8. HJZH 22-1009 AF 66 Template.xls

XLS spreadsheet 44 KB Posted

Attached to
Repair JBER-R Gate FDB Federal contract opportunity
Solicitation number
FA500022R0010
Issued by
Department of the Air Force Pacific Air Forces

About this file

This document contains a schedule of material submittals template for the Repair JBER-R Gate FDB project to be performed at Joint Base Elmendorf-Richardson, Alaska. The template lists 16 required submittals including notices, drawings, plans, test results, and other data. It specifies the number of copies required for each submittal, the type of submittal, required submission dates, review and return dates by the contracting and civil engineering offices, follow up dates, and spaces for remarks. Submittals include a notice of start of work, record drawings, design drawings, concrete and asphalt mix designs, utility outage plans, fencing plans, quality control plans, safety data sheets, and compaction and concrete testing results among others. Dates vary by submittal but many are required between notification of award and 30 days after notice to proceed or project completion.

View the file

Other files for this federal contract opportunity

Other files attached to Repair JBER-R Gate FDB, newest first.
File Type Posted
14.a DoD Anti-Ram Vehicle Barrier List.pdf PDF
4. HJZH 22-1009 OPSEC Validation.pdf PDF
10. HJZH 22-1009 Drawings.pdf PDF
9. HJZH 22-1009 Specs and Sow.pdf PDF
12. DD1354-fillable.pdf PDF
3. HJZH 22-1009 Green Procurement Statement.pdf PDF
13. Contractors Fire Safety Guide.pdf PDF
Sources sought new 1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FORM66e.XLM

SCHEDULE OF MATERIALS SUBMITTALSPROJECT NUMBERPROJECT TITLESOLICITATION/CONTRACT NO.
HJZH 22-1009Repair JBER-R Gate FDB
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT PREFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCEDRAWINGSPLANMSDSMANF'R RECOMMENDATIONSREQUEST LETTERCATALOG DATAREPORTSOTHER DATATEST RESULTSREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATEFOLLOW-UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RE-SUBMITTALFINAL APPROVALREMARKS
1Notice of Start of Work110 days prior to start of any work
2Record Drawings130 days after completion of Work
3Design Drawings130 Days after NTP
4Concrete Mix Design130 Days after NTP
5Utility Outages130 Days prior to start of start of work
6Form 3 (Dig Permit)17 Days prior to start of start of work
7Fence Plan1NTP +10 Days
8Quality Control Plan120 Days after NTP
9Material Safety Data Sheet130 days before brought on Base
10Fuel Spill Clean Up Plan130 Days prior to start of start of work
11Compaction Test Result13 Days after completion of test
12Concrete batch testing13 Days after completion of test
13Concrete cylinder break results13 Days after completion of test
14Hot Mix Asphalt1NTP +10 Days
15Base Course13 Days after completion of test
16Tack Coat1NTP +10 Days

&F Page &P Copy_Sheet (a) &CPAGE &P of &N