASA-STD) 6002, Applying Data Matrix Identification Symbols on Aerospace Parts or through the use of commercial marking techniques that: (1) are sufficiently durable to remain intact through the typical lifespan of the property: and, (2) contain the data and data format required by the standards. This requirement includes deliverable equipment listed in the schedule and other equipment when no longer required for contract performance and NASA directs physical transfer to NASA or a third party. The Contractor shall identify property in both machine and human readable form unless the use of a machine readable-only format is approved by the NASA Industrial Property Officer.

(b) Equipment shall be marked in a location that will be human readable, without disassembly or movement of the equipment, when the items are placed in service unless such placement would have a deleterious effect on safety or on the item's operation.

(c) Concurrent with equipment delivery or transfer, the Contractor shall provide the following data in an electronic spreadsheet format:

(1) Item Description.

(2) Unique Identification Number (License Tag).

(3) Unit Price.

(4) An explanation of the data used to make the unique identification number.

(d) For equipment no longer needed for contract performance and physically transferred under paragraph (a) of this clause, the following additional data is required:

(1) Date originally placed in service.

(2) Item condition.

(e) The data required in paragraphs (c) and (d) of this clause shall be delivered to the NASA center receiving activity listed below:

NASA Glenn Research Center 21000 Brookpark Road Cleveland, Ohio 44135

(f) The contractor shall include the substance of this clause, including this paragraph (f), in all subcontracts that require delivery of equipment.

[End of Section D]

80GRC023PA013 Page 16 of 71

SECTION E—INSPECTION AND ACCEPTANCE

E.1 52.246-2 INSPECTION OF SUPPLIES-FIXED-PRICE (AUG 1996)

E.2 52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)

E.3 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The Offeror is cautioned that the listed clauses may include blocks that must be completed by the Offeror and submitted with its quotation or offer. In lieu of submitting the full text of those clauses, the Offeror may identify the clause by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation clause may be accessed electronically at this/these address(es):

For Federal Acquisition Regulation (FAR) clauses, see https://www.acquisition.gov/?q=browsefar For NASA FAR Supplement (NFS) clauses, see http://www.hq.nasa.gov/office/procurement/regs/NFS.pdf

E.4 1852.246-72 MATERIAL INSPECTION AND RECEIVING REPORT (APR 2015)

(a) At the time of each delivery to the Government under this contract, the Contractor shall prepare and furnish a Material Inspection and Receiving Report (DD Form 250 series). The forms shall be prepared and distributed as follows:

One electronic copy of the DD Form 250 emailed to the Contract Specialist, Linda Nabors, at linda.m.nabors@nasa.gov.

(b) The Contractor shall prepare the DD Form 250 in accordance with NASA FAR Supplement 1846.6. The Contractor shall enclose the copies of the DD Form 250 in the package or seal them in a waterproof envelope, which shall be securely attached to the exterior of the package in the most protected location.

(c) When more than one package is involved in a shipment, the Contractor shall list on the DD Form 250, as additional information, the quantity of packages and the package numbers. The Contractor shall forward the DD Form 250 with the lowest numbered package of the shipment and print the words "CONTAINS DD FORM 250" on the package.

(End of Section E)

80GRC023PA013 Page 17 of 71

SECTION F—DELIVERIES OR PERFORMANCE

F.1 52.242-15 STOP-WORK ORDER (AUG 1989)

F.2 52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)

F.3 52.247-34 F.O.B. DESTINATION (NOV 1991)

(End of Section F)

80GRC023PA013 Page 18 of 71

SECTION G—CONTRACT ADMINISTRATION DATA

G.1 1852.232-80 SUBMISSION OF VOUCHERS/INVOICES FOR PAYMENT (APR

2018)

(a) The designated payment office is the NASA Shared Services Center (NSSC) located at FMD Accounts Payable, Bldg. 1111, Jerry Hlass Road, Stennis Space Center, MS 39529.

(b) Except for classified vouchers, the Contractor shall submit all vouchers and invoices using the steps described at NSSC’s Vendor Payment information web site at:

https://www.nssc.nasa.gov/vendorpayment. Please contact the NSSC Customer Contact Center at 1-877-NSSC123 (1-877-677-2123) with any additional questions or comments.

(c) Payment requests.

(1) The payment periods are stipulated in the payment clause(s) contained in this contract.

(2) Vouchers submitted under cost-type contracts and invoices submitted under fixed-price contracts shall include the items delineated in FAR 32.905(b) supported by relevant back-up documentation. Back-up documentation shall include at a minimum, the following information:

(i) Vouchers.

(A) Breakdown of billed labor costs and associated contractor generated supporting documentation for billed direct labor costs to include rates used and number of hours incurred.

(B) Breakdown of billed other direct costs (ODCs) and associated contractor generated supporting documentation for billed ODCs.

(C) Indirect rate(s) used to calculate the amount of billed indirect expenses.

(D) Progress reports, as required.

(ii) Invoices.

(A) Description of goods and services delivered as part of the contract’s terms and conditions, including the dates of delivery/performance.

(B) Progress reports, as required.

(C) Date goods and services were performed.

(iii) Fee vouchers.

(A) Listing of all provisionally-billed fee by period or date earned since contract award.

(B) A reconciliation of all billed and earned fee.

(C) A clear explanation of the fee calculations.

(d) Non-electronic payment requests. The Contractor may submit a non-electronic voucher/invoice using the steps for non-electronic payment requests described at https://www.nssc.nasa.gov/vendorpayment, when any of the following conditions are met:

(1) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor.

80GRC023PA013 Page 19 of 71

(2) The contract includes provisions allowing the contractor to submit vouchers or invoices using the steps for non-electronic payment requests. In such instances the Contractor agrees to submit non-electronic payment requests using the method or methods specified in Section G of the contract.

(e) Improper vouchers/invoices. The NSSC Payment Office will notify the contractor of any apparent error, defect, or impropriety in a voucher/invoice within seven calendar days of receipt by the NSSC Payment Office. Inquiries regarding requests for payment should be directed to the NSSC as specified in paragraph (b) of this section.

(f) Other payment clauses. In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests.

(g) In the event that amounts are withheld from payment in accordance with provisions of this contract, a separate payment request for the amount withheld will be required before payment for that amount may be made.

G.2 1852.245-82 OCCUPANCY MANAGEMENT REQUIREMENTS (SEP 2017)

(a) In addition to the requirements of the clause at FAR 52.245-1, Government Property, as included in this contract, the Contractor shall comply with the following in performance of work in and around Government real property:

(1) NPD 8800.14, Policy for Real Estate Management.

(2) NPD 8831.2, Facilities Maintenance and Operations Management.

(b) The Contractor shall obtain the written approval of the Contracting Officer before installing or removing Contractor-owned property onto or into any Government real property or when movement of Contractor-owned property may damage or destroy Government-owned property.

The Contractor shall restore damaged property to its original condition at the Contractor's expense.

(c) The Contractor shall not acquire, construct or install any fixed improvement or structural alterations in Government buildings or other real property without the advance, written approval of the Contracting Officer. Fixed improvement or structural alterations, as used herein, means any alteration or improvement in the nature of the building or other real property that, after completion, cannot be removed without substantial loss of value or damage to the premises. Title to such property shall vest in the Government.

(d) The Contractor shall report any real property or any portion thereof when it is no longer required for performance under the contract, as directed by the Contracting Officer.

[End Of Section G]

80GRC023PA013 Page 20 of 71

SECTION H—SPECIAL CONTRACT REQUIREMENTS

H.1 1852.223-70 SAFETY AND HEALTH MEASURES AND MISHAP REPORTING

(DEC 2015)

H.2 1852.223-75 MAJOR BREACH OF SAFETY OR SECURITY (FEB 2002)

ALTERNATE I (FEB 2006)

H.3 1852.242-72 DENIED ACCESS TO NASA FACILITIES (OCT 2015)

H.4 1852.225-70 EXPORT LICENSES (FEB 2000)

(a) The Contractor shall comply with all U.S. export control laws and regulations, including the International Traffic in Arms Regulations (ITAR), 22 CFR parts 120-130, and the Export Administration Regulations (EAR), 15 CFR parts 730-799, in the performance of this contract.

In the absence of available license exemptions/exceptions, the Contractor shall be responsible for obtaining the appropriate licenses or other approvals, if required, for exports of hardware, technical data, and software, or for the provision of technical assistance.

(b) The Contractor shall be responsible for obtaining export licenses, if required, before utilizing foreign persons in the performance of this contract, including instances where the work is to be performed on-site at [insert name of NASA installation], where the foreign person will have access to export-controlled technical data or software.

(c) The Contractor shall be responsible for all regulatory record keeping requirements associated with the use of licenses and license exemptions/exceptions.

(d) The Contractor shall be responsible for ensuring that the provisions of this clause apply to its subcontractors.

(End of clause)

H.5 GRC 52.236-13 GRC MODIFICATION (9/16) TO FAR 52.236-13 -- ACCIDENT

PREVENTION W/ (ALT I) (SEP 2016) ALTERNATE I (SEP 2016)

(a) The Contractor shall provide and maintain work environments and procedures which will—

(1) Safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to Contractor operations and activities;

(2) Avoid interruptions of Government operations and delays in project completion dates;

and

(3) Control costs in the performance of this contract.

(b) For these purposes on contracts for construction or dismantling, demolition, or removal of improvements, the Contractor shall—

(1) Provide appropriate safety barricades, signs, and signal lights;

(2) Comply with the standards issued by the Secretary of Labor at 29 CFR Part 1926 and 29 CFR Part 1910; and

80GRC023PA013 Page 21 of 71

(3) Ensure that any additional measures the Contracting Officer determines to be reasonably necessary for the purposes are taken.

(c) If this contract is for construction or dismantling, demolition or removal of improvements with any Department of Defense agency or component, the Contractor shall comply with all pertinent provisions of the latest version of U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, in effect on the date of the solicitation.

(d) Whenever the Contracting Officer becomes aware of any noncompliance with these requirements or any condition which poses a serious or imminent danger to the health or safety of the public or Government personnel, the Contracting Officer shall notify the Contractor orally, with written confirmation, and request immediate initiation of corrective action. This notice, when delivered to the Contractor or the Contractor’s representative at the work site, shall be deemed sufficient notice of the noncompliance and that corrective action is required. After receiving the notice, the Contractor shall immediately take corrective action. If the Contractor fails or refuses to promptly take corrective action, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. The Contractor shall not be entitled to any equitable adjustment of the contract price or extension of the performance schedule on any stop work order issued under this clause.

(e) The Contractor shall insert this clause, including this paragraph (e), with appropriate changes in the designation of the parties, in subcontracts.

(f) Within 30 calendar days after contract award, the Contractor shall submit to the Contracting Officer (CO) a detailed safety and occupational health plan for concurrence by the GRC Safety and Health Division, and approval by the CO. Until the Safety and Health Plan is approved, the contractor may only perform necessary phase-in and other administrative activities.

(1) If the contract is for services and/or operations, the Safety and Health Plan shall be prepared in accordance with NASA Procedural Requirements (NPR) 8715.3 NASA General Safety Program Requirements, Appendix E.

(2) If the contract is for construction, the Safety and Health Plan shall be prepared in accordance with: a) Chapter 17 of GLM-QS-8715, Glenn Safety Manual, and b) the General Safety Specification 01 35 26.98.

(3) If the contract statement of work or specification includes site-specific and/or unique safety and health requirements, they shall be addressed in the Safety and Health Plan as well.

Upon approval, the Safety and Health Plan will be incorporated as an Attachment to the contract via modification.

(End of Section H)

80GRC023PA013 Page 22 of 71

SECTION I—CONTRACT CLAUSES

I.1 52.202-1 DEFINITIONS (Jun 2020)

I.2 52.203-3 GRATUTIES (APR 1894)

I.3 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL

TRANSACTIONS (JUN 2020)

I.4 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER

CONTENT PAPER (MAY 2011)

I.5 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)

I.6 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE

(AUG 2020)

I.7 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND

CERTIFICATIONS (DEC 2014)

I.8 52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN

TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR

EQUIPMENT (NOV 2021)

I.9 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC

CORPORATIONS (NOV 2015)

I.10 52.212-4 CONTRACT TERMS AND CONDITIONS- COMMERCIAL ITEMS (OCT

2018)

I.11 52.215-8 ORDER OF PRECEDENCE—UNIFORM CONTRACT FORMAT (OCT 1997)

I.12 52.222-20 CONTRACTS FOR MATERIALS, SUPPLIES, ARTICLES, AND

EQUIPMENT (JUN 2020)

I.13 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)

I.14 52.227-1 AUTHORIZATION AND CONSENT (JUN 2020)

I.15 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT

INFRINGEMENT (JUN 2020)

I.16 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)

I.17 52.229-11 TAX ON CERTAIN FOREIGN PROCUREMENTS - NOTICE AND

REPRESENTATION (JUN 2020)

80GRC023PA013 Page 23 of 71

I.18 52.232-1 PAYMENTS (APR 1984)

I.19 52.232-8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)

I.20 52.232-11 EXTRAS (APR 1984)

I.21 52.232-17 INTEREST (MAY 2014)

I.22 52.323-18 AVAILABILITY OF FUNDS (APR 1984)

I.23 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)

I.24 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER - SYSTEM FOR

AWARD MANAGEMENT (OCT 2018)

I.25 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN

2013)

I.26 52.233-1 DISPUTES (MAY 2014)

I.27 52.233-3 PROTEST AFTER AWARD (AUG 1996)

I.28 52.237-2 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT, AND

VEGETATION (APR 1984)

I.29 52.242-13 BANKRUPTCY (JULY 1995)

I.30 52.242-15 STOP-WORK ORDER (AUG 1989)

I.31 52.243-1 CHANGES-FIXED PRICE (AUG 1987)

I.32 52.246-2 INSPECTION OF SUPPLIES-FIXED-PRICE (AUG 1996)

I.33 52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)

I.34 52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-

PRICE) (APR 2012)

I.35 52.249-8 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) (APR 1984)

I.36 52.253-1 COMPUTER GENERATED FORMS (JAN 1991)

I.37 1852.203-71 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER

RIGHTS (AUG 2014)

I.38 1852.215-84 OMBUDSMAN (NOV 2011)

80GRC023PA013 Page 24 of 71

I.39 1852.237-73 RELEASE OF SENSITIVE INFORMATION (JUN 2005)

I.40 1852.246-74 CONTRACTOR COUNTERFEIT ELECTRONIC PART DETECTION

AND AVOIDANCE (SEP 2020)

I.41 52.204-27 PROHIBITION ON A BYTEDANCE COVERED APPLICATION (JUN

2023)

(a) Definitions. As used in this clause— Covered application means the social networking service TikTok or any successor application or service developed or provided by ByteDance Limited or an entity owned by ByteDance Limited.

Information technology, as defined in 40 U.S.C. 11101(6)—

(1) Means any equipment or interconnected system or subsystem of equipment, used in the automatic acquisition, storage, analysis, evaluation, manipulation, management, movement, control, display, switching, interchange, transmission, or reception of data or information by the executive agency, if the equipment is used by the executive agency directly or is used by a contractor under a contract with the executive agency that requires the use—

(i) Of that equipment; or

(ii) Of that equipment to a significant extent in the performance of a service or the furnishing of a product;

(2) Includes computers, ancillary equipment (including imaging peripherals, input, output, and storage devices necessary for security and surveillance), peripheral equipment designed to be controlled by the central processing unit of a computer, software, firmware and similar procedures, services (including support services), and related resources; but

(3) Does not include any equipment acquired by a Federal contractor incidental to a Federal contract.

(b) Prohibition. Section 102 of Division R of the Consolidated Appropriations Act, 2023 (Pub. L.

117-328), the No TikTok on Government Devices Act, and its implementing guidance under Office of Management and Budget (OMB) Memorandum M-23-13, dated February 27, 2023, “No TikTok on Government Devices” Implementation Guidance, collectively prohibit the presence or use of a covered application on executive agency information technology, including certain equipment used by Federal contractors. The Contractor is prohibited from having or using a covered application on any information technology owned or managed by the Government, or on any information technology used or provided by the Contractor under this contract, including equipment provided by the Contractor’s employees; however, this prohibition does not apply if

80GRC023PA013 Page 25 of 71 the Contracting Officer provides written notification to the Contractor that an exception has been granted in accordance with OMB Memorandum M-23-13.

(c) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (c), in all subcontracts, including subcontracts for the acquisition of commercial products or commercial services.

I.42 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT

STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND

COMMERCIAL SERVICES (MAR 2022) (DEVIATION)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (NOV 2021) (Section 1634 of Pub. L. 115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).

(5) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(6) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services: [Contracting Officer check as appropriate.]

X (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with Alternate I (NOV 2021) (41 U.S.C. 4704 and 10 U.S.C. 2402).

__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (NOV 2021) (41 U.S.C. 3509).

80GRC023PA013 Page 26 of 71

__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

X (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109-282) (31 U.S.C. 6101 note).

__ (5) [Reserved]

__ (6) 52.204-14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111- 117, section 743 of Div. C).

__ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (OCT 2016) (Pub. L. 111-117, section 743 of Div. C).

X(8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (NOV 2021) (31 U.S.C. 6101 note).

__ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) (41 U.S.C. 2313).

__ (10) [Reserved]

__ (11) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (SEP 2021) (15 U.S.C. 657a).

__ (12) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (SEP 2021) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

__ (13) [Reserved]

__ (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2020) (15 U.S.C.

644).

__ (ii) Alternate I (MAR 2020) of 52.219-6.

__ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).

__ (ii) Alternate I (MAR 2020) of 52.219-7.

__ (16) 52.219-8, Utilization of Small Business Concerns (OCT 2018) (15 U.S.C.

637(d)(2) and (3)).

__ (17)(i) 52.219-9, Small Business Subcontracting Plan (NOV 2021) (15 U.S.C.

637(d)(4)).

__ (ii) Alternate I (NOV 2016) of 52.219-9.

80GRC023PA013 Page 27 of 71

__ (iii) Alternate II (NOV 2016) of 52.219-9.

__ (iv) Alternate III (JUN 2020) of 52.219-9.

__ (v) Alternate IV (SEP 2021) of 52.219-9.

__ (18)(i) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).

__ (ii) Alternate I (MAR 2020) of 52.219-13.

__ (19) 52.219-14, Limitations on Subcontracting (SEP 2021) (15 U.S.C. 657s).

__ (20) 52.219-16, Liquidated Damages - Subcontracting Plan (SEP 2021) (15 U.S.C.

637(d)(4)(F)(i)).

__ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set- Aside (SEP 2021) (15 U.S.C. 657f).

X (22)(i) 52.219-28, Post-Award Small Business Program Rerepresentation (SEP 2021) (15 U.S.C. 632(a)(2)).

__ (ii) Alternate I (MAR 2020) of 52.219-28.

__ (23) 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (SEP 2021) (15 U.S.C. 637(m)).

__ (24) 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (SEP 2021) (15 U.S.C. 637(m)).

__ (25) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) (15 U.S.C. 644(r)).

__ (26) 52.219-33, Nonmanufacturer Rule (SEP 2021) (15 U.S.C. 657s).

X (27) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).

X (28) 52.222-19, Child Labor - Cooperation with Authorities and Remedies (DEVIATION 20-02B, March 28, 2022) (E.O. 13126).

X (29) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

X (30)(i) 52.222-26, Equal Opportunity (SEPT 2016) (E.O. 11246).

__ (ii) Alternate I (Feb 1999) of 52.222-26.

X (31)(i) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).

__ (ii) Alternate I (July 2014) of 52.222-35.

X (32)(i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).

80GRC023PA013 Page 28 of 71

__ (ii) Alternate I (July 2014) of 52.222-36.

X(33) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).

X (34) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496).

X (35)(i) 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C.

chapter 78 and E.O. 13627).

__ (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O.

13627).

X(36) 52.222-54, Employment Eligibility Verification (MAY 2022). (E. O. 12989).

(Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)

__ (37)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA- Designated Items (MAY 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (38) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN 2016) (E.O. 13693).

__ (39) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (JUN 2016) (E.O. 13693).

__ (40)(i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and 13514).

__ (ii) Alternate I (OCT 2015) of 52.223-13.

__ (41)(i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (Jun 2014) (E.O.s 13423 and 13514).

(ii) Alternate I (Jun 2014) of 52.223-14.

__ (42) 52.223-15, Energy Efficiency in Energy-Consuming Products (MAY 2020) (42 U.S.C. 8259b).

__ (43)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).

__ (ii) Alternate I (Jun 2014) of 52.223-16.

X(44) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) (E.O. 13513).

80GRC023PA013 Page 29 of 71

__ (45) 52.223-20, Aerosols (JUN 2016) (E.O. 13693).

__ (46) 52.223-21, Foams (JUN 2016) (E.O. 13693).

__ (47)(i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).

__ (ii) Alternate I (JAN 2017) of 52.224-3.

X (48) 52.225-1, Buy American - Supplies (NOV 2021)) (41 U.S.C. chapter 83).

__ (49)(i) 52.225-3, Buy American - Free Trade Agreements - Israeli Trade Act (DEVIATION 20-02B, March 28, 2022) (19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C.

3805 note, 19 U.S.C. 4001 note, 19 U.S.C. chapter 29 (sections 4501-4732), Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

__ (ii) Alternate II (DEVIATION 20-02B, March 28, 2022) of 52.225-3.

__ (iii) Alternate III (DEVIATION 20-02B, March 28, 2022) of 52.225-3.

__ (50) 52.225-5, Trade Agreements (DEVIATION 20-02B, March 28, 2022) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

X (51) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

__ (52) 52.225-26, Contractors Performing Private Security Functions Outside the United States (OCT 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

__ (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (NOV 2007) (42 U.S.C. 5150).

__ (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area

(NOV 2007) (42 U.S.C. 5150).

__ (55) 52.229-12, Tax on Certain Foreign…