8-1. Attachment G - Sample Contract.pdf
PDF 786 KB Posted
- Attached to
- Traffic Signal – Intersection of Ronald W Reagan Blvd and Palmera Ridge Blvd/ Vista Heights Dr
- Solicitation number
- CIPS26-001
- Issued by
- Williamson County, Texas
About this file
This is a Sample Contract Agreement between the City of Leander, Texas and a contractor for construction services related to traffic signal installation at the intersection of Ronald W Reagan Boulevard and Palmera Ridge Boulevard/Vista Heights Drive. The work encompasses capital improvements including installation of temporary erosion control measures, new traffic signals with signal timings, advance flashing beacon assemblies, new curb ramps, and new pavement striping and signage installation. The contract specifies 72 unit price work items with estimated quantities ranging from single installations to thousands of linear feet of conduit, electrical conductors, and traffic signal cable. Substantial completion is required within 90 days from the Notice to Proceed, with final completion and readiness for payment required within 120 days. The engineer for the project is Tetra Tech, formerly RPS, who will serve as the Owner's representative and have designed the improvements.
The contract utilizes a stipulated price structure with compensation based on unit prices multiplied by actual quantities for the identified work items, subject to final adjustment. Liquidated damages are assessed at $1,000 per day for failure to achieve Substantial Completion and $1,000 per day for failure to complete remaining work after Substantial Completion, with damages not imposed concurrently. Progress payments are made monthly at 95 percent of completed work value with 5 percent retainage prior to Substantial Completion, and 80 percent of material and equipment costs not yet incorporated. Upon Substantial Completion, payments increase to 95 percent of work completed less 5 percent for punch list items. Final payment is made upon completion and acceptance. The contract requires performance and payment bonds, evidence of insurance, and compliance with multiple Texas Government Code requirements including anti-boycott certifications regarding Israel, energy companies, and firearm entities. All work must comply with Texas Department of Transportation specifications referenced in the unit price items.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EJCDC® C-520, Agreement between Owner and Contractor for Construction Contract (Stipulated Price).
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
ATTACHMENT G
AGREEMENT BETWEEN OWNER AND CONTRACTOR
FOR CONSTRUCTION CONTRACT (STIPULATED PRICE)
This Agreement is by and between CITY OF LEANDER, a Texas Municipal Corporation (“Owner”) and __________________ (“Contractor”).
Terms used in this Agreement have the meanings stated in the General Conditions and the Supplementary Conditions.
Owner and Contractor hereby agree as follows:
ARTICLE 1—WORK
1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: Capital improvements at the intersection of Ronald W Reagan Blvd and Palmera Ridge Blvd/ Vista Heights Dr including installation of temporary erosion control measures, new traffic signal and signal timings, advance flashing beacon assembly, new curb ramps and new pavement striping and signage installation
ARTICLE 2—THE PROJECT
2.01 The Project, of which the Work under the Contract Documents is a part, is generally described as follows: Traffic Signal for the Intersection of Ronald W Reagan Blvd and Palmera Ridge Blvd/ Vista Heights Dr
ARTICLE 3—ENGINEER
3.01 The Owner has retained Tetra Tech formally RPS (“Engineer”) to act as Owner’s representative, assume all duties and responsibilities of Engineer, and have the rights and authority assigned to Engineer in the Contract.
3.02 The part of the Project that pertains to the Work has been designed by Tetra Tech formally RPS.
ARTICLE 4—CONTRACT TIMES
4.01 Time is of the Essence
A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract.
4.02 Contract Times: Dates
A. The Work will be substantially complete on or before ninety (90) days from the date the Work is required to commence as stated in the Notice to Proceed and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before _one-hundred twenty_(120) days from the date the Work is required to commence as stated in the Notice to Proceed .
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
4.05 Liquidated Damages
A. Contractor and Owner recognize that time is of the essence as stated in Paragraph 4.01 above and that Owner will suffer financial and other losses if the Work is not completed and Milestones not achieved within the Contract Times, as duly modified. The parties also recognize the delays, expense, and difficulties involved in proving, in a legal or arbitration proceeding, the actual loss suffered by Owner if the Work is not completed on time.
Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty):
1. Substantial Completion: Contractor shall pay Owner one-thousand dollars $1,000.00 for each day that expires after the time (as duly adjusted pursuant to the Contract) specified above for Substantial Completion, until the Work is substantially complete.
2. Completion of Remaining Work: After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Times (as duly adjusted pursuant to the Contract) for completion and readiness for final payment, Contractor shall pay Owner one-thousand dollars $1,000.00 for each day that expires after such time until the Work is completed and ready for final payment.
3. Milestones: Contractor shall pay Owner one-thousand dollars $1,000.00 for each day that expires after the time (as duly adjusted pursuant to the Contract) specified above for achievement of Milestone 1, until Milestone 1 is achieved, or until the time specified for Substantial Completion is reached, at which time the rate indicated in Paragraph 4.05.A.1 will apply, rather than the Milestone rate.
4. Liquidated damages for failing to timely attain Milestones, Substantial Completion, and final completion are not additive, and will not be imposed concurrently.
B. If Owner recovers liquidated damages for a delay in completion by Contractor, then such liquidated damages are Owner’s sole and exclusive remedy for such delay, and Owner is precluded from recovering any other damages, whether actual, direct, excess, or consequential, for such delay, except for special damages (if any) specified in this Agreement.
4.06 Special Damages
A. Contractor shall reimburse Owner (1) for any fines or penalties imposed on Owner as a direct result of the Contractor’s failure to attain Substantial Completion according to the Contract Times, and (2) for the actual costs reasonably incurred by Owner for engineering, construction observation, inspection, and administrative services needed after the time specified in Paragraph 4.02 for Substantial Completion (as duly adjusted pursuant to the Contract), until the Work is substantially complete.
B. After Contractor achieves Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Times, Contractor shall reimburse Owner for the actual costs reasonably incurred by Owner for engineering, construction observation, inspection, and administrative services needed after the time specified in Paragraph 4.02 for Work to be completed and ready for final payment (as duly adjusted pursuant to the Contract), until the Work is completed and ready for final payment.
C. The special damages imposed in this paragraph are supplemental to any liquidated damages for delayed completion established in this Agreement.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
ARTICLE 5—CONTRACT PRICE
5.01 Owner shall pay Contractor for completion of the Work in accordance with the Contract Documents, the amounts that follow, subject to adjustment under the Contract:
A. For all Unit Price Work, an amount equal to the sum of the extended prices (established for each separately identified item of Unit Price Work by multiplying the unit price times the actual quantity of that item).
Unit Price Work Item No. Description Spec
Number Unit Estimated Quantity
Unit Price
Extended Price
1 PREPARING ROW
100-7002
(TXDOT)
STA 12 $ $
REMOV CONC (SIDEWALK, RAMP OR
SUP)
104-7013
(TXDOT)
SY 50 $ $
3 REMOVE CONC (GUTTER)
104-7019
(TXDOT) LF 60 $ $
4 FURN & PLACE TOPSOIL (4")
160-7002
(TXDOT)
SY 317 $ $
5 DRILL SEED (PERM_RURAL_CLAY)
164-7010
(TXDOT)
SY 317 $ $
6 VEGETATIVE WATERING
168-7001
(TXDOT)
TGL 30 $ $
7 DRILL SHAFT (TRF SIG POLE) (42 IN)
416-7045
(TXDOT)
LF 18 $ $
8 DRILL SHAFT (TRF SIG POLE) (48 IN)
416-7046
(TXDOT) LF 22 $ $
9 MOBILIZATION (10%)
500-7001 (TxDOT)
LS 1 $ $
BARRICADES, SIGNS AND TRAFFIC
HANDLING
502-7004
(TXDOT)
MO 3 $ $
11 PORTABLE CHANGEABLE MESSAGE SIGN 503-7002
(TXDOT)
DAY 70 $ $
12 TEMP SEDMT CONT FENCE (INSTALL)
506-7039
(TXDOT)
LF 235 $ $
13 TEMP SEDMT CONT FENCE (REMOVE)
506-7041
(TXDOT)
LF 235 $ $
14 CONC CURB (TY I)
529-7001
(TXDOT)
LF 30 $ $
15 CONC CURB (SLOTTED)
529-7013
(TXDOT)
LF 30 $ $
16 CONC SIDEWALKS (5")
531-7002
(TXDOT) SY 86 $ $
17 CONC RAMPS (TY 7)
531-7010
(TXDOT)
EA 4 $ $
18 CONC RAMPS (TY 20)
531-7012
(TXDOT
EA 2 $ $
19 CONDT (PVC) (SCH 40) (2") 618-7030
(TXDOT)
LF 1268 $ $
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Unit Price Work Item No. Description Spec
Number Unit Estimated Quantity
Unit Price
Extended Price
20 CONDT (PVC) (SCH 80) (2") (BORE)
618-7031
(TXDOT)
LF 1260 $ $
21 CONDT (PVC) (SCH 40) (3")
618-7036
(TXDOT) LF 144 $ $
22 CONDT (PVC) (SCH 80) (3") (BORE)
618-7037
(TXDOT)
LF 1188 $ $
23 ELEC CONDR (NO.8) BARE
620-7007
(TXDOT)
LF 1970 $ $
24 ELEC CONDR (NO.8) INSULATED
620-7008
(TXDOT)
LF 1692 $ $
25 ELEC CONDR (NO.6) BARE
620-7009
(TXDOT)
LF 1176 $ $
26 ELEC CONDR (NO.6) INSULATED
620-7010
(TXDOT) LF 1176 $ $
27 GROUND BOX TY D (162922) W/APRON
624-7008
(TXDOT)
EA 12 $ $
28 IN SM RD SN SUP&AM TY10BWG(1)SA(T)
644-7004
(TXDOT)
EA 4 $ $
29 REMOVE SM RD SN SUP&AM 644-7073
(TXDOT)
EA 5 $ $
30 REFL PAV MRK TY I (W)8"(SLD)(100MIL)
666-7024
(TXDOT)
LF 1125 $ $
31 REFL PAV MRK TY I (W)12"(SLD)(100MIL)
666-7030
(TXDOT)
LF 452 $ $
32 REFL PAV MRK TY I (W)24"(SLD)(100MIL)
666-7036
(TXDOT)
LF 145 $ $
33 REFL PAV MRK TY I (W)(ARROW)(100MIL)
666-7042
(TXDOT)
EA 6 $ $
34 REFL PAV MRK TY I (W)(WORD)(100MIL)
666-7066
(TXDOT) EA 6 $ $
35 REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
666-7123
(TXDOT)
LF 80 $ $
36 ALL-WTHER PM TY I (W)4"(SLD)(100MIL)
666-7306
(TXDOT)
LF 2000 $ $
37 ALL-WTHER PM TY I (W)4"(BRK)(100MIL) 666-7307
(TXDOT)
LF 2500 $ $
38 ALL-WTHER PM TY I (Y)4"(SLD)(100MIL)
666-7312
(TXDOT)
LF 2500 $ $
39 REFL PAV MRKR TY I-C
672-7002
(TXDOT) EA 60 $ $
40 REFL PAV MRKR TY II-A-A
672-7004
(TXDOT)
EA 5 $ $
41 REFL PAV MRKR TY II-C-R
672-7006
(TXDOT)
EA 34 $ $
42 ELIM EXT PAV MRK & MRKRS (4") 677-7001
(TXDOT)
LF 6020 $ $
43 ELIM EXT PAV MRK & MRKRS (8")
677-7004
LF 990 $ $
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Unit Price Work Item No. Description Spec
Number Unit Estimated Quantity
Unit Price
Extended Price
44 ELIM EXT PAV MRK & MRKRS (12")
677-7006
(TXDOT)
LF 80 $ $
45 ELIM EXT PAV MRK & MRKRS (24")
677-7008
(TXDOT) LF 160 $ $
46 ELIM EXT PAV MRK & MRKRS (ARROW)
677-7009
(TXDOT)
EA 1 $ $
47 ELIM EXT PAV MRK & MRKRS (WORD)
677-7015
(TXDOT)
EA 1 $ $
48 INSTALL HWY TRF SIG (ISOLATED)
680-7002
(TXDOT)
EA 1 $ $
49 VEH SIG SEC (12”) LED(GRN)
682-7001
(TXDOT)
EA 8 $ $
50 VEH SIG SEC (12”) LED (GRN ARW)
682-7002
(TXDOT) EA 2 $ $
51 VEH SIG SEC (12”) LED(YEL)
682-7003
(TXDOT)
EA 8 $ $
52 VEH SIG SEC (12”) LED (YEL ARW)
682-7004
(TXDOT)
EA 2 $ $
53 VEH SIG SEC (12”) LED(RED) 682-7005
(TXDOT)
EA 8 $ $
54 VEH SIG SEC (12”) LED (RED ARW)
682-7006
(TXDOT)
EA 2 $ $
55 PED SIG SEC (LED)(COUNTDOWN)
682-7018
(TXDOT)
EA 8 $ $
BACKPLATE W/REF BRDR (3 SEC)
(VENT)ALUM
682-7042
(TXDOT)
EA 10 $ $
57 TRF SIG CBL (TY A) (12 AWG) (3 CONDR)
684-7008
(TXDOT)
LF 288 $ $
58 TRF SIG CBL (TY A) (14 AWG) (2 CONDR)
684-7028
(TXDOT) LF 2786 $ $
59 TRF SIG CBL (TY A) (14 AWG) (5 CONDR)
684-7031
(TXDOT)
LF 7327 $ $
60 TRF SIG CBL (TY A) (14 AWG) (7 CONDR)
684-7033
(TXDOT)
LF 616 $ $
61 INSTALL RDSD FLASH BEACON ASSEMBLY 685-7001
(TXDOT)
EA 2 $ $
62 INS TRF SIG PL AM(S)2 ARM (44-32’) LUM
686-7163
(TXDOT)
EA 1 $ $
63 INS TRF SIG PL AM(S)2 ARM (50-44’) LUM
686-7195
(TXDOT) EA 1 $ $
64 PED POLE ASSEMBLY
687-7001
(TXDOT)
EA 7 $ $
65 PED DETECT PUSH BUTTON (APS)
688-7001
(TXDOT)
EA 8 $ $
66 PED DETECTOR CONTROLLER UNIT 688-7003
(TXDOT)
EA 1 $ $
67 VIVDS CAM ASSY VAR LNS
6006-7003
EA 2 $ $
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Unit Price Work Item No. Description Spec
Number Unit Estimated Quantity
Unit Price
Extended Price
RVDS (PRESENCE AND ADVANCE
DETECTION)
6008-7003
(TXDOT)
EA 2 $ $
ULTRADISH TP 27 PARABOLIC DISH
ANTENNA W/ TWISTPORT CONNECTOR
6043-7001
(TXDOT) EA 1 $ $
70 STREET SIGN 401-1 (COL) EA 2 $ $
71 STABILIZED CONSTRUCTION ENTRANCE
641S-1
(COA)
EA 3 $ $
INSTALL RED-LIGHT CONFIRMATION
LIGHT SYSTEM
9000 (COL)
EA 1 $ $
Total of all Extended Prices for Unit Price Work (subject to final adjustment based on actual quantities) $
The extended prices for Unit Price Work set forth as of the Effective Date of the Contract are based on estimated quantities. As provided in Paragraph 13.03 of the General Conditions, estimated quantities are not guaranteed, and determinations of actual quantities and classifications are to be made by Engineer.
B. Total of Lump Sum Amounts and Unit Price Work (subject to final Unit Price adjustment) $[number].
C. For all Work, at the prices stated in Contractor’s Bid, attached hereto as an exhibit.
ARTICLE 6—PAYMENT PROCEDURES
6.01 Submittal and Processing of Payments
A. Contractor shall submit Applications for Payment in accordance with Article 15 of the General Conditions. Applications for Payment will be processed by Owner and Engineer as provided in the General Conditions.
6.02 Progress Payments; Retainage
A. Owner shall make progress payments on the basis of Contractor’s Applications for Payment on or about the 30th day from Owner approval of Application for Payment of each month during performance of the Work as provided in Paragraph 6.02.A.1 below, provided that such Applications for Payment have been submitted in a timely manner and otherwise meet the requirements of the Contract. All such payments will be measured by the Schedule of Values established as provided in the General Conditions or, as may be provided elsewhere in the Contract.
1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below but, in each case, less the aggregate of payments previously made and less such amounts as Owner may withhold, including but not limited to liquidated damages, in accordance with the Contract.
a. Ninety-Five (95) percent of the value of the Work completed (with the balance being retainage).
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
b. Eighty (80) percent of cost of materials and equipment not incorporated in the Work (with the balance being retainage).
B. Upon Substantial Completion, Owner shall pay an amount sufficient to increase total payments to Contractor to Ninety-Five (95) percent of the Work completed, less such amounts set off by Owner pursuant to Paragraph 15.01.E of the General Conditions, and less Five (5) percent of Engineer’s estimate of the value of Work to be completed or corrected as shown on the punch list of items to be completed or corrected prior to final payment.
6.03 Final Payment
A. Upon final completion and acceptance of the Work, Owner shall pay the remainder of the Contract Price in accordance with Paragraph 15.06 of the General Conditions.
6.04 Consent of Surety
A. Owner will not make final payment, or return or release retainage at Substantial Completion or any other time, unless Contractor submits written consent of the surety to such payment, return, or release.
6.05 Interest
A. All amounts not paid when due will bear interest at the rate of 4.25% percent per annum.
ARTICLE 7—CONTRACT DOCUMENTS
7.01 Contents
A. The Contract Documents consist of all of the following:
1. This Agreement.
2. Bonds:
a. Performance bond (together with power of attorney).
b. Payment bond (together with power of attorney).
3. Evidence of Insurance
4. Standard General Conditions. Edits highlighted.
5. City of Leander Standard Definitions, Terms and Conditions
6. Specifications as listed in the table of contents of the project manual (copy of list attached).
7. Drawings listed on the attached sheet index.
8. IFB Bid documents.
9. Addenda No. _________
10. Addenda No. _________
11. The following which may be delivered or issued on or after the Effective Date of the Contract and are not attached hereto:
a. Notice to Proceed.
b. Work Change Directives.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
c. Change Orders.
d. Field Orders.
e. Project Schedule
e. Warranty Bond, if any.
B. The Contract Documents listed in Paragraph 7.01.A are attached to this Agreement (except as expressly noted otherwise above) and the terms and conditions of the Contract Documents are incorporated by reference and made part of this Agreement.
C. There are no Contract Documents other than those listed above in this Article 7.
D. The Contract Documents may only be amended, modified, or supplemented as provided in the Contract.
ARTICLE 8—REPRESENTATIONS, CERTIFICATIONS, AND STIPULATIONS
8.01 Contractor’s Representations
A. In order to induce Owner to enter into this Contract, Contractor makes the following representations:
1. Contractor has examined and carefully studied the Contract Documents, including Addenda.
2. Contractor has visited the Site, conducted a thorough visual examination of the Site and adjacent areas, and become familiar with the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
3. Contractor is familiar with all Laws and Regulations that may affect cost, progress, and performance of the Work.
4. Contractor has carefully studied the reports of explorations and tests of subsurface conditions at or adjacent to the Site and the drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, with respect to the Technical Data in such reports and drawings.
5. Contractor has carefully studied the reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, with respect to Technical Data in such reports and drawings.
6. Contractor has considered the information known to Contractor itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Contract Documents; and the Technical Data identified in the Supplementary Conditions or by definition, with respect to the effect of such information, observations, and Technical Data on (a) the cost, progress, and performance of the Work; (b) the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor; and (c) Contractor’s safety precautions and programs.
7. Based on the information and observations referred to in the preceding paragraph, Contractor agrees that no further examinations, investigations, explorations, tests, Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract.
8. Contractor is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents.
9. Contractor has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Contractor has discovered in the Contract Documents, and of discrepancies between Site conditions and the Contract Documents, and the written resolution thereof by Engineer is acceptable to Contractor.
10. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.
11. Contractor’s entry into this Contract constitutes an incontrovertible representation by Contractor that without exception all prices in the Agreement are premised upon performing and furnishing the Work required by the Contract Documents.
8.02 Contractor’s Certifications
A. Contractor certifies that it has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for or in executing the Contract. For the purposes of this Paragraph 8.02:
1. “corrupt practice” means the offering, giving, receiving, or soliciting of anything of value likely to influence the action of a public official in the bidding process or in the Contract execution;
2. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process or the execution of the Contract to the detriment of Owner,
(b) to establish Bid or Contract prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition;
3. “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish Bid prices at artificial, non-competitive levels; and
4. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract.
8.03 Standard General Conditions
A. Owner stipulates that if the General Conditions that are made a part of this Contract are EJCDC® C-700, Standard General Conditions for the Construction Contract (2018), published by the Engineers Joint Contract Documents Committee, and if Owner is the party that has furnished said General Conditions, then Owner has plainly shown all modifications to the standard wording of such published document to the Contractor, through a process such as highlighting or “track changes” (redline/strikeout), or in the Supplementary Conditions.
B. Although drawn by Owner, both parties hereto expressly agree and assert that in the event of any dispute over its meaning or application, this Agreement shall be interpreted reasonably and fairly, and neither more strongly for nor against either party.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
C. This Agreement is to be governed by and shall be construed in accordance with the laws of the State of Texas without regard to conflicts of law principles, thereof. Proper venue for any dispute or litigation shall be only in Williamson County, Texas.
D. This Agreement and all rights and obligations contained herein may not be assigned by Contractor without the prior written approval of the City. However, Contractor shall have the right to employ such assistance as may be required for the performance of the project, including the use of subcontractors, which employment shall not be deemed an assignment of the Contractors’ rights and duties hereunder.
E. To the extent this Agreement constitutes a contract for goods or services within the meaning of Section 2270.002 of the Texas Government Code, as amended, solely for purposes of compliance with Chapter 2270 of the Texas Government Code, and subject to applicable Federal law, Contractor represents that neither Contractor nor any wholly owned subsidiary, majority-owned subsidiary, parent company or affiliate of Contractor (i) boycotts Israel or (ii) will boycott Israel through the term of this Agreement. The terms “boycotts Israel” and “boycott Israel” as used in this paragraph have the meanings assigned to the term “boycott Israel” in Section 808.001 of the Texas Government Code, as amended.
F. To the extent this Agreement constitute a governmental contract within the meaning of Section 2252.151 of the Texas Government Code, as amended, solely for purposes of compliance with Chapter 2252 of the Texas Government Code, and except to the extent otherwise required by applicable federal law, Contractor represents that Contractor nor any wholly owned subsidiary, majority-owned subsidiary, parent company or affiliate of Contractor is a company listed by the Texas Comptroller of Public Accounts under Sections 2270.0201, or 2252.153 of the Texas Government Code.
G. Contractor hereby verifies that it and its parent company, wholly- or majority-owned subsidiaries, and other affiliates, if any, do not boycott energy companies and will not boycott energy companies during the term of this Agreement. The foregoing verification is made solely to comply with Section 2274.002, Texas Government Code, and to the extent such Section is not inconsistent with a governmental entity’s constitutional or statutory duties related to the issuance, incurrence, or management of debt obligations or the deposit, custody, management, borrowing, or investment of funds. As used in the foregoing verification, "boycott energy company" means, without an ordinary business purpose, refusing to deal with, terminating business activities with, or otherwise taking any action that is intended to penalize, inflict economic harm on, or limit commercial relations with a company because the company: (A) engages in the exploration, production, utilization, transportation, sale, or manufacturing of fossil fuel-based energy and does not commit or pledge to meet environmental standards beyond applicable federal and state law; or (B) does business with a company described by the preceding statement in (A).
H. Contractor hereby verifies that it and its parent company, wholly- or majority-owned subsidiaries, and other affiliates, if any, do not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association and will not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association during the term of this Agreement. The foregoing verification is made solely to comply with Section 2274.002, Texas Government Code. As used in the foregoing verification, “discriminate against a firearm entity or firearm trade association” means: (i) refuse to engage in the trade of any goods or services with the entity or association based
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
solely on its status as a firearm entity or firearm trade association; (ii) refrain from continuing an existing business relationship with the entity or association based solely on its status as a firearm entity or firearm trade association; or (iii) terminate an existing business relationship with the entity or association based solely on its status as a firearm entity or firearm trade association; but does not include (a) the established policies of a merchant, retail seller, or platform that restrict or prohibit the listing or selling of ammunition, firearms, or firearm accessories; or (b) a company's refusal to engage in the trade of any goods or services, decision to refrain from continuing an existing business relationship, or decision to terminate an existing business relationship to comply with federal, state, or local law, policy, or regulations or a directive by a regulatory agency; or for any traditional business reason that is specific to the customer or potential customer and not based solely on an entity's or association's status as a firearm entity or firearm trade association.
I. Texas law requires that business entities, as defined in Texas Government Code, Section 2252.908, who contract with the City complete the on-line of Form 1295 "Certificate of Interested Parties" as promulgated by the Texas Ethics Commission (https://www.ethics.state.tx.us/filinginfo/1295/). Form 1295 is also required for any and all contract amendments, extensions or renewals. Prior to any payment to Contractor hereunder, Contractor shall provide proof of submission to the City Secretary that the appropriate Form 1295 documentation has been submitted.
J. Pursuant to Subchapter J, Chapter 552, Texas Government Code, Contractor shall:
i. Preserve all contracting information related to the Agreement as provided by the records retention requirements applicable to the City for the duration of the Agreement;
ii. Promptly provide to the City any contracting information related to the Agreement that is in the custody or possession of the entity on request of the City; and
iii. On completion of the Agreement, either:
1. Provide at no cost to the City all contracting information related to the Agreement that is in the custody or possession of the Contractor; or
2. Preserve the contracting information related to the Agreement as provided by the records retention requirements applicable to the governmental body.
The requirements of Subchapter J, Chapter 552, Texas Government Code, may apply to this Agreement and the Contractor agrees that the Agreement can be terminated if the Contractor knowingly or intentionally fails to comply with a requirement of that subchapter. "Contracting information" includes, but is not limited to, records, communications and other documents related to the bid process, contract, payments, receipts, scope of work/services, and performance."
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
IN WITNESS WHEREOF, Owner and Contractor have signed this Agreement.
This Agreement will be effective on the date of the last signature and full execution of this agreement.
Owner: Contractor:
CITY OF LEANDER
(typed or printed name of organization) (typed or printed name of organization)
By: By:
(individual’s signature) (individual’s signature) Date: Date:
(date signed) (date signed) Name: Todd Parton Name:
(typed or printed) (typed or printed)
Title: City Manager Title:
(typed or printed) (typed or printed)
(If [Type of Entity] is a corporation, a partnership, or a joint venture, attach evidence of authority to sign.)
Attest: Attest:
(individual’s signature) (individual’s signature) Title: Title:
Address for giving notices: Address for giving notices:
Designated Representative: Designated Representative:
Name: Name:
(typed or printed) (typed or printed)
Title: Title:
Address: Address:
Phone: Phone:
Email: Email:
License No.:
(where applicable)
State:
File details come from the government source that posted it. Updated .