This is an Advertisement for Bids issued by the Massachusetts Water Resources Authority (MWRA) for the Needham Dewatering Drainage Line, MWRA Contract No. 8086. The project involves the construction of a dewatering drainage line consisting of approximately 1,250 linear feet of 36-inch diameter reinforced concrete pipe that will discharge to an outfall structure on the Charles River in Needham, Massachusetts. The work includes furnishing all equipment, tools, materials, supervision, and labor necessary for construction, as well as removal and replacement of approximately 288 linear feet of Town of Needham vitrified clay sewer main. Upon completion, the work will include milling and overlaying pavement from curb to curb along certain portions of the project area. The drainage line will extend east from the I-95/Highland Avenue interchange below Brook Road, Arlington Road, Charles Street, and a paved surface parking lot at 163 Highland Avenue. Electronic bids must be submitted through the MWRA Supplier Portal by 2:00 p.m. on Wednesday, October 28, 2026. Contract documents will be posted on or after Wednesday, September 23, 2026, and interested firms must register and join the Plan Holders' List to access the documents and submit bids. An online pre-bid conference will be held on Tuesday, September 29, 2026 at 11:00 a.m., with interested parties required to contact Michael LaValle at Michael.LaValle@mwra.com before 3:00 p.m. on Monday, September 28, 2026 for remote meeting access information. The estimated project completion timeframe is 517 days.
The estimated project cost is $15,100,000.00. This contract is subject to a 7.24% Minority Business Enterprise (MBE) participation requirement and a 3.6% Women Business Enterprise (WBE) participation requirement. No paper bids will be accepted; all bids must be submitted electronically through the MWRA Supplier Portal.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MASSACHUSETTS WATER RESOURCES AUTHORITY
ADVERTISEMENT FOR BIDS
The Massachusetts Water Resources Authority will receive electronic bids on the MWRA Supplier Portal (a link to the Supplier Portal is available at www.mwra.com at the top of the homepage), for Needham Dewatering Drainage Line, MWRA Contract No. 8086, until 2:00 p.m., Wednesday, October 28, 2026, after which bids will be publicly available.
The contract documents will be posted on the MWRA Supplier Portal on or after Wednesday, September 23, 2026. To access the contract documents and submit a bid for this Event, interested firms must register and join the Plan Holders’ List through the MWRA Supplier Portal. No paper bids will be accepted.
An online pre-bid conference will be held on Tuesday, September 29, 2026 at 11:00 a.m. Interested parties must contact Michael LaValle at Michael.LaValle@mwra.com before 3:00 p.m on Monday, September 28, 2026 for remote meeting access information.
The Needham Dewatering Drainage Line is an early enabling project for the Metropolitan Water Tunnel Program. The work includes: furnishing all equipment, tools, materials, supervision, labor and all other items necessary to construct a dewatering drainage line of approximately 1,250 linear feet of 36-inch diameter reinforced concrete pipe that will discharge to an outfall structure to the Charles River in Needham, MA. The outfall structure will consist of an HDPE pipe on a rip-rap splash pad. The drainage line will extend east from I-95/Highland Avenue interchange below Brook Road, Arlington Road, Charles Street, and a paved surface parking lot at 163 Highland Avenue. The work will also include the removal and replacement of approximately 288 linear feet of Town of Needham vitrified clay sewer main. Upon completion, the work will include milling and overlaying the pavement from curb to curb along certain portions of the work. The estimated time frame for project completion is 517 days.
The estimated project cost is: $15,100,000.00.
This contract is subject to a 7.24% MBE and a 3.6% WBE participation requirement.