Projects/Facilities Requirements Project Types Spaceflight Systems
• Spacecraft
• Instruments
• International Space Station Payloads
• Ground Support Systems Research Facilities: Modifications or Upgrades
• Wind Tunnels
• Centrifuges
• Arcjet
• Airborne
• Facilities Support Equipment
BioSentinel Mission
• Key BioSentinel Project Objectives
• Fill Human Exploration Strategic Knowledge Gaps in Radiation effects on Biology
• Develop a deep space nanosat capability
• Develop a radiation biosensor useful for other missions
• Define & validate SLS secondary payload interfaces and accommodations for a biological payload
• Schedule
• Delivery of Flight Hardware scheduled for 4/30/19
• Current EM-1 Launch Readiness Date 12/15/19 to 6/30/20 https://www.nasa.gov/centers/ames/engineering/projects/biosentinel.html
Tech Demonstration Small Sats Objective: Perform rapid turn around space technology demonstration for instrument or small sat-relevant technology as a payload using commercial Small Sat busses
• SBIR or university partnership development efforts can result in technologies of sufficient maturity to demonstrate in flight
• Lower cost, rapid turn around demonstrations are key
• Scope of effort includes:
o Mission design o Trade studies to identify a spacecraft bus and mission parameters that close o Minimizing cost with higher risk posture o Lean project implementation o Mission operations https://www.nasa.gov/directorates/spacetech/small_spacecraft/index.html
WetLab-2 System: Gene Expression for ISS https://upward.iss-casis.org/wetlab-2/ https://www.nasa.gov/ames/research/space-biosciences/wetlab-2
NASA Arcjet Facility The facilities simulate the aerothermodynamic heating that a spacecraft endures throughout atmospheric entry, and to test candidate TPS materials and systems.
The Complex includes four bays:
• The Aerodynamic Heating Facility (AHF)
• The Turbulent Flow Duct (TFD)
• The Panel Test Facility (PTF and Truncated
PTF)
• The Interaction Heating Facility (IHF)
For more information:
https://www.nasa.gov/centers/ames/thermophysics-facilities/arcjet-complex
LEAF New Panel TPS Sample Holder
Project Management Support
• Coordinating resources within functional areas
• Project Planning and Reviews
• Work Breakdown Structure (WBS) development
• Configuration Management
Systems Engineering (NPR 7123.1)
• Technical Planning
• Schedule Development
• Requirements Definition
• Mission/Architecture/ System Design Trade Studies
• Requirements Management
• Design Realization
• Verification and Validation
• Configuration Management
• Technical Risk Management
• Data Management
• Technical Assessment
• Decision Analysis
Design and Development
• Mechanical Design and Analysis o Systems/Mechanisms o Structures o Thermal Systems o Fluid Mechanics Systems o Cryogenic Systems
• Electrical/Electronics Design and Development o Sensors and Instrumentation o Embedded Computational Systems o Power Systems o Control Systems
• Chemical, Biological, Biomedical, and Radioactive Systems
Assembly, Integration & Test (AI&T)
• Touch labor for assembly & integration
• Test Procedure Development
• Instrumentation
• Conduct Testing
• Data Reduction & Test Reports
• Prototypes, EDUs, Qual and Flight Units
• Ground Systems Operations
• Concept Development
• Planning and Specification
• Ground Data Systems Specification and Development
• Execution of Operations Phase Sustainment and Closeout
• Maintenance of Systems and Infrastructure
• Data Reduction and Analysis
• Planning and preparation for deactivation or decommissioning
• Disposition and archival