FY23 ROADWAY VEGETATION MANAGEMENT MT. HOOD NATIONAL FOREST
Solicitation number
1240BD23Q0108
Issued by

About this file

This document provides specifications for roadway vegetation management and maintenance services on the Mount Hood National Forest. The solicitation seeks a contractor to provide services including vegetation treatment, roadside vegetation maintenance, hazard and obstruction removal, danger tree treatment, maintenance of cattleguards and other infrastructure, sign maintenance, equipment moving, and road decommissioning. The specifications define performance standards and measurement methods for each service. Work will be assigned under an Indefinite Delivery/Indefinite Quantity contract with task orders issued for individual projects. The solicitation number is 1240BD23Q0108 and was issued by the USDA Forest Service Pacific Northwest Region. Pricing will be on a firm-fixed unit price basis by the schedules of items.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Index:Index:

Page 2 Definitions and Abbreviations 6 800 SI Symbols and Illustration 7 801 Quantity Measurement Terms 8 803 Snow Removal 10 807 Equipment Rental 13 808 Work Area Management 15 811 Surface Maintenance 19 812 Surface Stabilization 21 813 Spot Surfacing 23 814 Asphalt Surface Maintenance

27 832 Load, Haul, and Place Materials

29 833 Drainage Structure, Install or Replace 32 834 Roadway Drainage System Maintenance

35 841 Vegetation Treatment

37 842 Roadway Vegetation Maintenance 41 851 Hazard and Obstruction Removal 44 854 Danger Tree Treatment and Cleanup 47 861 Maintenance of Cattleguards, Traffic Gates and Guardrails 50 872 Sign Maintenance 53 881 Mobilization/Equipment Moving

55 886 Decommissioning of Federal Roads

800.01 Definitions

SPS/F06 - Section 800 DEFINITIONS & ABBREVIATIONS

Wherever in these specifications, or in other contract documents, the following terms, or pronouns in place of them, are used. The intent and meaning shall be interpreted as follows:

1. Agreed or Approved - Official agreement or approval by use of a written document issued by the Government. Agreements also require signature of Service Provider's Representative and are dated.

2. Base course - The layer or layers of material placed on a sub-base or a subgrade to support a surface course. (See Illustration of Road Maintenance Terms.)

3. Berm - Acurb or dike that controls roadway runoff water, or delineates traffic direction.

4. Broad based dip - A shallow ditch placed across the roadbed to remove water from the roadbed surface that can be driven across by high clearance vehicles; usually placed diagonal to the centerline.

5. Catch Basin. The area immediately adjacent to inlet invert of the culvert.

6. Channel. A natural waterway leading into or away from a culvert or bridge.

7. Cross ditch. A shallow ditch placed across the roadbed to remove water from the roadbed surface that can be driven across by full-size pickups or other high clearance vehicles; usually placed diagonal to the centerline.

8. Culvert. Any structure that provides a passageway, drain, or waterway under a road or embankment.

9. Lead-off ditch. A ditch used to remove water from roadside drainage ditches, the roadway, cattle guards, or drainage structures such as culverts and drainage dips.

10. Ditch. A relatively long narrow excavation placed to collect or disperse water.

11. Drainage dip. A drainage structure that was previously constructed within the roadbed surface to form a uniform depression that allows routine passage of vehicles while diverting water from the traveled way.

12. Drainage .ditch. A ditch located parallel to and abutting the roadbed.

13. Drainage structure. A term identifying manufactured devices placed to control water movements.

14. Drawings. Illustrations showing details of required work.

15. Equipment. All machinery, operating supplies and tools necessary for the proper performance and acceptable completion of the work.

16. Excess Material. Material from the roadway in excess to that needed for maintenance of roadway.

17. Fore slope. The slope of the ditch section nearest to the traveled way.

18. Grade. The vertical alignment of the top surface of the road.

SPS _ AG 110606/22 800 - Definitions and Abbreviations (12/3/2013)

19. Highway Vehicles. Vehicles such as, passenger cars and high clearance vehicles.

20. High Clearance Vehicles. Vehicles such as pickups, four wheel drive vehicles, and log trucks. Those type of vehicles which are not constructed to be operated off paved structures due to the insufficient ground clearance.

21. Hydrologic Function. Physical properties of the occurrence and movement of water on the earth's surface and in particular that part which crosses transportation systems.

22. Materials. Any substances specified for use in the performance of the work.

23. Measurement. The process of identifying the dimensions, quantity, or capacity of an item.

24. Nominal Dimensions or Weights. The numerical values shown on the drawings or in the specifications as measurements for the work.

25. Original Contract Quantities. Those estimated quantities shown in the Schedule of Items or within the offerors block, as awarded.

26. Patching. Minor repairs to voids located within a structure.

27. Paved Surface or Pavement. Denotes asphalt, concrete, or other stabilized materials excluding natural aggregates or native surfacing. Dust palliative treatments are not considered as pavement.

28. Right-of-Way. A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private Lands), or (2) real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

29. Roadbed. The portion of a road between the intersection of the subgrade and side slopes, excluding that portion of the ditch below the subgrade.

30. Road Listing. A preliminary listing of road locations and any established work priorities.

31. Schedule of Items. A schedule in the contract that contains a listing and description of maintenance items, quantities, units of measure, methods of measurement, unit price, and amount.

32. Shoulder. The portion of the roadway continuous to the traveled way for accommodation of stopped vehicles, emergency use, and lateral support of travel way structure.

33. Slough or Slide. Material deposited on the roadway that may need to be repositioned or removed.

34. Slump. A localized portion of the roadbed that has slipped, or otherwise become lower than the adjacent roadbed, and constitutes a hazard to traffic.

35. Standard Specifications. Specifications for all divisions of work.

36. Subgrade. Top surface of roadbed upon which the pavement structure, shoulders, and curbs are constructed.

37; Traveled Way. The portion of the roadway designated for the movement of vehicles, exclusive of shoulders but including turnouts and curve widening.

38. Turnouts. A short auxiliary lane on a road provided for passage of meeting vehicles.

39. Unit of Measure. The unit and fractions of units shown in the Schedule of Items.

40. Unsuitable Material. Material removed during maintenance, which cannot be reused in maintenance activity or has no Engineering value for structural use and must be disposed of in designated locations. Includes material with substantial amounts of vegetation or other objectionable material.

41. Waterbar. A deeper type cross ditch, which is not intended for standard passenger vehicles.

42. Work Schedule. The Service Provider's current schedule for work progression.

A comprehensive list of definitions can be found in the FP-03, Division 100 (General Requirements), Section 101 (Terms, Format and Definitions), 101.04 Definitions, and are added to this list by reference.

800.02 Abbreviations

Whenever in these specifications, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows: (Reference to a specific standard or specification shall mean the latest addition or amendment thereto in effect on date of Invitation for Bids.)

AASHTO -American Association of State Highway and Transportation Officials.

ADA

ANSI

ASTM

BPA

BRD

BRWMA

co

COR

COPWB

CMP

CR

CRGNSA

CRRD

DECOM ·

EM-7100-15

EPA

FAR

FDR

FHWA

FP-03

FS

FSSS

- American Disabilities Act.

- American National Standards Institute.

-American Society for Testing and Materials.

- Blanket Purchase Agreement (type of service contract), or Bonneville Power Administration (federal agency).

- Barlow Ranger District of the Mt Hood National Forest.

- Bull Run Watershed Management Area.

- Contracting Officer.

- Contracting Officers Representative.

- City of Portland Water Bureau.

- Corrugated Metal Pipe.

- Contractors Representative.

- Columbia River Gorge National Scenic Area.

- Clackamas River Ranger District of the Mt Hood National Forest.

- Decommissioning.

- Sign and Poster Guidelines for the Forest Service.

- Environmental Protection Agency (federal agency).

- Federal Acquisition Regulation.

- Forest Development Road.

- Federal Highways Administration (federal agency).

- Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects.

- Forest Service (federal agency).

- Forest Service Supplemental Specifications.

HRRD

IDIQ

MHNF

MUTCD

NBS

NEPA

NFSR

OSHA

SDRR

SF

TDW

USDA

USFS

USGS

ZZRD

- Hood River Ranger District of the Mt Hood National Forest

- Indefinite Delivery, Indefinite Quantities. (type of service contract)

- Mount Hood National Forest.

- Manual of Uniform Traffic Control Devices.

- National Bureau of Standards.

- National Environmental Protection Act.

- National Forest System Road.

- Occupational Safety and Health Act.

- Storm Damage Risk Reduction.

- Standard Form.

- The Dalles Watershed Management Area

- United States Department of Agriculture (federal department).

- United States Forest Service (federal agency).

- United States Geological Survey (federal agency).

- Zigzag Ranger District of the Mt Hood National Forest.

A comprehensive list of abbreviations can be found in the FP-03, Division 100 (General Requirements), Section 101 (Terms, Format and Definitions), 101.03 Abbreviations, (a) Acronyms, and are added to this by reference.

800.03 SI Symbols

800.04

Whenever in these specifications, or in other contract documents, the following symbols are used, the intent and meaning shall be interpreted as follows:

A comprehensive list of symbols that will be used in conjunction with contracts and drawings can be found in the FP-03, Division 100 (Generai Requirements}, Section 101 (Terms, Format and Definitions), 101.03 Abbreviations, (b} SI Symbols, and are added to this list by reference.

Illustration of Road Maintenance Terms.

I I i Right- of- W&,f i i----ROadside Roadslde--i I Cle ari i-------1----------- Clearing Wldtll ___________ ____,_ I

Im X------------- Roaaway--------------Y I e:! 1.......................................... ,:Ll I

~ t: !-'.!·'.·'.·'.'.-'.·'.·'.-'. ·'.-'. ·'.·'.·'.·'.·'.'.'.·'.-'.·'.·'.·'.-'.·'.-'.·'.-'.·'.· '.-'.·'.-'. ·'.·'.·'.-'.·'.'.'.i:·. ·.-... ____ ____ ;::j I

~l;rn;rn;;(UI~i~:~~~k;);:, I T~d I ~in.···.· .. ce. c. urs. 9. . } ~ .. :. I 1::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::;::::::::::::::::. --~-~~~:~~-~~~~~~-'~~::.:.i·ase &urse ~ tr

I .... · ................................................................................................................................................... · 1:::::::::::::::::::::::::::: ::::::::::: :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::j

~ me,· -- ~QJ:/~~~UWS;~~J-rl~i~~~~a~:::~conamn• ----------- -- ---------J

SPS/F06 - Section 801 QUANTITY MEASUREMENT TERMS

1. U.S. Customary Units of measure are used in conjunction with these specifications.

2. The methods of measurement and computation will be those necessary to accurately determine the quantities of materials furnished and work performed.

3. All items, which are measured by the feet, will be measured parallel to its longitudinal centerline, unless otherwise shown on the drawings.

4. A station when used as a definition of term or measurement will be one hundred feet, or a precise location along a survey line.

5. Miles will, in the absence of known distances from existing plans or surveys, be determined by the Government using a calibrated survey odometer or equal substitute operated on the traveled way at or parallel to road centerline.

6. The term "ton" means 2000 pounds. Trucks used to haul material measured by truck weight shall be weighed empty at least once daily, and each truck shall bear a plainly legible identification mark. Weigh tickets furnished by the Contractor from certified scales will be used to determine weight measurements.

7. Materials measured by the cubic yard in the hauling vehicle shall be measured therein at the point of delivery. Vehicles may be of any size or type, provided that the box is of such shape that the actual volume may be readily and accurately determined.

8. Measurement by the acre will use the length and width treated. Measurement of width will approximate significant slope breaks, but will not include minor deviations along the slopes.

The measured slope distance for the length will multiply width treated and converted to a standard 10,000 square yard or acreage value of the surface area treated.

9. Measure square yard with horizontal longitudinal and traverse measurements.

1 0. The term "lump sum" when used in the Schedule of Items means the complete unit as required by or described in the contract.

11. Measurement will be made of each item or unit of work, as shown in the Schedule of Items, completed and accepted in accordance with the contract provisions, specifications, and drawings.

A comprehensive outline and specific terminology concerning measurement and payment can be found in the FP-03, Division 100 {General Requirements), Section 109 (Measurement and Payments), and is added by reference to this list.·

SPS_AG 110606/22 801 -Quantity Measurement Terms (12/03/2013)

803.01 Description

SPS/F06 - Section 803 SNOW REMOVAL

This section establishes contractors' responsibilities for snow removal located on National Forest System Roads. Activity is designed to mitigate snow depths and provide access deemed necessary in the administration of functional activities needed for resource protection and mitigation. Contractor shall utilize equipment and operators necessary to perform requested activity.

803.02 Service Required

Remove snow from designated surfaces. A snow plow permit shall be issued to allow requested action.

803.03 Performance Standard

803.04

Snow removal is complete when the surface is available and useable for all intended use, safe for the intended users, and will efficiently drain. Specifications shall be outlined within the "Snow Plow Permit" issued by Contracting Officer and approved by District Ranger, specifications differ from location to location and due to access needs.

Location of Work As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.

803.05 Measurement

803.06

Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.

A. Single Lane Roads: Snow removal will be measured along the centerline of the roadway. Turnouts are considered incidental. Measurement will be to the nearest one tenth (0.1) mile.

B. Double Lane Roads: Snow removal will be measured along the centerline of the roadway. Measurement will be to the nearest one-tenth (0.1) mile.

C. Lump Sum: The bid amount is complete payment for all work described in the contract and necessary to complete for that item.

D. Each: One entire unit. The quantity is the actual number of units completed and accepted.

Payment The accepted quantities will be paid at the contract price per unit of measurement for the Section 803 pay items listed in the schedule of items.

work prescribed in this Section.

Pay Item 803(1) 803(2) 803(3) 803(4)

Snow Removal (Single Lane) Snow Removal (Double Lane) Snow Removal Snow Removal

Pay Unit Mile Mile Lump Sum Each

SPS_AGl 10606/22 803 - Snow Removal (12/03/2013)

Payment will be full compensation for the

803.07 Acceptable Quality Levels

Surface Damage

Drainage: Impeded flow for ditches, inlet/outlet channels, and catch basins

Remaining Snow depth

Backs lopes

Overwidth Plowing

Underwidth Plowing

Damage to Structures and Appurtenances

Work Area Management

A loss of more than 10 CY /mile on agg surface roads or any damage on paved surfaces.

Water will be diverted out of the drainage structure or system

Exceed maximum depth by 2 inches for 100 feet of road and not to exceed 1 per mile

Undercut backslope will result in destabilization of slope

Undefined edge of traveled way

Too narrow for intended use

Any Damage

Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures

A loss of less than 10 CY /mile on agg surface roads or any damage on paved surfaces.

< 20% impeded, but water will stay in the channel.

Exceed maximum depth by 2 inches for 50 feet of road and not to exceed 3 per mile

Undercut backslope will not result in destabilization of slope

N/A

N/A

Any Damage

Not following approved safety plan which may include signs, flaggers; and other temporary traffic control measures

0 1 per mile

0 2 per mile

0 3 per mile

0 1 per mile

0 N/A

0 N/A

0 0

0 0

SPS_AG I 10606/22 803 - Snow Removal (12/03/2013)

Replace or recover lost material or repair damaged surface

Rework

Rework

Repair and Stabilize

Reshape as necessary

Widen as necessary

Repair or Replace

Suspend work until in compliance

Accept the loss of material or repair damaged surface

Rework if greater than 2 minor defects*

Repair if greater than 3 minor defects•

Revegetate if greater than 1 minor defects*

N/A

N/A

Repair or Replace

Suspend work until in compliance

807.01 Description

SPS/F06 - Section 807 EQUIPMENT RENTAL

This section establishes contractors' responsibilities for equipment rental while preforming maintenance activities on roads system(s), or at locations deemed necessary, located on National Forest lands. Activity is designed to utilize contractor's equipment and operators to fulfill requested action. Contractor shall provide adequately trained and experienced operator whom will provide a safe work environment during the prosecution of work, and equipment that is capable, meets specifications and is operational for request work.

807.02 Service Required

Furnish and operate equipment.

807.03 Performance Standards

A. Equipment shall be weed free before it used on National Forest System lands.

B. Equipment shall be free of leaks of petroleum based products, or any other fluid based system needed for equipment operation, prior to use on federal owned lands.

C. All protective.plating/armoring shall be intact and properly functioning on equipment.

D. All equipment shall have minimum required fire tools affixed in a manner that allows employee accessibility. All hand-tools on site shall be equipped with minimum fire prevention requirements, i.e. spark arrestors, etc. This will include all hand tools used in association with a requested action that may or may not be listed below or in contract.

All equipment shall be operated by a fully trained, qualified and competent operator at all times.

Make e ui ment available for inspection and a roval before use. Furnish thee ui ment s ecified in the table below:

55-125 18000 LBS 0.25 CY

120-240 41000 LBS 1.1 CY

55 25 FT SEE CONTRACT

155 BLADE:14'x24'

90-185 6 WAY BLADE 8' LENGTH, REAR MOUNTED 3 TEETH RIPPER 12' DEPTH

350 10CY

ROTARY HEAD WITH CAPABILITY OF CUTTING 4" FROM TERRAIN ABILITY TO REACH 20 FT. FROM RD

300 3000 GAL SEE CONTRACT

13 Front End Loader 75 3.0CY

14 Pavement Pulverize

SPS_AG110606/22 807 - Equipment Rental (12/03/2013)

17) Roadway Pavement Striper

18)Parkinq lot Striper

19) Low Boy

##) Other (specify)

807.04 Location of Work

Location of work is as specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.

807.05 --- Measurement

A. The accepted quantities will be paid at the established hourly rate, rounded to the nearest half (1/2) hour, that the equipment is in operation.

B. Non-operable equipment or equipment dependent on another piece of non-operable equipment will not be paid for.

C. Hours of operation shall be the same as for the Service Provider's regular work shift, unless otherwise directed in writing by the Contracting Officer.

D. Moving of equipment will be paid at the established hourly rate.

807.06 Payment

The accepted quantities will be paid at the contract price per unit of measurement for the Section 807 pay items listed in the schedule of items. Payment will be fully compensation for the work prescribed in this Section.

PAY ITEM DESCRIPTION PAY UNIT

807 (1) Mini-Excavator HOUR 807 (2) Excavator HOUR 807 (3) Back hoe HOUR 807 (4) Road Grader HOUR 807 (5) Dozer HOUR 807 (6) Dump Truck HOUR 807 (7) Brush Cutter HOUR 807 (8) Vibratorv Roller HOUR 807 (9) Water Tender HOUR 807 {10) Chain Saw HOUR 807 (11) Self-Loadino Loo Truck HOUR 807 {12) Skidder HOUR 807 {13) Front End Loader HOUR 807 (14) Pavement Pulverizer HOUR 807 (15) Pavement Broom HOUR 807 (16) Paver HOUR 807 (17) Roadway Pavement Striper HOUR 807 (18) Parking Lot Striper HOUR 807 (19) Low Boy HOUR

SPS_AG110606/22 807 - Equipment Rental (12/03/2013)

Weed-free Equipment

Maintenance of Equipment

Equipment meets all state and federal regulations

Equipment leaks

Equipment will be operated by a fully trained, qualified, and competent operator at all times.

Equipment not weed free.

Equipment not capable of operating at least 90% of the time

Does not meet state and federal regulations

Equipment leaks in sensitive areas or leaks that are large and not typically inherent in the specific equipment

Operator not fully trained, qualified, and competent.

NIA

NIA

NIA

Small leaks inherent in the specific type equipment

NIA

0 NIA

0 NIA

0 NIA

0 0

0 NIA

SPS_AG110606/22 807 - Equipment Rental (12/03/2013)

Equipment rejected until it can be made weed free

Replace defective equipment

Bring equipment up to state and federal regulations or replace equipment

Replace equipment and restore affected site as directed by the

Contracting Officer

Stop equipment operation until a fully trained, qualified, and competent operator is available. Repair any damage done by incompetent · . operator as directed by the

Contractin Officer

NIA

NIA

NIA

Place absorbent pads under equipment when not operating.

NIA

SPS/F06 - Section 808 WORK AREA MANAGEMENT

808.01 Description

This section establishes contractors' responsibilities for work area management located on National Forest System Roads. Activity is designed to mitigate traffic concerns on routes where maintenance, construction, resource protection and emergency situations are taking place and traffic control is deemed necessary. Contractor shall provide trained and certified flaggers and signage necessary to meet Manual of Uniform Traffic Control Devices (MUTCD) traffic control for Low Volume Roads.

808.02 Service Required

This Section establishes Contractor responsibilities for traffic control and equipment requirements in work areas.

808.02 Performance Standard

A. Traffic Conditions - Unless otherwise provided in the SPECIAL PROJECT SPECIFICATIONS, roads are open to traffic with not more than twenty (20) minutes maximum delay time.

Extended closures are acceptable but shall be advised in writing to Contracting Officer prior to commencement of activity, with reasonable time for public affairs notification, normally 10 working days.

B. A plan for satisfactory handling of traffic, approved by the Government, is required prior to initiating or performing work which interferes with use of traveled roadways.

C. Traffic Control Devices

1. Provide signs and other devices complying with National Standards as contained in Part VI of the MUTCD. Provide traffic control for occupied work areas that is in accordance with these specifications. All signs and devices remain the property of the Contractor.

2. Keep traffic devices current with maintenance operation and remove upon completion.

3. Use warning signs to control traffic approaching the work area from either direction and also from side accesses

4. Required signs may be mounted on portable or temporary mountings. Use standard MUTCD shapes, colors, sizes, and legends.

5. Mark hazards incidental to the work within or on the traveled way, shoulders, or turnouts with hazard identification markers, illuminated beacons, and other MUTCD devices to safely guide road users through the area. Mark work segments not completed on a daily basis appropriately for night travel. Obtain authorization before commencing work at night. ·

6. Advisory speed plates may be used to control traffic through the work area.

D. Flaggers

· Provide properly equipped, trained and certified, flag person(s) where the traffic is required to stop before proceeding. Stop traffic in locations which provide width enough for passage of traffic and reasonable protection for vehicles. When flag control is used, advance warning signs are required.

E. Contractor's Equipment

808.03 Measurement

1. Equip all vehicles and machinery operating on or from the traveled way or road shoulder with flashing lights, strobes, or rotary beacons operated continuously while work is in progress. Use truck headlights at all times while operating. Backup horns are required on all self-propelled equipment in excess of 5½ tons gross weight.

2. Park vehicles and machinery, not currently used in the maintenance operation, off the traveled way at approved locations to minimize interference with normal use.

Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS, or the OFFEROR'S BLOCK, completed and accepted.

Hour: Measure the actual number of hours ordered by C.O. and performed by contractor. Hours shall be paid to the nearest half (1/2) hour, charge shall include all certified traffic control specialists time, and cost of temporary signing as one hourly cost.

SPS_AG110606/22 808 - Work Area Management (12/03/2013)

808.06 Payment

The accepted quantities will be paid at the contract price per unit of measurement for the Section 808 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.

Pay Item 803(1) Temporary Traffic Control

Certifications

Temporary Signing

Work Area Management

Closure timing

Traffic control specialists are not Certified in State of activity

Does not meet MUTCD Standards

Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures

Exceeds 20 minutes maximum closure

Meets or exceeds 30 critical maximum closure

N/A

N/A

N/A

N/A

N/A

Pay Unit Hour

0 N/A

0 N/A

0 N/A

0 N/A

0 N/A

Suspend activity until contractor

· in compliance

Suspend activity until contractor in compliance

Suspend activity until contractor in compliance

Suspend activity until area under controlled management.

Reopen road in all directions for not less than 1 hour, prior to reclosing, Issue Notice Of Non- Com liance

SPS_AG110606/22 808 - Work Area Management (12/03/2013)

N/A

N/A

N/A

N/A

N/A

SPS/F06-Section 811 SURFACE MAINTENANCE 811.01 Description

811.02

This section establishes contractors' responsibilities for surface maintenance road section(s) of aggregate or native surfaced roads, is not intended for surface maintenance of paved or SST surfaced roads. Contractor shall utilize equipment and operators to maintain surface travelway by blading, shaping and recompacting road surface materials.

Service Required

811.03

Smooth, shape and recompact native or aggregate surfaced road sections including traveled way, shoulders, turnouts, and intersections. Reshape or recondition ditches, water bars, and drain dips. Compaction shall be done with added water for optimum moisture density to provide impervious surface after requested compaction action.

Performance Standards Maintenance Level 4 and 5 Roads

A road surface is maintained to standard when the travel way is free of washboards, potholes, or other irregularities. The surface is smooth, compact, crowned or sloped to drain, without segregation of the surfacing materials, and is impervious to surface water. Suitable materials have been recovered and incorporated. Unsuitable materials have been removed. Ditches and road surface drainage structures function efficiently. Unpaved shoulders are shaped to provide a smooth transition from the paved surface and drain efficiently.

Maintenance Level 3 Roads A road surface is maintained to standard when the surface is compact, crowned, or sloped to drain, without segregation of the surfacing materials, and is impervious to surface water. The road surface has no ruts or rills, suitable materials have been recovered and incorporated. Unsuitable materials have been removed. Ditches and road surface drainage structures function efficiently.

Maintenance Level 2 Roads

811.04

A road surface is maintained to standard when the surface is shaped and compacted to drain, where ditches and road surface drainage structures function efficiently, and surface is impervious to .surface water. The road surface has no continuous ruts or rills, and no large concentrations of unsuitable materials remain.

Location of Work As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.

811.05 Measurement

811.06

Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.

A. Single Lane Roads: Surface maintenance will be measured along the centerline of the roadway. Turnouts are incidental. Measurement will be to the nearest one-tenth (0.1) mile.

B. Double Lane Roads: Surface maintenance will be measured along the centerline of the roadway. Measurement will be to the nearest one-tenth (0.1) mile.

C. Road Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.

Payment The accepted quantities will be paid at the contract price per unit of measurement for the Section 811 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.

SPS_AG110606/22 811 - Surface Maintenance (Aggregate) (12/03/2013)

Pay Item 811 (1) 811 (2) 811 (3) 811 (4) 811 (5) 811 (6) 811 (7)

Surface Maintenance Level 4 & 5 roads (Single Lane) Surface Maintenance Level 4 & 5 roads (Double Lane) Surface Maintenance Level 3 roads (Single Lane) Surface Maintenance Level 3 roads (Double Lane) Surface Maintenance Level 2 roads (Single Lane) Surface Maintenance Level 2 roads (Double lane) Shoulder Maintenance

Pay Unit Mile Mile Mile

Mile Mile Mile Mile

Potholes greater than 2" deep Potholes 2" or less deep and 1 and wider than 1 foot foot or less wide

Surface Irregularities (Level 4 & 5) Washboards greater than 1" deep Washboards 1" or less deep and not exceeding 20 feet long

Potholes greater than 2" deep Potholes 2" or less deep and 1 and wider than 1 foot foot or less wide

Surface Irregularities (Level

3) Washboards greater than 1" deep Washboards less than 1" deep and not exceeding 20 feet long

Crown or Cross Slope is not Crown or Cross Slope is not uniform and does not drain as uniform and does not drain as

Road Cross Section (Level specified on more than 250' of · specified on less than 250' of 4 & 5) surface per mile surface per mile

Crown or Cross Slope is not Crown or Cross Slope is not

Road Cross Section (Level uniform and does not drain as uniform and does not drain as specified on more than 250' of specified on less than 250' of

3) surface per mile surface per mile

0 per Rework if greater than 0 1 per½ mile mile major defects

0 per Rework if greater than 0 1 per½ mile mile major defects

1 per Rework if greater than 1 1 per½ mile mile major defects

1 per Rework if greater than 1 1 per½ mile mile major defects

0 1 per mile Rework

0 1 per mile Rework

SPS_AG110606/22 811 - Surface Maintenance (Aggregate) (12/03/2013)

Rework if greater than 2 minor defects

Rework if greater than 2 minor defects

Rework if greater than 2 minor defects

Rework if greater than 2 minor defects

Rework if greater than 1 minor defects

Rework if greater than 1 minor defects

Road surface does not drain Road surface does not drain

Road Cross Section (Level properly and causes erosion, or properly, but does not cause Rework if greater than 1 Rework if greater than 1

2) obstructs high clearance vehicles erosion 1 per½ mile major defects * minor defects

Oversized Material (Level 3 Material greater than 3" diameter Material less than 3" diameter Rework if greater than 3

& 4 aggregate surfaced remaining on the road surface remaining on the road surface and 0 3 per mile Rework minor defects roads) traffic safety is not compromised

Objects in traveled way that Debris in traveled way that may Oversized Material (Level obstruct high clearance vehicles impede high clearance vehicles 0 1 per mile Rework Rework if greater than 1

2) minor defects

Gradation of surface aggregate is Gradation of surface aggregate is degraded by more than 10 % degraded by less than 10 % 0 0 per mile Rework Rework

A loss of more than 10 CY /mile A loss of less than 1 O CY /mile Replace or recover lost Replace or recover lost 0 O per mile material material

Aggregate Surface Quality surfacing is segregated over more surfacing is segregated over less than a 100 square yard area per than a 100 square yard area per 1000 linear feet of road and traffic 1000 linear feet of road and traffic

0 N/A Rework Rework safety is compromised safety is not compromised

Undercut backslope will result in Undercut backslope will not result

Backs lopes destabilization of slope in destabilization of slope 0 4 per mile Repair and Stabilize Revegetate if greater than 4 minor defects

Visible displacement occurs under N/A

Compaction hauling or spreading equipment 0 N/A Rework N/A

Impeded flow or water diverted out < 20% impeded, but water will stay Ditches and Road Drainage of drainage structures in the channel 0 2 per mile Rework Rework if greater than 2

Structures minor defects

Elevation difference between Elevation difference between pavement and shoulder is greater pavement and shoulder is less Rework if greater than 5 than 1" than 1" 0 5 per mile Rework minor defects

Unpaved Shoulders (Level Material greater than 1/4" Material 1/4" diameter or less

3, 4, & 5) diameter remaining on the road remaining on the road surface and Rework if greater than 5 surface traffic safety is not compromised 0 5 per mile Rework minor defects

Does not drain away from Does not drain away from 0 0 Rework pavement pavement Rework

SPS/F06- Section 812 SURFACE STABALIZATION 812.01 Description

812.02

This section establishes contractors' responsibilities for surface stabilization of road section(s) of aggregate or native surfaced roads, is not intended for surface maintenance of paved or BST surfaced roads. Contractor shall utilize equipment and operators to perform dust abatement and stabilization needs on aggregate, improved or native surfaced roads located on National Forest System Roads, or adjacent lands.

Service Required Stabilize surfaces and control dust.

812.03 Performance Standard

Surface Stabilization is complete when the surface remains stable and dust does not become air borne for the designated time period designated in the road listing.

812.04 Location of Work

As specified on roads listed on the ROAD LIS~ING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.

812.05 Measurement

Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.

Payment

A. Single Lane Roads: Surface Stabilization will be measured along the centerline of the roadway. Turnouts are incidental. Measurement will be to the nearest one-tenth (0.1) mile.

B. Double Lane Roads: Surface Stabilization will be measured along the centerline of the roadway. Measurement wHI be to the nearest one-tenth (0.1) mile.

C. Square Yard: Measurement of Surface Stabilization will be determined by multiplying the average length times the average width rounded to the nearest one (1) D. Lump Sum: The bid amount is complete payment for all work described in the contract and necessary to complete for that item. square yard.

The accepted quantities will be paid at the contract price per unit of measurement for the Section 812 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.

Pay Item 812(1) Surface Stabilization (Single lane) 812(2) Surface Stabilization (Double Lane) 812(3) Surface Stabilization 812(4) Surface Stabilization

Pay Unit Mile Mile Square Yard Lump Sum

SPS_AG110606/22 812 - Surface Stabalization (Aggregate) (12/03/2013)

Application

Loss of product off treatment surface

Compliance with laws/regulations

Work Area Management

Failure to stabilize material for designated time period over continuous sections of road

Application rates are more than 10% higher or lower than manufacturers recommendation product runs off surface and has potential to enter stream

Any non-compliance

Not following approved safety plan which may include signs, ftaggers, and other temporary traffic control measures

Failure to stabilize material over 50ft. length or area of road.

Application rates are less than 10% higher or lower than manufacturers recommendation product runs off surface but no potential to enter stream

Any non-compliance

Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures

1 per mile

1 per mile

Rework

Rework

Contain and remove

Suspend work until in compliance

Suspend work until in compliance

Accept if less than 50 ft.

per mile. Rework if more than 50 ft. per mile

Accept if less than 1 per mile. Possible pay reduction*

Contain and stabilize

Suspend work until in compliance

Suspend work until in compliance

SPS/F06-Section 813 SPOT SURFACING

813.01 Description

813.02

This section establishes contractors' responsibilities for spot surface maintenance of road section{s) of aggregate or native surfaced roads, is not intended for surface maintenance of paved or BST surfaced roads. Contractor shall utilize equipment and operators to load, haul and place road base rock, road surfacing material, or other structural design components needed in the maintenance activities for road prisms on National Forest System Roads or the land adjacent thereto.

Service Required Load, haul, and place surface material to repair or stabilize road surfaces as requested.

813.03 Performance Standard

813.04

Spot surfacing is complete when the designated quantity of the ordered material has been placed as outlined in maintenance activity. Quantities and gradations shall be outlined in the Estimate Of Quantities or the Offerer's Block, and shall comply to the materials requirements found in "Standard Specifications for the Construction of Roads and Bridges on Federal Highway Projects" FP-03 or current, Division 700 - Materials.

Location of Work As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.

813.05 Measurement

Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.

A. The quantity will be the number of cubic yards measured in the vehicles, or square yards of aggregate placed.

B. Material measured by the ton shall be verified by certified weight tickets.

Payment The accepted quantities will be paid at the contract price per unit of measurement for the Section 813 pay items listed in the schedule of items.

work prescribed in this Section.

Pay Item 813(1) 813(2)

Spot Surfacing, Gradation __ Spot Surfacing, Gradation __

Pay Unit Cubic Yard Ton

SPS_AG110606/22 813 - Spot Surfacing (12/03/2013)

Dimension of spot surfacing deviates Dimension of spot surfacing If depth is low, correct Accept aggregate as by more than 1" from depth specified. deviates by 1" or less than from placement of aggregate to placed, pay only for Or less than 1" from dimension depth specified and not specified dimensions. If depth delivered quantities.

Depth of Aggregate specified but is consistently high or consistently high or low. 0 NIA is high only pay for ordered low. amount

Dimension of spot surfacing is less Dimension of spot surfacing is up If width is narrow, correct Accept aggregate as than specified width or more than 1' to 1' wider than specified but not placement of aggregate to placed, pay only for

Width of Aggregate wider than specified. consistently wide. 0 NIA specified dimensions. If width is too wide reshape.

delivered quantities.

Dimension of spot surfacing is shorter Dimension of spot surfacing is If length is shorter than Accept aggregate as than specified length or more than shorter than specified length or up specified, correct placement placed, pay only for 100' longer than specified. to 100' longer than specified. of aggregate to specified delivered quantities.

Length 0 NIA dimensions. If too long pay only for ordered amount.

Visible displacement occurs under

Compaction heavy spreading equipment NIA 0 NIA Not compacted, Rework NIA

Does not meet specified gradation or Does not meet specified Reject and replace Accept but may reduce

Aggregate Quality durability requirements and is not gradation or durability

0 NIA

payment.

suitable for intended use requirements and is suitable for intended use

Spot surfacing doesn't conform to the Spot surfacing generally conforms Reshape or recompact Accept but may reduce adjacent road segments and traffic is to the adjacent road segments, 1 per site surfacing as needed. payment.

Finish Quality impeded. but traffic may be slowed. 0

SPS_AG110606/22 813 - Spot Surfacing (12/03/2013)

SPS/F06- Section 814 ASPHALT SURFACE MAINTENANCE 814.01 Description . .

814.02

This section establishes contractors' responsibilities for Asphalt or BST surface maintenance of road section( s) of non-aggregate or non-native surfaced roads, it is intended for surface maintenance of paved or BST surfaced roads. Contractor shall utilize equipment and operators to maintain asphalt surfaced roads, and parking structures on National Forest System Roads, or land adjacent thereto.

Service Required

814.03

Maintenance of asphalt or BST surfaced roads by pot hole patching, skin patching or crack sealing of existing pavement shortcomings and failures or for the preventive maintenance needs of road travelways. Service shall include cleaning of pavement surfaces along with the maintenance of striping on all asphalt surfaced roads or of paved parking areas.

Performance Standard

814.04

Asphalt surface maintenance is complete when the pavement is clean and free of cracks, potholes, and surface irregularities. Contractor shall use Oregon State Certified "C" mix for all paving work unless otherwise specified in task order. All joints shall be tacked and sanded. Materials shall conform to those depicted in the FP-03 "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects", Division 700 (Materials), Section 702 (Asphalt Material).

Asphalt/paving work shall follow industry standards as outlined in the Asphalt Institute Manual Series Number 16.

Striping maintenance is complete when all striping has been completed as described within scope.

Striping shall conform to standards set forth by MUTCD, ADA, and Forest Service specs found in EM7100-15 Sign and Poster Guidelines for the Forest Service, and depicted in the FP-03 "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects", Division 700 (Materials), Section 702 (Asphalt Materialj.

Pulverization of existing asphalt surface is complete when the surface has been scarified to the designated depth and width.

Material generated from pulverization activities shall adhere to a size one and one half the times of the maximum sized aggregate or to 1 ½ inches, whichever is greater. Mix, spread, compact and finish by determining the optimum moisture content according to AASHTO T180, method "D", spread, shape and compact mixture within 2 percent of optimum moisture content. Do not place mixtures in layers exceeding 6" for compaction.

Location of Work As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.

814.05 Measurement

Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS when completed and accepted.

A. Single Lane Roads: The work activity will be measured along the centerline of the roadway. Turnouts are incidental. Measurement will be to the nearest one-tenth (0.1) mile.

SPS_AG110606/22 814 - Surface Maintenance (Asphalt) (12/03/2013)

8. Double Lane Roads: The work activity will be measured along the centerline of the roadway. Measurement will be to the nearest one-tenth (0.1) mile.

C. Road Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.

D. Ton: Material measured by the ton shall be verified by certified weight tickets.

E. Linear Foot: Work activity by the linear foot will be measured using standard survey methods rounded to the nearest one (1) foot.

F. Square Foot: As measured on a plane parallel to the surface being measured, and shall be rounded to the nearest square foot.

G. Lump Sum: The bid amount is complete payment for all work described in the contract and necessary to complete for that item.

H. Each: One entire unit. The quantity is the actual number of units completed and accepted.

814.06 Payment

The accepted quantities will be paid at the contract price per unit of measurement for the Section 814 pay items listed in the schedule of items.

work prescribed in this Section.

Pay Item 814(1) Pothole Patching 814(2) Skin Patching 814(3) Crack Sealing 814(4) Crack Sealing 814(5) Paved Surface Cleaning (Single Lane) 814(6) Paved Surface Cleaning (Double Lane) 814(7) Paved Surface Cleaning 814(8) Parking Lot Striping 814(9) Parking Lot Striping 814(10) Painted Directional Arrows/Others 814(11) Two Colored Painted Handicap Emblems 814(12) Road Travelway Double Yellow Centerline Striping 814(13) Road Travelway Double Yellow Centerline Striping 814(14) Road Travelway Single White Fog Line Striping 814(15) Road Travelway Single White Fog Line Striping 814(16) Seal Coating 814( 17) Pavement Pulverization

Pay Unit Ton Ton Linear Foot Mile Mile Mile Each Linear Foot Lump Sum Each Each Linear Foot Mile Linear Foot Mile Square Foot Mile

Finished elevation does not match adjoining segments by more than 1/4 inch N/A 0 N/A Rework N/A

Pothole Patching Patched material does not properly adhere to N/A 0 N/A Rework N/A ad·acent surfaces

Area to be patched is not properly prepared N/A 0 N/A Rework N/A

Finished skin patch does not make smooth transition with adjoining pavement. N/A 0 N/A Rework N/A

Skin Patching Patched material does not properly adhere to N/A 0 N/A Rework N/A adjacent surfaces

Area to be patched is not properly prepared N/A 0 N/A Rework N/A

Crack Sealant does not completely fill the cracks Crack Sealant does not completely fill greater than 1 /4 inch the cracks 1/4 inch or less 0 1 ft per 500 ft Rework Rework

Crack Sealing Crack sealant does not properly adhem to N/A 0 N/A Rework N/A adjacent surfaces

Area to be sealed is not properly prepared N/A 0 N/A Rework N/A

More than 5% of surface is not cleaned as Less than 5% of surface is not 0 1 per 500 ft Rework Accept but may Surface Cleaning specified cleaned as specified reduce payment.

Product and gradation does not meet Product and gradation does not meet Asphalt Quality Specifications and is not suitable for job. Specifications but is otherwise suitable 0 0 Reject and replace · Reject and replace ..

for ·ob._

Parking Lot and Road Striping does not meet the standards set forth in Travelway Surface MUTCD, ADA Requirements or Forest Service N/A 0 N/A Rework NIA Striping 7100-15

Depth of Pulverization

Width of Pulverization

Compaction of Pulverization

Pulverization output quality

Dimension of Pulverization deviates by more than 1' from depth specified. Or less than 1" from dimension specified, but is consistently high or low

Dimension of pulverization is less than specified width or more than 1" wider than specified

Visible displacement occurs under heavy spreading equipment

Does not meet specified gradation requirements, is not suitable for intended use.

Dimension of Pulverization deviates by more than 1' from depth specified.

Or less than 1" from dimension specified, but is consistently high or low

Dimension of pulverization is less than specified width or more than 1" wider than specified, but not consistenly wide

N/A

Does not meet specified gradation requirements, is not suitable for intended use.

0 2 per mile

0 2 per mile

0 N/A

0 N/A

SPS_AG110606/22 814 - Surface Maintenance (Asphalt) (12/03/2013)

Accept as placed, Rework pay only for

<Jelivered quantities

Accept as placed, Rework pay only for delivered quantities

Rework N/A

SPS/F06-Section 832 LOAD, HAUL & PLACE MATERIALS 832.01 Description

832.02

This section establishes contractors' responsibilities for the services of retrieving, moving or relocating and the subsequent placement of requested materials action. Contractor shall utilize contractors equipment and provide operator for equipment to complete requested action, as described in maintenance request, on National Forest System Roads or lands adjacent thBreto.

Service Required

832.03

Load, haul, and place material from a designated site(s) to a designated site(s). Material may be obtained off forest from a commercial source, or retrieved from a government furnished stockpile site, which may be located on or off the forest. Contractor may be required to mine some material from government quarries, utilizing contractors' equipment and operators for mining operation. Additionally, Contractor may need to load, Haul and Place Failed cut or Fill slope failure material to a accepted disposition location which may be on Forest Land or off National Forest Service Land to an approved disposal site.

Performance Standard

832.04

Loading, hauling, and placement of materials is complete when no obstruction remains in or adjacent to the roadway or in ditches which would have the potential to interfere with traffic use, block or divert water from structures or channels, and material quantities requested have been met and approved by Contracting Officer. This includes relocation, repositioning, stabilization, and revegetation as ordered.

Location of Work As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.

832.05 Measurement

Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.

A. Cubic Yard: The quantity will be the number of cubic yards measured in the vehicles.

B. Mile: Work activity will be measured along the centerline…