8. HJZH 22-1009 AF 66 Template.xls
XLS spreadsheet 44 KB Posted
- Attached to
- Repair JBER-R Gate FDB Federal contract opportunity
- Solicitation number
- FA500022R0010
About this file
This document contains a schedule of material submittals template for the Repair JBER-R Gate FDB project to be performed at Joint Base Elmendorf-Richardson, Alaska. The template lists 16 required submittals including notices, drawings, plans, test results, and other data. It specifies the number of copies required for each submittal, the type of submittal, required submission dates, review and return dates by the contracting and civil engineering offices, follow up dates, and spaces for remarks. Submittals include a notice of start of work, record drawings, design drawings, concrete and asphalt mix designs, utility outage plans, fencing plans, quality control plans, safety data sheets, and compaction and concrete testing results among others. Dates vary by submittal but many are required between notification of award and 30 days after notice to proceed or project completion.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 14.a DoD Anti-Ram Vehicle Barrier List.pdf | ||
| 4. HJZH 22-1009 OPSEC Validation.pdf | ||
| 10. HJZH 22-1009 Drawings.pdf | ||
| 9. HJZH 22-1009 Specs and Sow.pdf | ||
| 12. DD1354-fillable.pdf | ||
| 3. HJZH 22-1009 Green Procurement Statement.pdf | ||
| 13. Contractors Fire Safety Guide.pdf | ||
| Sources sought new 1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FORM66e.XLM
| SCHEDULE OF MATERIALS SUBMITTALS | PROJECT NUMBER | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||
| HJZH 22-1009 | Repair JBER-R Gate FDB | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||
| NO. OF COPIES REQUIRED | ||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT PREFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | DRAWINGS | PLAN | MSDS | MANF'R RECOMMENDATIONS | REQUEST LETTER | CATALOG DATA | REPORTS | OTHER DATA | TEST RESULTS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RE-SUBMITTAL | FINAL APPROVAL | REMARKS |
| 1 | Notice of Start of Work | 1 | 10 days prior to start of any work | |||||||||||||||||
| 2 | Record Drawings | 1 | 30 days after completion of Work | |||||||||||||||||
| 3 | Design Drawings | 1 | 30 Days after NTP | |||||||||||||||||
| 4 | Concrete Mix Design | 1 | 30 Days after NTP | |||||||||||||||||
| 5 | Utility Outages | 1 | 30 Days prior to start of start of work | |||||||||||||||||
| 6 | Form 3 (Dig Permit) | 1 | 7 Days prior to start of start of work | |||||||||||||||||
| 7 | Fence Plan | 1 | NTP +10 Days | |||||||||||||||||
| 8 | Quality Control Plan | 1 | 20 Days after NTP | |||||||||||||||||
| 9 | Material Safety Data Sheet | 1 | 30 days before brought on Base | |||||||||||||||||
| 10 | Fuel Spill Clean Up Plan | 1 | 30 Days prior to start of start of work | |||||||||||||||||
| 11 | Compaction Test Result | 1 | 3 Days after completion of test | |||||||||||||||||
| 12 | Concrete batch testing | 1 | 3 Days after completion of test | |||||||||||||||||
| 13 | Concrete cylinder break results | 1 | 3 Days after completion of test | |||||||||||||||||
| 14 | Hot Mix Asphalt | 1 | NTP +10 Days | |||||||||||||||||
| 15 | Base Course | 1 | 3 Days after completion of test | |||||||||||||||||
| 16 | Tack Coat | 1 | NTP +10 Days |