8-1. Attachment F – Construction Plans.pdf
PDF 47 MB Posted
- Attached to
- City Park Parking Lot Expansion
- Solicitation number
- S2026-003
- Issued by
- Upton County, Texas
About this file
This is a construction plans document for the City of Liberty Hill, Texas, prepared by Kimley-Horn and Associates, Inc., detailing the City Park parking lot expansion project. The project involves the construction of approximately 103,900 square feet of concrete parking, 18,400 square feet of concrete sidewalk, curb ramps, site lighting, earthwork, landscaping and irrigation systems, erosion control measures, storm sewer infrastructure, a water quality pond, and related site improvements at 251 County Road 200 in Liberty Hill, Texas. The plans encompass 22.87 acres with total proposed impervious cover of 5.02 acres and include specifications for utility relocations, pavement construction, drainage systems, and landscape restoration. The construction documents include comprehensive civil, landscape, and electrical plans with detailed specifications for materials, installation procedures, testing requirements, and compliance with local codes including Edwards Aquifer Protection Program regulations and American Disabilities Act standards.
The project specifications require contractors to comply with City of Liberty Hill standards and City of Round Rock specifications, with all materials and construction methods subject to inspection and approval by city representatives. The contractor is responsible for securing all required permits, coordinating utility locations through Texas 811, performing materials testing through an approved independent laboratory, and maintaining erosion and sedimentation controls throughout construction. Key infrastructure elements include a water quality pond with 16,111 cubic feet of storage volume, storm sewer lines ranging from 18 inches to 36 inches in diameter, an estimated 740 linear feet of storm sewer installation, site lighting with multiple fixtures rated for parking area illumination, and landscaping incorporating native Texas species including live oaks, cedar elms, and crape myrtles. The plans indicate provision for both a base bid and alternative bid scope for additional parking lot areas, with the contractor responsible for all labor, materials, equipment, surveying, and quality assurance testing at no additional cost to the City.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AUSTIN, TEXAS 78759
10814 JOLLYVILLE ROAD, AVALLON IV, SUITE 200 Tel. No.
Fax No.
(512) 418-1771
(512) 418-1791
CERTIFICATE OF REGISTRATION #928
PREPARED BY:
LIBERTY HILL CITY PARK
PARKING LOT
EXPANSION
FOR
251 CO RD 200, LIBERTY HILL, TX 78642
PROJECT
LOCATION
SCALE: 1" = 1,000'
VICINITY MAP
CIVIL SITE DEVELOPMENT PLANS
ROBYN MIGA, DIRECTOR OF PLANNING AND DEVELOPMENT DATE
APPROVED BY:
TX
-2
LOOP 332
TX
-2
CO. RD. 200
OWNER
CITY OF LIBERTY HILL
PARKS AND RECREATION
926 MAIN STREET
LIBERTY HILL, TX 78642
PHONE: 512-778-5449
CONTACT: JACOB PARSONS
CIVIL ENGINEER
KIMLEY-HORN AND ASSOCIATES, INC.
10814 JOLLYVILLE ROAD
AVALLON IV, SUITE 200
AUSTIN, TX 78759
(512) 418-1771
CONTACT: LANCE ORITI, P.E.
LANDSCAPE ARCHITECT
KIMLEY-HORN AND ASSOCIATES, INC.
5301 SOUTHWEST PARKWAY
SUITE 100, BUILDING 2
AUSTIN, TX 78735
(512) 646-2237
CONTACT: AUSTIN POWERS, PLA
SURVEYOR
KIMLEY-HORN AND ASSOCIATES, INC.
10814 JOLLYVILLE ROAD
AVALLON IV, SUITE 200
AUSTIN, TX 78759
(512) 418-1771
CONTACT: MIKE MONTGOMERY, RPLS
SHEET INDEX
SHEET NO. DESCRIPTION
C-1.0
CIVIL ENG. PLANS
COVER SHEET
CITY OF LIBERTY HILL & TCEQ NOTES
KIMLEY HORN GENERAL NOTES
EXISTING CONDITIONS AND DEMOLITION PLAN
EROSION CONTROL PLAN
EROSION CONTROL DETAILS
SITE AND DIMENSION CONTROL PLAN
GRADING PLAN
GRADING PLAN - ALTERNATE BID
EXISTING DRAINAGE AREA MAP
PROPOSED DRAINAGE AREA MAP
INLET DRAINAGE AREA MAP
STORM SEWER PLAN
WATER QUALITY POND PLAN
CONSTRUCTION DETAILS
I, THE UNDERSIGNED PROFESSIONAL ENGINEER IN THE STATE OF TEXAS, DO HEREBY CERTIFY, TO
THE BEST OF MY KNOWLEDGE, THAT ALL REQUIRED DOCUMENTS ARE ACCURATE AND COMPLETE
AND THAT THE PROVISIONS CONTAINED ON THIS PLAN COMPLY WITH THE DEVELOPMENT
ORDINANCES AND DRAINAGE POLICIES ADOPTED BY THE CITY OF LIBERTY HILL AND OTHER FEDERAL, STATE, COUNTY, AND LOCAL REGULATIONS IN EFFECT ON THIS DATE.
DATED:
LANCE R. ORITI, P.E.
KIMLEY--HORN AND ASSOCIATES, INC
10814 JOLLYVILLE ROAD, AVALLON IV, SUITE 200
AUSTIN TX 78759
CERTIFICATE OF REGISTRATION #928
N O
R
TH
CITY
APPROVAL
REVISION BLOCK
NO. DESCRIPTION DATE
APPROVED
N o.
R
EV
IS
IO
N S
BY
D
AT
E
SHEET NUMBER
D
AT
E
AS
S
H O
W N
C H
EC
KE
D B
Y:
SC
AL
E:
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
KH
A
PR
O
JE
C
T
AP
R
IL
AP
LR
O
AJ
L
Know what'sbelow.
before you dig.Call
4/14/2026
L
IB
ER
TY
H
IL
L C
IT
Y
PA
R
K
PA
R
KI
N G
L O
T
EX
PA
N
SI
O
N C
IT
Y
PR
O
JE
C
T.
N
O . 2
5-
-S
D P
C O
R D
L
IB
ER
TY
H
IL
L, T
EX
AS
W
IL
LI
AM
SO
N C
O U
N
TY
CITY PROJECT. NO. 2025-15-SDP
C O
VE
R
S H
EE
T
C-1.0
C-2.0 C-2.1 C-3.0 C-4.0 C-4.1
C-9.0 C-9.1
C-5.0 C-6.0 C-7.0 C-8.0
C-10.0
C-11.1
C-12.0 C-13.0
CAP. METRO RAIL
PAVING AND STRIPING PLAN
WATER QUALITY POND DETAILSC-11.2
WATER QUALITY DRAINAGE AREA MAPC-11.0
SHEET NO. DESCRIPTION
L-0.1
LANDSCAPE ARCH. PLANS
SHEET NO. DESCRIPTION
E1.0
ELECTRIC & PHOTOMETRIC PLANS
L-1.0 L-1.1 L-1.2 L-1.3 L-2.0 L-5.0 L-5.1 L-5.2 L-5.3 L-6.0
OVERALL PLAN
LANDSCAPE SCHEDULE
LANDSCAPE PLAN
LANDSCAPE PLAN
LANDSCAPE PLAN
LANDSCAPE DETAILS
IRRIGATION NOTES
IRRIGATION PLAN
IRRIGATION PLAN
IRRIGATION PLAN
IRRIGATION DETAILS
E2.0 E3.0
PHOTOMETRIC PLAN (1 OF 2)
PHOTOMETRIC PLAN (2 OF 2)
PHOTOMETRIC DETAILS
4/14/2026
JENNIFER GLAESS P.E., CITY ENGINEER DATE
PROJECT DATA SUMMARY:
ZONING = PARK
PROPOSED USE = PARK
AREA = 22.87 ACRES
EX. BUILDING IMPERVIOUS COVER = 0.17 AC.
TOTAL IMPERVIOUS COVER = 5.02 AC.
LEGAL DESCRIPTION:
22.87 ACRES OF LAND OUT OF THE RICHARD WEST
SURVEY, ABSTRACT NO. 643, WILLIAMSON COUNTY,
TEXAS, MORE PARTICULARLY DESCRIBED AS
PROPERTY IN THE DONOR'S WARRANTY DEED
RECORDED IN DOCUMENT NO. 2004038173, OFFICIAL
PUBLIC RECORDS, WILLIAMSON COUNTY, TEXAS.
FUTURE LAND USE CATEGORY:
INTERCONNECTED NEIGHBORHOOD
UTILITY PROVIDERS:
WATER: CITY OF LIBERTY HILL
WASTEWATER: CITY OF LIBERTY HILL
ELECTRIC: PEDERNALES ELECTRIC COOPERATIVE, INC.
C-1.1 LEGAL LOT VERIFICATION LETTER
NOTES:
1. IT IS THE RESPONSIBILITY OF THE SIGNING/SEALING
ENGINEER TO PROVIDE DOCUMENTATION OF TDLR
APPROVAL PRIOR TO THE PRE-CONSTRUCTION MEETING.
2. THE CITY OF LIBERTY HILL HAS NOT REVIEWED THESE
PLANS FOR COMPLIANCE WITH THE AMERICANS WITH
DISABILITIES ACT. ALL SIDEWALKS SHALL COMPLY WITH
THE AMERICANS WITH DISABILITIES ACT. IT IS THE
RESPONSIBILITY OF THE OWNER TO PROVIDE COMPLIANCE
WITH ALL LEGISLATION RELATED TO ACCESSIBILITY WITHIN
THE LIMITS OF CONSTRUCTION SHOWN IN THESE PLANS.
3. ADEQUACY OF THESE PLANS FOR CONSTRUCTION IS THE
RESPONSIBILITY OF THE SIGNING/SEALING ENGINEER.
RELATED APPROVALS REQUIRED:
1. TCEQ CONTRIBUTING ZONE PLAN
2. TEXAS DEPARTMENT OF LICENSING AND REGULATIONS (TLDR)
APPLICATION #: TABS2026014033
E4.0 E5.0 E6.0
ELECTRICAL DETAILS
ELECTRICAL SITE PLAN (2 OF 2)
ELECTRICAL SITE PLAN (1 OF 2)
4-22-26
4-23-26
Approved by the City of Liberty Hill
04/23/2026 2:32:39 PM
N o.
R
EV
IS
IO
N S
BY
D
AT
E
SHEET NUMBER
D
AT
E
AS
S
H O
W N
C H
EC
KE
D B
Y:
SC
AL
E:
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
KH
A
PR
O
JE
C
T
M
AR
C H
6 AP
LR
O
AJ
L
Know what'sbelow.
before you dig.Call
L
IB
ER
TY
H
IL
L C
IT
Y
PA
R
K
PA
R
KI
N G
L O
T
EX
PA
N
SI
O
N C
IT
Y
PR
O
JE
C
T.
N
O . 2
5-
-S
D P
C O
R D
L
IB
ER
TY
H
IL
L, T
EX
AS
W
IL
LI
AM
SO
N C
O U
N
TY
CITY PROJECT. NO. 2025-15-SDP
LE
G
AL
L
O T
VE
R
IF
IC
AT
IO
N
LE
TT
ER
C-1.1Approved by the City of
04/23/2026 2:32:39 PM
CITY OF LIBERTY HILL GENERAL NOTES FOR SITE PLANS AND STORM WATER PERMITS:
o.
R
EV
IS
IO
N S
BY
D
AT
E
SHEET NUMBER
D
AT
E
AS
S
H O
W N
C H
EC
KE
D B
Y:
SC
AL
E:
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
KH
A
PR
O
JE
C
T
M
AR
C H
6 AP
LR
O
AJ
L
Know what'sbelow.
before you dig.Call
3/25/2026
L
IB
ER
TY
H
IL
L C
IT
Y
PA
R
K
PA
R
KI
N G
L O
T
EX
PA
N
SI
O
N C
IT
Y
PR
O
JE
C
T.
N
O . 2
5-
-S
D P
C O
R D
L
IB
ER
TY
H
IL
L, T
EX
AS
W
IL
LI
AM
SO
N C
O U
N
TY
CITY PROJECT. NO. 2025-15-SDP
C
IT
Y O
F
LI
BE
R
TY
H
IL
L
TC
EQ
N
O
TE
S
C-2.0
GENERAL
1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE CITY OF ROUND ROCK STANDARD
SPECIFICATIONS MANUAL.
2. ANY EXISTING UTILITIES, PAVEMENT, CURBS, SIDEWALKS, STRUCTURES, TREES, ETC., NOT PLANNED
FOR DESTRUCTION OR REMOVAL THAT ARE DAMAGED OR REMOVED SHALL BE REPAIRED OR
REPLACED AT THE CONTRACTOR’S EXPENSE.
3. THE CONTRACTOR SHALL VERIFY ALL DEPTHS AND LOCATIONS OF EXISTING UTILITIES PRIOR TO
ANY CONSTRUCTION. ANY DISCREPANCIES WITH THE PLANS FOUND IN THE FIELD SHALL BE
BROUGHT IMMEDIATELY TO THE ATTENTION OF THE ENGINEER, WHO SHALL BE RESPONSIBLE FOR
REVISING THE PLANS AS APPROPRIATE. FAILURE TO COMPLETE THIS STEP PRIOR TO THE
COMMENCEMENT OF CONSTRUCTION MAY RESULT IN SIGNIFICANT DELAYS AND/OR EXPENDITURES
FOR WHICH THE CITY SHALL NOT BE HELD LIABLE.
4. MANHOLE FRAMES, COVERS, VALVES, CLEANOUTS, ETC., SHALL BE RAISED TO FINISHED GRADE
PRIOR TO FINAL PAVING CONSTRUCTION.
5. THE CONTRACTOR SHALL GIVE THE CITY OF LIBERTY HILL PLANNING AND DEVELOPMENT
DEPARTMENT 48 HOURS’ NOTICE BEFORE BEGINNING EACH PHASE OF CONSTRUCTION BY BOTH
CALLING (512) 548-5519 AND EMAILING PLANNING@LIBERTYHILLTX.GOV.
6. ALL AREAS DISTURBED OR EXPOSED DURING CONSTRUCTION SHALL BE REVEGETATED IN
ACCORDANCE WITH THE PLANS AND SPECIFICATIONS. THIS INCLUDES ANY AREAS LOCATED
OUTSIDE OF THE DEFINED LIMITS OF CONSTRUCTION (LOC), IN RIGHTS-OF-WAY (ROW), OR LOCATED
ON ADJACENT PROPERTIES.REVEGETATION OF ALL DISTURBED OR EXPOSED AREAS SHALL
CONSIST OF SODDING OR SEEDING, AT THE CONTRACTOR'S OPTION. HOWEVER, THE TYPE OF
REVEGETATION MUST EQUAL OR EXCEED THE TYPE OF VEGETATION PRESENT BEFORE
CONSTRUCTION.
7. PRIOR TO ANY CONSTRUCTION, THE ENGINEER SHALL CONVENE A PRECONSTRUCTION
CONFERENCE BETWEEN THE CITY OF LIBERTY HILL, HIMSELF, THE CONTRACTOR, OTHER UTILITY
COMPANIES, ANY AFFECTED PARTIES, AND ANY OTHER ENTITY THE CITY OR ENGINEER MAY
REQUIRE.
8. THE ENGINEER SHALL FURNISH THE CITY OF LIBERTY HILL WITH ACCURATE "AS-BUILT" DRAWINGS
FOLLOWING THE COMPLETION OF ALL CONSTRUCTION. THE CONTRACTOR AND THE ENGINEER
SHALL KEEP ACCURATE RECORDS OF ALL CONSTRUCTION THAT DEVIATES FROM THE PLANS.
THESE "AS-BUILT" DRAWINGS SHALL MEET ALL APPLICABLE REQUIREMENTS TO THE SATISFACTION OF THE CITY ENGINEER PRIOR TO FINAL SITE INSPECTION APPROVAL. CHANGES TO APPROVED, CONSTRUCTION-STAMPED PLANS SHALL REQUIRE AN APPROVED SITE PLAN OR STORMWATER
PERMIT AMENDMENT THAT IS APPROVED BY THE CITY PRIOR TO FIELD USE.
9. THE CITY OF LIBERTY HILL SHALL NOT BE PETITIONED FOR APPROVAL UNTIL ALL NECESSARY
EASEMENT DOCUMENTS HAVE BEEN SIGNED AND RECORDED.
10. WHEN CONSTRUCTION IS BEING CARRIED OUT WITHIN EASEMENTS, THE CONTRACTOR SHALL
CONFINE CONTRACTOR’S WORK TO WITHIN THE PERMANENT AND ANY TEMPORARY EASEMENTS.
PRIOR TO FINAL APPROVAL, THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING ALL TRASH AND DEBRIS WITHIN THE PERMANENT AND TEMPORARY EASEMENTS. CLEAN-UP SHALL BE TO THE
SATISFACTION OF THE CITY ENGINEER AND/OR DIRECTOR OF PUBLIC WORKS.
11. PRIOR TO ANY CONSTRUCTION, THE CONTRACTOR SHALL APPLY FOR AND SECURE ALL PROPER
PERMITS FROM THE APPROPRIATE AUTHORITIES.
12. PRIOR TO FINAL SITE INSPECTION APPROVAL, THE ENGINEER/DEVELOPER/OWNER SHALL SUBMIT TO THE PLANNING AND DEVELOPMENT DEPARTMENT DOCUMENTATION THAT THE SITE WAS INSPECTED
BY A TDLR OR A REGISTERED ACCESSIBILITY SPECIALIST (RAS) AND THAT THE SITE IS IN
COMPLIANCE WITH THE REQUIREMENTS OF THE TABA.
13. AVAILABLE PERMANENT BENCHMARKS WITH VERTICAL DATUM INFORMATION THAT MAY BE UTILIZED
FOR THE CONSTRUCTION OF THIS PROJECT ARE DESCRIBED AS FOLLOWS:
DATUM IS NAVD '88, USING GEOID 18, BASED ON GPS OBSERVATIONS.
BM #101 MAG NAIL SET IN THE NORTH END OF A WESTERLY WATER VAULT . ± 35-FEET SOUTH OF
THE NORTH ENTRANCE TO THE CITY PARK. (ELEV.=1055.62').
BM #102 MAG NAIL SET IN THE TOP OF A STORM DRAIN HEADWALL, IN THE WEST RIGHT-OF-WAY OF FM 200. ±115-FEET SOUTH OF THE SOUTHER ENTRANCE TO THE CITY PARK.(ELEV.=1052.57')
14. THE CITY OF LIBERTY HILL HAS NOT REVIEWED THESE PLANS FOR COMPLIANCE WITH THE AMERICANS WITH DISABILITIES ACT (ADA). IT IS THE RESPONSIBILITY OF THE OWNER TO PROVIDE
COMPLIANCE WITH ALL LEGISLATION RELATED TO ACCESSIBILITY WITHIN THE LIMITS OF
CONSTRUCTION SHOWN IN THESE PLANS.
15. NO IMPROVEMENTS OR INFRASTRUCTURE PROPOSED WITHIN THIS APPLICATION WILL BE
CONSIDERED FOR DEDICATION AND/OR ACCEPTANCE BY THE CITY OF LIBERTY HILL. ALL
IMPROVEMENTS WITHIN THIS PLAN SET SHALL BE DEEMED PRIVATE AND PRIVATELY MAINTAINED.
SHOULD ANY DRAWINGS OR PLANS WITHIN THIS APPLICATION INDICATE OTHERWISE, THIS NOTE
SHALL CONTROL.
16. ALL RESPONSIBILITY FOR THE ADEQUACY OF THESE PLANS REMAINS WITH THE ENGINEER WHO PREPARED THEM. IN REVIEWING THESE PLANS, THE CITY OF LIBERTY HILL MUST RELY ON THE
ADEQUACY OF THE WORK OF THE DESIGN ENGINEER.
17. CONTRACTORS ON SITE SHALL HAVE AN APPROVED SET OF PLANS AT ALL TIMES. FAILURE TO HAVE
AN APPROVED PLAN SET MAY RESULT IN A STOP WORK ORDER.
TRENCH SAFETY NOTES
1. IN ACCORDANCE WITH THE LAWS OF THE STATE OF TEXAS AND THE U. S. OCCUPATIONAL SAFETY
AND HEALTH ADMINISTRATION REGULATIONS, ALL TRENCHES OVER 5 FEET IN DEPTH, IN EITHER HARD AND COMPACT OR SOFT AND UNSTABLE SOIL, SHALL BE SLOPED, SHORED, SHEETED, BRACED OR OTHERWISE SUPPORTED. FURTHERMORE, ALL TRENCHES LESS THAN 5 FEET IN DEPTH SHALL
ALSO BE EFFECTIVELY PROTECTED WHEN HAZARDOUS GROUND MOVEMENT MAY BE EXPECTED.
TRENCH SAFETY SYSTEMS TO BE UTILIZED FOR THIS PROJECT SHALL BE PROVIDED AS PART OF A
PACKAGE REQUIRED PRIOR TO THE PRE-CONSTRUCTION MEETING AND ANY CONSTRUCTION
ACTIVITIES.
2. IN ACCORDANCE WITH THE U.S. OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
REGULATIONS, WHEN PERSONS ARE IN TRENCHES 4 FEET DEEP OR MORE, ADEQUATE MEANS OF
EXIT, SUCH AS A LADDER OR STEPS, MUST BE PROVIDED AND LOCATED SO AS TO REQUIRE NO MORE
THAN 25 FEET OF LATERAL TRAVEL.
3. IF TRENCH SAFETY SYSTEM DETAILS WERE NOT PROVIDED IN THE PLANS BECAUSE TRENCHES WERE ANTICIPATED TO BE LESS THAN 5 FEET IN DEPTH AND DURING CONSTRUCTION, IT IS FOUND THAT TRENCHES ARE, IN FACT, 5 FEET OR MORE IN DEPTH {OR} TRENCHES LESS THAN 5 FEET IN DEPTH ARE IN AN AREA WHERE HAZARDOUS GROUND MOVEMENT IS EXPECTED, ALL CONSTRUCTION
SHALL CEASE, THE TRENCHED AREA SHALL BE BARRICADED, AND THE ENGINEER NOTIFIED
IMMEDIATELY. CONSTRUCTION SHALL NOT RESUME UNTIL APPROPRIATE TRENCH SAFETY SYSTEM DETAILS, AS DESIGNED BY A PROFESSIONAL ENGINEER IN THE STATE OF TEXAS, ARE SUBMITTED TO
THE CITY OF LIBERTY HILL FOR REVIEW AND APPROVAL.
STREET AND DRAINAGE NOTES:
1. ALL TESTING SHALL BE DONE BY AN INDEPENDENT LABORATORY AT THE OWNER'S EXPENSE. ANY
RETESTING SHALL BE PAID FOR BY THE CONTRACTOR. A CITY INSPECTOR SHALL BE PRESENT
DURING ALL TESTS. TESTING SHALL BE COORDINATED WITH THE CITY OF LIBERTY HILL PUBLIC WORKS DEPARTMENT, AND THEY SHALL BE GIVEN A MINIMUM OF 24 HOURS’ NOTICE PRIOR TO ANY
TESTING BY BOTH CALLING (512) 548-5529 AND EMAILING PUBWORKS@LIBERTYHILLTX.GOV.
2. ALL SIDEWALKS SHALL COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA). THE CITY OF LIBERTY HILL HAS NOT REVIEWED THESE PLANS FOR COMPLIANCE WITH THE ADA OR ANY OTHER ACCESSIBILITY LEGISLATION AND DOES NOT WARRANT OR APPROVE THEM FOR ANY ACCESSIBILITY
STANDARDS.
3. BACKFILL BEHIND THE CURB SHALL BE COMPACTED TO OBTAIN A MINIMUM OF 95% MAXIMUM DENSITY TO WITHIN 3" OF TOP OF CURB. MATERIAL USED SHALL BE PRIMARILY GRANULAR WITH NO ROCKS LARGER THAN 6" IN THE GREATEST DIMENSION. THE REMAINING 3" SHALL BE CLEAN TOPSOIL
FREE FROM ALL CLODS AND SUITABLE FOR SUSTAINING PLANT LIFE.
4. THE DEPTH OF COVER FOR ALL CROSSINGS UNDER PAVEMENT, INCLUDING GAS, ELECTRIC,
TELEPHONE, TELECOMMUNICATIONS, WATER SERVICES, ETC., SHALL BE A MINIMUM OF 30" BELOW
SUBGRADE.
5. STREET RIGHTS-OF-WAY SHALL BE GRADED AT A SLOPE OF 1/4" PER FOOT TOWARD THE CURB UNLESS OTHERWISE INDICATED. HOWEVER, IN NO CASE SHALL THE WIDTH OF RIGHT-OF-WAY AT 1/4"
PER FOOT SLOPE BE LESS THAN 10 FEET UNLESS A SPECIFIC REQUEST FOR AN ALTERNATE
GRADING SCHEME IS REQUESTED TO AND APPROVED BY THE CITY ENGINEER.
6. BARRICADES BUILT TO CITY OF LIBERTY HILL STANDARDS SHALL BE CONSTRUCTED ON ALL
DEAD-END STREETS AND AS NECESSARY DURING CONSTRUCTION TO MAINTAIN JOB AND PUBLIC
SAFETY.
7. ALL REINFORCED CONCRETE PIPE (R.C.P.) SHALL BE A MINIMUM CLASS III. ALL PUBLIC R.C.P. SHALL
BE A MINIMUM OF 18-INCHES IN DIAMETER.
8. THE SUBGRADE MATERIAL FOR THE STREETS SHOWN HEREIN WAS TESTED BY UES ON THIS DATE:
JUNE 25, 2025 AND THE PAVING SECTIONS DESIGNED IN ACCORDANCE WITH THE CURRENT CITY OF LIBERTY HILL DESIGN CRITERIA. THE PAVING SECTIONS ARE TO BE CONSTRUCTED AS FOLLOWS:
FLEX. BASE HMAC LIME STAB.
STREET STATION THICKNESS THICKNESS THICKNESS
9. THE GEOTECHNICAL ENGINEER SHALL INSPECT THE SUBGRADE FOR COMPLIANCE WITH THE DESIGN
ASSUMPTIONS MADE DURING PREPARATION OF THE APPROVED GEOTECHNICAL REPORT. ANY
ADJUSTMENTS THAT ARE REQUIRED SHALL BE MADE THROUGH REVISION OF THE PLANS AND
ADDENDUM TO ANY APPROVED GEOTECHNICAL REPORT.
10. WHERE PLASTICITY INDEX (PI) IS OVER 20, SUBGRADES MUST BE STABILIZED UTILIZING A METHOD
ACCEPTABLE TO THE CITY ENGINEER. THE GEOTECHNICAL ENGINEER SHALL RECOMMEND
ANAPPROPRIATE SUBGRADE STABILIZATION IF SULFATES ARE DETERMINED TO BE PRESENT. WHEN UTILIZING LIME FOR SOIL STABILIZATION, PLACEMENT SHALL BE IN THE FORM OF LIME SLURRY, NOT
PELLETS.
WATER AND WASTEWATER NOTES:
1. PIPE MATERIAL FOR WATER MAINS SHALL BE PVC (AWWA C-900, MIN. CLASS 200), OR DUCTILE IRON
(AWWA C-100, MIN. CLASS 200). WATER SERVICES (2" OR LESS) SHALL BE POLYETHYLENE TUBING
(BLACK, 200 PSI, DR 9).
2. PIPE MATERIAL FOR PRESSURE WASTEWATER MAINS SHALL BE PVC (AWWA C-900, MIN. CLASS 150), SDR26 HIGHER PRESSURE RATED (160 PSI), OR DUCTILE IRON (AWWA C-100, MIN. CLASS 200). PIPE MATERIAL FOR GRAVITY WASTEWATER MAINS SHALL BE PVC (ASTM D2241 OR D3034, MAX. DR-26)
AND DUCTILE IRON (AWWA C-100, MIN. CLASS 200).
3. UNLESS OTHERWISE APPROVED BY THE CITY ENGINEER, MINIMUM DEPTH OF COVER FOR ALL LINES OUTSIDE OF THE PAVEMENT SHALL BE 42" BELOW FINISHED GRADE AND 30” BELOW SUBGRADE FOR
ALL LINES LOCATED IN PAVED AREAS.
4. ALL FIRE HYDRANT LEADS SHALL BE DUCTILE IRON PIPE (AWWA C-100, MIN. CLASS 200).
5. ALL DUCTILE IRON PIPE AND FITTINGS SHALL BE WRAPPED WITH A MINIMUM OF 8-MIL POLYETHYLENE
AND SEALED WITH DUCT TAPE OR AN EQUIVALENT ACCEPTABLE BY THE CITY ENGINEER.
6. THE CONTRACTOR SHALL CONTACT THE CITY OF LIBERTY HILL PUBLIC WORKS DEPARTMENT BY
BOTH CALLING (512) 548-5529 AND EMAILING PUBWORKS@LIBERTYHILLTX.GOV TO COORDINATE UTILITY TIE-INS AND NOTIFY THEM AT LEAST 48 HOURS PRIOR TO CONNECTING TO ANY EXISTING
LINES.
7. ALL MANHOLES SHALL BE CONCRETE WITH CAST IRON RING AND COVER. ALL MANHOLES LOCATED
OUTSIDE OF THE PAVEMENT SHALL HAVE BOLTED COVERS. CORE CONNECTIONS TO FIBERGLASS
MANHOLES SHALL NOT BE ALLOWED.
8. THE CONTRACTOR MUST OBTAIN A BULK WATER PERMIT OR PURCHASE AND INSTALL A WATER METER FOR ALL WATER USED DURING CONSTRUCTION. A COPY OF THIS PERMIT MUST ALWAYS BE
POSSESSED BY ANY PARTIES WHO UTILIZE WATER.
9. LINE FLUSHING OR ANY ACTIVITY USING A LARGE QUANTITY OF WATER MUST BE SCHEDULED WITH THE CITY OF LIBERTY HILL PUBLIC WORKS DEPARTMENT BY BOTH CALLING (512) 548-5529 AND
EMAILING PUBWORKS@LIBERTYHILLTX.GOV.
10. THE CONTRACTOR, AT THE CONTRACTOR’S EXPENSE, SHALL PERFORM STERILIZATION OF ALL
POTABLE WATER LINES CONSTRUCTED AND SHALL PROVIDE ALL EQUIPMENT (INCLUDING TEST
GAUGES), SUPPLIES (INCLUDING CONCENTRATED CHLORINE DISINFECTING MATERIAL), AND
NECESSARY LABOR REQUIRED FOR THE STERILIZATION PROCEDURE. THE STERILIZATION
PROCEDURE SHALL BE MONITORED BY CITY OF LIBERTY HILL PERSONNEL. WATER SAMPLES WILL BE COLLECTED BY THE CITY OF LIBERTY HILL TO VERIFY EACH TREATED LINE HAS ATTAINED AN INITIAL
CHLORINE CONCENTRATION OF 50 PPM. WHERE MEANS OF FLUSHING IS NECESSARY, THE
CONTRACTOR, AT THE CONTRACTOR’S EXPENSE, SHALL PROVIDE FLUSHING DEVICES AND REMOVE
SAID DEVICES PRIOR TO FINAL APPROVAL BY THE CITY OF LIBERTY HILL.
11. SAMPLING TAPS SHALL BE BROUGHT UP TO 3 FEET ABOVE GRADE AND SHALL BE EASILY
ACCESSIBLE FOR CITY PERSONNEL. AT THE CONTRACTOR'S REQUEST AND IN THE CONTRACTOR’S PRESENCE, SAMPLES FOR BACTERIOLOGICAL TESTING WILL BE COLLECTED BY THE CITY OF LIBERTY
HILL NOT LESS THAN 24 HOURS AFTER THE TREATED LINE HAS BEEN FLUSHED OF THE
CONCENTRATED CHLORINE SOLUTION AND CHARGED WITH WATER APPROVED BY THE CITY. THE
CONTRACTOR SHALL SUPPLY A CHECK OR MONEY ORDER, PAYABLE TO THE CITY OF LIBERTY HILL, TO COVER THE FEE CHARGED FOR TESTING EACH WATER SAMPLE. CITY OF LIBERTY HILL FEE
AMOUNTS MAY BE OBTAINED THROUGH THE CITY OF LIBERTY HILL PLANNING AND DEVELOPMENT DEPARTMENT BY BOTH CALLING (512) 548-5519 AND EMAILING PLANNING@LIBERTYHILLTX.GOV.
12. THE CONTRACTOR, AT CONTRACTOR’S EXPENSE, SHALL PERFORM QUALITY TESTING FOR ALL WASTEWATER PIPE INSTALLED AND PRESSURE PIPE HYDROSTATIC TESTING OF ALL WATER LINES CONSTRUCTED AND SHALL PROVIDE ALL EQUIPMENT (INCLUDING PUMPS AND GAUGES), SUPPLIES
AND LABOR NECESSARY TO PERFORM THE TESTS. QUALITY AND PRESSURE TESTING SHALL BE
MONITORED BY CITY OF LIBERTY HILL PERSONNEL.
13. THE CONTRACTOR SHALL COORDINATE TESTING WITH THE CITY OF LIBERTY HILL PUBLIC WORKS
DEPARTMENT AND PROVIDE NO LESS THAN 24 HOURS’ NOTICE PRIOR TO PERFORMING
STERILIZATION, QUALITY TESTING OR PRESSURE TESTING BY BOTH CALLING (512) 548-5529 AND
EMAILING PUBWORKS@LIBERTYHILLTX.GOV.
14. THE CONTRACTOR (OR SUBCONTRACTORS) SHALL NOT OPEN OR CLOSE ANY VALVES UNLESS
AUTHORIZED BY THE CITY OF LIBERTY HILL PERSONNEL.
15. ALL VALVE BOXES AND COVERS SHALL BE CAST IRON.
16. ALL WATER SERVICE, WASTEWATER SERVICE AND VALVE LOCATIONS SHALL BE APPROPRIATELY
MARKED AS FOLLOWS:
WATER SERVICE "W" ON TOP OF CURB
WASTEWATER SERVICE "S" ON TOP OF CURB
VALVE "V" ON FACE OF CURB
TOOLS FOR MARKING THE CURB SHALL BE PROVIDED BY THE CONTRACTOR. OTHER APPROPRIATE
MEANS OF MARKING SERVICE AND VALVE LOCATIONS SHALL BE PROVIDED IN AREAS WITHOUT
CURBS. SUCH MEANS OF MARKING SHALL BE AS SPECIFIED BY THE ENGINEER AND APPROVED BY
THE CITY OF LIBERTY HILL.
17. CONTACT THE CITY OF LIBERTY HILL PUBLIC WORKS DEPARTMENT FOR ASSISTANCE IN OBTAINING EXISTING WATER AND WASTEWATER LOCATIONS BY BOTH CALLING (512) 548-5529 AND EMAILING
PUBWORKS@LIBERTYHILLTX.GOV.
18. WILLIAMSON COUNTY ESD NO. 4 SHALL BE NOTIFIED 48 HOURS PRIOR TO TESTING OF ANY BUILDING SPRINKLER PIPING SO THAT THE FIRE DEPARTMENT MAY BE PRESENT TO MONITOR SUCH TESTING
BY BOTH CALLING (512) 515-5165 AND EMAILING MDICKENS@LIBERTYHILLFIRE.ORG.
19. SAND, AS DESCRIBED IN SPECIFICATION ITEM 510 PIPE, SHALL NOT BE USED AS BEDDING FOR WATER AND WASTEWATER LINES. ACCEPTABLE BEDDING MATERIALS ARE PIPE BEDDING STONE, PEA GRAVEL AND, IN LIEU OF SAND, A NATURALLY OCCURRING OR MANUFACTURED STONE MATERIAL
CONFORMING TO ASTM C33 FOR STONE QUALITY AND MEETING THE FOLLOWING GRADATION
SPECIFICATION:
SIEVE SIZE PERCENT RETAINED BY WEIGHT
1/2" 0 3/8" 0-2 #4 40-85 #10 95-100
20. THE CONTRACTOR IS HEREBY NOTIFIED THAT CONNECTING TO, SHUTTING DOWN, OR TERMINATING EXISTING UTILITY LINES MAY HAVE TO OCCUR AT OFF-PEAK HOURS. SUCH HOURS ARE USUALLY
OUTSIDE NORMAL WORKING HOURS (7AM – 4PM) AND POSSIBLY BETWEEN 12 A.M. AND 6 A.M.
21. ALL WASTEWATER CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE TEXAS COMMISSION ON ENVIRONMENTAL QUALITY (TCEQ) REGULATIONS, 30 TAC CHAPTER 213 AND 317, AS APPLICABLE. ALL
WATER CONSTRUCTION SHALL BE IN ACCORDANCE WITH TCEQ REGULATIONS, 30 TAC CHAPTER
290.WHENEVER TCEQ AND CITY OF LIBERTY HILL SPECIFICATIONS CONFLICT, THE MORE
STRINGENT SHALL APPLY.
22. ALL FIRE LINES MUST BE A MINIMUM OF 6” IN DIAMETER.
23. ALL FIRE LINES MUST BE HYDROSTATIC TESTED AT 200 PSI FOR A MINIMUM OF 2 HOURS, TO BE
VERIFIED BY THE FIRE CODE OFFICIAL.
24. ALL FIRE LINES MUST BE SUPPORTED BY CONCRETE THRUST BLOCKING WHERE NECESSARY. THE
BLOCKING MUST BE VERIFIED BY THE FIRE CODE OFFICIAL PRIOR TO COVER UP.
TRAFFIC MARKING NOTES:
1. ANY METHODS, STREET MARKINGS AND SIGNAGE NECESSARY FOR WARNING MOTORISTS,
WARNING PEDESTRIANS, OR DIVERTING TRAFFIC DURING CONSTRUCTION SHALL CONFORM TO THE TEXAS MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS (TMUTCD), LATEST EDITION.
2. ALL PAVEMENT MARKINGS, MARKERS, PAINT, TRAFFIC BUTTONS, TRAFFIC CONTROLS AND SIGNS
SHALL BE INSTALLED IN ACCORDANCE WITH THE TEXAS DEPARTMENT OF TRANSPORTATION
STANDARD SPECIFICATIONS FOR CONSTRUCTION OF HIGHWAYS, STREETS AND BRIDGES AND, THE
TEXAS MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS, LATEST
EDITIONS.
EROSION AND SEDIMENTATION CONTROL NOTES:
1. EROSION CONTROL MEASURES, SITE WORK, AND RESTORATION WORK SHALL BE IN ACCORDANCE
WITH THE CITY OF LIBERTY HILL UNIFIED DEVELOPMENT CODE.
2. ALL SLOPES SHALL BE SODDED OR SEEDED WITH APPROVED GRASS, GRASS MIXTURES OR
GROUND COVER SUITABLE TO THE AREA AND SEASON IN WHICH THEY ARE APPLIED.
3. SILT FENCES, ROCK BERMS, SEDIMENTATION BASINS AND SIMILARLY RECOGNIZED TECHNIQUES
AND MATERIALS SHALL BE EMPLOYED DURING CONSTRUCTION TO PREVENT POINT SOURCE
SEDIMENTATION LOADING OF DOWNSTREAM FACILITIES. INSTALLATION AND CONDITION SHALL BE
REGULARLY INSPECTED BY THE CITY OF LIBERTY HILL FOR EFFECTIVENESS. ADDITIONAL
MEASURES MAY BE REQUIRED IF, IN THE OPINION OF THE CITY ENGINEER, THEY ARE WARRANTED.
4. ALL TEMPORARY EROSION CONTROL MEASURES SHALL NOT BE REMOVED UNTIL REVEGETATION HAS BEEN ESTABLISHED AND APPROVAL RECEIVED FROM THE CITY OF LIBERTY HILL. IT SHALL BE
THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN ALL TEMPORARY EROSION CONTROL
STRUCTURES AND TO REMOVE EACH STRUCTURE AS APPROVED BY THE ENGINEER.
5. ALL MUD, DIRT, ROCKS, DEBRIS, ETC., SPILLED, TRACKED, OR OTHERWISE DEPOSITED ON EXISTING PAVED STREETS, DRIVES AND AREAS USED BY THE PUBLIC SHALL BE CLEANED UP IMMEDIATELY.
FIRE DEPARTMENT NOTES:
1. GENERAL: ALL DEVELOPMENTS SHALL COMPLY WITH THE CURRENT FIRE CODE, APPENDICES, AND
ANY LOCAL AMENDMENTS AS ADOPTED BY THE CITY OF LIBERTY HILL.
2. COMBUSTIBLE MATERIALS ON-SITE: ALL WATER LINES SHALL BE TESTED AND FIRE HYDRANTS
IN-SERVICE, PRIOR TO BRINGING COMBUSTIBLE MATERIALS (WOOD, PACKAGING, PLASTICS, ETC.)
ON ANY JOB SITE.
3. FIRE LANES: FIRE APPARATUS ACCESS ROADS/DRIVES SHALL HAVE A MINIMUM UNOBSTRUCTED
WIDTH OF 26 FEET. IF RAISED CURBING OR MEDIANS COMPROMISE MINIMUM WIDTH, CURBING
SHALL BE MOUNTABLE AND RAISED AREA SHALL CONTAIN NO OBSTRUCTIONS SUCH AS
LANDSCAPING, SIGNAGE, GROUND-MOUNTED EQUIPMENT, ETC.
4. ALL-WEATHER SURFACE: THE PAVEMENT STRUCTURE FOR FIRE ACCESS ROADS/DRIVES MUST BE ALL- WEATHER SURFACE (ASPHALT/CONCRETE) DESIGNED TO SUPPORT AN 80,000 LB. APPARATUS
LOADING.
5. GRADE: THE GRADE THROUGH THE FIRE LANE ACCESS SHALL NOT EXCEED 7% AND NO GRADE
BREAKS SHALL EXCEED 3%.
6. TURNING RADII: TURNING RADII SHALL BE A MINIMUM OF 25-FTT INSIDE AND 50-FT OUTSIDE AS
MEASURED FROM FACE-OF-CURB (WHEN PRESENT) OR ON DRIVABLE, PAVED SURFACE.
7. VERTICAL CLEARANCE: THE VERTICAL CLEARANCE OVER A DESIGNATED FIRE LANE SHALL NOT BE
LESS THAN 13'-6".
8. EMERGENCY RESPONDER RADIO COVERAGE: ADEQUATE EMERGENCY RESPONDER RADIO
COVERAGE SHALL BE REQUIRED FOR ALL NEW BUILDINGS. A PRE-ENHANCEMENT RADIO SURVEY
SHALL BE REQUIRED AT THE 80% CONSTRUCTION PHASE FOR CERTAIN BUILDING TYPES BASED ON
THE SIZE OF THE BUILDING. PRE- ENHANCEMENT RADIO SURVEY REQUIREMENTS INCLUDE THE
FOLLOWING BUILDING TYPES:
· GREATER THAN (5) STORIES
· BELOW GRADE PLANE
· WOOD FRAMED CONSTRUCTION GREATER THAN 50,000 SF
· CONCRETE OR METAL FRAMED CONSTRUCTION GREATER THAN 25,000 SF
9. REQUIRED FIRE FLOWS: A PROJECT’S MINIMUM FIRE FLOW FOR THE LARGEST BUILDING SHALL BE MEASURED AT (20) PSI RESIDUAL PRESSURE THAT IS AVAILABLE FOR FIREFIGHTING PER THE FLOWS ON TABLES B105.1 OR B105.2 OF THE INTERNATIONAL FIRE CODE (IFC), APPENDIX B.
DISCLAIMER: IT IS THE RESPONSIBILITY OF THE DEVELOPER AND ENGINEER TO ENSURE THESE
MINIMUM FIRE FLOW REQUIREMENTS FOR THE SITE ARE MET VIA FLOW TESTING AND WATER
MODELING.
10. FIRE DEPARTMENT CONNECTIONS: ALL FDC’S MUST BE OF THE REMOTE TYPE AND CONSTRUCTED TO THE CURRENT ADOPTED FDC DETAIL. THE FDC SHALL HAVE A FIRE HYDRANT LOCATED WITHIN 100’ OF THE FDC. FDC SHALL BE IDENTIFIED ON THE SITE VIA SIGNAGE. (WCESD NO. 4 FDC DETAIL
MUST BE ATTACHED TO PLANS.)
11. GATES: IF GATES ARE PROVIDED ALONG ANY FIRE ACCESS ROAD/DRIVE, MINIMUM PASSABLE WIDTH SHALL NOT BE LESS THAN (20) FEET AND SHALL COMPLY WITH IFC APPENDIX D AND LIBERTY
HILL CODE OF ORDINANCES REGARDING EMERGENCY ACCESS SYSTEMS. GATES WILL REQUIRE A
KNOX-BOX® KEY SWITCH.
12. FIRE LANES MUST BE PAINTED WITH A MINIMUM OF A 6” RED STRIPE AND 4” WHITE LETTERS
STATING, “FIRE LANE – TOW AWAY ZONE.” (WCESD NO. 4 FIRE LANE DETAIL MUST BE
ATTACHED TO PLANS.)
13. ALL NEW CONSTRUCTION PROJECTS ARE REQUIRED TO HAVE A MINIMUM OF TWO FIRE HYDRANTS, ONE WITHIN 300’ OF THE BUILDING AND ONE WITHIN 500’ OF THE BUILDING. IF PRE-EXISTING FIRE
HYDRANTS ARE IN PLACE MEETING THESE REQUIREMENTS, THEY MAY BE USED FOR THE NEW
PROJECT.
14. ALL NEW FIRE HYDRANTS MUST MEET THE CURRENT ADOPTED WCESD NO. 4 STANDARDS. (WCESD
NO. 4 FIRE HYDRANT DETAIL MUST BE ATTACHED TO PLANS.)
15. FIRE LANES EXCEEDING 150’ IN LENGTH MUST BE PROVIDED WITH WIDTH AND TURNAROUND
PROVISIONS IN ACCORDANCE WITH IFC APPENDIX D.
Texas Commission on Environmental Quality Contributing Zone Plan General Construction Notes Edwards Aquifer Protection Program Construction Notes – Legal Disclaimer
The following/listed “construction notes” are intended to be advisory in nature only and do not constitute an approval or conditional approval by the Executive Director (ED), nor do they constitute a comprehensive listing of rules or conditions to be followed during construction. Further actions may be required to achieve compliance with TCEQ regulations found in Title 30, Texas Administrative Code (TAC), Chapters 213 and 217, as well as local ordinances and regulations providing for the protection of water quality. Additionally, nothing contained in the following/listed “construction notes” restricts the powers of the ED, the commission or any other governmental entity to prevent, correct, or curtail activities that result or may result in pollution of the Edwards Aquifer or hydrologically connected surface waters. The holder of any Edwards Aquifer Protection Plan containing “construction notes” is still responsible for compliance with Title 30, TAC, Chapters 213 or any other applicable TCEQ regulation, as well as all conditions of an Edwards Aquifer Protection Plan through all phases of plan implementation. Failure to comply with any condition of the ED's approval, whether or not in contradiction of any “construction notes,” is a violation of TCEQ regulations and any violation is subject to administrative rules, orders, and penalties as provided under Title 30, TAC § 213.10 (relating to Enforcement). Such violations may also be subject to civil penalties and injunction. The following/listed “construction notes” in no way represent an approved exception by the ED to any part of Title 30 TAC, Chapters 213 and 217, or any other TCEQ applicable regulation.
1. A written notice of construction must be submitted to the TCEQ regional office at least 48 hours prior to the start of any ground disturbance or construction activities. This notice must include:
- the name of the approved project;
- the activity start date; and
- the contact information of the prime contractor.
2. All contractors conducting regulated activities associated with this project should be provided with complete copies of the approved Contributing Zone Plan (CZP) and the TCEQ letter indicating the specific conditions of its approval. During the course of these regulated activities, the contractor(s) should keep copies of the approved plan and approval letter on�site.
3. No hazardous substance storage tank shall be installed within 150 feet of a water supply source, distribution system, well, or sensitive feature.
4. Prior to beginning any construction activity, all temporary erosion and sedimentation (E&S) control measures must be properly installed and maintained in accordance with the manufacturers specifications. If inspections indicate a control has been used inappropriately, or incorrectly, the applicant must replace or modify the control for site situations. These controls must remain in place until the disturbed areas have been permanently stabilized.
5. Any sediment that escapes the construction site must be collected and properly disposed of before the next rain event to ensure it is not washed into surface streams, sensitive features, etc.
6. Sediment must be removed from the sediment traps or sedimentation basins when it occupies 50% of the basin’s design capacity.
7. Litter, construction debris, and construction chemicals exposed to stormwater shall be prevented from being discharged offsite.
8. All excavated material that will be stored on-site must have proper E&S controls.
9. If portions of the site will have a cease in construction activity lasting longer than 14 days, soil
TCEQ-0592A (Rev. July 15, 2015) Page 2 of stabilization in those areas shall be initiated as soon as possible prior to the 14th day of inactivity. If activity will resume prior to the 21st day, stabilization measures are not required. If drought conditions or inclement weather prevent action by the 14th day, stabilization measures shall be initiated as soon as possible.
10. The following records should be maintained and made available to the TCEQ upon request:
- the dates when major grading activities occur;
- the dates when construction activities temporarily or permanently cease on a portion of the site; and
- the dates when stabilization measures are initiated.
11. The holder of any approved CZP must notify the appropriate regional office in writing and obtain approval from the executive director prior to initiating any of the following:
A. any physical or operational modification of any best management practices (BMPs) or structure(s), including but not limited to temporary or permanent ponds, dams, berms, silt fences, and diversionary structures;
B. any change in the nature or character of the regulated activity from that which was originally approved;
C. any change that would significantly impact the ability to prevent pollution of the Edwards Aquifer; or
D. any development of land previously identified as undeveloped in the approved contributing zone plan
TCEQ NOTES(REVISED JUNE 10, 2024)
Approved by the City of
04/23/2026 2:32:40 PM
ABBREVIATIONS AND DEFINITIONS:
A AREA
ADA AMERICANS WITH DISABILITIES ACT
AWWA AMERICAN WATER WORKS
ASSOCIATION
B-B BACK TO BACK
BC BEGIN CURVE
BC BACK OF CURB
BCR BEGIN CURB RETURN
BMP BEST MANAGEMENT PRACTICE
BOC BACK OF CURB
BVCE BEGIN VERTICAL CURVE ELEVATION
BVCS BEGIN VERTICAL CURVE STATION
BW BOTTOM OF WALL
CFS CUBIC FEET PER SECOND
CITY CITY, TOWN, OR OTHER APPLICABLE
LOCAL GOVERNMENT JURISDICTION
C/L CENTERLINE
CL CENTERLINE
CONC CONCRETE
CY CUBIC YARD
DEMO DEMOLITION
DG DECOMPOSED GRANITE
DTL DETAIL
EA EACH
EC END CURVE
ECR END CURB RETURN
EG EXISTING GROUND
EL ELEVATION
ELEC ELECTRICAL / ELECTRICITY
ELEV ELEVATION
EPA UNITES STATES ENVIRONMENTAL
PROTECTION AGENCY
ESMT EASEMENT
EVCE END VERTICAL CURVE ELEVATION
EVCS END VERTICAL CURVE STATION
EX. EXISTING
F-F FACE TO FACE
FG FINISHED GROUND
FH FIRE HYDRANT
FL FLOW LINE
FOC FACE OF CURB
FT FEET
HGL HYDRAULIC GRADE LINE
KH KIMLEY-HORN AND ASSOCIATES, INC.
KHA KIMLEY-HORN AND ASSOCIATES, INC.
LAT LATERAL
LF LINEAR FEET
LT LEFT
MAX MAXIMUM
ME MATCH EXISTING ELEVATION
MH MANHOLE
MIN MINUTE / MINIMUM
NO NUMBER
NOI NOTICE OF INTENT, REF. TCEQ
GENERAL PERMIT
NOT NOTICE OF TERMINATION, REF. TCEQ
GENERAL PERMIT
NTS NOT TO SCALE
OC ON CENTER
OFF OFFSET
OSHA OCCUPATIONAL SAFETY AND
HEALTH ADMINISTRATION
PC POINT OF CURVATURE
PCC PORTLAND CEMENT CONCRETE /
POINT OF COMPOUND CURVATURE
PGL PROPOSED GRADE LINE
PI POINT OF INFLECTION
PROP PROPOSED
PRC POINT OF REVERSE CURVATURE
PSI POUNDS PER SQUARE INCH
PT POINT OF TANGENCY
PVC POLYVINYL CHLORIDE
PVI POINT OF VERTICAL INFLECTION
PVMT PAVEMENT
RCP REINFORCED CONCRETE PIPE
ROW RIGHT OF WAY
RT RIGHT
SF SQUARE FEET
SS SANITARY SEWER
SSMH SANITARY SEWER MANHOLE
STA STATION
STD STANDARD
SY SQUARE YARD
TAS ARCHITECTURAL BARRIERS TEXAS
ACCESSIBILITY STANDARDS
TC TOP OF CURB
TCEQ TEXAS COMMISSION OF
ENVIRONMENTAL QUALITY
TEMP TEMPORARY
TXDOT TEXAS DEPARTMENT OF
TRANSPORTATION
TXMUTCD TEXAS MANUAL ON UNIFORM
TRAFFIC CONTROL DEVICES
TW TOP OF WALL
TYP TYPICAL
VC VERTICAL CURVE
WTR WATER
WW WASTEWATER
THESE PLAN AND GENERAL NOTES REFER TO:
GEOTECHNICAL ENGINEERING REPORT
UES
Proposed Liberty Hill City Park - Parking Lot, 255 County Road 200
UES Project No. Y252041
June 25, 2025
INCLUDING ALL REVISIONS AND ADDENDA TO THIS
REPORT THAT MAY HAVE BEEN RELEASED AFTER
THE NOTED DATE.
N o.
R
EV
IS
IO
N S
BY
D
AT
E
SHEET NUMBER
D
AT
E
AS
S
H O
W N
C H
EC
KE
D B
Y:
SC
AL
E:
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
KH
A
PR
O
JE
C
T
M
AR
C H
6 AP
LR
O
AJ
L
Know what'sbelow.
before you dig.Call
3/25/2026
L
IB
ER
TY
H
IL
L C
IT
Y
PA
R
K
PA
R
KI
N G
L O
T
EX
PA
N
SI
O
N C
IT
Y
PR
O
JE
C
T.
N
O . 2
5-
-S
D P
C O
R D
L
IB
ER
TY
H
IL
L, T
EX
AS
W
IL
LI
AM
SO
N C
O U
N
TY
CITY PROJECT. NO. 2025-15-SDP
KH GENERAL NOTES
OVERALL:
1. ALL CONSTRUCTION AND MATERIALS SHALL BE IN ACCORDANCE WITH THESE PLANS, CITY (OR TOWN) STANDARD DETAILS AND SPECIFICATIONS, THE FINAL GEOTECHNICAL REPORT AND ALL ISSUED ADDENDA, AND COMMONLY ACCEPTED CONSTRUCTION STANDARDS. THE CITY SPECIFICATIONS SHALL GOVERN WHERE OTHER SPECIFICATIONS DO NOT EXIST. IN CASE OF CONFLICTING SPECIFICATIONS OR DETAILS, THE MORE RESTRICTIVE SPECIFICATION AND DETAIL SHALL BE FOLLOWED.
2. THE CONTRACTOR SHALL COMPLY WITH CITY (OR TOWN) “GENERAL NOTES” FOR CONSTRUCTION, IF EXISTING AND REQUIRED BY THE CITY. FOR INSTANCES WHERE THEY CONFLICT WITH THESE KH GENERAL NOTES, THEN THE MORE RESTRICTIVE SHALL APPLY.
3. THE CONTRACTOR SHALL FURNISH ALL MATERIAL AND LABOR TO CONSTRUCT THE FACILITY AS SHOWN AND DESCRIBED IN THE CONSTRUCTION DOCUMENTS IN ACCORDANCE WITH THE APPROPRIATE AUTHORITIES' SPECIFICATIONS AND REQUIREMENTS.
4. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO BIDDING TO DETERMINE EXISTING CONDITIONS.
5. THE EXISTING CONDITIONS SHOWN ON THESE PLANS WERE PROVIDED BY THE TOPOGRAPHIC SURVEY PREPARED BY THE PROJECT
SURVEYOR, AND ARE BASED ON THE BENCHMARKS SHOWN. THE CONTRACTOR SHALL REFERENCE THE SAME BENCHMARKS.
6. THE CONTRACTOR SHALL REVIEW AND VERIFY THE EXISTING TOPOGRAPHIC SURVEY SHOWN ON THE PLANS REPRESENTS EXISTING
FIELD CONDITIONS PRIOR TO CONSTRUCTION, AND SHALL REPORT ANY DISCREPANCIES FOUND TO THE OWNER AND ENGINEER
IMMEDIATELY.
7. IF THE CONTRACTOR DOES NOT ACCEPT THE EXISTING TOPOGRAPHIC SURVEY AS SHOWN ON THE PLANS, WITHOUT EXCEPTION, THEN THE CONTRACTOR SHALL SUPPLY AT THEIR OWN EXPENSE, A TOPOGRAPHIC SURVEY BY A REGISTERED PROFESSIONAL LAND
SURVEYOR TO THE OWNER AND ENGINEER FOR REVIEW.
8. CONTRACTOR SHALL PROVIDE ALL CONSTRUCTION SURVEYING AND STAKING.
9. CONTRACTOR SHALL VERIFY HORIZONTAL AND VERTICAL CONTROL, INCLUDING BENCHMARKS PRIOR TO COMMENCING
CONSTRUCTION OR STAKING OF IMPROVEMENTS. PROPERTY LINES AND CORNERS SHALL BE HELD AS THE HORIZONTAL CONTROL.
10.THE CONTRACTOR SHALL REVIEW AND VERIFY ALL DIMENSIONS, ELEVATIONS, AND FIELD CONDITIONS THAT MAY AFFECT
CONSTRUCTION. ANY DISCREPANCIES ON THE DRAWINGS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ARCHITECT AND ENGINEER BEFORE COMMENCING WORK. NO FIELD CHANGES OR DEVIATIONS FROM DESIGN ARE TO BE MADE WITHOUT PRIOR APPROVAL OF THE ARCHITECT, ENGINEER, AND IF APPLICABLE THE CITY AND OWNER. NO CONSIDERATION WILL BE GIVEN TO CHANGE ORDERS FOR WHICH THE CITY, ENGINEER, AND OWNER WERE NOT CONTACTED PRIOR TO CONSTRUCTION OF THE AFFECTED ITEM.
11.CONTRACTOR SHALL THOROUGHLY CHECK COORDINATION OF CIVIL, LANDSCAPE, MEP, ARCHITECTURAL, AND OTHER PLANS PRIOR TO COMMENCING CONSTRUCTION. OWNER/ENGINEER SHALL BE NOTIFIED OF ANY DISCREPANCY PRIOR TO COMMENCING WITH
CONSTRUCTION.
12.IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE VARIOUS UTILITY COMPANIES WHICH MAY HAVE BURIED OR AERIAL UTILITIES WITHIN OR NEAR THE CONSTRUCTION AREA BEFORE COMMENCING WORK TO HAVE THEM LOCATE THEIR EXISTING UTILITIES PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE AN ADEQUATE MINIMUM NOTICE TO ALL UTILITY COMPANIES PRIOR TO
BEGINNING CONSTRUCTION.
13.CONTRACTOR SHALL CALL TEXAS 811 AN ADEQUATE AMOUNT OF TIME PRIOR TO COMMENCING CONSTRUCTION OR ANY EXCAVATION.
14.CONTRACTOR SHALL USE EXTREME CAUTION AS THE SITE CONTAINS VARIOUS KNOWN AND UNKNOWN PUBLIC AND PRIVATE UTILITIES.
15.THE LOCATIONS, ELEVATIONS, DEPTH, AND DIMENSIONS OF EXISTING UTILITIES SHOWN ON THE PLANS WERE OBTAINED FROM
AVAILABLE UTILITY COMPANY MAPS AND PLANS, AND ARE CONSIDERED APPROXIMATE AND INCOMPLETE. IT SHALL BE THE CONTRACTORS' RESPONSIBILITY TO VERIFY THE PRESENCE, LOCATION, ELEVATION, DEPTH, AND DIMENSION OF EXISTING UTILITIES SUFFICIENTLY IN ADVANCE OF CONSTRUCTION SO THAT ADJUSTMENTS CAN BE MADE TO PROVIDE ADEQUATE CLEARANCES. THE ENGINEER SHALL BE NOTIFIED WHEN A PROPOSED IMPROVEMENT CONFLICTS WITH AN EXISTING UTILITY.
16.THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING ANY ADJUSTMENTS AND RELOCATIONS OF EXISTING UTILITIES THAT CONFLICT WITH THE PROPOSED IMPROVEMENTS, INCLUDING BUT NOT LIMITED TO, ADJUSTING EXISTING MANHOLES TO MATCH PROPOSED GRADE, RELOCATING EXISTING POLES AND GUY WIRES THAT ARE LOCATED IN PROPOSED DRIVEWAYS, ADJUSTING THE HORIZONTAL OR VERTICAL ALIGNMENT OF EXISTING UNDERGROUND UTILITIES TO ACCOMMODATE PROPOSED GRADE OR CROSSING WITH A PROPOSED UTILITY, AND ANY OTHERS THAT MAY BE ENCOUNTERED THAT ARE UNKNOWN AT THIS TIME AND NOT SHOWN ON
THESE PLANS.
17.CONTRACTOR SHALL ARRANGE FOR OR PROVIDE, AT ITS EXPENSE, ALL GAS, TELECOMMUNICATIONS, CABLE, OVERHEAD AND
UNDERGROUND POWER LINE, AND UTILITY POLE ADJUSTMENTS NEEDED.
18.CONTRACTOR IS RESPONSIBLE FOR COORDINATING INSTALLATION OF FRANCHISE UTILITIES THAT ARE NECESSARY FOR ON-SITE AND
OFF-SITE CONSTRUCTION, AND SERVICE TO THE PROPOSED DEVELOPMENT.
19.THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ALL DAMAGES DUE TO THE CONTRACTORS' FAILURE TO EXACTLY LOCATE AND PRESERVE ALL UTILITIES. THE OWNER OR ENGINEER WILL ASSUME NO LIABILITY FOR ANY DAMAGES SUSTAINED OR COST INCURRED BECAUSE OF THE OPERATIONS IN THE VICINITY OF EXISTING UTILITIES OR STRUCTURES. IF IT IS NECESSARY TO SHORE, BRACE, SWING OR RELOCATE A UTILITY, THE UTILITY COMPANY OR DEPARTMENT AFFECTED SHALL BE CONTACTED BY THE CONTRACTOR AND THEIR
PERMISSION OBTAINED REGARDING THE METHOD TO USE FOR SUCH WORK.
20.BRACING OF UTILITY POLES MAY BE REQUIRED BY THE UTILITY COMPANIES WHEN TRENCHING OR EXCAVATING IN CLOSE PROXIMITY TO THE POLES. THE COST OF BRACING POLES WILL BE BORNE BY THE CONTRACTOR, WITH NO SEPARATE PAY ITEM FOR THIS WORK.
THE COST IS INCIDENTAL TO THE PAY ITEM.
21.CONTRACTOR SHALL USE ALL NECESSARY SAFETY PRECAUTIONS TO AVOID CONTACT WITH OVERHEAD AND UNDERGROUND POWER LINES. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE LOCAL, STATE, FEDERAL AND UTILITY OWNER REGULATIONS PERTAINING
TO WORK SETBACKS FROM POWER LINES.
22.THE CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN ALL REQUIRED CONSTRUCTION PERMITS, APPROVALS, AND BONDS PRIOR TO
CONSTRUCTION.
23.THE CONTRACTOR SHALL HAVE AVAILABLE AT THE JOB SITE AT ALL TIMES A COPY OF THE CONTRACT DOCUMENTS INCLUDING PLANS, GEOTECHNICAL REPORT AND ADDENDA, PROJECT AND CITY SPECIFICATIONS, AND SPECIAL CONDITIONS, COPIES OF ANY REQUIRED
CONSTRUCTION PERMITS, EROSION CONTROL PLANS, SWPPP AND INSPECTION REPORTS.
24.ALL SHOP DRAWINGS AND OTHER DOCUMENTS THAT REQUIRE ENGINEER REVIEW SHALL BE SUBMITTED BY THE CONTRACTOR SUFFICIENTLY IN ADVANCE OF CONSTRUCTION OF THAT ITEM, SO THAT NO LESS THAN 10 BUSINESS DAYS FOR REVIEW AND RESPONSE
IS AVAILABLE.
25.ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED BY CODES, JURISDICTIONAL AGENCIES, AND/OR UTILITY SERVICE COMPANIES SHALL BE PERFORMED PRIOR TO USE OF THE FACILITY AND THE FINAL CONNECTION OF SERVICES.
26.CONTRACTOR SHALL ARRANGE FOR REQUIRED CITY INSPECTIONS.
27.CONTRACTOR'S BID PRICE SHALL INCLUDE ALL INSPECTION FEES.
28.ALL SYMBOLS SHOWN ON THESE PLANS (E.G. FIRE HYDRANT, METERS, VALVES, INLETS, ETC.…) ARE FOR PRESENTATION PURPOSES
ONLY AND ARE NOT TO SCALE. CONTRACTOR SHALL COORDINATE FINAL SIZES AND LOCATIONS WITH APPROPRIATE CITY INSPECTOR.
29.THE SCOPE OF WORK FOR THE CIVIL IMPROVEMENTS SHOWN ON THESE PLANS TERMINATES 5-FEET FROM THE BUILDING. REFERENCE
THE BUILDING PLANS (E.G. ARCHITECTURAL, STRUCTURAL, MEP) FOR AREAS WITHIN 5-FEET OF THE BUILDING AND WITHIN THE
BUILDING FOOTPRINT.
30.REFER TO ARCHITECTURAL AND STRUCTURAL PLANS FOR ALL FINAL BUILDING DIMENSIONS.
31.THE PROPOSED BUILDING FOOTPRINT(S) SHOWN IN THESE PLANS WAS PROVIDED TO KIMLEY-HORN AND ASSOCIATES, INC. (KH) BY THE
PROJECT ARCHITECT AT THE TIME THESE PLANS WERE PREPARED. IT MAY NOT BE THE FINAL CORRECT VERSION BECAUSE THE BUILDING DESIGN WAS ONGOING. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR CONFIRMING THE FINAL CORRECT VERSION OF THE BUILDING FOOTPRINT WITH THE ARCHITECT AND STRUCTURAL ENGINEER PRIOR TO LAYOUT. DIMENSIONS AND/OR COORDINATES SHOWN ON THESE PLANS WERE BASED ON THE ABOVE STATED ARCHITECTURAL FOOTPRINT, AND ARE THEREFORE A PRELIMINARY LOCATION OF THE BUILDING. THE CONTRACTOR IS SOLELY RESPONSIBLE TO VERIFY WHAT PART OF THE BUILDING THE ARCHITECT'S FOOTPRINT REPRESENTS (E.G. SLAB, OUTSIDE WALL, MASONRY LEDGE, ETC.….) AND TO CONFIRM ITS FINAL POSITION ON THE SITE BASED ON THE FINAL ARCHITECTURAL FOOTPRINT, CIVIL DIMENSION CONTROL PLAN, SURVEY BOUNDARY AND/OR PLAT. ANY
DIFFERENCES FOUND SHALL BE REPORTED TO KH IMMEDIATELY.
32.ALL CONSTRUCTION SHALL COMPLY WITH THE PROJECT'S FINAL GEOTECHNICAL REPORT (OR LATEST EDITION), INCLUDING
SUBSEQUENT ADDENDA.
33.CONTRACTOR IS RESPONSIBLE FOR ALL MATERIALS TESTING AND CERTIFICATION, UNLESS SPECIFIED OTHERWISE BY OWNER. ALL MATERIALS TESTING SHALL BE COORDINATED WITH THE APPROPRIATE CITY INSPECTOR AND COMPLY WITH CITY STANDARD SPECIFICATIONS AND GEOTECHNICAL REPORT. TESTING SHALL BE PERFORMED BY AN APPROVED INDEPENDENT AGENCY FOR TESTING MATERIALS. OWNER SHALL APPROVE THE AGENCY NOMINATED BY THE CONTRACTOR FOR MATERIALS TESTING.
34.ALL COPIES OF MATERIALS TEST RESULTS SHALL BE SENT TO THE OWNER, ENGINEER AND ARCHITECT DIRECTLY FROM THE TESTING
AGENCY.
35.IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO SHOW, BY THE STANDARD TESTING PROCEDURES OF THE MATERIALS, THAT THE
WORK CONSTRUCTED MEETS THE PROJECT REQUIREMENTS AND CITY SPECIFICATIONS.
36.DUE TO THE POTENTIAL FOR DIFFERENTIAL SOIL MOVEMENT ADJACENT TO THE BUILDING, THE CONTRACTOR SHALL ADHERE TO GEOTECHNICAL REPORT'S RECOMMENDATION FOR SUBGRADE PREPARATION SPECIFIC TO FLATWORK ADJACENT TO THE PROPOSED BUILDING. THE OWNER AND CONTRACTOR ARE ADVISED TO OBTAIN A GEOTECHNICAL ENGINEER RECOMMENDATION SPECIFIC TO
FLATWORK ADJACENT TO THE BUILDING, IF NONE IS CURRENTLY EXISTING.
37.ALL CONTRACTORS MUST CONFINE THEIR ACTIVITIES TO THE WORK AREA. NO ENCROACHMENTS OUTSIDE OF THE WORK AREA WILL BE ALLOWED. ANY DAMAGE RESULTING THEREFROM SHALL BE CONTRACTOR'S SOLE RESPONSIBILITY TO REPAIR.
38.THE CONTRACTOR SHALL PROTECT ALL EXISTING STRUCTURES, UTILITIES, MANHOLES, POLES, GUY WIRES, VALVE COVERS, VAULT LIDS, FIRE HYDRANTS, COMMUNICATION BOXES/PEDESTALS, AND OTHER FACILITIES TO REMAIN AND SHALL REPAIR ANY DAMAGES AT
NO COST TO THE OWNER.
39.THE CONTRACTOR SHALL IMMEDIATELY REPAIR OR REPLACE ANY PHYSICAL DAMAGE TO PRIVATE PROPERTY OR PUBLIC IMPROVEMENTS, INCLUDING BUT NOT LIMITED TO: FENCES, WALLS, SIGNS, PAVEMENT, CURBS, UTILITIES, SIDEWALKS, GRASS, TREES, LANDSCAPING, AND IRRIGATION SYSTEMS, ETC.… TO ORIGINAL CONDITION OR BETTER AT NO COST TO THE OWNER.
40.ALL AREAS IN EXISTING RIGHT-OF-WAY DISTURBED BY SITE CONSTRUCTION SHALL BE REPAIRED TO ORIGINAL CONDITION OR BETTER, INCLUDING AS NECESSARY GRADING, LANDSCAPING, CULVERTS, AND PAVEMENT.
41.THE CONTRACTOR SHALL SALVAGE ALL EXISTING POWER POLES, SIGNS, WATER VALVES, FIRE HYDRANTS, METERS, ETC... THAT ARE
TO BE RELOCATED DURING CONSTRUCTION.
42.CONTRACTOR SHALL MAINTAIN ADEQUATE SITE DRAINAGE DURING ALL PHASES OF CONSTRUCTION, INCLUDING MAINTAINING EXISTING
DITCHES OR CULVERTS FREE OF OBSTRUCTIONS AT ALL TIMES.
43.THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING AND SUBMITTING A TRENCH SAFETY PLAN, PREPARED BY A PROFESSIONAL ENGINEER IN THE STATE OF TEXAS, TO THE CITY PRIOR TO CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING TRENCH SAFETY REQUIREMENTS IN ACCORDANCE WITH CITY, STATE, AND FEDERAL REQUIREMENTS, INCLUDING OSHA FOR ALL TRENCHES. NO OPEN TRENCHES SHALL BE ALLOWED OVERNIGHT WITHOUT PRIOR WRITTEN APPROVAL OF THE CITY.
44.THE CONTRACTOR SHALL KEEP TRENCHES FREE FROM WATER.
45.SITE SAFETY IS SOLELY THE RESPONSIBILITY OF THE CONTRACTOR.
46.THESE PLANS DO NOT EXTEND TO OR INCLUDE DESIGNS OR SYSTEMS PERTAINING TO THE SAFETY OF THE CONTRACTOR OR ITS
EMPLOYEES, AGENTS OR REPRESENTATIVES IN THE PERFORMANCE OF THE WORK. THE ENGINEER'S SEAL HEREON DOES NOT EXTEND TO ANY SUCH SAFETY SYSTEM. THE CONTRACTOR SHALL BE RESPONSIBLE FOR IMPLEMENTATION OF ALL REQUIRED SAFETY
PROCEDURES AND PROGRAMS.
47.SIGNS RELATED TO SITE OPERATION OR SAFETY ARE NOT INCLUDED IN THESE PLANS.
48.CONTRACTOR OFFICE AND STAGING AREA SHALL BE AGREED ON BY THE OWNER AND CONTRACTOR PRIOR TO BEGINNING OF
CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR ALL PERMITTING REQUIREMENTS FOR THE CONSTRUCTION OFFICE, TRAILER, STORAGE, AND STAGING OPERATIONS AND LOCATIONS.
49.LIGHT POLES, SIGNS, AND OTHER OBSTRUCTIONS SHALL NOT BE PLACED IN ACCESSIBLE ROUTES.
50.ALL SIGNS, PAVEMENT MARKINGS, AND OTHER TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE "TEXAS MANUAL ON UNIFORM
TRAFFIC CONTROL DEVICES".
51.TOP RIM ELEVATIONS OF ALL EXISTING AND PROPOSED MANHOLES SHALL BE COORDINATED WITH TOP OF PAVEMENT OR FINISHED
GRADE AND SHALL BE ADJUSTED TO BE FLUSH WITH THE ACTUAL FINISHED GRADE AT THE TIME OF PAVING.
52.CONTRACTOR SHALL ADJUST ALL EXISTING AND PROPOSED VALVES, FIRE HYDRANTS, AND OTHER UTILITY APPURTENANCES TO MATCH
ACTUAL FINISHED GRADES AT THE TIME OF PAVING.
53.THE CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTION SEQUENCING AND PHASING, AND SHALL CONTACT THE APPROPRIATE CITY
OFFICIALS, INCLUDING BUILDING OFFICIAL, ENGINEERING INSPECTOR, AND FIRE MARSHALL TO LEARN OF ANY REQUIREMENTS.
54.CONTRACTOR IS RESPONSIBLE FOR PREPARATION, SUBMITTAL, AND APPROVAL BY THE CITY OF A TRAFFIC CONTROL PLAN PRIOR TO
THE START OF CONSTRUCTION, AND THEN THE IMPLEMENTATION OF THE PLAN.
55.CONTRACTOR SHALL KEEP A NEAT AND ACCURATE RECORD OF CONSTRUCTION, INCLUDING ANY DEVIATIONS OR VARIANCES FROM
THE PLANS.
56.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AS-BUILT PLANS TO THE ENGINEER AND CITY IDENTIFYING ALL DEVIATIONS
AND VARIATIONS FROM THESE PLANS MADE DURING CONSTRUCTION.
EROSION CONTROL:
1. THE CONTRACTOR SHALL COMPLY WITH ALL LOCAL, STATE, AND FEDERAL EROSION CONTROL AND WATER QUALITY REQUIREMENTS, LAWS, AND ORDINANCES THAT APPLY TO THE CONSTRUCTION SITE LAND DISTURBANCE.
2. CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF THE “TCEQ GENERAL PERMIT TO DISCHARGE UNDER THE TEXAS
POLLUTANT DISCHARGE ELIMINATION SYSTEM TXR 150000”.
3. EROSION CONTROL DEVICES SHOWN ON THE EROSION CONTROL PLAN FOR THE PROJECT SHALL BE INSTALLED PRIOR TO THE START
OF LAND DISTURBANCE.
4. ALL EROSION CONTROL DEVICES ARE TO BE INSTALLED IN ACCORDANCE WITH THE APPROVED PLANS AND SPECIFICATIONS FOR THE
PROJECT.
5. CONTRACTOR IS SOLELY RESPONSIBLE FOR INSTALLATION, IMPLEMENTATION, MAINTENANCE, AND EFFECTIVENESS OF ALL EROSION CONTROL DEVICES, BEST MANAGEMENT PRACTICES (BMPS), AND FOR UPDATING THE EROSION CONTROL PLAN DURING
CONSTRUCTION AS FIELD CONDITIONS CHANGE.
6. CONTRACTOR SHALL DOCUMENT THE DATES OF INSTALLATION, MAINTENANCE OR MODIFICATION, AND REMOVAL FOR EACH BMP
EMPLOYED IN THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) IF APPLICABLE.
7. AS STORM SEWER INLETS ARE INSTALLED ON-SITE, TEMPORARY EROSION CONTROL DEVICES SHALL BE INSTALLED AT EACH INLET PER
APPROVED DETAILS.
8. THE EROSION CONTROL DEVICES SHALL REMAIN IN PLACE UNTIL THE AREA IT PROTECTS HAS BEEN PERMANENTLY STABILIZED.
9. CONTRACTOR SHALL PROVIDE ADEQUATE EROSION CONTROL DEVICES NEEDED DUE TO PROJECT PHASING.
10.CONTRACTOR SHALL OBSERVE THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES AND MAKE FIELD ADJUSTMENTS AND MODIFICATIONS AS NEEDED TO PREVENT SEDIMENT FROM LEAVING THE SITE. IF THE EROSION CONTROL DEVICES DO NOT EFFECTIVELY CONTROL EROSION AND PREVENT SEDIMENTATION FROM WASHING OFF THE SITE, THEN THE CONTRACTOR SHALL
NOTIFY THE ENGINEER.
11.OFF-SITE SOIL BORROW, SPOIL, AND STORAGE AREAS (IF APPLICABLE) ARE CONSIDERED AS PART OF THE PROJECT SITE AND MUST ALSO COMPLY WITH THE EROSION CONTROL REQUIREMENTS FOR THIS PROJECT. THIS INCLUDES THE INSTALLATION OF BMP'S TO CONTROL EROSION AND SEDIMENTATION AND THE ESTABLISHMENT OF PERMANENT GROUND COVER ON DISTURBED AREAS PRIOR TO FINAL APPROVAL OF THE PROJECT. CONTRACTOR IS RESPONSIBLE FOR MODIFYING THE SWPPP AND EROSION CONTROL PLAN TO INCLUDE BMPS FOR ANY OFF-SITE THAT ARE NOT ANTICIPATED OR SHOWN ON THE EROSION CONTROL PLAN.
12. ALL STAGING, STOCKPILES, SPOIL, AND STORAGE SHALL BE LOCATED SUCH THAT THEY WILL NOT ADVERSELY AFFECT STORM WATER QUALITY. PROTECTIVE MEASURES SHALL BE PROVIDED IF NEEDED TO ACCOMPLISH THIS REQUIREMENT, SUCH AS COVERING OR
ENCIRCLING THE AREA WITH AN APPROPRIATE BARRIER.
13.CONTRACTORS SHALL INSPECT ALL EROSION CONTROL DEVICES, BMPS, DISTURBED AREAS, AND VEHICLE ENTRY AND EXIT AREAS WEEKLY AND WITHIN 24 HOURS OF ALL RAINFALL EVENTS OF 0.5 INCHES OR GREATER, AND KEEP A RECORD OF THIS INSPECTION IN THE SWPPP BOOKLET IF APPLICABLE, TO VERIFY THAT THE DEVICES AND EROSION CONTROL PLAN ARE FUNCTIONING PROPERLY.
14.CONTRACTOR SHALL CONSTRUCT A STABILIZED CONSTRUCTION ENTRANCE AT ALL PRIMARY POINTS OF ACCESS IN ACCORDANCE WITH CITY SPECIFICATIONS.