Other files for this federal contract opportunity
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The file's text, extracted by GovTribe without its formatting.
Base
| SCHEDULE OF RATES | | |
| CONTRACTOR | | |
| Solicitation #: | | |
| TO #: | | |
| Assumption Projects Include for 2020: | TBD |
| Contractor Name: | | | | | | | |
| Prepared by: | | | | | | | |
| ITEM # | DESCRIPTION | Assumption Base Year | ABC Contractor | XYZ Contractor | ABC Unit | XYZ Total | COMMENTS |
| POTENTIAL ON SITE PERSONNEL (This is intended to be all inclusive/Contractors to list typical items and clarify approach for each) | | | | | | |
| 1 | Administrative Assistant | 500 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 2 | Project Manager | 1040 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3 | Project Engineer | 1040 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 4 | Project Superintendent | 2080 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 5 | Mechanical/Electrical Superintendent | 100 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 6 | Quality Control Engineer | 100 | $0.00 | $0.00 | $0.00 | $0.00 | |
| POTENTIAL OFFICE - OFF SITE PERSONNEL (Not intended to be all inclusive/Contractors to list typical items and clarify approach for each) | | | | | |
| 7 | Project Accountant | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 8 | Project Principal/Executive | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 9 | Project Scheduler | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 10 | Project Estimator | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 11 | Safety Manager/Engineer | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 12 | LEED Coordinator | 40 | $0.00 | $0.00 | $0.00 | $0.00 |
| 13 | BIM | 40 | $0.00 | $0.00 | $0.00 | $0.00 |
| 14 | Other | 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| POTENTIAL DESIGN CONSULTANT PERSONNEL (Not intended to be all inclusive/Contractors to list typical items and clarify approach for each) | | | | | |
| 15 | Architect/Mechanical/Electrical - Principal | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 16 | Architect - Project | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 17 | Architect - Preservation/Medical | 10 | $0.00 | $0.00 | $0.00 | $0.00 |
| 18 | CAD/Draftsperson | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 19 | Mechanical Engineer | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 20 | Electrical Engineer | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 21 | Civil Engineer | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 22 | Structural Engineer | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 23 | Clerical | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| GENERAL CONDITIONS (Not intended to be all inclusive/Contractors to list typical items and clarify approach for each) | | | | | |
| 24 | Jobsite Trailer/Set-up | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 25 | Telecommunication | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 26 | Printer/Copier | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 27 | Electronic Project Platform | $ 5,000,000.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 28 | Electronic Archiving | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 29 | Photos/Video | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 30 | Documents | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 31 | Temporary Water | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 32 | Temporary Toilet | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 33 | Temporary Fence | 200 | $0.00 | $0.00 | $0.00 | $0.00 |
| 34 | On Going Cleaning | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 35 | Final Cleaning | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 36 | Subcontract Bonds | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 37 | Other | 0 | | $0.00 | $0.00 | $0.00 |
| PROPOSED FEES/INSURANCES/BONDS (This is intended to be all inclusive/Contractors to list typical items and clarify approach for each) | | | | | |
| 38 | On Self Performed Work | $ 500,000 | 0% | $0.00 | 0% | $0.00 |
| 39 | On Subcontracted Work | $ 2,500,000 | 0% | $0.00 | 0% | $0.00 |
| 40 | On D/B Work | $ 2,000,000 | 0% | $0.00 | 0% | $0.00 |
| 41 | PLM Bonds | $ 5,000,000 | 0% | $0.00 | 0% | $0.00 |
| 42 | Insurance | $ 5,000,000 | 0% | $0.00 | 0% | $0.00 |
| 43 | Builders Risk Insurance | $ 5,000,000 | 0% | $0.00 | 0% | $0.00 |
| 44 | Office Overhead | $ 5,000,000 | 0% | $0.00 | 0% | $0.00 |
| GRAND TOTALS | ____ | $0.00 | | $0.00 |
| | | | $0.00 | |
| GENERAL NOTES: | | | | | |
| 1 | NOTE THE ITEMS ABOVE INTENDED TO PROVIDE A BASELINE FOR A TYPICAL PROJECT EXPECTED UNDER THIS IDIQ. | | | | |
| 2 | ADDITIONAL OR FEWER ITEMS MAY ACTUALLY BE USED FOR AN INDIVIDUAL TASK ORDER. | | | | |
| Base Year | $ 5,000,000 | $0.00 | | $0.00 | $0.00 |
| Option #1 | $ 5,000,000 | $0.00 | | $0.00 | $0.00 |
| Option #2 | $ 5,000,000 | $0.00 | | $0.00 | $0.00 |
| Option #3 | $ 2,000,000 | $0.00 | | $0.00 | $0.00 |
| Option #4 | $ 2,000,000 | $0.00 | | $0.00 | $0.00 |
| Grand Total | $ 19,000,000 | $0.00 | | $0.00 | $0.00 |
| Delta | | | $0.00 | | |
&P of &N &D
Option Year #1
| SCHEDULE OF RATES | | |
| CONTRACTOR | | |
| Solicitation #: | | |
| TO #: | | |
| Assumption Projects Include for 2021: | TBD |
| Contractor Name: | | | | | | | |
| Prepared by: | | | | | | | |
| ITEM # | DESCRIPTION | Assumption Base Year | ABC Unit | ABC | XYZ Unit | XYZ | COMMENTS |
| POTENTIAL ON SITE PERSONNEL (This is intended to be all inclusive/Contractors to list typical items and clarify approach for each) | | | | | | |
| 1 | Administrative Assistant | 500 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 2 | Project Manager | 1040 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3 | Project Engineer | 2080 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 4 | Project Superintendent | 2080 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 5 | Mechanical/Electrical Superintendent | 100 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 6 | Quality Control Engineer | 100 | $0.00 | $0.00 | $0.00 | $0.00 | |
| POTENTIAL OFFICE - OFF SITE PERSONNEL (Not intended to be all inclusive/Contractors to list typical items and clarify approach for each) | | | | | |
| 7 | Project Accountant | 250 | $0.00 | $0.00 | $0.00 | $0.00 |
| 8 | Project Principal/Executive | 250 | $0.00 | $0.00 | $0.00 | $0.00 |
| 9 | Project Scheduler | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 10 | Project Estimator | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 11 | Safety Manager/Engineer | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 12 | LEED Coordinator | 40 | $0.00 | $0.00 | $0.00 | $0.00 |
| 13 | BIM | 40 | $0.00 | $0.00 | $0.00 | $0.00 |
| 14 | Other | 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| POTENTIAL DESIGN CONSULTANT PERSONNEL (Not intended to be all inclusive/Contractors to list typical items and clarify approach for each) | | | | | |
| 15 | Architect/Mechanical/Electrical - Principal | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 16 | Architect - Project | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 17 | Architect - Preservation/Medical | 10 | $0.00 | $0.00 | $0.00 | $0.00 |
| 18 | CAD/Draftsperson | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 19 | Mechanical Engineer | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 20 | Electrical Engineer | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 21 | Civil Engineer | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 22 | Structural Engineer | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 23 | Clerical | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| GENERAL CONDITIONS (Not intended to be all inclusive/Contractors to list typical items and clarify approach for each) | | | | | |
| 24 | Jobsite Trailer/Set-up | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 25 | Telecommunication | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 26 | Printer/Copier | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 27 | Electronic Project Platform | $ 6,500,000.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 28 | Electronic Archiving | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 29 | Photos/Video | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 30 | Documents | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 31 | Temporary Water | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 32 | Temporary Toilet | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 33 | Temporary Fence | 200 | $0.00 | $0.00 | $0.00 | $0.00 |
| 34 | On Going Cleaning | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 35 | Final Cleaning | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 36 | Subcontract Bonds | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 37 | Other | 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| PROPOSED FEES/INSURANCES/BONDS (This is intended to be all inclusive/Contractors to list typical items and clarify approach for each) | | | | | |
| 38 | On Self Performed Work | $ 500,000 | 0% | $0.00 | 0% | $0.00 |
| 39 | On Subcontracted Work | $ 2,500,000 | 0% | $0.00 | 0% | $0.00 |
| 40 | On D/B Work | $ 2,000,000 | 0% | $0.00 | 0% | $0.00 |
| 41 | PLM Bonds | $ 5,000,000 | 0% | $0.00 | 0% | $0.00 |
| 42 | Insurance | $ 5,000,000 | 0% | $0.00 | 0% | $0.00 |
| 43 | Builders Risk Insurance | $ 5,000,000 | 0% | $0.00 | 0% | $0.00 |
| 44 | Office Overhead | $ 5,000,000 | 0% | $0.00 | 0% | $0.00 |
| GRAND TOTALS | $0.00 | | $0.00 |
| | | $0.00 | |
| GENERAL NOTES: | | | | |
| 1 | NOTE THE ITEMS ABOVE INTENDED TO PROVIDE A BASELINE FOR A TYPICAL PROJECT EXPECTED UNDER THIS IDIQ. | | | |
| 2 | ADDITIONAL OR FEWER ITEMS MAY ACTUALLY BE USED FOR AN INDIVIDUAL TASK ORDER. | | | |
Option Year #2
| SCHEDULE OF RATES | | |
| CONTRACTOR | | |
| Solicitation #: | | |
| TO #: | | |
| Assumption Projects Include for 2022: | TBD |
| Contractor Name: | | | | | | | |
| Prepared by: | | | | | | | |
| ITEM # | DESCRIPTION | Assumption Base Year | ABC Unit | ABC | XYZ Unit | XYZ | COMMENTS |
| POTENTIAL ON SITE PERSONNEL (This is intended to be all inclusive/Contractors to list typical items and clarify approach for each) | | | | | | |
| 1 | Administrative Assistant | 500 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 2 | Project Manager | 1040 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3 | Project Engineer | 1040 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 4 | Project Superintendent | 2080 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 5 | Mechanical/Electrical Superintendent | 100 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 6 | Quality Control Engineer | 100 | $0.00 | $0.00 | $0.00 | $0.00 | |
| POTENTIAL OFFICE - OFF SITE PERSONNEL (Not intended to be all inclusive/Contractors to list typical items and clarify approach for each) | | | | | |
| 7 | Project Accountant | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 8 | Project Principal/Executive | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 9 | Project Scheduler | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 10 | Project Estimator | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 11 | Safety Manager/Engineer | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 12 | LEED Coordinator | 40 | $0.00 | $0.00 | $0.00 | $0.00 |
| 13 | BIM | 40 | $0.00 | $0.00 | $0.00 | $0.00 |
| 14 | Other | 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| POTENTIAL DESIGN CONSULTANT PERSONNEL (Not intended to be all inclusive/Contractors to list typical items and clarify approach for each) | | | | | |
| 15 | Architect/Mechanical/Electrical - Principal | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 16 | Architect - Project | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 17 | Architect - Preservation/Medical | 10 | $0.00 | $0.00 | $0.00 | $0.00 |
| 18 | CAD/Draftsperson | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 19 | Mechanical Engineer | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 20 | Electrical Engineer | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 21 | Civil Engineer | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 22 | Structural Engineer | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 23 | Clerical | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| GENERAL CONDITIONS (Not intended to be all inclusive/Contractors to list typical items and clarify approach for each) | | | | | |
| 24 | Jobsite Trailer/Set-up | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 25 | Telecommunication | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 26 | Printer/Copier | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 27 | Electronic Project Platform | $ 5,000,000.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 28 | Electronic Archiving | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 29 | Photos/Video | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 30 | Documents | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 31 | Temporary Water | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 32 | Temporary Toilet | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 33 | Temporary Fence | 200 | $0.00 | $0.00 | $0.00 | $0.00 |
| 34 | On Going Cleaning | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 35 | Final Cleaning | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 36 | Subcontract Bonds | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 37 | Other | 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| PROPOSED FEES/INSURANCES/BONDS (This is intended to be all inclusive/Contractors to list typical items and clarify approach for each) | | | | | |
| 38 | On Self Performed Work | $ 500,000 | 0% | $0.00 | 0% | $0.00 |
| 39 | On Subcontracted Work | $ 2,500,000 | 0% | $0.00 | 0% | $0.00 |
| 40 | On D/B Work | $ 2,000,000 | 0% | $0.00 | 0% | $0.00 |
| 41 | PLM Bonds | $ 5,000,000 | 0% | $0.00 | 0% | $0.00 |
| 42 | Insurance | $ 5,000,000 | 0% | $0.00 | 0% | $0.00 |
| 43 | Builders Risk Insurance | $ 5,000,000 | 0% | $0.00 | 0% | $0.00 |
| 44 | Office Overhead | $ 5,000,000 | 0% | $0.00 | 0% | $0.00 |
| GRAND TOTALS | $0.00 | | $0.00 |
| | | $0.00 | |
| GENERAL NOTES: | | | | |
| 1 | NOTE THE ITEMS ABOVE INTENDED TO PROVIDE A BASELINE FOR A TYPICAL PROJECT EXPECTED UNDER THIS IDIQ. | | | |
| 2 | ADDITIONAL OR FEWER ITEMS MAY ACTUALLY BE USED FOR AN INDIVIDUAL TASK ORDER. | | | |
Option Year #3
| SCHEDULE OF RATES | | |
| CONTRACTOR | | |
| Solicitation #: | | |
| TO #: | | |
| Assumption Projects Include for 2023: | TBD |
| Contractor Name: | | | | | | | |
| Prepared by: | | | | | | | |
| ITEM # | DESCRIPTION | Assumption Base Year | ABC Unit | ABC | XYZ Unit | XYZ | COMMENTS |
| POTENTIAL ON SITE PERSONNEL (This is intended to be all inclusive/Contractors to list typical items and clarify approach for each) | | | | | | |
| 1 | Administrative Assistant | 500 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 2 | Project Manager | 520 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3 | Project Engineer | 520 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 4 | Project Superintendent | 2080 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 5 | Mechanical/Electrical Superintendent | 100 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 6 | Quality Control Engineer | 100 | $0.00 | $0.00 | $0.00 | $0.00 | |
| POTENTIAL OFFICE - OFF SITE PERSONNEL (Not intended to be all inclusive/Contractors to list typical items and clarify approach for each) | | | | | |
| 7 | Project Accountant | 80 | $0.00 | $0.00 | $0.00 | $0.00 |
| 8 | Project Principal/Executive | 80 | $0.00 | $0.00 | $0.00 | $0.00 |
| 9 | Project Scheduler | 80 | $0.00 | $0.00 | $0.00 | $0.00 |
| 10 | Project Estimator | 80 | $0.00 | $0.00 | $0.00 | $0.00 |
| 11 | Safety Manager/Engineer | 80 | $0.00 | $0.00 | $0.00 | $0.00 |
| 12 | LEED Coordinator | 40 | $0.00 | $0.00 | $0.00 | $0.00 |
| 13 | BIM | 40 | $0.00 | $0.00 | $0.00 | $0.00 |
| 14 | Other | 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| POTENTIAL DESIGN CONSULTANT PERSONNEL (Not intended to be all inclusive/Contractors to list typical items and clarify approach for each) | | | | | |
| 15 | Architect/Mechanical/Electrical - Principal | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 16 | Architect - Project | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 17 | Architect - Preservation/Medical | 10 | $0.00 | $0.00 | $0.00 | $0.00 |
| 18 | CAD/Draftsperson | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 19 | Mechanical Engineer | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 20 | Electrical Engineer | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 21 | Civil Engineer | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 22 | Structural Engineer | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 23 | Clerical | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| GENERAL CONDITIONS (Not intended to be all inclusive/Contractors to list typical items and clarify approach for each) | | | | | |
| 24 | Jobsite Trailer/Set-up | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 25 | Telecommunication | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 26 | Printer/Copier | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 27 | Electronic Project Platform | $ 2,000,000.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 28 | Electronic Archiving | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 29 | Photos/Video | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 30 | Documents | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 31 | Temporary Water | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 32 | Temporary Toilet | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 33 | Temporary Fence | 200 | $0.00 | $0.00 | $0.00 | $0.00 |
| 34 | On Going Cleaning | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 35 | Final Cleaning | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 36 | Subcontract Bonds | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 37 | Other | 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| PROPOSED FEES/INSURANCES/BONDS (This is intended to be all inclusive/Contractors to list typical items and clarify approach for each) | | | | | |
| 38 | On Self Performed Work | $ 200,000 | 0% | $0.00 | 0% | $0.00 |
| 39 | On Subcontracted Work | $ 1,000,000 | 0% | $0.00 | 0% | $0.00 |
| 40 | On D/B Work | $ 800,000 | 0% | $0.00 | 0% | $0.00 |
| 41 | PLM Bonds | $ 2,000,000 | 0% | $0.00 | 0% | $0.00 |
| 42 | Insurance | $ 2,000,000 | 0% | $0.00 | 0% | $0.00 |
| 43 | Builders Risk Insurance | $ 2,000,000 | 0% | $0.00 | 0% | $0.00 |
| 44 | Office Overhead | $ 2,000,000 | 0% | $0.00 | 0% | $0.00 |
| GRAND TOTALS | $0.00 | | $0.00 |
| | | $0.00 | |
| GENERAL NOTES: | | | | |
| 1 | NOTE THE ITEMS ABOVE INTENDED TO PROVIDE A BASELINE FOR A TYPICAL PROJECT EXPECTED UNDER THIS IDIQ. | | | |
| 2 | ADDITIONAL OR FEWER ITEMS MAY ACTUALLY BE USED FOR AN INDIVIDUAL TASK ORDER. | | | |
Option Year #4
| SCHEDULE OF RATES | | |
| CONTRACTOR | | |
| Solicitation #: | | |
| TO #: | | |
| Assumption Projects Include for 2024: | TBD |
| Contractor Name: | | | | | | | |
| Prepared by: | | | | | | | |
| ITEM # | DESCRIPTION | Assumption Base Year | ABC Unit | ABC | XYZ Unit | XYZ | COMMENTS |
| POTENTIAL ON SITE PERSONNEL (This is intended to be all inclusive/Contractors to list typical items and clarify approach for each) | | | | | | |
| 1 | Administrative Assistant | 500 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 2 | Project Manager | 520 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3 | Project Engineer | 520 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 4 | Project Superintendent | 2080 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 5 | Mechanical/Electrical Superintendent | 100 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 6 | Quality Control Engineer | 100 | $0.00 | $0.00 | $0.00 | $0.00 | |
| POTENTIAL OFFICE - OFF SITE PERSONNEL (Not intended to be all inclusive/Contractors to list typical items and clarify approach for each) | | | | | |
| 7 | Project Accountant | 80 | $0.00 | $0.00 | $0.00 | $0.00 |
| 8 | Project Principal/Executive | 80 | $0.00 | $0.00 | $0.00 | $0.00 |
| 9 | Project Scheduler | 80 | $0.00 | $0.00 | $0.00 | $0.00 |
| 10 | Project Estimator | 80 | $0.00 | $0.00 | $0.00 | $0.00 |
| 11 | Safety Manager/Engineer | 80 | $0.00 | $0.00 | $0.00 | $0.00 |
| 12 | LEED Coordinator | 40 | $0.00 | $0.00 | $0.00 | $0.00 |
| 13 | BIM | 40 | $0.00 | $0.00 | $0.00 | $0.00 |
| 14 | Other | 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| POTENTIAL DESIGN CONSULTANT PERSONNEL (Not intended to be all inclusive/Contractors to list typical items and clarify approach for each) | | | | | |
| 15 | Architect/Mechanical/Electrical - Principal | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 16 | Architect - Project | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 17 | Architect - Preservation/Medical | 10 | $0.00 | $0.00 | $0.00 | $0.00 |
| 18 | CAD/Draftsperson | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 19 | Mechanical Engineer | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 20 | Electrical Engineer | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 21 | Civil Engineer | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 22 | Structural Engineer | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 23 | Clerical | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| GENERAL CONDITIONS (Not intended to be all inclusive/Contractors to list typical items and clarify approach for each) | | | | | |
| 24 | Jobsite Trailer/Set-up | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 25 | Telecommunication | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 26 | Printer/Copier | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 27 | Electronic Project Platform | $ 6,500,000.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 28 | Electronic Archiving | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 29 | Photos/Video | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 30 | Documents | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 31 | Temporary Water | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 32 | Temporary Toilet | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 33 | Temporary Fence | 200 | $0.00 | $0.00 | $0.00 | $0.00 |
| 34 | On Going Cleaning | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 35 | Final Cleaning | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 36 | Subcontract Bonds | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 37 | Other | 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| PROPOSED FEES/INSURANCES/BONDS (This is intended to be all inclusive/Contractors to list typical items and clarify approach for each) | | | | | |
| 38 | On Self Performed Work | $ 200,000 | 0% | $0.00 | 0% | $0.00 |
| 39 | On Subcontracted Work | $ 1,000,000 | 0% | $0.00 | 0% | $0.00 |
| 40 | On D/B Work | $ 800,000 | 0% | $0.00 | 0% | $0.00 |
| 41 | PLM Bonds | $ 2,000,000 | 0% | $0.00 | 0% | $0.00 |
| 42 | Insurance | $ 2,000,000 | 0% | $0.00 | 0% | $0.00 |
| 43 | Builders Risk Insurance | $ 2,000,000 | 0% | $0.00 | 0% | $0.00 |
| 44 | Office Overhead | $ 2,000,000 | 0% | $0.00 | 0% | $0.00 |
| GRAND TOTALS | $0.00 | | $0.00 |
| | | $0.00 | |
| GENERAL NOTES: | | | | |
| 1 | NOTE THE ITEMS ABOVE INTENDED TO PROVIDE A BASELINE FOR A TYPICAL PROJECT EXPECTED UNDER THIS IDIQ. | | | |
| 2 | ADDITIONAL OR FEWER ITEMS MAY ACTUALLY BE USED FOR AN INDIVIDUAL TASK ORDER. | | | |
File details come from the government source that posted it.
Updated .