8. 21-1501 - AF 66.pdf

PDF 134 KB Posted

Attached to
Repair Fire Suppression System
Solicitation number
FA500021Q0062
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF FORM 66, OCT 99 Previous Edition Will Be Used

LI

NE

N

UM

BE

R Note: 3 copies required per submittal.

Government will retain all submittals.

Provide an electronic copy for each submittal.

C

ER

TI

F.

O F

C O

M

PL

IA

N

C E

SH

O

P D

R

AW

IN

G

S

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

TU

R

U R

'S R

EC

O

M M

EN

D

AT

IO

N

C

AT

AL

O

G D

AT

A

O &M

R

EC

O M

M

EN

D

AT

IO

N

S

C

AL

C U

LA

TI

O N

S

W

AR

R

AN

TY

D R

AW

IN

G S

R

EP

O R

T

TE

ST

R

ES

U

LT

S

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E

TO

C O

N

TR

AC

TI

N G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

SU

BM

IT

TA

L N

U M

BE

R

S

AP

PR

O

VE

D

D

IS

AP

PR

O

VE

D

C O

N

TR

AC

TO

R S

U

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

NOTES

GENERAL

1 Project Specific Form 66 X NTP + 30 2 Construction Schedule X NTP + 30 3 Contractor's Health, Safety, and Environment Plan X NTP + 30 4 Contractor's QA/QC Plan X NTP + 30 5 Environmental Precon Checklist X NTP + 10

6 HAZMAT Approval, General Specs 01500 X

NLT 14 working days prior to material being brought onto installation

7 HAZMAT Usage Report, General Specs 01500 X NLT 7 Working Days After Final

Acceptance

8 Copy of Engineering License(s) of person or consultancy responsible for design X Design

DESIGN

All submissions to be provided in hard copy and electronically (The electronic submission will include the *.CTB file and any other supporting file required to print the drawing correctly) 65% and 100% Design Drawings to include:

X NTP + 90 (100%)

10 Floor Plan, Elevations, Sections, Schedules, and Details X NTP + 90

11 Fire Supression Layout X NTP + 90

DEMOLITION

12 Demolition Plan X X NTP+30

MECHANICAL/FIRE PROTECTION

13 Piping X X NTP + 90 14 Equipment/'Devices X X NTP + 90

CLOSEOUT

15 O&M maint. data and maint manuals & Manufacturer's Warranty for All Equipment Installed X X Install + 7

16 Equipment Test Results/Balancing Report X X Prior to Project Closeout

17 As Builts (electronic in AutoCAD and hard copies on Mylar) X Final + 7

SOLICITATION /CONTRACT NUMBERPROJECT NAME

Repair Fire Suppression (FSD 1)

B8088

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

PROJECT NUMBER

FXSB 21-1501

Submittal 1

File details come from the government source that posted it. Updated .