78451 - Purchase Description (PD) - Lift Station.pdf
PDF 243 KB Posted
- Attached to
- LIFT STATION REDESIGN B20128
- Solicitation number
- FA857126Q0079
About this file
This is a Purchase Description for a Lift Station Redesign project (B20128) dated 1 May 2026, issued by the U.S. Air Force for delivery to the Commodities Maintenance Group at Robins Air Force Base, Georgia.
The contractor must provide six redesigned lift stations with dual electric pumps, polypropylene tanks (50-75 gallons), stainless steel control panels, and associated components. Each lift station shall measure 4 feet long by 3 feet wide by 4 feet high and feature two CPVC or 316 Stainless Steel pumps rated at 25 gallons per minute with 30-foot total dynamic head, disconnect switches, hands-off-auto controls, and level sensors. The redesign consolidates multiple waste streams (acid/alkali, chelate, and chrome) into three common lift stations that pump to the Industrial Waste Treatment Plant 3 holding tanks. Deliverables include six pump lift stations, six flex conduits, six upgraded NEMA 4X stainless steel panels, and one on-site engineer for startup and training. The contractor must submit engineering drawings in PDF format within four weeks of award, with Government review and approval within 14 days, followed by equipment delivery within 12 weeks of drawing acceptance. Additional deliverables include complete engineering drawings, component manuals, operation and maintenance manuals, spare parts lists, and bill of materials. The contractor shall provide one engineer on-site for one day of training for up to five Government personnel within 14 business days after delivery, and furnish a 12-month warranty on all equipment, parts, and workmanship from startup. Work shall be performed at Building 20128, Robins Air Force Base, Georgia, with standard hours 6:30 a.m. to 3:15 p.m. EST, Monday through Friday. The contractor must comply with extensive security, safety, environmental management, and supply chain risk management requirements, including OSHA Voluntary Protection Program standards, EMS and EnMS awareness training, safety plan submission within 10 calendar days of award, mishap notification procedures, and Unique Item Identification marking per DFARS requirements. Payment shall be submitted through the Procurement Integrated Enterprise Environment Wide Area Workflow system.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PURCHASE DESCRIPTION
LIFT STATION REDESIGN B20128
1 May 2026
1.0 DESCRIPTION. The Contractor shall provide all the tools, parts, materials, equipment, labor, transportation, startup, and training for a redesigned lift station to the Commodities Maintenance Group (CMXG) at Robins Air Force Base (AFB), Georgia. These lift stations will be used to transport liquid chemical waste that could present environmental danger (i.e.
acid waste, chrome waste).
1.1 Detail the Commodity/Deliverables:
Description Quantity
56-Gal Dup Vert Pump Lift Sta/Incl ipcp-DP-007-1-N4 6
FLEX CONDUIT 6
Upgrade Panels to Nema 4x Stainless Steel 6 Engineer on Site for Startup & Training 1
1.1.1 Each Lift Station shall have the following features:
• Two (2) electric pumps made of CPVC or 316 Stainless Steel. Pump fittings must be CPVC with a two (2) inch maximum nominal size. The pump flowrate should be 25 gallons per minute per pump. The pump must have a 30-foot total dynamic head.
• The tank material shall be polypropylene, with a volume of 50 to 75 gallons and a single tank containment style.
• The dimensions of the lift station shall be four (4) feet long, three (3) feet wide, and four (4) feet high.
• The control panel enclosure shall be made of stainless steel.
• The power supply shall be 120V or 208V.
• Each pump shall have disconnect switches, hands-off-auto, and level sensors for automation on/off pump operation.
1.1.2 The redesigned lift station shall collect industrial waste from the rinse tanks and pump it to the Industrial Waste Treatment Plant 3 (IWTP3) holding tanks.
The redesign and implementation of the new lift station will reduce the number of lift stations to three (3) with the discrete waste types of acid/alkali, chelate, and chrome to flow into a common larger lift station.
1.1.3 Each lift station will feature two (2) pumps for redundancy. These pumps shall be no smaller than 1.5”. Level controls that interact with these pumps are needed, so they know when to cut off/on.
1.2 Over and Above Work. Work discovered during the course of performance that is:
1.2.1 Within the general scope of the contract, not covered by the line item(s) for the basic work under the contract, and necessary in order to satisfactorily complete the contract.
1.2.2 Upon discovery of the need for over and above work, the Contractor shall prepare and furnish a work request to the Government. Upon request the Contractor shall promptly submit to the Contracting Officer, a proposal for the over and above work. The Government and Contractor will then negotiate a settlement for the over and above work. Contract modifications will be executed to definitize all over and above work.
1.3 Engineering Drawings and Manuals. The Contractor shall provide a full set of engineering drawings, component manuals, operation and maintenance manuals, spare parts list, and a bill of material. The Engineering drawings shall be in Adobe Portable Document Format (PDF) to the Government Representatives listed in PD paragraph 2.1.1. and shall provide sufficient information to permit Government analysis and approval prior to the Contractor beginning any work. The Operation and Installation Manual shall be delivered in PDF format as well as a hard copy. (CDRL A001 DI-SESS-81003F NOT 1/T, Commercial Drawings/Models and Associated Lists)
2.0 Service Support.
2.1 Delivery.
2.1.1 Government Representatives. The following individuals will serve as the Primary and Alternate Government Representatives as the points of contact through which all contractor-provided services will be requested and accomplished for MXSG.
Government Representatives will not supervise the Contractor, and they are not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The following individuals will serve as Government Representatives for MXSG.
2.2 Shipping/Delivery/Period of Performance. The Contractor shall provide delivery of the lift station engineering drawings within four (4) weeks of ARO. The Government shall have 14 days to review and offer feedback on the drawings. Once the drawings are accepted, the Contractor shall provide delivery of the equipment within 12 weeks of the acceptance date of the drawings.
Primary Government Representative Alternate Government Representative Name: Sandra Gibbs Name: Reginald Burnette Unit: 402 MXSG/MXDPM Unit: 402 MXSG/MXDPM Phone: 478-222-0919 Phone: 478-222-0655 Email: sandra.gibbs@us.af.mil Email: reginald.burnette@us.af.mil mailto:sandra.gibbs@us.af.mil mailto:reginald.burnette@us.af.mil
2.2.1 Packaging. The lift station equipment shall be securely shipped on pallets that are transportable by forklift.
2.3 Ship To Address.
Attention: Sandra Gibbs
Unit: 402 MXSG/MXDPM
DODAAC: F3QCBK
Address: 235 Robins Pkwy, Station 15, B321 Robins AFB, GA 31098-1621
2.4 Incidental Services.
2.4.1 Startup and Training. The Contractor shall have one (1) Engineer on-site to manage startup and to provide one (1) day of training for up to five (5) Government personnel. The Contractor shall coordinate with Government personnel in paragraph
2.1.1 to schedule the startup and training dates within 14 business days after delivery of parts.
2.5 Warranty. The Contractor shall provide a 12-month warranty on equipment, parts, and workmanship which will begin from startup of the equipment.
2.6 Options. None.
3.0 Government Furnished Equipment and Services or Government Furnished Property
(GFP) and services. There is no government property as a part of this acquisition.
4.0 General Information.
4.1 Contractor Program Manager. The Contractor shall provide a Program Manager who shall be the single point of contact between the Contractor and the Government. The name and phone number of the Contractor’s Program Manager shall be provided in writing to the Contracting Officer, Government Representatives, and COR no later than five (5) calendar days after contract award date.
4.2 Place of Performance and Hours of Work. On-site contract services shall be performed at the Warner Robins Air Logistic Complex. The work will take place in building 20128 at Robins Air Force Base, GA. The Contractor’s work hours (shifts) shall normally be from 6:30 am to 3:15 pm (EST), Monday through Friday. The Government may adjust the Contractor’s work hours based on workload requirements, with the flexibility to start work earlier, work odd shifts, and/or work weekends. The Government will provide the Contractor the required work hours (schedule) for contractor personnel and will provide a 48-hour notice prior to changing any work hours.
4.3 Recognized Holidays. Unless otherwise required by the Government, the Contractor shall not have access to Government facilities to work or telework on all federal holidays or during facility closings as authorized by the Government. If the holiday falls on Saturday, it is observed on Friday. If the holiday falls on a Sunday, it is observed on Monday.
4.4 Security Requirements.
4.4.1 Government Security Regulations. The Contractor shall ensure personnel, information, system, facility, and international security requirements are met in accordance with 32 CFR Part 117, National Industrial Security Program Operating Manual (NISPOM), Department of the Air Force Instruction (DAFI) 31-101, Base Defense Operations.
4.4.2 Communications Security (COMSEC). The Contractor shall use only secure communications methods and/or equipment to transmit or otherwise transfer classified and/or sensitive, but unclassified, information in accordance with 32 CFR Part 117.21, National Industrial Security Program Operating Manual (NISPOM).
4.4.3 Visitors Only – No Badging ID. The Air Force has mandated all visitors consent to a check of their criminal history prior to being allowed access to installations. The check will be conducted at the Visitor Control Center (VCC) off Watson Boulevard, Robins AFB, GA. Visitors requiring unescorted access will need their driver’s license or state-issued ID along with insurance and registration if driving on base. The pass issued by the Visitor Control Center authorizes unescorted entry to Robins AFB for the bearer only.
For visitors, a short-term pass is up to 60 days. Any time greater than 60 days requires a secondary form of ID (Social security card, birth certificate or passport).
4.4.4 Operations Security (OPSEC). The purpose of OPSEC is to reduce the vulnerability of USAF missions to adversary collection and exploitation of critical information. The Contractor shall comply with DoDD 5205.02E “DoD Operations Security (OPSEC) Program”, DoD Manual 5205.02 “DoD Operations Security (OPSEC) Program Manual” and AFI 10-701 “Operations Security (OPSEC)” to protect United States (U.S. Government interest. The Contractor shall ensure compliance with OPSEC requirements including procedures to protect classified and/or sensitive, but unclassified, Government projects and/or programs. The Contractor shall ensure Contractor personnel who perform work at Robins AFB or another Government facility comply with the OPSEC procedures of the facility.
4.4.5 Security Incident or Violation. The Contractor shall immediately notify the Government Security Office of any potential or actual security incidents or violations including potential or actual unauthorized disclosure or compromise of classified and/or sensitive, but unclassified, information.
4.5 Supply Chain Risk Management. The Contractor shall implement risk management procedures to ensure that system, equipment, components, software, maintenance equipment, and supplies do not incorporate counterfeit parts, malicious code, or other elements that would allow adversaries to gain access to data and critical program information and disrupt operations. Contractor risk management procedures shall comply with:
DoDI5000.83 DAFI 63-113, Program Protection Planning for Life Cycle
Management, SAE Aerospace Standard AS5553D, Counterfeit Electrical, Electronic, and
Electromechanical (EEE) Parts; Avoidance, Detection, Mitigation and Disposition, National Institute of Standards and Technology (NIST) Special Publication 800-53
Rev 5, Security and Privacy Controls for Information Systems and Organizations.
4.6 Contractor Identification. Contractor personnel shall wear visible identification designating them as contractors at all times while on Robins Air Force Base.
4.7 Contractor Vehicle Entry. The Contractor shall contact the Robins Air Force Base Visitor's Center to and comply with local procedures for obtaining credentials and vehicle entry. Information may be obtained by calling the following phone number: Commercial 478-222-1972.
4.8 Agency Affirmative Procurement Program. In accordance with FAR 23.107-1 and FAR 23.107-2, 100% of purchases of Environmental Protection Agency (EPA)-designated products included in the Comprehensive Procurement Guidelines (CPG) list [https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program] and/or United States Department of Agriculture (USDA)-designated products included in the bio based product listings [http://www.biopreferred.gov] shall, at a minimum, meet the EPA or USDA standards for recovered materials or bio based content, respectively, unless an item cannot be acquired competitively within a realistic timeframe, meet appropriate performance standards, and/or be acquired at a reasonable price.
4.8.1 The Contractor shall provide estimates and verification of recovered material for EPA-designated CPG products and certification for both EPA-designated CPG products and USDA-designated bio based products. In accordance with the Robins Air Force Base, Georgia / Affirmative Procurement Program (formerly Green Procurement Program (GPP)) Plan, the Contractor shall provide estimates and certifications to the Government for completion of the applicable attachment(s) to be included in the Purchase Request (PR) package.
4.9 Environmental Management Systems (EMS) Awareness. Environmental Management Systems (EMS) Awareness Training: All contractor personnel working on Robins AFB who perform activities on the installation are required to complete Air Force-provided initial EMS Awareness Training. It is the responsibility of the Prime Contractor to ensure that all sub-contractors, vendors, and employees complete this training prior to beginning work on Robins AFB. Notification of training completion shall be sent to the Robins AFB Contracting Officer (CO) to be maintained in the contract file for tracking purposes. Failure to provide documentation of EMS Training may result in termination of the contract.
http://www.biopreferred.gov/
4.9.1 EMS training is provided by Environmental Management. Contractors have two options to satisfy the mandatory EMS Awareness Training requirement. (Front Desk:
478-926-1176)
4.9.2 Option 1: Contractors can register for an account through The Environmental Awareness Course Hub (TEACH), the Air Force training database: https://usaf.learningbuilder.com/account/login/?ReturnUrl=%2f Search for Course ID: EMS110UHHZ00293 Directions:
1. Hover your mouse over the Courses and Transcripts tab.
2. Click on Transcripts
3. Click into the TEACH Course Completion Log by clicking the orange Continue or Begin button.
4. When you are on the transcript, click on the blue “Search for Course” button.
5. When the pop up appears enter the course name or course number and press search.
6. Once you find the course you want to add, click on the +Select button to add the course to your transcript.
(Note: TEACH may not be supported by Internet Explorer; recommend using Chrome.)
4.9.3 Option 2: Contractor requests a copy of the Robins EMS Awareness Training PowerPoint Presentation from Environmental Management. The request should be sent to the Environment Management Workflow Box at the following email address, jessica.parker.15@us.af.mil. Once the presentation is received, the contractor is responsible for ensuring that all his/her employees view the training. (CDRL A002 DI-MGMT-80368A/T, Status Report/EMS Training)
4.10 ISO 50001-Energy Management System. Due to the WR-ALC being ISO 50001 certified, all contractors are subject to the Energy Management System (EnMS) requirements and shall abide by certification guidelines whenever applicable.
4.10.1. EnMS Training. All contractor personnel working on Robins AFB who perform activities on the installation are required to complete Air Force provided initial EnMS Training. It is the responsibility of the Prime Contractor to ensure that all sub-contractors, vendors, and employees complete this training prior to beginning work on Robins AFB.
4.10.1.1. EnMS training is provided by the Energy Assurance Office. The Contractor shall request the training by sending an email to 402MXSG.MXDEA.EnergyAssurance@us.af.mil.
4.10.2. Notification of training completion shall be sent to the Energy Assurance Office (402MXSG.MXDEA.EnergyAssurance@us.af.mil) and the CSMO POC to be maintained for tracking purposes. Failure to provide documentation of EnMS Training https://usaf.learningbuilder.com/account/login/?ReturnUrl=%2f mailto:jessica.parker.15@us.af.mil mailto:402MXSG.MXDEA.EnergyAssurance@us.af.mil mailto:402MXSG.MXDEA.EnergyAssurance@us.af.mil prior to beginning work may result in termination of the contract. (CDRL A003 DI- MGMT-80368A/T, Status Report/EnMS Training)
4.11 Contractor’s Safety Program. (See Appendix C, Part II, Para 7) The Contractor shall establish and maintain an acceptable safety program in accordance with their accepted Safety and Health Plan. The Air Force is part of the OSHA Voluntary Protection Program (VPP).
All shall familiarize themselves with the requirements of VPP. Information on the VPP can be accessed at http://www.osha.gov/dcsp/vpp/index.html. Additionally, the Contractor is responsible for the safety and health of all subcontractor employees. No more than two Class C mishaps per contract year and Zero Class A or B mishaps will be tolerated. All changes to the plan must also be submitted in writing and approved by the Government.
4.11.1 Safety and Health Plan: Within 10 calendar days after contract award, the contractor shall email a copy of their company Safety Plan that is required to ensure compliance with the Occupational Safety and Health Act (OSHA) (Public Law 91-596) to 402mxw.se.wf@us.af.mil. The Safety Plan will be provided to the Safety Office for review. The Safety Office will provide acceptance or non-acceptance within 5 working days of receipt to the government point-of-contact who will notify the CO. (CDRL A004, DI-SAFT-82080/T NOT 1, Contractor's Safety Plan).
4.11.2 The Contractor Safety Plan shall address in detail the items listed in the Contract Appendix C, Part II through Part IV as applicable. For task specific procedures identified in the Contract Appendix C, the contractor’s internal procedures for those tasks must be identifiable within the submitted Safety Plan or shall be provided in an amendment or addendum to the company’s Safety Plan. If task specific procedures identified in the Contract Appendix C, are not submitted with the contractor’s Safety Plan, the submitted Safety Plan will be returned as NOT ACCEPTED. The contractor will have 5 working days to resubmit the Safety Plan, amendment or addendum to address or correct issues identified for non-acceptance. The Safety Office will provide acceptance or non-acceptance of the resubmission within 5 workings days of receipt to the government POC who will notify the CO.
4.12 Mishap Notification. (See Appendix C, Part II, Para 5) The Contractor shall notify the Robins AFB Safety Office telephonically at (478)327-4862 during duty hours and (478)926- 3567 after hours, within four (4) hour after initial notification of all mishaps or incidents for damage to DoD property (material plus labor) entrusted by this contract and employee injuries as a result of the contract operation. A follow-up (written or e-mail) of this mishap/incident notification shall be sent within three calendar days to the Government Representative, the Procurement Contracting Officer (PCO), Contract Surveillance Management Office (CSMO) Representative (with a copy to program manager), who will forward it to the Safety Office. The information that is not available at the time of the initial notification shall be provided within 20 calendar days after the mishap. Mishap notification shall contain, as a minimum, the following information:
a. Contract, Contract Number, Name and Title of Person(s) Reporting
b. Date, Time and exact location of accident/incident http://www.osha.gov/dcsp/vpp/index.html mailto:402mxw.se.wf@us.af.mil
c. Brief Narrative of accident/incident (Events leading to accident/incident)
d. Cause of accident/incident, if known
e. Estimated cost of accident/incident (material and labor to repair/replace)
f. Impound Authority Name and Phone Number (as applicable)
g. Nomenclature of equipment and personnel involved in accident/incident
h. Corrective actions (taken or proposed)
i. Other pertinent information
(CDRL A005, DI-SAFT-81563 NOT 2, Accident/Incident Report)
4.13 Essential Services During Crisis. The Services Acquisition Lead (SAL) has determined, by placing in writing their decision, that this requirement IS NOT Mission Essential (M-E) in accordance with DFARS 252.237-7023, Continuation of Essential Contractor Services.
4.14 Inspection of Services/Inspection of Supply: In accordance with the Inspection of Supply/Services clause(s) identified in the contract/order, the Government reserves the right to inspect Contractor performance.
4.15 Invoice/Payment and Receipt/Acceptance: In accordance with DFARS clause 252.232-7003, Electronic submission of Payment Requests and Receiving Reports, the Contractor shall submit/process payment requests (invoices, Receiving Reports or combos) and receipt/acceptance documents via Procurement Integrated Enterprise Environment (PIEE) through module Wide Area Workflow (WAWF). Access at the following site:
https://piee.eb.mil/
4.16 Marking Requirement: Unique Item Identification (UID) is required for all items to be delivered to the Department of defense (DoD) that meet the criteria established by the DFARS Clause 252.211-7003.
5.0 Appendices – None.
https://piee.eb.mil/
File details come from the government source that posted it. Updated .