7615B.docx

DOCX document 18 KB Posted

Attached to
MWRA Contract No. 7615B Armoring and Overtopping Protection Foss Reservoir Dam
Solicitation number
BD-19-1212-MWRA-DITP-134569
Issued by
Massachusetts

About this file

Summary

This is a Scope of Work document for MWRA (Massachusetts Water Resources Authority) Contract No. 7615B, addressing armoring and overtopping protection for Foss Reservoir Dam in Massachusetts. The project involves the design and construction of protective measures to safeguard the dam structure against erosion and overtopping events. The scope encompasses geotechnical investigations, engineering design, material procurement, and construction activities to implement armoring solutions and install overtopping protection systems. The work requires coordination with MWRA personnel and compliance with applicable engineering standards and environmental regulations. The contract involves a defined project timeline with specific milestones for design completion, material procurement, and construction phases, though exact response dates, bid due dates, and project commencement dates are not specified in this document excerpt.

The pricing structure, contract term, and specific funding allocations are not detailed in this scope of work document. Additional procurement documents, including bid solicitation materials, detailed specifications, and contract terms and conditions, would contain information regarding estimated project costs, budget sources, payment terms, set-asides for small or minority-owned businesses, performance schedules, and any renewal or option periods. Interested bidders should consult the complete solicitation package and related addenda for comprehensive pricing requirements, bonding obligations, insurance provisions, and award criteria.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MASSACHUSETTS WATER RESOURCES AUTHORITY

ADVERTISEMENT FOR BIDS

The Massachusetts Water Resources Authority will receive electronic bids on the MWRA Supplier Portal (www.mwra.com) for Armoring and Overtopping Protection Foss Reservoir Dam, MWRA Contract No. 7615B, until 2:00 p.m., Wednesday, December 2, 2026, after which bids will be publicly available.

The contract documents will be posted on the MWRA Supplier Portal on or after Wednesday, October 21, 2026. To access the contract documents and submit a bid for this Event, interested firms must register and join the Plan Holders’ List through the MWRA Supplier Portal. No paper bids will be accepted.

A site visit will be held on Thursday, October 29, 2026 at 10:00 a.m. at Foss Reservoir (Framingham Reservoir Number 3) Dam, 1558 Worcester Rd (Route 9), Framingham, MA 01701. Please contact Karla Cuarezma at Karla.Cuarezma@mwra.com by 12:00 p.m. on Wednesday, October 28, 2026 to register and for access instructions.

The work includes: furnishing all equipment, tools, materials, labor, supervision, and all other items necessary for the work of the contract, such as clearing and raising of dam embankment, installing specialized turf, tree clearing, installing instrumentation, constructing a wall, and erecting fencing. The estimated time frame for project completion is 425 days. The work is being bid pursuant to M.G.L. c. 30, sec. 39M.

The estimated project cost is: $1,400,000.00.

This contract is subject to a 7.24% MBE and a 3.6% WBE participation requirement.

Douglas J. Rice Director of Procurement

Date: October 17, 2026

S/W-30 Rev. 8- 8/15

00030

- 1 -

File details come from the government source that posted it. Updated .