8-00 41 00 Bid Proposal Part B.xlsx
XLSX spreadsheet 70 KB Posted
- Attached to
- PW ITB - 106066 - Small Diameter Water Main Extensions, Replacements, and Relocations Contract 2025
- Solicitation number
- 25-0093
- Issued by
- Tarrant County, Texas
About this file
This file is a bid proposal spreadsheet (Part B) for the City of Texas's Small Diameter Water Main Extensions, Replacements, and Relocations Contract 2025, which involves extending, replacing, and relocating small-diameter water mains, service lines, and other pertinent construction to upgrade existing infrastructure or provide water service to individual customers and developers. The bid form contains 278 line items covering mobilization services (50 work order mobilizations and 10 emergency mobilizations), extensive sewer pipe installation ranging from 8-inch to 16-inch diameter PVC and ductile iron pipe (DIP) at various depths, manholes and access chambers, abandonment and removal services, service line connections, pavement repairs, and traffic control measures. Quantities vary significantly across items, from single units for permits to 1,000 linear feet for CCTV inspections, with most pipe installation quantities ranging from 30 to 400 linear feet depending on diameter and depth specifications.
The bid form requires contractors to provide unit prices and total amounts for each item, with pricing fields formatted for written dollar and cent amounts alongside numerical entries. While funding comes from the Water and Sewer Capital Projects Fund, the Water Department issues work orders to contractors after customers and/or developers pay applicable estimated costs. The spreadsheet includes blank pricing columns indicating this is an unfilled bid proposal template, with only one pre-filled item showing a plumbing permit cost of $32.82. The work encompasses comprehensive utility construction including specialized techniques like boring and jacking, wood box tunneling, concrete encasement, and CLSM (Controlled Low Strength Material) backfill options, suggesting complex urban infrastructure projects requiring varied construction methodologies.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 ITEM NO. BID LIST ITEM NO. QTY. DESCRIPTION OF ITEMS WITH BID PRICES WRITTEN IN WORDS SPECIFICATION SECTION NO. UNIT PRICE TOTAL AMOUNT
| 1. | 0170.0102 | 50 | Ea. | Work Order Mobilization | 01 70 00 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 2. | 0170.0103 | 10 | Ea. | Work Order Emergency Mobilization | 01 70 00 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 3. | 3331.5301 | 300 | Lf. | 8" PVC Sewer Pipe, 0' to 6' | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 4. | 3331.5304 | 400 | Lf. | 8" PVC Sewer Pipe, 6' to 8' | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 5. | 3331.5307 | 300 | Lf. | 8" PVC Sewer Pipe, 8' to 10' | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 6. | 3331.5310 | 30 | Lf. | 8" PVC Sewer Pipe, 10' to 12' | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 7. | 3331.5313 | 100 | Lf. | 8" PVC Sewer Pipe, 12' to 14' | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 8. | 3331.5316 | 100 | Lf. | 8" PVC Sewer Pipe, 14' to 16' | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 9. | 3331.5319 | 100 | Lf. | 8" PVC Sewer Pipe, 16' to 18' | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 10. | 3331.5401 | 100 | Lf. | 10" PVC Sewer Pipe, 0' to 6' | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 11. | 3331.5404 | 100 | Lf. | 10" PVC Sewer Pipe, 6' to 8' | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 12. | 3331.5407 | 100 | Lf. | 10" PVC Sewer Pipe, 8' to 10' | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 13. | 3331.5410 | 50 | Lf. | 10" PVC Sewer Pipe, 10' to 12' | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 14. | 3331.5413 | 50 | Lf. | 10" PVC Sewer Pipe, 12' to 14' | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 15. | 3331.5416 | 50 | Lf. | 10" PVC Sewer Pipe, 14' to 16' | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 16. | 3331.5419 | 50 | Lf. | 10" PVC Sewer Pipe, 16' to 18' | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 17. | 3331.5501 | 50 | Lf. | 12" PVC Sewer Pipe, 0' to 6' | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 18. | 3331.5504 | 50 | Lf. | 12" PVC Sewer Pipe, 6' to 8' | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 19. | 3331.5507 | 50 | Lf. | 12" PVC Sewer Pipe, 8' to 10' | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 20. | 3331.5510 | 50 | Lf. | 12" PVC Sewer Pipe, 10' to 12' | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 21. | 50 | Lf. | 12" PVC Sewer Pipe, 12' to 14' | 33 31 20 | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 22. | 50 | Lf. | 12" PVC Sewer Pipe, 14' to 16' | 33 31 20 | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 23. | 50 | Lf. | 12" PVC Sewer Pipe, 16' to 18' | 33 31 20 | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 24. | 3331.5601 | 50 | Lf. | 15" PVC Sewer Pipe, 0' to 6' | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 25. | 3331.5604 | 50 | Lf. | 15" PVC Sewer Pipe, 6' to 8' | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 26. | 3331.5607 | 50 | Lf. | 15" PVC Sewer Pipe, 8' to 10' | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 27. | 3331.5610 | 50 | Lf. | 15" PVC Sewer Pipe, 10' to 12' | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 28. | 50 | Lf. | 15" PVC Sewer Pipe, 12' to 14' | 33 31 20 | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 29. | 50 | Lf. | 15" PVC Sewer Pipe, 14' to 16' | 33 31 20 | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 30. | 50 | Lf. | 15" PVC Sewer Pipe, 16' to 18' | 33 31 20 | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 31. | 3331.5331 | 50 | Lf. | 8" DIP Sewer Pipe, 0' to 6' | 33 11 10 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 32. | 3331.5334 | 50 | Lf. | 8" DIP Sewer Pipe, 6' to 8' | 33 11 10 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 33. | 3331.5337 | 50 | Lf. | 8" DIP Sewer Pipe, 8' to 10' | 33 11 10 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 34. | 3331.5340 | 50 | Lf. | 8" DIP Sewer Pipe, 10' to 12' | 33 11 10 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 35. | 3331.5343 | 50 | Lf. | 8" DIP Sewer Pipe, 12' to 14' | 33 11 10 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 36. | 3331.5346 | 50 | Lf. | 8" DIP Sewer Pipe, 14' to 16' | 33 11 10 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 37. | 3331.5349 | 50 | Lf. | 8" DIP Sewer Pipe, 16' to 18' | 33 11 10 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 38. | 3331.5431 | 50 | Lf. | 10" DIP Sewer, 0' to 6' | 33 11 10 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 39. | 3331.5434 | 50 | Lf. | 10" DIP Sewer, 6' to 8' | 33 11 10 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 40. | 3331.5437 | 50 | Lf. | 10" DIP Sewer, 8' to 10' | 33 11 10 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 41. | 3331.5440 | 50 | Lf. | 10" DIP Sewer, 10' to 12' | 33 11 10 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 42. | 3331.5444 | 50 | Lf. | 10" DIP Sewer, 12' to 14' | 33 11 10 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 43. | 3331.5446 | 50 | Lf. | 10" DIP Sewer, 14' to 16' | 33 11 10 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 44. | 3331.5449 | 50 | Lf. | 10" DIP Sewer, 16' to 18' | 33 11 10 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 45. | 3331.5531 | 50 | Lf. | 12" DIP Sewer, 0' to 6' | 33 11 10 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 46. | 3331.5534 | 50 | Lf. | 12" DIP Sewer, 6' to 8' | 33 11 10 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 47. | 3331.5537 | 50 | Lf. | 12" DIP Sewer, 8' to 10' | 33 11 10 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 48. | 3331.5540 | 50 | Lf. | 12" DIP Sewer, 10' to 12' | 33 11 10 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 49. | 50 | Lf. | 12" DIP Sewer, 12' to 14' | 33 11 10 | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 50. | 50 | Lf. | 12" DIP Sewer, 14' to 16' | 33 11 10 | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 51. | 50 | Lf. | 12" DIP Sewer, 16' to 18' | 33 11 10 | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 52. | 3331.5731 | 50 | Lf. | 16" DIP Sewer, 0' to 6' | 33 11 10 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 53. | 3331.5734 | 50 | Lf. | 16" DIP Sewer, 6' to 8' | 33 11 10 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 54. | 3331.5737 | 50 | Lf. | 16" DIP Sewer, 8' to 10' | 33 11 10 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 55. | 3331.5740 | 50 | Lf. | 16" DIP Sewer, 10' to 12' | 33 11 10 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 56. | 50 | Lf. | 16" DIP Sewer, 12' to 14' | 33 11 10 | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 57. | 50 | Lf. | 16" DIP Sewer, 14' to 16' | 33 11 10 | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 58. | 50 | Lf. | 16" DIP Sewer, 16' to 18' | 33 11 10 | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 59. | 3331.5815 | 50 | Lf. | 8" PVC Sewer Pipe, 0' to 6' , CLSM Backfill | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 60. | 3331.5816 | 50 | Lf. | 8" PVC Sewer Pipe, 6' to 8' , CLSM Backfill | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 61. | 3331.5817 | 50 | Lf. | 8" PVC Sewer Pipe, 8' to 10' , CLSM Backfill | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 62. | 3331.5818 | 50 | Lf. | 8" PVC Sewer Pipe, 10' to 12' , CLSM Backfill | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 63. | 3331.5819 | 50 | Lf. | 8" PVC Sewer Pipe, 12' to 14' , CLSM Backfill | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 64. | 3331.5820 | 50 | Lf. | 8" PVC Sewer Pipe, 14' to 16' , CLSM Backfill | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 65. | 3331.5821 | 50 | Lf. | 8" PVC Sewer Pipe, 16' to 18' , CLSM Backfill | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 66. | 3331.5830 | 50 | Lf. | 10" PVC Sewer Pipe, 0' to 6' , CLSM Backfill | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 67. | 3331.5831 | 50 | Lf. | 10" PVC Sewer Pipe, 6' to 8' , CLSM Backfill | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 68. | 3331.5832 | 50 | Lf. | 10" PVC Sewer Pipe, 8' to 10' , CLSM Backfill | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 69. | 3331.5833 | 50 | Lf. | 10" PVC Sewer Pipe, 10' to 12' , CLSM Backfill | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 70. | 3331.5834 | 50 | Lf. | 10" PVC Sewer Pipe, 12' to 14' , CLSM Backfill | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 71. | 3331.5835 | 50 | Lf. | 10" PVC Sewer Pipe, 14' to 16' , CLSM Backfill | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 72. | 3331.5836 | 50 | Lf. | 10" PVC Sewer Pipe, 16' to 18' , CLSM Backfill | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 73. | 3331.5845 | 50 | Lf. | 12" PVC Sewer Pipe, 0' to 6' , CLSM Backfill | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 74. | 3331.5846 | 50 | Lf. | 12" PVC Sewer Pipe, 6' to 8' , CLSM Backfill | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 75. | 3331.5847 | 50 | Lf. | 12" PVC Sewer Pipe, 8' to 10' , CLSM Backfill | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 76. | 3331.5848 | 50 | Lf. | 12" PVC Sewer Pipe, 10' to 12' , CLSM Backfill | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 77. | 50 | Lf. | 12" PVC Sewer Pipe, 12' to 14' , CLSM Backfill | 33 31 20 | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 78. | 50 | Lf. | 12" PVC Sewer Pipe, 14' to 16' , CLSM Backfill | 33 31 20 | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 79. | 50 | Lf. | 12" PVC Sewer Pipe, 16' to 18' , CLSM Backfill | 33 31 20 | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 80. | 3331.5853 | 50 | Lf. | 15" PVC Sewer Pipe, 0' to 6' , CLSM Backfill | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 81. | 3331.5854 | 50 | Lf. | 15" PVC Sewer Pipe, 6' to 8' , CLSM Backfill | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 82. | 3331.5855 | 50 | Lf. | 15" PVC Sewer Pipe, 8' to 10' , CLSM Backfill | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 83. | 3331.5856 | 50 | Lf. | 15" PVC Sewer Pipe, 10' to 12' , CLSM Backfill | 33 31 20 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 84. | 50 | Lf. | 15" PVC Sewer Pipe, 12' to 14' , CLSM Backfill | 33 31 20 | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 85. | 50 | Lf. | 15" PVC Sewer Pipe, 14' to 16' , CLSM Backfill | 33 31 20 | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 86. | 50 | Lf. | 15" PVC Sewer Pipe, 16' to 18' , CLSM Backfill | 33 31 20 | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 87. | 3331.5822 | 50 | Lf. | 8" DIP Sewer Pipe, 0' to 6' , CLSM Backfill | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 88. | 3331.5823 | 50 | Lf. | 8" DIP Sewer Pipe, 6' to 8' , CLSM Backfill | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 89. | 3331.5824 | 50 | Lf. | 8" DIP Sewer Pipe, 8' to 10' , CLSM Backfill | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 90. | 3331.5825 | 50 | Lf. | 8" DIP Sewer Pipe, 10' to 12' , CLSM Backfill | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 91. | 3331.5826 | 50 | Lf. | 8" DIP Sewer Pipe, 12' to 14' , CLSM Backfill | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 92. | 3331.5827 | 50 | Lf. | 8" DIP Sewer Pipe, 14' to 16' , CLSM Backfill | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 93. | 3331.5828 | 50 | Lf. | 8" DIP Sewer Pipe, 16' to 18' , CLSM Backfill | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 94. | 3331.5837 | 50 | Lf. | 10" DIP Sewer, 0' to 6' , CLSM Backfill | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 95. | 3331.5838 | 50 | Lf. | 10" DIP Sewer, 6' to 8' , CLSM Backfill | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 96. | 3331.5839 | 50 | Lf. | 10" DIP Sewer, 8' to 10' , CLSM Backfill | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 97. | 3331.5840 | 50 | Lf. | 10" DIP Sewer, 10' to 12' , CLSM Backfill | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 98. | 3331.5841 | 50 | Lf. | 10" DIP Sewer, 12' to 14' , CLSM Backfill | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 99. | 3331.5842 | 50 | Lf. | 10" DIP Sewer, 14' to 16' , CLSM Backfill | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 100. | 3331.5843 | 50 | Lf. | 10" DIP Sewer, 16' to 18' , CLSM Backfill | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 101. | 3331.5849 | 50 | Lf. | 12" DIP Sewer, 0' to 6' , CLSM Backfill | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 102. | 3331.5850 | 50 | Lf. | 12" DIP Sewer, 6' to 8' , CLSM Backfill | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 103. | 3331.5851 | 50 | Lf. | 12" DIP Sewer, 8' to 10' , CLSM Backfill | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 104. | 3331.5852 | 50 | Lf. | 12" DIP Sewer, 10' to 12' , CLSM Backfill | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 105. | 50 | Lf. | 12" DIP Sewer, 12' to 14' , CLSM Backfill | $ | $ |
| Per Linear Foot: | |||||
| _________________________ Dollars and _____________________ Cents |
| 106. | 50 | Lf. | 12" DIP Sewer, 14' to 16' , CLSM Backfill | $ | $ |
| Per Linear Foot: | |||||
| _________________________ Dollars and _____________________ Cents |
| 107. | 50 | Lf. | 12" DIP Sewer, 16' to 18' , CLSM Backfill | $ | $ |
| Per Linear Foot: | |||||
| _________________________ Dollars and _____________________ Cents |
| 108. | 3331.5857 | 50 | Lf. | 16" DIP Sewer, 0' to 6' , CLSM Backfill | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 109. | 3331.5858 | 50 | Lf. | 16" DIP Sewer, 6' to 8' , CLSM Backfill | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 110. | 3331.5859 | 50 | Lf. | 16" DIP Sewer, 8' to 10' , CLSM Backfill | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 111. | 3331.5860 | 50 | Lf. | 16" DIP Sewer, 10' to 12' , CLSM Backfill | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 112. | 50 | Lf. | 16" DIP Sewer, 12' to 14' , CLSM Backfill | $ | $ |
| Per Linear Foot: | |||||
| _________________________ Dollars and _____________________ Cents |
| 113. | 50 | Lf. | 16" DIP Sewer, 14' to 16' , CLSM Backfill | $ | $ |
| Per Linear Foot: | |||||
| _________________________ Dollars and _____________________ Cents |
| 114. | 50 | Lf. | 16" DIP Sewer, 16' to 18' , CLSM Backfill | $ | $ |
| Per Linear Foot: | |||||
| _________________________ Dollars and _____________________ Cents |
| 115. | 3305.3002 | 50 | Lf. | 8" D.I. Sewer Carrier Pipe | 33 05 24 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 116. | 3305.3003 | 50 | Lf. | 10" D.I. Sewer Carrier Pipe | 33 05 24 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 117. | 3305.3004 | 50 | Lf. | 12" D.I. Sewer Carrier Pipe | 33 05 24 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 118. | 3305.3006 | 50 | Lf. | 16" D.I. Sewer Carrier Pipe | 33 05 24 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 119. | 3305.1001 | 50 | Lf. | 12" Casing By Open Cut | 33 05 22 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 120. | 3305.1002 | 50 | Lf. | 16" Casing By Open Cut | 33 05 22 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 121. | 3305.1003 | 50 | Lf. | 20" Casing By Open Cut | 33 05 22 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 122. | 3305.1004 | 50 | Lf. | 24" Casing By Open Cut | 33 05 22 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 123. | 3305.1005 | 50 | Lf. | 30" Casing By Open Cut | 33 05 22 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 124. | 3305.1101 | 50 | Lf. | 12" Casing By Other Than Open Cut | 33 05 22 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 125. | 3305.1102 | 50 | Lf. | 16" Casing By Other Than Open Cut | 33 05 22 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 126. | 3305.1003 | 50 | Lf. | 20" Casing By Other Than Open Cut | 33 05 22 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 127. | 3305.1104 | 50 | Lf. | 24" Casing By Other Than Open Cut | 33 05 22 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 128. | 3305.1105 | 50 | Lf. | 30" Casing By Other Than Open Cut | 33 05 22 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 129. | 50 | Lf. | Bore & Jack 8" D.I. Sewer Pipe | $ | $ |
| Per Linear Foot: | |||||
| _________________________ Dollars and _____________________ Cents |
| 130. | 50 | Lf. | Bore & Jack 10" D.I. Sewer Pipe | $ | $ |
| Per Linear Foot: | |||||
| _________________________ Dollars and _____________________ Cents |
| 131. | 50 | Lf. | Bore & Jack 12" D.I. Sewer Pipe | $ | $ |
| Per Linear Foot: | |||||
| _________________________ Dollars and _____________________ Cents |
| 132. | 50 | Lf. | Bore & Jack 16" D.I. Sewer Pipe | $ | $ |
| Per Linear Foot: | |||||
| _________________________ Dollars and _____________________ Cents |
| 133. | 50 | Lf. | 42" Wood Box Tunnel w/ 8" D.I. or PVC Pipe and Grout, as Specified by Engineer | $ | $ |
| Per Linear Foot: | |||||
| _________________________ Dollars and _____________________ Cents |
| 134. | 50 | Lf. | 42" Wood Box Tunnel w/ 10" D.I. or PVC Pipe and Grout, as Specified by Engineer | $ | $ |
| Per Linear Foot: | |||||
| _________________________ Dollars and _____________________ Cents |
| 135. | 50 | Lf. | 42" Wood Box Tunnel w/ 12" D.I. or PVC Pipe and Grout, as Specified by Engineer | $ | $ |
| Per Linear Foot: | |||||
| _________________________ Dollars and _____________________ Cents |
| 136. | 50 | Lf. | 42" Wood Box Tunnel w/ 16" D.I. Pipe and Grout, as Specified by Engineer | $ | $ |
| Per Linear Foot: | |||||
| _________________________ Dollars and _____________________ Cents |
| 137. | 50 | Lf. | 48" Wood Box Tunnel w/ 8" D.I. or PVC Pipe and Grout, as Specified by Engineer | $ | $ |
| Per Linear Foot: | |||||
| _________________________ Dollars and _____________________ Cents |
| 138. | 50 | Lf. | 48" Wood Box Tunnel w/ 10" D.I. or PVC Pipe and Grout, as Specified by Engineer | $ | $ |
| Per Linear Foot: | |||||
| _________________________ Dollars and _____________________ Cents |
| 139. | 50 | Lf. | 48" Wood Box Tunnel w/ 12" D.I. or PVC Pipe and Grout, as Specified by Engineer | $ | $ |
| Per Linear Foot: | |||||
| _________________________ Dollars and _____________________ Cents |
| 140. | 50 | Lf. | 48" Wood Box Tunnel w/ 16" D.I. Pipe and Grout, as Specified by Engineer | $ | $ |
| Per Linear Foot: | |||||
| _________________________ Dollars and _____________________ Cents |
| 141. | 0330.0001 | 50 | Lf. | Concrete Encase Sewer Pipe | 03 30 00 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 142. | 3301.0001 | 1000 | Lf. | Pre-CCTV Inspection | 33 01 31 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 143. | 3301.0002 | 1000 | Lf. | Post-CCTV Inspection | 33 01 31 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 144. | 3305.0109 | 200 | Lf. | Trench Safety | 33 05 10 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 145. | 3305.0103 | 5 | Ea. | Exploratory Excavation of Existing Utilities (0'-5') | 33 05 30 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 146. | 3305.0103 | 5 | Ea. | Exploratory Excavation of Existing Utilities (5'-10') | 33 05 30 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 147. | 3305.0103 | 5 | Ea. | Exploratory Excavation of Existing Utilities (10'-20') | 33 05 30 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 148. | 3339.1001 | 30 | Ea. | 4' Dia. Manhole (0'-6' Depth) | 33 39 10, 33 39 20 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 149. | 3339.1003 | 10 | Vf. | 4' Dia. Manhole Extra Depth | 33 39 10, 33 39 20 | $ | $ |
| Per Vertical Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 150. | 3339.1002 | 20 | Ea. | 4' Dia. Drop Manhole (0'-6' Depth) | 33 39 10, 33 39 20 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 151. | 10 | Vf. | 4' Dia. Drop Manhole Extra Depth | 33 39 10, 33 39 20 | $ | $ |
| Per Vertical Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 152. | 3339.1004 | 20 | Ea. | 4' Dia. Shallow Cone Section Manhole | 33 39 10, 33 39 20 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 153. | 3339.1005 | 5 | Ea. | 4' Dia. Type A Manhole (0'-6' Depth) | 33 39 10, 33 39 20 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 154. | 5 | Vf. | 4' Dia. Type A Manhole Extra Depth | $ | $ |
| Per Vertical Foot: | |||||
| _________________________ Dollars and _____________________ Cents |
| 155. | 3339.1006 | 5 | Ea. | 4' Dia. Fiberglass Manhole (0'-6' Depth) | 33 39 30 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 156. | 5 | Vf. | 4' Dia. Fiberglass Manhole Extra Depth | $ | $ |
| Per Vertical Foot: | |||||
| _________________________ Dollars and _____________________ Cents |
| 157. | 3339.1007 | 5 | Ea. | 4' Dia. Fiberglass Drop Manhole (0'-6' Depth) | 33 39 30 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 158. | 5 | Vf. | 4' Dia. Fiberglass Drop Manhole Extra Depth | $ | $ |
| Per Vertical Foot: | |||||
| _________________________ Dollars and _____________________ Cents |
| 159. | 3339.1010 | 5 | Ea. | 4' Dia. Fiberglass Type A Manhole (0'-6' Depth) | 33 39 30 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 160. | 5 | Vf. | 4' Dia. Fiberglass Type A Manhole Extra Depth | $ | $ |
| Per Vertical Foot: | |||||
| _________________________ Dollars and _____________________ Cents |
| 161. | 3339.1101 | 5 | Ea. | 5' Dia. Manhole (0'-6' Depth) | 33 39 10, 33 39 20 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 162. | 3339.1103 | 5 | Vf. | 5' Dia. Manhole Extra Depth | 33 39 10, 33 39 20 | $ | $ |
| Per Vertical Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 163. | 3339.1102 | 5 | Ea. | 5' Dia. Drop Manhole (0'-6' Depth) | 33 39 10, 33 39 20 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 164. | 5 | Vf. | 5' Dia. Drop Manhole Extra Depth | $ | $ |
| Per Vertical Foot: | |||||
| _________________________ Dollars and _____________________ Cents |
| 165. | 3339.1104 | 5 | Ea. | 5' Dia. Shallow Manhole | 33 39 10, 33 39 20 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 166. | 3339.1105 | 5 | Ea. | 5' Dia. Type A Manhole (0'-6' Depth) | 33 39 10, 33 39 20 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 167. | 5 | Vf. | 5' Dia. Type A Manhole Extra Depth | $ | $ |
| Per Vertical Foot: | |||||
| _________________________ Dollars and _____________________ Cents |
| 168. | 3339.1106 | 5 | Ea. | 5' Dia. Fiberglass Manhole (0'-6' Depth) | 33 39 30 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 169. | 5 | Vf. | 5' Dia. Fiberglass Manhole Extra Depth | $ | $ |
| Per Vertical Foot: | |||||
| _________________________ Dollars and _____________________ Cents |
| 170. | 3339.1107 | 5 | Ea. | 5' Dia. Fiberglass Drop Manhole (0'-6' Depth) | 33 39 30 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 171. | 5 | Vf. | 5' Dia. Fiberglass Drop Manhole Extra Depth | $ | $ |
| Per Vertical Foot: | |||||
| _________________________ Dollars and _____________________ Cents |
| 172. | 3339.1110 | 5 | Ea. | 5' Dia. Fiberglass Type A Manhole (0'-6' Depth) | 33 39 30 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 173. | 5 | Vf. | 5' Dia. Fiberglass Type A Manhole Extra Depth | $ | $ |
| Per Vertical Foot: | |||||
| _________________________ Dollars and _____________________ Cents |
| 174. | 5 | Ea. | External Drop Into Existing Manhole (Up to 6' of Drop) | $ | $ |
| Per Each: | |||||
| _________________________ Dollars and _____________________ Cents |
| 175. | 5 | Vf. | External Drop Extra Depth (Over 6' of Depth) | $ | $ |
| Per Vertical Foot: | |||||
| _________________________ Dollars and _____________________ Cents |
| 176. | 5 | Vf. | Internal Drop into Existing M.H. (Up to 6' of Drop) | $ | $ |
| Per Vertical Foot: | |||||
| _________________________ Dollars and _____________________ Cents |
| 177. | 5 | Ea. | Internal Drop Extra Depth (Over 6' of Drop) | $ | $ |
| Per Each: | |||||
| _________________________ Dollars and _____________________ Cents |
| 178. | 3339.0003 | 5 | Ea. | Wastewater Access Chamber (Any Depth) | 33 39 40 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 179. | 3305.0112 | 30 | Ea. | Concrete Collar | 33 05 17 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 180. | 3301.0101 | 30 | Ea. | Manhole Vacuum Testing | 33 01 30 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 181. | 3305.0107 | 10 | Ea. | Manhole Adjustment, Minor (Grade Ring Adjustment) | 33 05 14 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 182. | 3305.0106 | 10 | Ea. | Manhole Adjustment, Major (Structural Modification) | 33 05 14 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 183. | 3305.0114 | 10 | Ea. | Manhole Adjustment, Major w/ Cover | 33 05 14 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 184. | 60 | Sf. | Interior Coat Manhole | $ | $ |
| Per Each: | |||||
| _________________________ Dollars and _____________________ Cents |
| 185. | 0241.5001 | 10 | Ea. | Abandon Manhole | 02 41 14 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 186. | 0241.2201 | 10 | Ea. | Remove 4' Dia. Sewer Manhole | 02 41 14 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 187. | 0241.2202 | 10 | Ea. | Remove 5' Dia. Sewer Manhole | 02 41 14 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 188. | 0241.2001 | 20 | Cy. | Sanitary Line Grouting | 02 41 14 | $ | $ |
| Per Cubic Yard: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 189. | 0241.2101 | 10 | Ea. | 4" Sewer Abandonment Plug | 02 41 14 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 190. | 0241.2102 | 10 | Ea. | 6" Sewer Abandonment Plug | 02 41 14 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 191. | 0241.2103 | 10 | Ea. | 8" Sewer Abandonment Plug | 02 41 14 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 192. | 0241.2104 | 5 | Ea. | 10" Sewer Abandonment Plug | 02 41 14 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 193. | 0241.2105 | 5 | Ea. | 12" Sewer Abandonment Plug | 02 41 14 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 194. | 0241.2106 | 5 | Ea. | 15" Sewer Abandonment Plug | 02 41 14 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 195. | 0241.2107 | 5 | Ea. | 16" Sewer Abandonment Plug | 02 41 14 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 196. | 20 | Ea. | 4" Sewer Service Tap | $ | $ |
| Per Each: | |||||
| _________________________ Dollars and _____________________ Cents |
| 197. | 3331.3101 | 50 | Lf. | 4" PVC Sewer Service Line | 33 31 50 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 198. | 3331.3103 | 50 | Lf. | 4" Bored Sewer Service Line | 33 31 50 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 199. | 3331.3106 | 50 | Lf. | 4" DIP Sewer Service Line | 33 31 50 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 200. | 3331.3107 | 50 | Lf. | 4" DIP Bored Sewer Service Line | 33 31 50 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 201. | 3331.3105 | 50 | Lf. | 4" Private Sewer Service Line | 33 31 50 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 202. | 3331.3109 | 50 | Lf. | 4" DIP Private Sewer Service ine | 33 31 50 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 203. | 3331.3102 | 20 | Ea. | 4" 2-Way PVC Cleanout | 33 31 50 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 204. | 10 | Ea. | 4" 2-Way Cast Iron Cleanout | 33 31 50 | $ | $ |
| Per Each: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 205. | 20 | Ea. | 4" Private Service Line PVC Cleanout | $ | $ |
| Per Each: | |||||
| _________________________ Dollars and _____________________ Cents |
| 206. | 50 | Ea. | 6" Sewer Service Tap | $ | $ |
| Per Each: | |||||
| _________________________ Dollars and _____________________ Cents |
| 207. | 3331.3201 | 50 | Lf. | 6" PVC Sewer Service Line | 33 31 50 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 208. | 3331.3203 | 50 | Lf. | 6" Bored Sewer Service Line | 33 31 50 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 209. | 3331.3206 | 50 | Lf. | 6" DIP Sewer Service Line | 33 31 50 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 210. | 3331.3207 | 50 | Lf. | 6" DIP Bored Sewer Service Line | 33 31 50 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 211. | 3331.3205 | 50 | Lf. | 6" Private Sewer Service Line | 33 31 50 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 212. | 3331.3209 | 50 | Lf. | 6" DIP Private Sewer Service Line | 33 31 50 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 213. | 3331.3202 | 50 | Ea. | 6" 2-way PVC Cleanout | 33 31 50 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 214. | 10 | Ea. | 6" 2-way Cast Iron Cleanout | 33 31 50 | $ | $ |
| Per Each: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 215. | 20 | Ea. | 6" Private Service Line PVC Cleanout | $ | $ |
| Per Each: | |||||
| _________________________ Dollars and _____________________ Cents |
| 216. | 20 | Ea. | 8" Sewer Service Tap | $ | $ |
| Per Each: | |||||
| _________________________ Dollars and _____________________ Cents |
| 217. | 3331.3301 | 50 | Lf. | 8" PVC Sewer Service Line | 33 31 50 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 218. | 3331.3303 | 50 | Lf. | 8" Bored Sewer Service Line | 33 31 50 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 219. | 3331.3306 | 50 | Lf. | 8" DIP Sewer Service Line | 33 31 50 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 220. | 3331.3308 | 50 | Lf. | 8" DIP Bored Sewer Service Line | 33 31 50 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 221. | 3331.3305 | 50 | Lf. | 8" Private Sewer Service Line | 33 31 50 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 222. | 3331.3310 | 50 | Lf. | 8" DIP Private Sewer Service Line | 33 31 50 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 223. | 3331.3302 | 20 | Ea. | 8" 2-way PVC Cleanout | 33 31 50 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 224. | 20 | Ea. | 8" 2-way Cast Iron Cleanout | 33 31 50 | $ | $ |
| Per Each: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 225. | 20 | Ea. | 8" Private Service Line PVC Cleanout | $ | $ |
| Per Each: | |||||
| _________________________ Dollars and _____________________ Cents |
| 226. | 1 | Ea. | Plumbing Permit for Sewer Service Inspection | $ | $32.82 | $ | 32.82 |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 227. | 3137.0101 | 20 | Sy. | Concrete Riprap | 31 37 00 | $ | $ |
| Per Square Yard: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 228. | 3137.0102 | 20 | Cy. | Large Stone Riprap, dry | 31 37 00 | $ | $ |
| Per Cubic Yard: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 229. | 3137.0103 | 20 | Cy. | Large Stone Riprap, grouted | 31 37 00 | $ | $ |
| Per Cubic Yard: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 230. | 3305.0203 | 100 | Cy. | Imported Embedment/Backfill, Controlled Low Strength Material (CLSM) | 33 05 10 | $ | $ |
| Per Cubic Yard: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 231. | 3305.0204 | 50 | Cy. | Imported Embedment/Backfill, Crushed Rock | 33 05 10 | $ | $ |
| Per Cubic Yard: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 232. | 50 | Cy. | Imported Embedment/Backfill, Cement Stabilized Sand (CSS) | 33 05 10 | $ | $ |
| Per Cubic Yard: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 233. | 50 | Cy. | Imported Acceptable Backfill Material | 33 05 10 | $ | $ |
| Per Cubic Yard: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 234. | 3292.0100 | 20 | Sy. | Block Sod Placement | 32 92 13 | $ | $ |
| Per Square Yard: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 235. | 3292.0200 | 20 | Sy. | Seeding, Broadcast | 32 92 13 | $ | $ |
| Per Square Yard: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 236. | 3292.0400 | 20 | Sy. | Seeding, Hydromulch | 32 92 13 | $ | $ |
| Per Square Yard: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 237. | 3292.0500 | 20 | Sy. | Seeding, Soil Retention Blanket | 32 92 13 | $ | $ |
| Per Square Yard: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 238. | 3213.0301 | 40 | Sy. | 4" Conc Sidewalk | 32 13 20 | $ | $ |
| Per Square Yard: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 239. | 3213.0351 | 20 | Sy. | 4" Conc Sidewalk, Exposed Aggregate | 32 13 20 | $ | $ |
| Per Square Yard: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 240. | 3213.0401 | 50 | Sy. | 6" Concrete Driveway | 32 13 20 | $ | $ |
| Per Square Yard: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 241. | 3213.0451 | 20 | Sy. | 6" Concrete Driveway, Exposed Aggregate | 32 13 20 | $ | $ |
| Per Square Yard: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 242. | 3216.0101 | 60 | Lf. | 6" Conc Curb and Gutter | 32 16 13 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 243. | 60 | Lf. | 6" Conc Curb & Gutter Attached to Conc Pvmt. | 32 16 13 | $ | $ |
| Per Linear Foot: | ||||||
| _________________________ Dollars and _____________________ Cents |
| 244. | 3216.0301 | 20 | Sy. | 9" Conc Valley Gutter, Residential | 32 16 13 | $ | $ |
| Per Square Yard: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 245. | 3216.0302 | 20 | Sy. | 11" Conc Valley Gutter, Arterial/Industrial | 32 16 13 | $ | $ |
| Per Square Yard: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 246. | 3201.0150 | 100 | Lf. | Asphalt Pvmt Repair, Sewer Service | 32 01 17 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 247. | 3201.0111 | 100 | Lf. | 4' Wide Asphalt Pvmt Repair, Residential | 32 01 17 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 248. | 3201.0112 | 300 | Lf. | 5' Wide Asphalt Pvmt Repair, Residential | 32 01 17 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 249. | 3201.0113 | 300 | Lf. | 6' Wide Asphalt Pvmt Repair, Residential | 32 01 17 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 250. | 3201.0121 | 300 | Lf. | 4' Wide Asphalt Pvmt Repair, Arterial | 32 01 17 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 251. | 3201.0122 | 300 | Lf. | 5' Wide Asphalt Pvmt Repair, Arterial | 32 01 17 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 252. | 3201.0123 | 300 | Lf. | 6' Wide Asphalt Pvmt Repair, Arterial | 32 01 17 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 253. | 3201.0131 | 300 | Lf. | 4' Wide Asphalt Pvmt Repair, Industrial | 32 01 17 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 254. | 3201.0132 | 300 | Lf. | 5' Wide Asphalt Pvmt Repair, Industrial | 32 01 17 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 255. | 3201.0133 | 300 | Lf. | 6' Wide Asphalt Pvmt Repair, Industrial | 32 01 17 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 256. | 3201.0201 | 300 | Sy. | Asphalt Pvmt Repair Beyond Defined Width, Residential | 32 01 17 | $ | $ |
| Per Square Yard: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 257. | 3201.0202 | 300 | Sy. | Asphalt Pvmt Repair Beyond Defined Width, Arterial | 32 01 17 | $ | $ |
| Per Square Yard: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 258. | 3201.0203 | 300 | Sy. | Asphalt Pvmt Repair Beyond Defined Width, Industrial | 32 01 17 | $ | $ |
| Per Square Yard: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 259. | 3201.0301 | 100 | Sy. | 2" Thick Extra Width Asphalt Pavment Repair | 32 01 17 | $ | $ |
| Per Square Yard: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 260. | 3201.0302 | 100 | Sy. | 3" Thick Extra Width Asphalt Pavment Repair | 32 01 17 | $ | $ |
| Per Square Yard: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 261. | 3201.0303 | 100 | Sy. | 4" Thick Extra Width Asphalt Pavment Repair | 32 01 17 | $ | $ |
| Per Square Yard: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 262. | 3201.0303 | 75 | Lf. | Temporary Asphalt Paving Repair | 32 01 17 | $ | $ |
| Per Linear Foot: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 263. | 3211.0112 | 40 | Sy. | 6" Flexible Base, Type B, GR-1 | 32 11 23 | $ | $ |
| Per Square Yard: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 264. | 3211.0122 | 40 | Sy. | 6" Flexible Base, Type B, GR-2 | 32 11 23 | $ | $ |
| Per Square Yard: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 265. | 3201.0614 | 300 | Sy. | Conc Pvmt Repair, Residential | 32 01 29 | $ | $ |
| Per Square Yard: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 266. | 3201.0616 | 300 | Sy. | Conc Pvmt Repair, Arterial/Industrial | 32 01 29 | $ | $ |
| Per Square Yard: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 267. | 300 | Sy. | Conc. Pvmt. Repair Beyond Defined Width, Residential | $ | $ |
| Per Square Yard: | |||||
| _________________________ Dollars and _____________________ Cents |
| 268. | 100 | Sy. | Conc. Pvmt. Repair Beyond Defined Width, Arterial/Industrial | $ | $ |
| Per Square Yard: | |||||
| _________________________ Dollars and _____________________ Cents |
| 269. | 50 | Sy. | High Early Strength Conc. | $ | $ |
| Per Square Yard: | |||||
| _________________________ Dollars and _____________________ Cents |
| 270. | 3214.0100 | 50 | Sy. | Brick Pvmt Repair | 32 14 16 | $ | $ |
| Per Square Yard: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 271. | 3214.0400 | 50 | Sy. | Brick Pvmt Repair (City Supplied) | 32 14 16 | $ | $ |
| Per Square Yard: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 272. | 3305.0001 | 5 | Ea. | 4" Waterline Lowering | 33 05 12 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 273. | 3305.0002 | 5 | Ea. | 6" Waterline Lowering | 33 05 12 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 274. | 3305.0003 | 5 | Ea. | 8" Waterline Lowering | 33 05 12 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 275. | 3305.0004 | 5 | Ea. | 10" Waterline Lowering | 33 05 12 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 276. | 3305.0005 | 5 | Ea. | 12" Waterline Lowering | 33 05 12 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 277. | 3471.0003 | 25 | Ea. | Traffic Control | 34 71 13 | $ | $ |
| Per Each: | |||||||
| _________________________ Dollars and _____________________ Cents |
| 278. | 25 | Ea. | Street Use Permit | $ | $ |
| Per Each: | |||||
| _________________________ Dollars and _____________________ Cents |
TOTAL AMOUNT BID $
B - &P
Sheet2
Sheet3
File details come from the government source that posted it. Updated .