This document is a Statement of Work (SOW) for a federal contract opportunity to remove and replace two sets of double exterior metal doors at the Federal Correctional Institution (FCI) in Fairton, New Jersey.

The SOW details the requirements for the contractor to provide all labor, material, and equipment necessary to acquire, transport, and install new metal frames and doors. The contractor must be licensed to perform work in New Jersey and have a ten-day period to begin work upon issuance of the Notice to Proceed. The contract period is up to 180 days after the Notice to Proceed. The doors, jambs, and installation must meet current BOP Technical Design Guidelines for strength and security. The contractor will be responsible for removing the existing doors and frames and installing the new doors and frames. The work must be completed in accordance with the provided specifications, details, and federal regulations. Payment terms are per the Prompt Payment Act.

View the file

Other files for this federal contract opportunity

Other files attached to FCI Fairton Center Gate Doors, newest first.
File Type Posted
8_FAI_22Z2AT3_20240425_SOW_Rev4.pdf PDF
P1030129.JPG JPG image
23Z2AT3 Synopsis_Solicitation Cover.pdf PDF
RFQ 15B20424Q00000004.pdf PDF
P1030130.JPG JPG image
P1030127.JPG JPG image

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FCI FAIRTON NJ

STATEMENT OF WORK

EMG REPLACE DOORS

INTRODUCTION

The Federal Correctional Institution (FCI) located at Fairton, New Jersey, intends to make a single award to a responsible entity for installation of two (2) sets of double exterior metal doors as set forth in this solicitation/contract.

The Government reserves the right to award without discussion and to make a single award. Therefore, each initial quoted should contain the best terms from a cost or price standpoint.

PLACE OF PERFORMANCE

FCI Fairton 655 Fairton-Millville Road Fairton, New Jersey 08320

SCHEDULE OF DELIVERY PERFORMANCE

The contractor will provide all labor, material, and equipment necessary to acquire, transport, and install new metal frames and doors. The contractor must be licensed to perform work in the state of New Jersey and must provide licensure and/or certifications prior to award.

SCHEDULE OF PERFORMANCE

Normal working hours are estimated Monday thru Friday 6:00AM- 3:00PM to exclude federal holidays. Saturday and Sunday hours may be utilized due to adverse weather conditions or other contributing factors that would cause delay if approved by the COR and the contractor. The contractor cannot be guaranteed a forty (40) hour work week at the work site.

The contractor will have ten (10) calendar days upon issuance of the Notice to Proceed to begin work. The contract period will be in effect from the date of award to no later than one hundred eighty (180) days after Notice to Proceed.

DESCRIPTION OF WORK

The current double doors (2 Sets) on the Center Gate building that separates the upper and lower compound in which all inmate movement occurs at FCI Fairton have outlived their duty cycle and need a total replacement. The doors, jambs, and installation must meet current BOP Technical Design Guidelines for strength and security.

MATERIALS

A. Provide products meeting the following criteria.

DOORS

B. Detention Hollow Metal Doors:

1. Detention hollow metal doors shall be provided by the Government and shall be installed by the contractor.

2. Detention hollow metal doors shall have a thickness of 2" (actual).

3. Doors shall have 0.12 in. side clearance with proper bevel to operate without binding. Furnish all accessory items as required for a complete installation.

4. Doors shall be custom-made, of the types and sizes shown on approved shop drawings and shall be prepared for hardware in accordance with the manufacturer's recommendation and the final approved Hardware Schedule. Doors shall be constructed using commercial-quality cold-rolled steel that complies with ASTM A366. The steel used shall be free from scale, pitting, coil breaks, or other surface blemishes.

The steel shall also be free of buckles, waves, or any other defects caused using improperly leveled sheets. Door face sheet thicknesses shall be 12-gauge. All exterior frames, and frames used in areas with high humidity shall have a zinc (galvanized) or zinc-iron alloy (galvanneal) coating per HMMA 863-04. High humidity areas include the Kitchen and Dishwash areas. (Refer to Section 08 71 63 for locations.)

5. Door edge seams shall be continuously welded and finished smooth such that there are no visible seams. Doors shall be strong, rigid, and neat in appearance, free from warpage or buckle. Edge bends shall be true and straight and of minimum radius for the thickness of metal used.

6. Doors shall be stiffened by continuous vertically formed steel sections that, upon assembly, shall span the full thickness of the interior space between door faces. These stiffeners shall be 16-gauge minimum thickness, spaced such that the vertical interior webs shall be no more than 4 in.

o.c. and securely fastened to both face sheets by spot welds spaced a maximum of 2.4 in. o.c. vertically. Spaces between stiffeners shall be filled with 3 pounds per cubic foot fiberglass or mineral rock wool batt-type material. If the manufacturer must use heavier materials and/or closer stiffener and weld spacings to meet the performance criteria set forth in Subparagraph, 1.2.C "Certification," of this section, they shall be used in the door construction for this project. Door construction details must be submitted for approval as part of the submittal build drawings.

7. Vertical edges shall be reinforced by a continuous steel channel, not less than 10-gauge thick, extending the full length of the door. Channel that is broken at the hinge mortises shall not be acceptable. Noncontinuous channel at lock edge shall be acceptable only to accommodate lock preparation. In these cases, hardware reinforcements shall be welded to the channel such that they become an integral part of the channel. The top and bottom edges shall be closed with a continuous channel, also not less than 10-gauge spot-welded to both face sheets a maximum of 3 in.

o.c. The 10-gauge closing channels shall be continuously welded to the vertical reinforcing channel at all four corners.

8. Top and bottom channel shall be fitted with an additional flush closer plate of not less than 16-gauge. The flush closing plate shall be welded in place at the corners and

2.4 in. long welds 12 in. o.c. Installation of closer plate using screws, security or otherwise, shall be deemed unacceptable. The end channel and flush closer plate shall be installed such that they are permanent and non-removable.

9. Edge profiles shall be provided on both vertical edges of door as follows:

a. Single-Acting Doors: Beveled 0.12" in 50 mm.

b. Horizontal tract doors on equivalent square profiles.

Hardware Reinforcements:

1. Doors shall be mortised, reinforced, drilled, and tapped at the factory for completely templated, mortised hardware in accordance with the final approved hardware schedule and templates provided by the hardware supplier. Where surface-mounted hardware is to be applied, door shall be reinforced, drilled, and tapped in accordance with final approved hardware schedules and templates.

2. Minimum thicknesses for hardware reinforcements shall be as follows:

a. Full mortised hinges and pivots: 0.24 in.

b. Surface-applied maximum security: 0.24 in. plate.

c. Reinforcements for lock fronts, concealed holders, or surface: 0.2 in.

d. Mounted closures: 0.2 in.

e. Internal reinforcements for all other surface-applied hardware: 0.2 in.

3. Hinge and pivot reinforcement shall consist of an 8" long, Pressed formed, 4.5 mm angle that is projection-welded in six (6) places to the face of the door, and additionally plug-welded at each end to the opposite door face sheet, forming a rigid structural angle reinforcement at each hinge. Flat or offset strap reinforcements that are welded to the inside edge of the door or to perimeter channel shall be unacceptable. Reinforcements for mortised hardware occurring in the edge of the door shall be securely welded to the inside of both face sheets of the door.

4 Embedded items shall be mild steel shapes and plate and, where required, shall be 0.2 in. or 0.24 in. thick, and shall comply with ASTM A366

GLASS/GLAZING

Glass Moldings and Stops:

a. Doors shall be provided with steel moldings to secure glazing in accordance with glass sizes and thicknesses shown with a minimum 1" glass engagement.

b. Fixed glass molding shall be not less than 0.01", and shall be spot-welded on the secure side a minimum of 3" o.c.

c. Removable glass stops shall be pressed steel angle not less than 0.14" with tight-fitting mitered corner joints or notched corner joints and secured with #1/4-20 torx pinhead screws spaced 6" o.c. maximum with a maximum spacing of 2" from the ends of the stops.

d. Where glass thickness dictates, 10-gauge, offset surface mounted glass stops shall be used. The corners shall be tight-fitting mitered or notched corners, and the glass stop shall be secured to the face of the door using #1/4-20 torx pinhead screws spaced 6" o.c. maximum with a maximum spacing of 2" from the ends of the stops.

e. Removable glass stops specified in paragraphs 2.3 I.3 and

2.3 I.4 shall meet performance criteria designated in the

performance section of this specification.

f. Removable stops shall be on the side opposite the area of inmate confinement or where they are likely to be unsupervised.

DOOR FRAMES

D. Detention Hollow Metal Frames:

1. Detention hollow metal frames shall be provided by Government and shall be installed by the Contractor.

2. Frames shall be constructed of commercial-quality cold-rolled steel that complies with ASTM A366. The steel shall be free of scale, pitting, coil breaks, or other surface defects. Metal thicknesses shall be 12-gauge or 10-gauge as noted. All exterior frames, and frames used in areas with high humidity shall have a zinc(galvanized) or zinc-iron alloy (galvanneal) coating per HMMA 863-04.

3. Detention door openings 36" wide and wider shall have 10- Gauge hollow metal frames. All other door frames shall be

12 auge.

2. Frames shall be custom-made welded units of the sizes and types shown on approved shop drawings. Finished work shall be strong and rigid, neat in appearance, square, and free of defects, warps, or buckles. Pressed steel members shall be straight and of uniform profile throughout their lengths.

3. Corner joints shall have contact edges closed tight with faces mitered and stops either butted or mitered. Corner joints shall be continuously welded, and the use of gussets or splice plates will be unacceptable.

4. Stops: Minimum depth of stops in door opening shall be 15 mm except at electric locks; the minimum depth of the stop on the lock side of the jamb shall be 1" in lieu of the 0.6". For glass and panel openings, stops shall be 1" minimum glass or panel engagement, or as approved by the security glazing manufacturer, to include rabbeted depth of stops.

5. Frames for multiple openings shall have mullion members that, after fabrication, are closed tubular shaped conforming to profiles shown and having no visible seams or joints. Joints between faces of abutted members shall be continuously welded and finished smooth. Joints between stops of abutted members shall be welded along the depth of the stop and left neat and uniform in appearance.

8. Hardware Reinforcements and Preparation: Frames shall be mortised, reinforced, drilled, and tapped for all templated mortised hardware in accordance with the final approved

Jamb Anchors:

1. Masonry: At each jamb provide 12-gauge floating masonry “TEE” anchors or “UL” strap/stirrup anchors at a maximum spacing of 16" (See Detail D6).

2. Concrete: 12-gauge steel anchors or ½ " X 6" headed studs fully welded to the back side of the frame, with a maximum spacing of 16" (See Detail D6). The use of weld plate embeds for concrete cell construction is prohibited, frames for cells must be cast in place.

3. Pre-finished Masonry and Concrete openings: 0.2" thick steel angles or formed-steel plates, 4" long, welded to back of detention window frames as required to secure frames to embed plates.

4. Embedded Plates: Fabricated from mild steel shapes and plates, minimum 6 mm thick; with minimum ½ " X 4" headed studs welded to back of plate.

5. Floor anchors with two holes for fasteners shall be

Fastened Inside jambs with at least four (4) spot welds per anchor. Where so scheduled, adjustable floor anchors providing not less than 2" height adjustment shall be fastened in place with at least four (4) spot welds per anchor. Thickness of floor anchors shall be 0.2" steel.

6. Provide a 1" stitch weld at 16" centers to secure the window to the embed plate.

a. The use of any other type of jamb anchor requires FBOP approval. For approval to be considered, submit manufacturer’s test data showing that the proposed anchors are equal or superior to the required type.

b. Plaster guards made from no less than 0.02" thick steel shall be welded in place at hardware mortises on frames to be set in masonry or concrete openings.

c. Prepare frame for silencers. Provide three single silencers. For single doors on strike side and two single silencers on frame head at double doors without mullions.

Hardware

E. Detention Hardware:

1. Schedule and templates provided by the hardware supplier.

Where surface-mounted hardware is to be applied, frames shall be reinforced, drilled, and tapped in accordance with final approved hardware schedules and templates.

Minimum thicknesses of hardware reinforcing plates shall be as follows:

a. Hinge and pivot reinforcements – 0.24" x 10" steel plate.

b. Strike reinforcements – 0.2".

c. Closer reinforcements – 0.2".

d. Flush bolt reinforcements – 0.2".

e. Reinforcements for surface-applied hardware – 0.2".

f. Frame reinforcements for glazing stops - 1" x 0.14" continuous around entire opening.

g. Hinge and pivot reinforcements shall consist of 0.24" x 1.5" long straps, projection-welded in a triangle pattern in three (3) places at each end. The strap shall be Additionally reinforced by a 0.01" thick by 2" side angle welded in two (2) places at the center

Of the strap reinforcement and two places to the Inside face of the frame. This additional angle is to Be provided at all hinges.

f. Hinges shall be constructed of a high-grade security steel with 10-gauge plating for mortised or face mounted hinges to meet door rating.

1. All detention grade hollow metal doors 35" or greater in width shall be hung using 4 hinges. (See detail 08 34 63 – D5 for hinge locations.

2. All hinges shall meet the requirements of ASTM F1758

(Grade 2).

3. Each hinge shall be 112 mm x 112 mm (4.4" x 4.4") with

4.7 mm (0.188") thick leaves. Hinge leaves shall be investment cast from 304 stainless steel having a tensile strength of not less than 0.089 MPa (0.01 ksi) of cross-section.

4. Hinge pins shall be stainless steel. Hinge pin shall be fully concealed, non-removable. Hinge pins held in place with set screws is not acceptable.

5. Entire assembly shall be cross pinned at assembly.

6. Hinges shall be finished US32, US32D, or USP-PRIMED, as called for in the hardware schedule.

7. Hinges shall be mounted pinned Torx style heads of appropriate size and length.

LOCK POCKET

Lock pockets on each door must fit one (1) Folder Adams series 80 lock. The lock will be provided and installed by FCI Fairton.

1. Doors containing manual prison locks (80 series) will be flush mounted with the face sheets of the door (refer to detail).

REMOVAL OF EXISTING DOORS AND FRAMES

The contractor shall remove all components of metal framing and doors to include but not limited to metal framing, doors, anchors, masonry block to accommodate the new opening. The existing (old) products will remain the property of the institution unless otherwise approved by the COR.

INSTALLATON OF NEW DOORS AND FRAMES

INSTALLATION

1. The installation will consist of removing and installing two (2) sets of 7’x7’double door with mullion and adjusting the door rough opening as needed to accommodate new door size. NOTE: (Once contract is awarded, a pre construction site visit will be conducted by the contractor and actual measurements of doors, frames and rough openings will be taken and verified by FCI Fairton prior to purchasing material and installation of doors).

A. Installation shall be in accordance with shop drawings and shall be accomplished by skilled workmen. Welding shall be done as indicated in accordance with American Welding Society Publication D1.1.

B. Install frames plumb, square, straight, true, rigidly secured in place, and properly braced. Anchor frames securely to floor and at jambs. Weld field joints, grind smooth, and fill with body putty to completely conceal seams, including those at transom paneling, and to form a smooth, unbroken, finished surface. Frames and mullions shall be filled with grout that has a minimum strength of 25 MPa.

C. Expansion bolts shall not be utilized for the installation of frames in prefinished and existing opening. All other methods of attachment are subject to approval by the FBOP.

contract and the COR.

D. The following standard drawings and/or details are provided as examples of how the requirements for this section can be met. These or other drawings approved by FBOP shall be included in the contract documents for the project.

E. For security reasons, door undercuts shall be a maximum of

¾ ".

FINISH:

1. After fabrication, tool marks and surface blemishes shall Be filled and sanded as required to make both faces and both vertical edges smooth and free from irregularities.

After appropriate preparation, exposed surfaces shall receive two shop coats of a rust-inhibitive primer that meets or exceeds ASTM B117 salt spray for 150 hours and ASTM D1735 water fog test for organic coatings for 200 hours, and that is fully cured prior to shipment.

2. Door manufacturer shall provide drilled and tapped holes for all surface-applied hardware according to approved templates.

3. Final finish coat will be applied by FCI Fairton once all work is completed.

DELIVERY OF MATERIALS

All construction related equipment and materials required for the contractor to work on this project will be processed by the contractor and delivered to the contractors approved storage area. Any construction related deliveries which are delivered on site, can be received by the contractor Monday through Friday, excluding Federal Holidays between the hours of 7:00AM - 3:00PM.

The contractor will be required to notify the COR when a delivery is scheduled, and a contractor representative must be present at time of delivery.

1. Frames shall be provided with two (2) temporary steel Spreaders welded to the feet of jambs to serve as bracing during shipping, handling, and installation.

2. When shipping limitations so dictate, fabricate frames for Large openings in sections designated for splicing in the field by others. Where splicing is necessary, install angle splices at the corners of the profile and extend at least 4" on either side of the joint. Splicing angles shall be the same gauge thickness as the frame.

FINAL INSPECTION AND WARRANTIES:

The contractor at a minimum shall meet manufacturer recommendations, and industry standards set forth in accordance with all federal, state, and local regulations. Upon the completion of the installation, the contractor will inspect and verify all work is completed to the satisfaction of the Contract Officer Representative (COR). The contractor shall warrant its products and labor procured and installed to be free of defects in materials and workmanship for a minimum period of 12 months from the date the system is accepted by the COR. Upon completion of the installation, testing, and acceptance, the contractor shall provide the COR a hardcopy and/or a PDF version maintenance manuals and software manuals.

STORAGE OF TOOLS, MATERIALS, AND EQUIPMENT

Any contractor materials, tools, and/or equipment that will be required to be brought on site for an extended period to expedite the project completion shall be permitted to be stored in a previously approved location agreed upon by the Contract Officer Representative (COR) and the contractor.

Any tool considered a high security risk will be required to exit the institution grounds daily.

CONSTRUCTION PROGRESS MEETINGS

The Contract Officer Representative or Facility Manager reserve the right to require weekly or bi-weekly progress meetings with the contractor(s) project manager to ensure scheduling requirements are met in accordance with this contract. Meetings shall include but not limited to pre-construction meeting(s) progress meeting(s), meeting agenda, minutes, and construction schedule.

DEFINITIONS

The Contract Officer (CO) executes the contract on behalf of the Government; this shall include a duly appointed successor. The Contracting Officer is the only official authorized to administer, modify and/or terminate the contract. The Contracting Officer makes related approvals, determinations, and finding pertaining to the contract and is the only individual on the project staff who can obligate funds on behalf of the Government.

The FCI shall ensure a Contract Officer’s Representative (COR) is present to allow access to all areas by the contractor. The COR will be located at the project site and has overall responsibility for the administration of the operations and activities at the project site. The COR represents the Contract Officer for all technical matters that arise under the contract.

The COR will evaluate the contractor’s performance and prepare a performance report at the end of the contract.

The Contract Officer Representative (COR) shall not and has no authority to re-delegate authority to any other person, change or modify any terms of the contract, obligate the payment of any money by the Government and/or cause the contractor to incur cost not otherwise covered by the contract.

The contractor shall provide to the Contract Officer, (3) three copies of the safety data sheet (SDS) on all materials and substances that may be used during the project. In the event the Institution Safety Manager does not approve the material, it shall be the responsibility of the Contractor to locate and procure an alternative product.

OTHER CONSIDERATION

Lost time due to security restrictions/considerations:

contractors should plan for a certain amount of time accrued for security considerations, i.e., base security checkpoint, check in screening, delays due to inmate movements, institution lockdowns, institution emergencies, institution counts etc. In the event of an institutional emergency, the Contractor will be instructed to secure and stow all tools, equipment and materials, and contractor will be escorted off the institution grounds. Work will be suspended until the institution emergency passes. The work location is considered inside the confines of the secure institution. The institution reserves the right to suspend work for any reason listed above.

Contractor will NOT be allowed to bring weapons, cell phones or any other objects that violate criminal laws or are prohibited by Federal regulations or Bureau of Prisons policies on institution grounds. The Contractor shall be responsible for removing all waste from the institution grounds and disposing of in accordance with all federal, state, and local regulations.

INSTITUTION SECURTIY

The Contractor agrees to adhere to all regulations as outlined in HSPD-12 (Homeland Security Presidential Directive), agrees to adhere to all regulations prescribed by the institution for safety, custody and conduct of staff, contractor workers and inmates. The contractor will be required to complete a limited background investigation through the National Crime Information Center (NCIC). The Contractor may at any time be removed from the institution grounds at the discretion of the Warden.

PAYMENT TERMS

The Contractor must provide a means for electronic payment to include bank routing and account number, payment terms are specified in FAR 52.212-4(g). The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C 3903 and prompt payment regulations at 5 CFR part 1315). The Contractor can however offer discount payment terms for prompt payments as specified in block 12 on the SF 1449 form of this solicitation.

Partial or half sessions will not be authorized for payment.