80756 - PD.pdf

PDF 200 KB Posted

Attached to
Heat Treat Hardness Tester
Solicitation number
FA857126Q0043
Issued by

About this file

This is a Purchase Description for the provision and installation of a Wilson RH2150 Rockwell C-Scale Hardness Tester and associated equipment to the 402nd Commodities Maintenance Group at Robins Air Force Base, Georgia. The contractor shall deliver the hardness tester and 24 line items of ancillary equipment including indenters, anvils, and extensions within 30 days of order receipt on an FOB Destination basis. The contractor must perform initial system calibration, provide calibration certification (one hard copy and one electronic copy), and deliver a calibration sticker. Installation services are required in Zone 4 (76-150 miles) with hardness test calibration for four scales included. The contractor shall provide one half-day of onsite training for up to four personnel and a standard one-year parts warranty. A standard one-year parts warranty is provided.

Additional requirements include designating a Program Manager within five calendar days of award and submitting a company Safety Plan within 10 calendar days of award to 402mxw.se.wf@us.af.mil. Contractor personnel must complete Environmental Management Systems (EMS) Awareness Training and Energy Management System (EnMS) training prior to beginning work, with documentation submitted to designated offices. The contractor shall implement security procedures complying with 32 CFR Part 117, NISPOM, OPSEC regulations, and counterfeit parts prevention requirements per DoDI 5000.83 and SAE Aerospace Standard AS5553D. Work shall be performed at Building 140, Robins AFB, with normal hours 7:00 a.m. to 1:00 p.m. EST, Monday through Friday. Government Representatives are Alexander Grosskopf (Primary) and Joshua Rousey (Alternate), both of 402 CMXG/MXDEE. The shipping address is Attn: Alexander Grosskopf, Unit: 402 CMXG, DoDAAC: FA2082, 455 First Street, Building 140, Robins AFB, GA 31098.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PURCHASE DESCRIPTION

Heat Treat Hardness Tester

29 Dec 2025

1. DESCRIPTION. The Contractor shall provide all the necessary tools, materials, equipment, labor, and transportation to provide and install a Wilson RH2150 Rockwell C-Scale Hardness Tester and the ancillary equipment and services listed in the table below to the 402nd Commodities Maintenance Group (MXSG) Warner Robins Air Logistics Complex (WR- ALC) at Robins Air Force base (AFB), Georgia. The contractor shall perform the initial calibration of the system and provide the necessary calibration label and certificate. The contractor shall provide operation training for the system after installation.

1.1 Commodity/Deliverables:

Part #

Qty

Description

W2101R 1 Wilson RH2150 - Size 1, Regular W2100E2 1 2" (50mm) INDENTER EXTENSION FOR RH2150 CLAMPING W2100E4 1 4" (100mm) INDENTER EXTENSION FOR RH2150 CLAMPING W2100E6 1 6" (150mm) INDENTER EXTENSION FOR RH2150 CLAMPING 9100401 1 Diamond Indenter, Rockwell "C" 9100402 1 Diamond Indenter, Rockwell "C, D, A, N" 9100431 1 Rockwell indenter C, A, D scales ISO and ASTM cert 9100434 1 ROCKWELL INDENTER C,A,D,N SCALES ISO & ASTM cert A582143 1 Rockwell Regular Scale Accessory Kit 900001236 1 ANVIL-FLAT 2-1/2"-dia W741246 1 ANVIL FLAT D-190mm - R2000

900007388 1 V ANVIL-SHALLOW - 1/2" STEM

900007195 1 V-ANVIL- SHALLOW - 1" STEM

900030797 1 ANVIL-STANDARD "V" 1.5"

900007425 1 ANVIL-CYLINDRON JUNIOR

900007147 1 ANVIL-CYLINDRON STANDARD

900007387 1 ANVIL-PEDESTAL SPOT 1/2in STEM 900007156 1 ANVIL-PEDESTAL SPOT w/1in STEM 900007400 1 ANVIL-DIAMOND SPOT w/OXIDE FINISH

9100405 1 CARBIDE BALL INDENTER -1/16"

R1400023 1 Install - Zone 4 (76-150 Miles) HRD R1400054 1 Install - HRD Test Cal 4 Scales

1.2 Over and Above Work. Any work discovered during contract performance that is:

1.2.1 Within the general scope of the contract, not covered by the line item(s) for the basic work under the contract, and necessary in order to satisfactorily complete the contract.

1.2.2 Upon discovery of the need for over and above work, the Contractor shall prepare and furnish to the Government a work request. Upon request the Contractor shall promptly submit to the Contracting Officer, a proposal for the over and above work. The Government and Contractor will then negotiate a settlement for the over and above work. Contract modifications will be executed to definitize all over and above work.

2. Service Support.

2.1 Delivery.

2.1.1 Government Representatives. The following individuals will serve as the Primary and Alternate Government Representatives as the points of contact through which all contractor-provided services will be requested and accomplished for CMXG.

Government Representatives will not supervise the Contractor, and they are not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The following individuals will serve as Government Representatives for CMXG.

2.2 Shipping/Delivery/Period of Performance. The Contractor shall deliver the Wilson

RH2150 Rockwell C-Scale Hardness Tester and the ancillary equipment no later than thirty (30) days after receiving the order. FOB Destination.

2.3 Ship To Address.

Attn: Alexander Grosskopf

Unit: 402 CMXG DoDAAC: FA2082 455 First Street Building 140 Robins AFB, GA 31098 Ph: (478) 222-4071 Email: alexander.grosskopf@us.af.mil

Primary Government Representative Alternate Government Representative Name: Alexander Grosskopf Name: Joshua Rousey Unit: 402 CMXG/MXDEE Unit: 402 CMXG/MXDEE Phone: (478) 222-4071 Phone: (478) 954-6035 Email: alexander.grosskopf@us.af.mil Email: joshua.rousey@us.af.mil mailto:alexander.grosskopf@us.af.mil mailto:alexander.grosskopf@us.af.mil mailto:joshua.rousey@us.af.mil

Alternate: Joshua Rousey Ph: (478) 954-6035 Email: joshua.rousey@us.af.mil

2.4 Incidental Services.

2.4.1 Installation. The contractor shall install the Wilson RH2150 Rockwell C-Scale

Hardness Tester and all applicable equipment required for its installation. After the initial installation and calibration of the Wilson RH2150 Rockwell C-Scale Hardness Tester and associated equipment, the Contractor shall provide a Calibration sticker with the completed calibration date. The Contractor shall also provide one (1) hard copy and one (1) electronic copy of the Calibration Certificate.

Repairs will be performed under para 1.2 Over and Above work. (CDRL A001, DI- QCIC-80798C/T, Calibration Certificate).

2.4.2 Training. The contractor shall provide onsite training for one half-day for up to four

(4) personnel on the newly installed Wilson RH2150 Rockwell C-Scale Hardness Tester.

2.4.3 Technical support. None.

2.5 Warranty. The Contractor shall provide a standard one (1) year parts warranty.

2.6 Options. None.

3. Government Furnished Equipment and Services or Government Furnished Property

(GFP) and services.

3.1 None.

4. General Information.

4.1 Contractor Program Manager. The Contractor shall provide a Program Manager who shall be the single point of contact between the Contractor and the Government. The name and phone number of the Contractor’s Program Manager shall be provided in writing to the Contracting Officer, Government Representatives, and COR no later than five (5) calendar days after contract award date.

4.2 Place of Performance and Hours of Work. On-site contract services shall be performed at the Warner Robins Air Logistic Complex. The work will take place in building 140 at Robins Air Force Base, GA. The Contractor’s work hours (shifts) shall normally be from 7:00 am to 1:00 pm (EST), Monday through Friday. The Government may adjust the Contractor’s work hours based on workload requirements, with the flexibility to start work earlier, work odd shifts, and/or work weekends. The Government will provide the Contractor the required work hours (schedule) for contractor personnel, and will provide a 48-hour notice prior to changing any work hours.

mailto:joshua.rousey@us.af.mil

4.3 Recognized Holidays. Unless otherwise required by the Government, the Contractor shall not have access to Government facilities to work or telework on all federal holidays or during facility closings as authorized by the Government. If the holiday falls on Saturday, it is observed on Friday. If the holiday falls on a Sunday, it is observed on Monday.

4.4 Security Requirements.

4.4.1 Government Security Regulations. The Contractor shall ensure personnel, information, system, facility, and international security requirements are met in accordance with 32 CFR Part 117, National Industrial Security Program Operating Manual (NISPOM), Department of the Air Force Instruction (DAFI) 31-101, Base Defense Operations.

4.4.2 Communications Security (COMSEC). The Contractor shall use only secure communications methods and/or equipment to transmit or otherwise transfer classified and/or sensitive, but unclassified, information in accordance with 32 CFR Part 117.21, National Industrial Security Program Operating Manual (NISPOM).

4.4.3 Visitors Only – No Badging ID. The Air Force has mandated all visitors consent to a check of their criminal history prior to being allowed access to installations. The check will be conducted at the Visitor Control Center (VCC) off Watson Boulevard, Robins AFB, GA. Visitors requiring unescorted access will need their driver’s license or state-issued ID along with insurance and registration if driving on base.

The pass issued by the Visitor Control Center authorizes unescorted entry to Robins AFB for the bearer only. For visitors, a short term pass is up to 60 days. Any time greater than 60 days requires a secondary form of ID (Social security card, birth certificate or passport).

4.4.4 Operations Security (OPSEC). The purpose of OPSEC is to reduce the vulnerability of USAF missions to adversary collection and exploitation of critical information. The Contractor shall comply with DoDD 5205.02E “DoD Operations Security (OPSEC) Program”, DoD Manual 5205.02 “DoD Operations Security (OPSEC) Program Manual” and AFI 10-701 “Operations Security (OPSEC)” to protect United States (U.S. Government interest. The Contractor shall ensure compliance with OPSEC requirements including procedures to protect classified and/or sensitive, but unclassified, Government projects and/or programs. The Contractor shall ensure Contractor personnel who perform work at Robins AFB or another Government facility comply with the OPSEC procedures of the facility.

4.4.5 Security Incident or Violation. The Contractor shall immediately notify the

Government Security Office of any potential or actual security incidents or violations including potential or actual unauthorized disclosure or compromise of classified and/or sensitive, but unclassified, information.

4.5 Supply Chain Risk Management. The Contractor shall implement risk management procedures to ensure that system, equipment, components, software, maintenance equipment, and supplies do not incorporate counterfeit parts, malicious code, or other elements that would allow adversaries to gain access to data and critical program information and disrupt operations. Contractor risk management procedures shall comply with:

DoDI5000.83 DAFI 63-113, Program Protection Planning for Life Cycle

Management, SAE Aerospace Standard AS5553D, Counterfeit Electrical, Electronic, and

Electromechanical (EEE) Parts; Avoidance, Detection, Mitigation and Disposition, National Institute of Standards and Technology (NIST) Special Publication 800-53

Rev 5, Security and Privacy Controls for Information Systems and Organizations.

4.6 Contractor Identification. Contractor personnel shall wear visible identification designating them as contractors at all times while on Robins Air Force Base.

4.7 Contractor Vehicle Entry. The Contractor shall contact the Robins Air Force Base

Visitor's Center to and comply with local procedures for obtaining credentials and vehicle entry. Information may be obtained by calling the following phone number:

Commercial 478-222-1972.

4.8 Agency Affirmative Procurement Program. In accordance with FAR 23.107-1 and

FAR 23.107-2, 100% of purchases of Environmental Protection Agency (EPA)-designated products included in the Comprehensive Procurement Guidelines (CPG) list [https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program] and/or United States Department of Agriculture (USDA)-designated products included in the bio based product listings [http://www.biopreferred.gov] shall, at a minimum, meet the EPA or USDA standards for recovered materials or bio based content, respectively, unless an item cannot be acquired competitively within a realistic timeframe, meet appropriate performance standards, and/or be acquired at a reasonable price.

4.8.1 The Contractor shall provide estimates and verification of recovered material for

EPA-designated CPG products and certification for both EPA-designated CPG products and USDA-designated bio based products. In accordance with the Robins Air Force Base, Georgia / Affirmative Procurement Program (formerly Green Procurement Program (GPP)) Plan, the Contractor shall provide estimates and certifications to the Government for completion of the applicable attachment(s) to be included in the Purchase Request (PR) package.

4.9 Environmental Management Systems (EMS) Awareness. Environmental

Management Systems (EMS) Awareness Training: All contractor personnel working on Robins AFB who perform activities on the installation are required to complete Air Force-provided initial EMS Awareness Training. It is the responsibility of the Prime Contractor to ensure that all sub-contractors, vendors, and employees complete this training prior to beginning work on Robins AFB. Notification of training completion shall be sent to the Robins AFB Contracting Officer (CO) to be maintained in the http://www.biopreferred.gov/ contract file for tracking purposes. Failure to provide documentation of EMS Training may result in termination of the contract.

4.9.1 EMS training is provided by Environmental Management. Contractors have two options to satisfy the mandatory EMS Awareness Training requirement. (Front Desk: 478-926-1176)

4.9.2 Option 1: Contractors can register for an account through The Environmental

Awareness Course Hub (TEACH), the Air Force training database: https://usaf.learningbuilder.com/account/login/?ReturnUrl=%2f

Search for Course ID: EMS110UHHZ00293 Directions:

1. Hover your mouse over the Courses and Transcripts tab.

2. Click on Transcripts

3. Click into the TEACH Course Completion Log by clicking the orange

Continue or Begin button.

4. When you are on the transcript, click on the blue “Search for Course” button.

5. When the pop up appears enter the course name or course number and press search.

6. Once you find the course you want to add, click on the +Select button to add the course to your transcript.

(Note: TEACH may not supported by Internet Explorer; recommend using

Chrome.)

4.9.3 Option 2: Contractor requests a copy of the Robins EMS Awareness Training

PowerPoint Presentation from Environmental Management. The request should be sent to the Environment Management Workflow Box at the following email address, jessica.parker.15@us.af.mil. Once the presentation is received, the contractor is responsible for ensuring that all his/her employees view the training. (CDRL A002 DI-MGMT-80368A/T, Status Report/EMS Training)

4.10 ISO 50001-Energy Management System. Due to the WR-ALC being ISO 50001 certified, all contractors are subject to the Energy Management System (EnMS) requirements and shall abide by certification guidelines whenever applicable.

4.10.1. EnMS Training. All contractor personnel working on Robins AFB who perform activities on the installation are required to complete Air Force provided initial EnMS Training. It is the responsibility of the Prime Contractor to ensure that all sub-contractors, vendors, and employees complete this training prior to beginning work on Robins AFB.

4.10.1.1. EnMS training is provided by the Energy Assurance Office. The

Contractor shall request the training by sending an email to 402MXSG.MXDEA.EnergyAssurance@us.af.mil.

https://usaf.learningbuilder.com/account/login/?ReturnUrl=%2f mailto:jessica.parker.15@us.af.mil mailto:402MXSG.MXDEA.EnergyAssurance@us.af.mil

4.10.2. Notification of training completion shall be sent to the Energy Assurance Office (402MXSG.MXDEA.EnergyAssurance@us.af.mil) and the CSMO POC to be maintained for tracking purposes. Failure to provide documentation of EnMS Training prior to beginning work may result in termination of the contract.

(CDRL A003 DI-MGMT-80368A/T, Status Report/EnMS Training)

4.11 Contractor’s Safety Program. (See Appendix C, Part II, Para 7) The Contractor shall establish and maintain an acceptable safety program in accordance with their accepted Safety and Health Plan. The Air Force is part of the OSHA Voluntary Protection Program (VPP). All shall familiarize themselves with the requirements of VPP.

Information on the VPP can be accessed at http://www.osha.gov/dcsp/vpp/index.html.

Additionally, the Contractor is responsible for the safety and health of all subcontractor employees. No more than two Class C mishaps per contract year and Zero Class A or B mishaps will be tolerated. All changes to the plan must also be submitted in writing and approved by the Government.

4.11.1 Safety and Health Plan: Within 10 calendar days after contract award, the contractor shall email a copy of their company Safety Plan that is required to ensure compliance with the Occupational Safety and Health Act (OSHA) (Public Law 91-596) to 402mxw.se.wf@us.af.mil. The Safety Plan will be provided to the Safety Office for review. The Safety Office will provide acceptance or non-acceptance within 5 working days of receipt to the government point-of-contact who will notify the CO. (CDRL A004, DI-SAFT- 82080/T NOT 1, Contractor's Safety Plan).

4.11.2 The Contractor Safety Plan shall address in detail the items listed in the Contract

Appendix C, Part II through Part IV as applicable. For task specific procedures identified in the Contract Appendix C, the contractor’s internal procedures for those tasks must be identifiable within the submitted Safety Plan or shall be provided in an amendment or addendum to the company’s Safety Plan. If task specific procedures identified in the Contract Appendix C, are not submitted with the contractor’s Safety Plan, the submitted Safety Plan will be returned as NOT ACCEPTED. The contractor will have 5 working days to resubmit the Safety Plan, amendment or addendum to address or correct issues identified for non-acceptance. The Safety Office will provide acceptance or non-acceptance of the resubmission within 5 workings days of receipt to the government POC who will notify the CO.

4.12 Mishap Notification. (See Appendix C, Part II, Para 5) The Contractor shall notify the

Robins AFB Safety Office telephonically at (478)327-4862 during duty hours and (478)926-3567 after hours, within four (4) hour after initial notification of all mishaps or incidents for damage to DoD property (material plus labor) entrusted by this contract and employee injuries as a result of the contract operation. A follow-up (written or e-mail) of this mishap/incident notification shall be sent within three calendar days to the Government Representative, the Procurement Contracting Officer (PCO), Contract Surveillance Management Office (CSMO) Representative (with a copy to program mailto:402MXSG.MXDEA.EnergyAssurance@us.af.mil http://www.osha.gov/dcsp/vpp/index.html mailto:402mxw.se.wf@us.af.mil manager), who will forward it to the Safety Office. The information that is not available at the time of the initial notification shall be provided within 20 calendar days after the mishap. Mishap notification shall contain, as a minimum, the following information:

a. Contract, Contract Number, Name and Title of Person(s) Reporting

b. Date, Time and exact location of accident/incident

c. Brief Narrative of accident/incident (Events leading to accident/incident)

d. Cause of accident/incident, if known

e. Estimated cost of accident/incident (material and labor to repair/replace)

f. Impound Authority Name and Phone Number (as applicable)

g. Nomenclature of equipment and personnel involved in accident/incident

h. Corrective actions (taken or proposed)

i. Other pertinent information

(CDRL A005, DI-SAFT-81563 NOT 2, Accident/Incident Report)

4.13 Essential Services During Crisis. The Services Acquisition Lead (SAL) has determined, by placing in writing their decision, that this requirement is not Mission Essential (M-E) in accordance with DFARS 237.76-7023, Continuation of Essential Contractor Services.

4.14 Inspection of Services/Inspection of Supply: In accordance with the Inspection of

Supply/Services clause(s) identified in the contract/order, the Government reserves the right to inspect Contractor performance.

4.15 Invoice/Payment and Receipt/Acceptance: In accordance with DFARS clause

252.232-7003, Electronic submission of Payment Requests and Receiving Reports, the Contractor shall submit/process payment requests (invoices, Receiving Reports or combos) and receipt/acceptance documents via Procurement Integrated Enterprise Environment (PIEE) through module Wide Area Workflow (WAWF). Access at the following site: https://piee.eb.mil/

5. Appendices.

5.1 Atch 1 – Section 01560 Environmental Requirements for Robins Air Force Base https://piee.eb.mil/