This is a solicitation for a personal services contract to provide construction project management services. The solicitation will be open only to individual applicants to serve as a sole proprietor employee. The contractor will be responsible for planning, scheduling, and managing construction and renovation projects for the Development Finance Corporation headquarters located in Washington, D.C. Duties will include project management, construction oversight, coordination with third parties, project design review, and ensuring work quality and compliance. The period of performance is one base year with four optional one-year extensions. Quotes will be evaluated on technical qualifications, past performance, and price to award a firm fixed price contract to the offeror representing the best value. The solicitation will be available on March 23, 2021 with quotes due by March 29, 2021.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NO. 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NO.
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
RFQ IFB RFP
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
29. AWARD OF CONTRACT: REF. OFFER
DATED . . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NAICS:
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
8 (A)
EDWOSB
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
STANDARD FORM 1449 (REV. 2/2012) BACK
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
40. PAID BY
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
PARTIAL FINAL
37. CHECK NUMBER
38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER
36. PAYMENT
COMPLETE PARTIAL FINAL
77344421Q0017
TABLE OF CONTENTS:
1. Listing of Incorporated Purchase Requisitions
2. Section B - Supplies or Services and Prices/Costs
3. Section C - Description/Specifications/Work Statement
4. Section D - Packaging and Marking
5. Section E - Inspection and Acceptance Terms
6. Section F - Delivery or Performance
7. Section G - Contract Administration Data
8. Section H - Special Contract Requirements
9. Section I - Contract Clauses
10. Section J - List of Documents, Exhibits, and other Attachments
11. Section K - Representations, Certifications, and Other Statements of Offerors
12. Section L - Instructions, Conditions and Notices to Offerors
13. Section M - Evaluation Factors for Award
1. Listing of Incorporated Purchase Requisitions
Incorporated Purchase Requisition Numbers:
2. Section B - Supplies or Services and Prices/Costs
Item Number Base Item Number
Supplies/Services Quantity Unit
0001 PSC - Construction and Facilities Project Manager
2080 HRS
Contract Type:Firm Fixed Price Unit Price
Extended Price
Description:
Personal Services of one (1) FTE PSC -Construction and Facilities Project Manager, in accordance with the attached PWS.
Anticipated Base Period of Performance: May 13 2021 to May 12 2022.
Purchase Requisitions
IDC Type: Not Applicable FSC Codes: R497 Prof services/personal services contracts NAICS Code: 541611 Administrative Management and General Management Co...
Supplies/Services Quantity Unit
0002 DFC Paid Taxes 1 JB Contract Type:Firm Fixed Price
Unit Price Extended Price
Description:
** Do not quote. This amount will be calculated by DFC* Employer paid payroll taxes.
Anticipated Base Period of Performance: May 13 2021 to May 12 2022.
Purchase Requisitions
IDC Type: Not Applicable
Supplies/Services Quantity Unit
0003 Performance Incentive 1 JB Contract Type:Firm Fixed Price
Unit Price Extended Price
Description:
** Do not quote. This amount will be calculated by DFC*
Performance Incentive Cash Award. The amount of the incentive is determined by the PSC's supervisor but is no more than the percentage applied when determining the DFC non-SL performance award. This CLIN does not guarantee payment of an award.
Anticipated Base Period of Performance: May 13 2021 to May 12 2022.
Purchase Requisitions
IDC Type: Not Applicable
Supplies/Services Quantity Unit
0004 Special Pay 1 JB Contract Type:Firm Fixed Price
Unit Price Extended Price
Description:
** Do not quote. This amount will be calculated by DFC* For travel to areas designated to receive pay other than per diem.
Anticipated Base Period of Performance: May 13 2021 to May 12 2022.
Purchase Requisitions
IDC Type: Not Applicable
Supplies/Services Quantity Unit
0005 Floating Hour Pay-Out 36 HRS Contract Type:Firm Fixed Price
Unit Price Extended Price
Description:
Pay out of accrued floating hours at the end of the period of performance. Not to exceed 36 hours.
Anticipated Base Period of Performance: May 13 2021 to May 12 2022.
Purchase Requisitions
IDC Type: Not Applicable
Supplies/Services Quantity Unit
1001 0001 PSC - Construction and Facilities Project Manager
2080 HRS
Contract Type:Firm Fixed Price Unit Price
Extended Price
Description:
Personal Services of one (1) FTE PSC - Construction and Facilities Project Manager, in accordance with the attached PWS.
First Option Period: 13 May 2022 to 12 May 2023.
Purchase Requisitions
Option: 1 Option Time Date: 5/13/22 Option Time Duration: 364 Option Time Units: Days IDC Type: Not Applicable
Supplies/Services Quantity Unit
1002 0002 DFC Paid Taxes 1 JB Contract Type:Firm Fixed Price
Unit Price Extended Price
Description:
** Do not quote. This amount will be calculated by DFC* Employer paid payroll taxes.
First Option Period: 13 May 2022 to 12 May 2023.
Purchase Requisitions
Option: 1 Option Time Date: 5/13/22 Option Time Duration: 364 Option Time Units: Days IDC Type: Not Applicable
Supplies/Services Quantity Unit
1003 0003 Performance Incentive 1 JB Contract Type:Firm Fixed Price
Unit Price Extended Price
Description:
** Do not quote. This amount will be calculated by DFC*
Performance Incentive Cash Award. The amount of the incentive is determined by the PSC's supervisor but is no more than the percentage applied when determining the DFC non-SL performance award. This CLIN does not guarantee payment of an award.
First Option Period: 13 May 2022 to 12 May 2023.
Purchase Requisitions
Option: 1 Option Time Date: 5/13/22 Option Time Duration: 364 Option Time Units: Days IDC Type: Not Applicable
Supplies/Services Quantity Unit
1004 0004 Special Pay 1 JB Contract Type:Firm Fixed Price
Unit Price Extended Price
Description:
** Do not quote. This amount will be calculated by DFC* For travel to areas designated to receive pay other than per diem.
First Option Period: 13 May 2022 to 12 May 2023.
Purchase Requisitions
Option: 1 Option Time Date: 5/13/22 Option Time Duration: 364 Option Time Units: Days IDC Type: Not Applicable
Supplies/Services Quantity Unit
1005 0005 Floating Hour Pay-Out 36 HRS Contract Type:Firm Fixed Price
Unit Price Extended Price
Description:
Pay out of accrued floating hours at the end of the period of performance. Not to exceed 36 hours.
First Option Period: 13 May 2022 to 12 May 2023.
Purchase Requisitions
Option: 1 Option Time Date: 5/13/22 Option Time Duration: 364 Option Time Units: Days IDC Type: Not Applicable
Supplies/Services Quantity Unit
2001 0001 PSC - Construction and Facilities Project Manager
2080 HRS
Contract Type:Firm Fixed Price Unit Price
Extended Price
Description:
Personal Services of one (1) FTE- PSC- Construction and Facilities Project Manager, in accordance with the attached PWS.
Second Option Period: 13 May 2023 to 12 May 2024.
Purchase Requisitions
Option: 2 Option Time Date: 5/13/23 Option Time Duration: 365 Option Time Units: Days IDC Type: Not Applicable
Supplies/Services Quantity Unit
2002 0002 DFC Paid Taxes 1 JB Contract Type:Firm Fixed Price
Unit Price Extended Price
Description:
** Do not quote. This amount will be calculated by DFC* Employer paid payroll taxes.
Second Option Period: 13 May 2023 to 12 May 2024.
Purchase Requisitions
Option: 2 Option Time Date: 5/13/23 Option Time Duration: 365 Option Time Units: Days IDC Type: Not Applicable
Supplies/Services Quantity Unit
2003 0003 Performance Incentive 1 JB Contract Type:Firm Fixed Price
Unit Price Extended Price
Description:
** Do not quote. This amount will be calculated by DFC*
Performance Incentive Cash Award. The amount of the incentive is determined by the PSC's supervisor but is no more than the percentage applied when determining the DFC non-SL performance award. This CLIN does not guarantee payment of an award.
Second Option Period: 13 May 2023 to 12 May 2024.
Purchase Requisitions
Option: 2 Option Time Date: 5/13/23 Option Time Duration: 365 Option Time Units: Days IDC Type: Not Applicable
Supplies/Services Quantity Unit
2004 0004 Special Pay 1 JB Contract Type:Firm Fixed Price
Unit Price Extended Price
Description:
** Do not quote. This amount will be calculated by DFC*
For travel to areas designated to receive pay other than per diem.
Second Option Period: 13 May 2023 to 12 May 2024.
Purchase Requisitions
Option: 2 Option Time Date: 5/13/23 Option Time Duration: 365 Option Time Units: Days IDC Type: Not Applicable
Supplies/Services Quantity Unit
2005 0005 Floating Hour Pay-Out 36 HRS Contract Type:Firm Fixed Price
Unit Price Extended Price
Description:
Pay out of accrued floating hours at the end of the period of performance. Not to exceed 36 hours.
Second Option Period: 13 May 2023 to 12 May 2024.
Purchase Requisitions
Option: 2 Option Time Date: 5/13/23 Option Time Duration: 365 Option Time Units: Days IDC Type: Not Applicable
Supplies/Services Quantity Unit
3001 0001 PSC - Construction and Facilities Project Manager
2080 HRS
Contract Type:Firm Fixed Price Unit Price
Extended Price
Description:
Personal Services of one (1) FTE PSC - Construction and Facilities Project Manager, in accordance with the attached PWS.
Third Option Period: 13 May 2024 to 12 May 2025.
Purchase Requisitions
Option: 3 Option Time Date: 5/13/24 Option Time Duration: 364 Option Time Units: Days IDC Type: Not Applicable
Supplies/Services Quantity Unit
3002 0002 DFC Paid Taxes 1 JB Contract Type:Firm Fixed Price
Unit Price Extended Price
Description:
** Do not quote. This amount will be calculated by DFC* Employer paid payroll taxes.
Third Option Period: 13 May 2024 to 12 May 2025.
Purchase Requisitions
Option: 3 Option Time Date: 5/13/24 Option Time Duration: 364 Option Time Units: Days IDC Type: Not Applicable
Supplies/Services Quantity Unit
3003 0003 Performance Incentive 1 JB Contract Type:Firm Fixed Price
Unit Price Extended Price
Description:
** Do not quote. This amount will be calculated by DFC*
Performance Incentive Cash Award. The amount of the incentive is determined by the PSC's supervisor but is no more than the percentage applied when determining the DFC non-SL performance award. This CLIN does not guarantee payment of an award.
Third Option Period: 13 May 2024 to 12 May 2025.
Purchase Requisitions
Option: 3 Option Time Date: 5/13/24 Option Time Duration: 364 Option Time Units: Days IDC Type: Not Applicable
Supplies/Services Quantity Unit
3004 0004 Special Pay 1 JB Contract Type:Firm Fixed Price
Unit Price Extended Price
Description:
** Do not quote. This amount will be calculated by DFC*
For travel to areas designated to receive pay other than per diem.
Third Option Period: 13 May 2024 to 12 May 2025.
Purchase Requisitions
Option: 3 Option Time Date: 5/13/24 Option Time Duration: 364 Option Time Units: Days IDC Type: Not Applicable
Item Number Base Item Number
Supplies/Services Quantity Unit
3005 0005 Floating Hour Pay-Out 36 HRS Contract Type:Firm Fixed Price
Unit Price Extended Price
Description:
Pay out of accrued floating hours at the end of the period of performance. Not to exceed 36 hours.
Third Option Period: 13 May 2024 to 12 May 2025.
Purchase Requisitions
Option: 3 Option Time Date: 5/13/24 Option Time Duration: 364 Option Time Units: Days IDC Type: Not Applicable
Supplies/Services Quantity Unit
4001 PSC - Construction and Facilities Project Manager
2080 HRS
Contract Type:Firm Fixed Price Unit Price
Extended Price
Description:
Personal Services of one (1) FTE PSC - Construction and Facilities Project Manager, in accordance with the attached PWS.
Fourth Option Period: 13 May 2025 to 12 May 2026.
Purchase Requisitions
Option:
Option Time Date: 5/13/25 Option Time Duration: 364 Option Time Units: Days IDC Type: Not Applicable
Supplies/Services Quantity Unit
4002 DFC Paid Taxes 1 JB Contract Type:Firm Fixed Price
Unit Price Extended Price
Description:
** Do not quote. This amount will be calculated by DFC* Employer paid payroll taxes.
Fourth Option Period: 13 May 2025 to 12 May 2026
Purchase Requisitions
Option:
Option Time Date: 5/13/25 Option Time Duration: 364 Option Time Units: Days IDC Type: Not Applicable
Supplies/Services Quantity Unit
4003 Performance Incentive 1 JB Contract Type:Firm Fixed Price
Unit Price Extended Price
Description:
** Do not quote. This amount will be calculated by DFC*
Performance Incentive Cash Award. The amount of the incentive is determined by the PSC's supervisor but is no more than the percentage applied when determining the DFC non-SL performance award. This CLIN does not guarantee payment of an award.
Fourth Option Period: 13 May 2025 to 12 May 2026
Purchase Requisitions
Option:
Option Time Date: 5/13/25 Option Time Duration: 364 Option Time Units: Days IDC Type: Not Applicable
Supplies/Services Quantity Unit
4004 Special Pay 1 JB Contract Type:Firm Fixed Price
Unit Price Extended Price
Description:
** Do not quote. This amount will be calculated by DFC*
For travel to areas designated to receive pay other than per diem.
Fourth Option Period: 13 May 2025 to 12 May 2026
Purchase Requisitions
Option:
Option Time Date: 5/13/25 Option Time Duration: 364 Option Time Units: Days IDC Type: Not Applicable
Supplies/Services Quantity Unit
4005 Floating Hour Pay-Out 36 HRS Contract Type:Firm Fixed Price
Unit Price Extended Price
Description:
Pay out of accrued floating hours at the end of the period of performance. Not to exceed 36 hours.
Fourth Option Period: 13 May 2025 to 12 May 2026
Purchase Requisitions
Option:
Option Time Date: 5/13/25 Option Time Duration: 364 Option Time Units: Days IDC Type: Not Applicable
Clauses incorporated by reference
None
Clauses incorporated by full text
3. Section C - Description/Specifications/Work Statement
Performance Work Statement
Section C
Performance Work Statement (PWS) / Statement of Work (SOW)
Project Title: Construction and Facilities Project Manager
C.1 INTRODUCTION
1.1 This position is located in the Office of Administration, Facilities, Travel, and Security Services (FTS) Division of the Development Finance Corporation (DFC). FTS provides comprehensive facilities maintenance and operations, space planning and management, and construction and renovation services for DFC. The position provides construction and facilities management support for DFC Headquarters located at 1100 New York Avenue, NW.
1.2. The contractor shall provide personal services as the Construction and Facilities Project Manager for the DFC and reports to the FTS Managing Director (MD). The responsibilities include: overall project management; daily construction oversight; coordination with third-party contractors; review of project plans, scope, schedules, product submittals; project design; and, monitoring progress and the quality of work as well as the punch-list and project close-out to guard the Agency against defects and deficiencies in the construction work. DFC is retaining the consultant to advise DFC regarding the compliance with recognized national building standards and the agency internal policies
1.3. Work involves serving as the Project Manager to ensure the successful execution of DFC facility operations and renovation and construction projects.
1.4 The position will support FTS to safely deliver quality planning, design, and construction on time and on budget for a portfolio of upgrade projects at the DFC Headquarters in Washington, DC.
C.2 MAJOR DUTIES AND RESPONSIBILITIES
2.1 The Construction/Facilities Project Manager will plan, schedule, and manage construction and renovation projects to meet customer requirements. The position is responsible for creating safe, secure, and functional work environments to support the Agency's mission.
2.1.1 The Construction/Facilities Project Manager will be responsible for planning and execution of one or more facilities project management activities throughout the life of a project.
2.1.2. The duties include assisting with safety management, quality, cost management, contracting, scheduling, estimating, bidding and contract administration functions to ensure successful completion of the project, both timely and within budget.
2.1.3. The position will ensure coordination with the Landlord and third-party contractors and partake in sensitive and high visibility activities to achieve the project objectives and customer requirements.
2.1.4 The position is responsible for performing a variety of facilities management services relative to interior spaces, including programming, design analysis, space planning, moving and relocation, and aesthetics, using specialized knowledge of interior construction, building systems and components, building codes, equipment, materials, and furnishings and for p lanning and coordination of commercial vendors, serving as the liaison.
2.1.5 This position routinely works with the highest level of management within DFC, therefore the person should have experience dealing with high profile clients.
2.2. EVALUATING PERFORMANCE: The COR shall conduct annual performance reviews of PSCs. The review shall be submitted to the Contract Specialist prior to the option period being exercised.
C.3 QUALIFICATIONS
3.1 EDUCATION and CERTIFICATION: Minimum Education - Bachelor's or associate degree with 10+ years of experience in one of the following fields or related studies:
• Construction Management
• Engineering
• HVAC Systems
• Project Management discipline with a focus in facilities management or engineering
3.2 EXPERIENCE: Minimum (10) years of senior, hands-on experience working in construction management for existing commercial offices, engineering and particularly HVAC, facilities / space / building and/or project management.
3.3 PREFFERRED EXPERIENCE: Working knowledge of AutoCAD and Microsoft Office including Word, Excel and PowerPoint. Experience in the development and preparation or drafting of drawings and related materials. Excellent writing skills. Experience construction management and/or project in the federal sector is preferred. Knowledge of the federal government regulations and procurement processes is preferred. Knowledge of building codes, Americans with Disabilities (ADA) requirements, and working knowledge of information technology, mechanical, electrical, or communication systems.
C.4 SUPERVISION RECEIVED
4.1 The PSC works under the supervision of the FTS MD. The FTS MD provides only broad policy guidance and strategic goals. Incumbent independently plans the details of each assignment, gathers information and negotiates internal changes to effect assigned goals. Works on difficult, sensitive matters, keeping the FTS MD informed. Work may be reviewed to see that broad policy and corporate objectives have been fulfilled.
C.5 GUIDELINES
5.1. The employee uses guidelines that are often ambiguous and express conflicting or incompatible goals and objectives, requiring extensive interpretation. The employee uses judgment and ingenuity and exercises broad latitude to: determine the intent of applicable guidelines; develop policy and guidelines for specific areas of work; and formulate interpretations that may take the form of policy statements and guidelines. Top agency management officials and senior staff recognize the employee as a technical expert.
C.6 COMPLEXITY
6.1. The PSC shall have lead responsibility for work that is complex, and highly difficult that require analyzing facility operations policies and processes, construction and building codes and regulations, external regulations, and work on precedent setting FTS matters that will have long-term consequences.
6.2 The PSC works on largely undefined issues, problems, and conditions of a highly variable nature requiring extensive probing and analysis to determine the nature and scope of the problems and issues.
6.3 The PSC encounters extreme difficulty in identifying and isolating the nature of issues or problems into their components.
Problems are particularly stubborn and require continuing efforts to establish new concepts and techniques for resolving problems.
C. 7 SCOPE AND EFFECT
7.1. Work involves planning, developing, and carrying out broad and extensive construction and facilities projects and assignments (i.e., involving third party contractors and outside entities include DC government and GSA). The work effects services provided to all DFC employees and the management of this project significantly impacts the ability to provide adequate space and facilities across the agency.
C.8 PERSONAL CONTACTS
8.1. Contacts are with persons outside the agency, including third party contractors, DC government, John Hancock, Manulife , and other federal agencies such as GSA, in moderately unstructured settings. This level may also include contacts with agency officials who are several managerial levels removed from the employee when such contacts occur on an ad hoc basis.
C.9 PURPOSE OF CONTACTS
9.1. The purpose of the contacts is to present, justify, defend, negotiate, or settle matters involving significant or controversial facilities issues; e.g., recommendations affecting major programs, dealing with substantial expenditures, or significantly changing the nature and scope of organizations.
C.10 PHYSICAL DEMANDS
10.1. The work requires walking and standing for short periods of time including through areas under construction.
C.11 TRAVEL
11.1 Travel is not required.
C.11. WORK ENVIRONMENT
11.1. The work is typically performed in an office setting and in areas under construction. Work is performed at 1100 New York Ave., NW, Washington DC.
C.12 HOURS OF PERFORMANCE
12.1. DFC's core operating hours are from 09:00am to 3:00pm. The PSC shall provide 40 hours of service each week. PSCs are not eligible for overtime or compensatory time. All PSCs must submit a timecard. Timecards must be approved by the PSC Supervisor and submitted in the Harvest Timekeeping System for processing. Timecards will be used to monitor the balance of the PSC's PTO and Floating Hours Earned.
12.2. Telework: PSCs are authorized to telework and must have a Telework Agreement in place. Telework must be approved by the COR and PSC's supervisor. This position may be done virtually, i.e., 100% telework arrangement.
12.3. Floating Hours: PSCs are eligible for floating hours for time worked over 80 hours in a pay period. The annual accrual of floating hours is not limited. However, no more than 36 hours of unused floating hours will be paid out to the PSC at the end of the option period. Floating hours accrued and used shall be recorded on the timesheet and approved by the PSC supervisor. Only travel during non-work hours can receive floating hours. All floating hours earned must be used by the end of the current option period. Floating hours are paid with current year funds that expire at the end of the option. Therefore, floating hours do not roll over to the next option period. Any unpaid or unused floating hours will be removed from the timesheet at the end of the current option or contract expiration.
12.4. Paid Time Off (PTO): All PSCs receive 15 days, 120 hours, of PTO per year. This time can be used as annual or sick leave and the balance shall be tracked on the PSC's timecard. All PTO are available for use on the first performance day of the contract. PTO does not roll over and must be used by the end of the current option. Unused PTO will not be paid out at the end of the option period. All PTO requests shall be approved by both the COR and PSC's supervisor.
12.5. Facility Closure: PSCs are only permitted to invoice for hours worked. Therefore, in the event of facility closure, delayed opening, or early dismissal of DFC staff, the PSC will not be paid for unworked hours. In these situations, the PSC has the option to telework, or use floating hours or PTO.
12.6. Federal Holidays – PSCs are paid for all Federal Holidays as listed below and any additional Federal Holidays granted by executive order. As PSCs are not authorized overtime or comp time, any hours worked on a Federal Holiday are added to the timesheet as floating hours earned.
New Year's Day, January 1st
Martin Luther King's Birthday, 3rd Monday in January
President's Day, 3rd Monday in February
Memorial Day, Last Monday in May
Independence Day, July 4th
Labor Day, 1st Monday in September
Columbus Day, 2nd Monday in October
Veteran's Day, November 11th
Thanksgiving Day, 4th Thursday in November
Christmas Day, December 25th
12.7 Conduct: By law and by the terms of their contracts with DFC, PSCs are subject to the laws, rules and regulations applicable to non-contract employees, including, without limitation, the Anti-Deficiency Act, the Hatch Act, and the laws and regulations governing the ethical conduct of Federal employees of the United States Government. Additionally, because PSCs are sole proprietors, they are subject to Section 441C of the Federal Election Campaign Act (FECA) which prohibits PSCs "from making or soliciting a contribution to "any political party, committee, or candidate for public office or to any person for any political purpose or use."
12.8 Taxes: DFC issues W-2s to PSCs and makes the employer contribution to FICA and Medicare for the PSC. DFC also withholds FICA, Medicare, federal tax and state tax on behalf of the PSC. The PSC is not eligible for the Foreign Earned Income Exclusion.
12.9 Performance Incentive: PSCs are eligible to receive annual performance incentive cash awards. The amount of the incentive is determined by the PSC's supervisor but is no more than the percentage applied when determining the DFC non- SL performance award cap. It is the COR's responsibility to submit a performance appraisal along with funding to PSC Contracting Officer so that the incentive award can be processed. PSCs contain a performance incentive CLIN that will be funded at the time of the incentive amount determination made by the supervisor.
C.13 GOVERNMENT FURNISHED PROPERTY/EQUIPMENT
13.1. The Government will provide all necessary equipment, supplies and materials to include workstations, computer, telephone and other materials and equipment to fulfill the requirements of this contract.
C.14 NONSALARY BENEFITS
14.1 Health Insurance and Retirement Subsidies: Per the Build Act, PSCs shall not be considered Federal employees for any provision of law administered by the Director of the Office of Personnel Management (OPM). Therefore, PSCs are not eligible to participate in employer-provided health insurance or the Federal Employees Retirement System (FERS). In lieu of these benefits, DFC provides standard non-negotiable health insurance and retirement subsidies.
14.1.1 Health Insurance: this subsidy is based on the average of 72% of the OPM program-wide weighted average of premiums for "self only" and "self plus one" at the time of contract award. This amount is paid directly to the PSC as part of their salary regardless of their insured status. PSCs do not have to provide proof of insurance to receive this subsidy.
This subsidy is fixed and does not increase in option years. The OPM rates can be found at https://www.opm.gov/healthcare-insurance/healthcare/plan-information/premiums/
14.1.2. Retirement: this subsidy is a percentage equal to the federal employee contribution to OPM FERS at the time of contract award. The subsidy is applied to the PSC's annual salary inclusive of locality. The percentage of the subsidy does not increase over the contract period of performance. However, the amount of the subsidy increases as the PSC's annual salary increases according to the contract escalation rate. Current employee contribution rates to FERS can be found at https://www.dm.usda.gov/employ/policy/docs/USDA%20FERS%20Summary%20v2.pdf. Employees hired in 2014 or later contribute 4.4%.
14.3 Metro Subsidy or Parking Subsidy: PSCs are eligible to receive either the metro subsidy or parking subsidy. The amount of the subsidies are subject to annual changes and are processed by FTS, and the Department of Finance. The parking subsidy requires PSCs to authorize a payroll deduction for the reduced parking fee from their pay.
14.4. Gym Membership: PSCs are eligible to receive on-site gym membership subject to the same process as for FTEs.
Reimbursement for other gyms is not authorized.
C.15. DELIVERABLES
15.1 The PSC is responsible and accountable for the successful execution and completion of assigned renovation and construction projects, including safety, project costs, scheduling, relationships, market reputation and profitability. The contractor is responsible for starting, managing, and completing large and most complex projects at DFC.
15.2 The PSC will work under the Office of Administration, FTS MD and in coordination with the DFC Facilities Director as follows:
a. Conducting pre-planning and pre-construction meetings and activities and plans; develops initial project schedule; after project starts, oversees the coordination of scheduling efforts with the superintendent, subcontractors, and suppliers to create and maintain a construction schedule; and ,ensures the successful completion of all project elements for assigned projects.
b. Performing services relative to interior spaces, including programming, design analysis, space planning and aesthetics, using specialized knowledge of interior construction, building systems and components, building codes, equipment, materials, and furnishings.
c. Preparing drawings and documents as necessary relative to the design of interior spaces in order to enhance and protect the health, safety, and welfare of the end users as well as the public.
d. Coordinating and integrating the mechanical, electrical, and structural engineering disciplines within the interior context.
e. Coordinating employee relocations as part of space renovation projects including moves swing space and final office occupancies.
f. Managing projects, developing cost estimates, evaluating bid proposals, reviewing construction documents, participating in on-site construction visits, conducting pre- and post-occupancy evaluations, developing standards for efficient space management, etc.
g. Reviews and manages project scope and approach regarding constructability and submits recommendations for change where appropriate. Negotiates, prepares, and assists with change orders (proposals) to clients/owners, design team, subcontractors, and others, and prepare revisions to the original budget because of changes and revisions to work.
h. Responsible for customer interface, relates and anticipates customer needs, and provides clear communications to customer and team. Attends job progress meetings as required. Ensures subcontractors understand expectations of the project.
15.3 The PSC will provide project management oversight for multiple disparate parallel projects including:
a. Directs the design, testing, planning, and implementation of complex projects for construction or facilities management projects that typically affect many users.
b. A self-motivated and well-organized individual with a high degree of business expertise as well as strong innovation and facilitation skills.
c. Possesses solid analytic and problem-solving skills and superior multitasking and time-management abilities.
d. Excellent verbal and written communication, interpersonal and presentation skills and the ability to effectively communicate project details and objectives to individuals at all levels of the organization, are vital skills for this role.
e. Lead the project team to deliver business and technical objectives on-time, within budget and to specification
f. Engage directly with internal business clients to understand their business objectives and translate them into delivery plans
g. Collaborating with other project managers and program managers to manage project interdependencies
h. Developing and gaining agreement with stakeholders on designs or plans and budgets
i. Collaborating with the Landlord, architects, and construction company to create a Project schedule using the prescribed toolsets and utilizing a resource schedule to communicate and manage work on the project.
j. Reporting status, issues and risks according to the Managing Director or designee on milestones and schedule
k. Coordinating employee relocations including moves into swing space and final moves
l. Collaborating with the designated moving company to ensure moves are coordinated with all impacted staff and offices.
C.16. PERFORMANCE REQUIREMENT SUMMARY
16.1. Performance Standards define required performance for specific tasks:
Performance Metric
Performance Standard
(for each AIA)
Acceptable Level of Performance
Surveillance
Method
Project Execution Successful execution and completion of assigned renovation and construction projects, including safety, project costs, scheduling, relationships, market reputation and profitability.
Satisfactory or Higher Periodic Inspection
Construction Management
Managing projects, developing cost estimates, evaluating bid proposals, reviewing construction documents, participating in on-site construction visits, conducting pre- and post-occupancy evaluations, developing standards for efficient space management, etc.
Satisfactory or Higher Periodic Inspection
Scope Management
Reviews and manages project scope and approach regarding constructability and submits recommendations for change where appropriate. Negotiates, prepares, and assists with change orders (proposals) to
Satisfactory or Higher Periodic Inspection
Performance Metric
Performance Standard
(for each AIA)
Acceptable Level of Performance
Surveillance
Method clients/owners, design team, subcontractors, and others, and prepare revisions to the original budget because of changes and revisions to work.
Stakeholder Engagement
Responsible for customer interface, relates and anticipates customer needs, and provides clear communications to customer and team. Attends job progress meetings as required. Ensures subcontractors understand expectations of the project.
Satisfactory or Higher Stakeholder/ Customer Input
Space Planning Performing services relative to interior spaces, including programming, design analysis, space planning and aesthetics, using specialized knowledge of interior construction, building systems and components, building codes, equipment, materials, and furnishings
Satisfactory or Higher Periodic Inspection
16.2. Methods of Surveillance: Various methods exist to monitor performance. The COR shall use any or several of the surveillance methods listed below in the administration of this contract.
16.2.1. Periodic Inspection: Evaluation of some outcomes and deliverables. Services are sampled to determine if performance level is acceptable.
16.2.2. Customer Input: Customer feedback on the quality and timeliness of services provided to determine if performance level is acceptable
16.3. PERFORMANCE RATINGS: The following rating definitions can be used as a guide when completing the Performance Assessment:
16.3.1. Exceptional Performance meets all contractual requirements and exceeds most to the government's benefit. The contractual performance of the element or sub-element being assessed was accomplished with almost no minor problems for which corrective actions were taken by the contractor, and the corrective actions were highly effective.
16.3.2. Very Good Performance meets all contractual requirements and exceeds some to the government's benefit. The contractual performance element or sub-element being assessed was accomplished with very few minor problems for which corrective actions taken by the contractor were highly effective.
16.3.3 Satisfactory Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
16.3.4. Below Satisfactory Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.
16.3.5. Poor Performance does not meet most contractual requirements and recovery is not likely in a timely manner.
The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
17.0 Security Requirements: Applicant must be able to pass a Moderate Background Investigation and receive a Moderate Risk Public Trust clearance.
4. Section D - Packaging and Marking
5. Section E - Inspection and Acceptance Terms
Supplies/Services will be inspected/accepted at:
Line Number Inspect At Inspect By Accept At 0001 Destination
1100 New York Avenue, NW Washington
DC
20527
US
Government Destination 1100 New York Avenue, NW Washington
DC
20527
US
0002 Destination 1100 New York Avenue, NW Washington
DC
20527
US
Government Destination 1100 New York Avenue, NW Washington
DC
20527
US
0003 Destination 1100 New York Avenue, NW Washington
DC
20527
US
Government Destination 1100 New York Avenue, NW Washington
DC
20527
US
0004 Destination 1100 New York Avenue, NW Washington
DC
20527
US
Government Destination 1100 New York Avenue, NW Washington
DC
20527
US
0005 Destination 1100 New York Avenue, NW Washington
DC
20527
US
Government Destination 1100 New York Avenue, NW Washington
DC
20527
US
1001 Destination 1100 New York Avenue, NW Washington
DC
20527
Government Destination 1100 New York Avenue, NW Washington
DC
20527
US US
1002 Destination
1100 New York Avenue, NW Washington
DC
20527
US
Government Destination 1100 New York Avenue, NW Washington
DC
20527
US
1003 Destination 1100 New York Avenue, NW Washington
DC
20527
US
Government Destination 1100 New York Avenue, NW Washington
DC
20527
US
1004 Destination 1100 New York Avenue, NW Washington
DC
20527
US
Government Destination 1100 New York Avenue, NW Washington
DC
20527
US
1005 Destination 1100 New York Avenue, NW Washington
DC
20527
US
Government Destination 1100 New York Avenue, NW Washington
DC
20527
US
2001 Destination 1100 New York Avenue, NW Washington
DC
20527
US
Government Destination 1100 New York Avenue, NW Washington
DC
20527
US
2002 Destination 1100 New York Avenue, NW Washington
DC
20527
US
Government Destination 1100 New York Avenue, NW Washington
DC
20527
US
2003 Destination 1100 New York Avenue, NW Washington
DC
20527
US
Government Destination 1100 New York Avenue, NW Washington
DC
20527
US
2004 Destination 1100 New York Avenue, NW Washington
DC
20527
US
Government Destination 1100 New York Avenue, NW Washington
DC
20527
US
2005 Destination 1100 New York Avenue, NW Washington
DC
20527
US
Government Destination 1100 New York Avenue, NW Washington
DC
20527
US
3001 Destination 1100 New York Avenue, NW Washington
DC
20527
US
Government Destination 1100 New York Avenue, NW Washington
DC
US
3002 Destination 1100 New York Avenue, NW Washington
DC
20527
US
Government Destination 1100 New York Avenue, NW Washington
DC
20527
US
3003 Destination 1100 New York Avenue, NW Washington
DC
20527
US
Government Destination 1100 New York Avenue, NW Washington
DC
20527
US
3004 Destination 1100 New York Avenue, NW Washington
DC
20527
US
Government Destination 1100 New York Avenue, NW Washington
DC
20527
US
3005 Destination 1100 New York Avenue, NW Washington
DC
20527
US
Government Destination 1100 New York Avenue, NW Washington
DC
20527
US
4001 Destination 1100 New York Avenue, NW Washington
DC
20527
US
Government Destination 1100 New York Avenue, NW Washington
DC
20527
US
4002 Destination 1100 New York Avenue, NW Washington
DC
20527
US
Government Destination 1100 New York Avenue, NW Washington
DC
20527
US
4003 Destination 1100 New York Avenue, NW Washington
DC
20527
US
Government Destination 1100 New York Avenue, NW Washington
DC
20527
US
4004 Destination 1100 New York Avenue, NW Washington
DC
20527
US
Government Destination 1100 New York Avenue, NW Washington
DC
20527
US
4005 Destination 1100 New York Avenue, NW Washington
DC
20527
US
Government Destination 1100 New York Avenue, NW Washington
DC
US
6. Section F - Delivery or Performance
Line Item: 0001 Period Of Performance Start Date Period Of Performance End Date Period Of Performance Address
5/13/21 5/12/22
DFC
1100 New York Avenue, NW Washington
US 20527
Line Item: 0002
5/13/21 5/12/22
DFC
1100 New York Avenue, NW
Line Item: 0003
5/13/21 5/12/22
DFC
1100 New York Avenue, NW
Line Item: 0004
5/13/21 5/12/22
DFC
1100 New York Avenue, NW
Line Item: 0005
5/13/21 5/12/22
DFC
1100 New York Avenue, NW
Line Item: 1001
5/13/22 5/12/23
DFC
1100 New York Avenue, NW
Line Item: 1002
5/13/22 5/12/23
DFC
1100 New York Avenue, NW
Line Item: 1003
5/13/22 5/12/23
DFC
1100 New York Avenue, NW
Line Item: 1004
5/13/22 5/12/23
DFC
1100 New York Avenue, NW
Line Item: 1005
5/13/22 5/12/23
DFC
1100 New York Avenue, NW
Line Item: 2001
5/13/23 5/12/24
DFC
1100 New York Avenue, NW
Line Item: 2002
5/13/23 5/12/24
DFC
1100 New York Avenue, NW
Line Item: 2003
5/13/23 5/12/24
DFC
1100 New York Avenue, NW
Line Item: 2004
5/13/23 5/12/24
DFC
1100 New York Avenue, NW
Line Item: 2005
5/13/23 5/12/24
DFC
1100 New York Avenue, NW
Line Item: 3001
5/13/24 5/12/25
DFC
1100 New York Avenue, NW
Line Item: 3002
5/13/24 5/12/25
DFC
1100 New York Avenue, NW
Line Item: 3003
5/13/24 5/12/25
DFC
1100 New York Avenue, NW
Line Item: 3004
5/13/24 5/12/25
DFC
1100 New York Avenue, NW
Line Item: 3005
5/13/24 5/12/25
DFC
1100 New York Avenue, NW
Line Item: 4001
5/13/25 5/12/26
DFC
1100 New York Avenue, NW
Line Item: 4002
Period Of Performance Start Date Period Of Performance End Date Period Of Performance Address
5/13/25 5/12/26
DFC
1100 New York Avenue, NW
Line Item: 4003
5/13/25 5/12/26
DFC
1100 New York Avenue, NW
Line Item: 4004
5/13/25 5/12/26
DFC
1100 New York Avenue, NW
Line Item: 4005
5/13/25 5/12/26
DFC
1100 New York Avenue, NW
7. Section G - Contract Administration Data
Requesting Office Address
1100 New York Avenue, NW Washington DC 20527 Phone: Fax:
Contact Details:
Property Administration Office Address
1100 New York Avenue, NW Washington DC 20527 Phone: Fax:
Contact Details:
COR Office Address
1100 New York Avenue, NW Washington DC 20527 Phone: (202) 336-6211 Fax:
Contact Details:
NEUSTADT, MARLA
marla.neustadt@dfc.gov
Issuing Office Address
DFC
1100 New York Avenue, NW Washington DC 20527 Phone: (202) 312-2160 Fax:
Contact Details:
RASPITHA, ELENA MARIA
elena.raspitha@dfc.gov
8. Section H - Special Contract Requirements
9. Section I - Contract Clauses
Article Number Reference Text 52.212-4 52.212-4 Contract Terms and Conditions-Commercial Items (OCT 2018)
52.202-1 52.202-1 Definitions (JUN 2020)
52.204-2 52.204-2 Security Requirements (AUG 1996)
52.204-9 52.204-9 Personal Identity Verification of Contractor Personnel (MAY 2014)
52.204-13 52.204-13 System for Award Management Maintenance (OCT 2018)
52.204-14 52.204-14 Service Contract Reporting Requirements (OCT 2016)
52.204-25 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (AUG 2020)
52.209-10 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015)
52.217-5 52.217-5 Evaluation of Options (JULY 1990)
52.223-5 52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011)
52.225-13 52.225-13 Restrictions on Certain Foreign Purchases (JUNE 2008)
52.232-3 52.232-3 Payments under Personal Services Contracts (APR 1984)
52.232-18 52.232-18 Availability of Funds (APR 1984)
52.232-23 52.232-23 Assignment of Claims (MAY 2014)
52.232-33 52.232-33 Payment by Electronic Funds Transfer-System for Award Management (OCT 2018)
52.232-39 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013)
52.233-1 52.233-1 Disputes (MAY 2014)
52.233-3 52.233-3 Protest after Award (AUG 1996)
52.233-4 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004)
52.237-2 52.237-2 Protection of Government Buildings, Equipment, and Vegetation (APR 1984)
52.245-1 52.245-1 Government Property (JAN 2017)
52.249-12 52.249-12 Termination (Personal Services) (APR 1984)
52.204-24 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (OCT 2020)
The Offeror shall not complete the representation at paragraph (d)(1) of this provision if the Offeror has represented that it "does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument" in paragraph (c)(1) in the provision at 52.204-26, Covered Telecommunications Equipment or Services-Representation, or in paragraph (v)(2)(i) of the provision at 52.212-3, Offeror Representations and Certifications-Commercial Items. The Offeror shall not complete the representation in paragraph (d)(2) of this provision if the Offeror has represented that it "does not use covered telecommunications equipment or services, or any equipment, system, or service that uses covered telecommunications equipment or services" in paragraph (c)(2) of the provision at 52.204-26, or in paragraph (v)(2)(ii) of the provision at 52.212-3.
(a) Definitions. As used in this provision-
Backhaul, covered telecommunications equipment or services, critical technology, interconnection arrangements, reasonable inquiry, roaming, and substantial or essential component have the meanings provided in the clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
(b) Prohibition.
(1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. Nothing in the prohibition shall be construed to-
(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or
(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(2) Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract or extending or renewing a contract with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a Federal contract. Nothing in the prohibition shall be construed to-
(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or
(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(c) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for "covered telecommunications equipment or services."
(d) Representation. The Offeror represents that-
(1) It _ will, _ will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation. The Offeror shall provide the additional disclosure information required at paragraph (e)(1) of this section if the Offeror responds "will" in paragraph (d)(1) of this section; and
(2) After conducting a reasonable inquiry, for purposes of this representation, the Offeror represents that-
It _ does, _ does not use covered telecommunications equipment or services, or use any equipment, system, or service that uses covered telecommunications equipment or services.