79-5 SJVAPCD ISR 20250142 Summary.pdf
PDF 67 KB Posted
- Solicitation number
- RFB-25-26-05
- Issued by
- Tulare County, California
About this file
This document is an Indirect Source Review (ISR) Project Summary Sheet from the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD), involving the City of Visalia for the East Side Regional Park Groundwater Recharge-Basin D project. The project is located at the northwest corner of East Mineral King Avenue and Road 152, spanning 51.3 acres with a project ID number C-20250142. The site is designated as 16 acres of "Other" land use, and the public agency permit number is currently unknown.
The document outlines three district-enforced emission reduction measures that require detailed recordkeeping and reporting. Specifically, the City of Visalia must maintain on-site records during construction and for ten years following construction completion, documenting construction start and end dates, and the first certificate of occupancy. Additionally, within 30 days of project phase completion or first occupancy, the city must submit summary reports to the district. There are no existing or non-district emission reduction measures identified for this project, and the document serves as a monitoring and reporting schedule to ensure compliance with local air quality regulations.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SJVUAPCD Indirect Source Review 5/1/25 Complete Project Summary Sheet & 2:53 pm Monitoring and Reporting Schedule
Project Name: EAST SIDE REGIONAL PARK GROUNDWATER RECHARGE-BASIN D Applicant Name: CITY OF VISALIA Project Location: NW COR E MINERAL KING AVE & ROAD 152
EAST MINERAL KING AVE & ROAD 152
APN(s): 103-500-001
Project Description: LAND USE:
Other - 16 Acres - Other Other - 16 Acres - Other
ACREAGE: 51.3
ISR Project ID Number: C-20250142 Applicant ID Number: C-301430 Permitting Public Agency: CITY OF VISALIA Public Agency Permit No. UNKNOWN
Existing Emission Reduction Measures Enforcing Agency
Measure Quantification Notes
There are no Existing Measures for this project.
Non-District Enforced Emission Reduction Measures Enforcing Agency
Measure Specific Implementation Source Of Requirements
There are no Non-District Enforced Measures for this project.
District Enforced Emission Reduction Measures Enforcing Agency
Measure Specific Implementation Measure For Compliance
District Review
SJVAPCD Construction and Operation - Recordkeeping
For each project phase, all records shall be maintained on site during construction and for a period of ten years following either the end of construction or the issuance of the first certificate of occupancy, whichever is later. Records shall be made available for District inspection upon request.
(Compliance Dept.
Review)
SJVAPCD Construction and Operational Dates
For each project phase, maintain records of (1) the construction start and end dates and (2) the date of issuance of the first certificate of occupancy, if applicable.
(Compliance Dept.
Review)
SJVUAPCD Indirect Source Review 5/1/25
Complete Project Summary Sheet & 2:53 pm
Monitoring and Reporting Schedule
(District Enforced Emission Reduction Measures Continued) Enforcing Agency
Measure Specific Implementation Measure For Compliance
District Review
SJVAPCD Construction and Operation - Exempt from Off-site Fee
For each project phase, within 30-days of issuance of the first certificate of occupancy, if applicable, submit to the District a summary report of the construction start, and end dates, and the date of issuance of the first certificate of occupancy. Otherwise, submit to the District a summary report of the construction start and end dates within 30-days of the end of each phase of construction.
(Compliance Dept.
Review)
Number of District Enforced Measures: 3