7m RIB Mk4 - SOLAS Testing Descriptions and Sketches - Discussion with Crane Company v3.pdf
PDF 911 KB Posted
- Attached to
- Crane Support Services Federal contract opportunity
- Solicitation number
- N0016722Q0187
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 02. STATEMENT OF WORK (6-6-22).docx | DOCX document | |
| N0016722Q0187 CSS.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FY22
SOLAS 7M RIB
Test Planning – Crane Involvement
Crane Test Logistics
• Seeking crane lift insight for the following test
– Righting Test
– Seating Strength Test
– Drop Test
– Impact Test
– Overload Test
Desired Test Location
• NOB V47, 1052 Pocahontas St.
Righting Test
• Procedure: The rescue boat should be loaded with its equipment. Fuel tanks should be flooded or filled to the final waterline resulting from this test.
– Craft Load Condition: ~4350 lbs. (Full Fuel, No Personnel)
– Crane will be used to invert/flip the RIB
– Righting bag will be activated to demonstrate righting (Additional procedure information on next slide)
• Environmental Mitigations
– Remove the inboard engine and replace with ballast.
– Empty the fuel tank and fill with water to represent the weight of full fuel.
– To the extent possible remove all operational fluids and replace the approximate weight with ballast.
– If possible, remove all equipment that will be damaged by submergence and replace associated weights with ballast.
– Prepare an oil boom around the test site.
– Ensure clean up material is available and on standby.
– Prepare facility pump to remove flooded water after the test
Righting Test
• Crane Rigging
– Connect two hoisting lines on the side of the boat (bow and stern), where the loop goes under the hull of the boat. The crane operator will then come up on the hoisting lines to turn the boat upside down.
– The righting bag on the craft’s aft arch will be activated to invert/right the craft https://www.youtube.com/watch?v=ggNx7G6i664 [3]
Hoisting Lines
Seating Strength Test
• Procedure: The seating should be loaded with a mass of 100 kg in each position allocated for a person to sit in the rescue boat. Each type of seat should be loaded with a mass of 100 kg in any single seat location when dropped into the water from height of at least 3 m.
– Craft Load Condition: ~5,800 lbs.
– Crane will be used to lift the craft 3m above the surface of the water
– A quick release between the boat slings and crane rigging will be activated, dropping the craft into the water (Additional procedure information on next slide)
Seating Strength Test
• Rigging
– Connect a hoisting line to the craft. Connect two guiding lines (bow and stern) to keep the boat inline. The crane operator will then come up on the hoisting line until the boat is at least 3 meters above the surface of the water. Once the boat is at the desired dropping height, the quick release will be activated from the pier.
3m
Hoisting Line
Guide Line
Quick Release
Guide Line
Drop Test
• Procedure: The rescue boat, complete with all its equipment, should be dropped three times from a height of at least 3 m on to water. The drops should be from level trim, 45-degree bow-down, and 45-degree stern-down attitudes.
– Craft Load Condition: 5,800 lbs. (Maximum Full/Hoisting Load)
– Crane will be used to lift the craft 3m above the surface of the water
• Sling baskets (sling extenders) may be used to achieve desired trim
– A quick release between the boat slings and crane rigging will be activated, dropping the craft into the water
Drop Test
• Rigging
– Connect a hoisting line to the craft. Connect two guiding lines (bow and stern) to keep the boat inline. The crane operator will then come up on the hoisting line until the boat is at least three meters above the surface of the water. Once the boat is at the desired dropping height and the boat is inline, the quick release will be activated from the pier.
– Three lifts and drops will be required. Different boat slings may be used to achieve desired craft trim.
3m 45°
3m
Hoisting Line
Guide Line
Quick Release
Guide Line
3m 45°
Impact Test
• Procedure: The rescue boat, in a free hanging position, should be pulled laterally to a position so that when released it will strike a fixed rigid vertical surface at a velocity of 3.5 m/s. The boat should be released to impact against the rigid vertical surface. Skates or fenders, if required, should be in position.
– Craft Load Condition: 5,800 lbs. (Maximum Full/Hoisting Load)
– Use crane 1 to lift the craft
– Use crane 2 / winch to pull the craft laterally (rigging will include a quick release)
• Craft will be pulled laterally until a height of approximately 2 feet above the craft’s starting position is achieved
– Activate the quick release to release crane 2 / winch rigging
I m p a c t
Hard Vertical Structure
Quick Release
Prime Mover / Winch
Hard Vertical Structure Quick Release
(Craft Vertically Lifted)
Prime Mover / Winch
I m p a c t
(Craft Vertically Lifted)
• General Rigging
• Test Example (prior to release) https://www.youtube.com/watch?v=Ot3AMe1BDb8
Quick Release
• Test Example (At impact) https://www.youtube.com/watch?v=Ot3AMe1BDb8
I m p a c t
Impact Test
• NAVFAC Rigging – Additional Option
Pierside
Pierside Quick
Release Crane 1 (vertical lift)
C rane 2
Overload Test
• Procedure: The rescue boat should be loaded with a properly distributed load of four times the weight to represent the equipment and full complement of persons each weighing 82.5 kg for which it is to be approved and suspended for 5 minutes from its bridle or hooks.
– Craft Load Condition: ~10,165 lbs. (Four times equipment and personnel weight)
– Ballast the craft to achieve the desired load out
– Complete a single point lift and hold the lift for 5 minutes
Hoisting LineQuick Release
Boat Trailer
References
1. MSC. 1/Circ. 1631, Revised Standardized Life-Saving Appliance Evaluation and Test Report Forms (Recue Boats), 14 December 2020
2. How Not To Capsize - Self-Righting Explained, https://www.youtube.com/watch?v=ggNx7G6i664, 4 May 2021
3. MSC.48(66), LSA Code – International Life-Saving Appliance Code – Resolution
4. MSC.81(70), Revised Recommendation on Testing of Life-Saving Appliances, 11
December 1998
5. Wahoo SOLAS Side Impact Test V2 https://www.youtube.com/watch?v=Ot3AMe1BDb8
| Slide Number 1 |
| Crane Test Logistics |
| Desired Test Location |
| Righting Test |
| Righting Test |
| Seating Strength Test |
| Seating Strength Test |
| Drop Test |
| Drop Test |
| Impact Test |
| Impact Test |
| Impact Test |
| Impact Test |
| Impact Test |
| Overload Test |
| References |