Amendment 01_SMART.docx
DOCX document 54 KB Posted
- Solicitation number
- 75N98026Q00287
About this file
This file is Amendment 01 to Solicitation 75N98026Q00287, a Request for Quotation (RFQ) issued by the National Center for Translational Sciences (NCATS) within the National Institutes of Health (NIH). The amendment clarifies RFQ requirements through consolidated questions and answers and adds IT-applicable clauses to the solicitation. The National Institute on Drug Abuse is listed as a related federal agency. The underlying requirement is for Governance, Administration, and Operations Support (GAOS) services for the SMART IRB (Streamlined, Multisite, Accelerated Resources for Trials Institutional Review Board) program. The contract is anticipated to be firm-fixed-price and covers a 54-month period of performance from January 1, 2027 through June 30, 2031, comprising a 12-month base period and four option periods (three 12-month periods and one 6-month period), plus an additional up-to-six-month extension at rates specified in the contract under FAR 52.217-8. The current contract is administered by Harvard under contract number 75N95023C00008.
The contractor shall provide functional support for three systems: SMARTIRB.org (website for content distribution and notifications), Joinder (institutional enrollment), and the Online Reliance System (ORS) (study-by-study reliance documentation). Services include user administration, helpdesk support, content development and moderation, educational material creation (modules, webinars, videos, in-person workshops), governance model development and coordination, expert consultation, identification and resolution of single-IRB process discordance, quarterly and monthly metrics reporting, and participation in up to four annual conferences with reimbursable travel under FAR 31.205-46. Work shall be performed at the contractor's facility without required on-site NIH presence; a U.S.-only domestic model is preferred. Offerors should submit firm-fixed-price quotes based on their understanding of the Statement of Work without a provided pricing template or CLIN structure. Technical proposals are limited to 20 pages (Word or PDF format) and should follow the three evaluation criteria. Award will be made using a best-value tradeoff process where non-cost technical factors combined are more important than cost. Past performance, demonstrating recent (within five years) and relevant (similar complexity and magnitude) experience, will strengthen proposals. Questions were due November 4, 2026 by 5 PM EST, and quotations must be received by November 13, 2026 at 12:00 PM Eastern Time via email to polina.klimenkova@nih.gov using the stated RFQ subject line.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ_75N98026Q00287.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Number 75N98026Q00287 “SMART IRB Governance, Administration, and Operations Support (GAOS)”
Amendment 01
The purpose of this amendment # 01 is to clarify the RFQ requirements by responding to questions submitted and also to add IT applicable clauses into the solicitation. Unless specifically noted, all other terms remain unchanged.
Note: The Offeror should acknowledge on the cover page or first pages on its Quote receipt of this amendment.
Consolidated Questions and Answers
Contract structure and pricing Q01 Period of performance Question: What are the intended base and option period dates, and how many months of performance should be priced?
Answer: Section 1.3 of the SOW notes the anticipated period of performance, totaling 54 months:
Base Period: Jan 1, 2027– Dec 31, 2027 (12 months).
Option Period 1: Jan 1, 2028 – Dec 31, 2028 (12 months).
Option Period 2: Jan 1, 2029 – Dec 31, 2029 (12 months).
Option Period 3: Jan 1, 2030 – Dec 31, 2030 (12 months).
Option Period 4: Jan 1, 2031 – June 30, 2031 (6 months).
The FAR 52.217-8 extension is addressed separately in Q04.
Q02 Contract type Question: Is this requirement firm-fixed-price, time-and-materials, labor-hour, or another contract type, and on what basis should pricing be submitted?
Answer: The Government anticipates firm-fixed price contract.
Q03 Price schedule and travel line Question: Will NIH provide a pricing template or CLIN structure, including the base period, each option period, travel, and other direct costs? Should travel be estimated as a separate cost-reimbursable line, and is there a common ceiling?
Answer: SOW 11.2 makes travel reimbursable when approved in advance by the COR and CO and in accordance with FAR 31.205-46. The attachments do not supply a pricing template, CLIN structure, common travel ceiling, or separate-line instruction as the Government anticipates the firm-fixed price contract.
Q04 Extension of services pricing Question. Should the up-to-six-month extension under FAR 52.217-8 be priced separately from the stated 54-month schedule, and how will it be reflected in the quote and evaluated price?
Answer: RFQ 7(b)(i) permits up to six months of continued services at the rates specified in the contract, separate from the six-month Option Period 4 in SOW Section 1.3.
Q05 Commercial quotation fields Question. How should offerors interpret the requests for unit price, list price, delivery days after award, delivery terms, and product description for professional services?
Answer: The offeror should submit the FFP quote based on their understanding of the SOW. Comment by Document Review: COR review Q05: The quotation fields are supported; revise the second sentence for clarity without establishing an unsupported unit-pricing method.
Source: RFQ 12.
Suggested answer for review only — two sentences:
RFQ 12 requires unit price, list price, delivery days after award, delivery terms, prompt-payment discount terms, and a product description. The solicitation does not provide service-specific instructions for applying these fields; the CO should clarify the required pricing basis.
Q06 Annual option rates Question: May each annual option use independently proposed rates and stated annual labor-rate escalation assumptions?
Answer: The offeror should submit the FFP quote based on their understanding of the SOW.
Incumbent staffing and transition Q07 Incumbent identity and continuity Question: Who currently administers SMART IRB, under what contract or award number, and does this requirement continue that work?
Answer: The current contract is administered by Harvard under contract number 75N95023C00008.
Q08 Staffing levels and labor mix Question: Will NIH provide estimated or historical FTEs, annual labor hours, staffing by function or labor category, and anticipated labor mix? Are minimum staffing levels or labor categories required, or should offerors size their own teams?
Answer: The Government anticipates firm-fixed price contract. Offerors should propose qualified personnel and resources sufficient to perform the SOW and address Attachment 2.
Q09 Transition timing and incumbent support Question: What transition period, overlap, knowledge-transfer activities, and incumbent assistance are anticipated before or after the January 1, 2027 start?
Answer: The anticipated base period begins January 1, 2027. Any additional transition requirements would be provided by the Program to the awardee during the kick-off meeting.
Q10 Transfer of existing materials Question: Which SOPs, helpdesk articles and knowledge base, directories, training records and modules, metrics baselines, program records, agreements and versions, educational materials, and governance documents will be furnished at award or transition?
Answer: Any additional transition requirements would be provided by the Program to the awardee during the kick-off meeting.
Q11 First day readiness and transition deliverables Question. What operational activities and deliverables must be in place on the first day, and is a mobilization or transition plan required?
Answer: The solicitation does not establish a separate mobilization plan, transition plan, or first-day acceptance milestone. The contractor shall perform the SOW during the stated period of performance and provide the monthly, quarterly, and closeout reports required by Section 9.
Workload governance and engagement Q12 Helpdesk and recurring workload Question: What historical workload data are available, including average monthly helpdesk tickets, calls and emails; support channels; the share requiring regulatory or reliance expertise; and major recurring administrative tasks?
Answer: SOW Section 7.6 requires maintenance of the SMART IRB Helpdesk in collaboration with the software partner. The solicitation does not provide historical ticket, call, or email volumes, support channels, regulatory-expertise percentages, or a quantified recurring administrative workload. Helpdesk tickets volume and support is variable and dependent on community questions related to platform use, and agreement execution.
Q13 Institutions users and onboarding Question: How many participating institutions and ORS users are active, how many institutions joined in the past 12 months, and what is the average monthly onboarding volume?
Answer: SOW Section 1.2 states that SMART IRB is used nationwide by over a thousand institutions.
Q14 Consultation volume and expertise Question: What are historical and anticipated monthly expert consultations, institutional inquiries, and community support interactions, and what regulatory qualifications or personnel mix do they require?
Answer: SOW Sections 4.4 and 6.5 require expert consultation and community support but do not specify monthly volumes or a required personnel mix. Offerors should describe how their proposed personnel will perform these functions and address Attachment 2.
Q15 Governance bodies and meeting workload Question: Which committees, working groups, and regulatory or governance bodies require support, how many are active, how often do they meet, and what document-production and decision-record support is required?
Answer: SOW Section 3 requires development and maintenance of a governance model, coordination with the SMART IRB Regulatory body, and coordination of governance committees and administration. The solicitation does not specify active committee counts, meeting frequencies, or detailed document-production and decision-record as these requirements may vary.
Q16 Governance authority Question. With which existing governance and regulatory bodies will the contractor coordinate, and which decisions remain with NIH versus the contractor or governance bodies?
Answer. The contractor shall develop and maintain the governance model and coordinate the SMART IRB Regulatory body, committees, and administrative processes under SOW Section 3. The Government retains responsibility for infrastructure and policy governance under Section 10.1
Q17 Authorization Agreement revisions Question: What contractor work is required to draft and revise the SMART IRB Authorization Agreement, obtain expert review and approval, communicate changes, manage versions, and coordinate institutional transition?
Answer: Under SOW Sections 3.2–3.4, the contractor shall coordinate with the SMART IRB Regulatory body and coordinate agreement change control, amendments, versioning, transition, and maintenance.
Q18 Legal counsel and interpretation Question: Must the contractor provide substantive legal advice or independent legal counsel, or only coordinate responses from Government-approved counsel or other authorized experts?
Answer: SOW Section 3.6 requires the contractor to coordinate responses to legal, governance, and operational questions from current or potential users.
Q19 Annual outreach expectations Question: What minimum annual outreach is expected for prospective institutional contacts, consultations, newsletters, campaigns, and other engagement?
Answer: SOW Section 4 requires promotion and dissemination, messaging and documentation, expert consultation, and periodic communications but does not establish minimum annual outreach volumes. Offerors should describe their approach under Attachment 2 and may include proposed frequencies and measurable targets.
Education and harmonization Q20 Single IRB process priorities Question: What are the highest-priority areas of discordance in single-IRB processes, and what studies, improvement backlogs, or stakeholder findings will be available?
Answer: SOW Sections 5.1–5.3 require identification of discordance in sIRB processes and development and dissemination of resources to simplify and align those processes.
Q21 Training products and platforms Question: What annual numbers and types of new or maintained modules, webinars, videos, written resources, and in-person workshops are anticipated, and which authoring and hosting platforms are required?
Answer: SOW Section 6 requires educational modules, written resources, live webinars, on-demand videos, in-person workshops, community support, and website-material maintenance, but specifies no annual counts, cadence, or authoring or hosting platform. Section 2 requires the contractor to furnish necessary materials, equipment, and facilities not otherwise provided by the Government . The smartirb.org platform will remain available.
Q22 Content review and final approval Question: What review and approval steps apply to educational and website content, and who gives final approval for regulatory or institutional reliance content?
Answer: The contractor shall develop and maintain educational materials and written documentation, keep website educational resources current, and facilitate content moderation and notifications under SOW Sections 6 and 7.5. The Government retains the responsibilities in Section 10.
Systems helpdesk and security Q23 Joinder and ORS operating interfaces Question: Will Joinder and the Online Reliance System be supported separately or through a consolidated Reliance System, and what is the scope for each?
Answer: SOW Sections 1.1–1.2 identify SMARTIRB.org, Joinder, and ORS as three systems, with distinct functional support responsibilities described in Sections 7.3–7.5. The solicitation does not direct offerors to assume a consolidated single-platform architecture. The Joinder Agreement is a short document which institutions sign to become a party to the SMART IRB Reliance agreement. The Reliance System generates an institution-specific Joiner and route to the specific Institutional Official for electronic signature. Therefore, the offeror should anticipate the support of both in a single platform.
Q24 Responsibilities across GAOS software partner and ITRB Question: How are user provisioning and administration, functional support, bug triage, incident resolution, website content, helpdesk maintenance, and feature prioritization divided among GAOS, the software partner, and NIH ITRB?
Answer: The separate partner provides software development and infrastructure operations. The contractor shall support community feedback, Joinder and ORS user administration and processes, website content, feature-update prioritization, and collaborative helpdesk maintenance under SOW Section 7. Government and NIH/NCATS ITRB responsibilities are stated in Sections 1.2 and 10.
Q25 Helpdesk coverage and service targets Question: What hours, time-zone coverage, response and resolution targets, escalation procedures, and after-hours obligations apply?
Answer: SOW Sections 7.3-7.6 require functional user support and maintenance of the SMART IRB Helpdesk in collaboration with the software partner.
Q26 Support tools platforms and access Question: Will the Government or incumbent provide the ticketing platform, knowledge base, customer database, administrative tools, and access to Joinder, ORS, and the SMARTIRB.org content system, or must the contractor furnish them?
Answer: The contractor shall provide functional support, user administration, content moderation, and collaborative Helpdesk maintenance under SOW Section 7, while infrastructure and website responsibilities are addressed in Section 10.
Q27 Change requests and coordination Question: How are usability input, enhancement recommendations, and change requests prioritized and approved across NIH, GAOS, and the software partner, and what cadence, meetings, deliverables, and records are required?
Answer: SOW Section 7.2-7.5 require periodic community feedback and prioritization of potential feature updates for the development team. SOW Section 1.2 directs documented needs to NCATS and places suggested website and systems development outside this contract.
Q28 Personnel access security and privacy Question: Which security, privacy, HHS training, background investigation, PIV credential, and system-access approval requirements apply to staff supporting Joinder, ORS, and related systems?
Answer: SOW Sections 1.2 and 10.2 assign NCATS/ITRB and Government responsibilities for the specified infrastructure, including security. The NIH ICO Information Security Office determined Privacy Act applies to this procurement, specifically, RFO clause 52.224-1, Privacy Act Notification, RFO clause 52.224-2, Privacy Act, RFO clause 52.224-3, Privacy Training. Also, HHSAR 352.239-78 (FEB 2024) (DEVIATION) Information and Communication Technology Accessibility Notice and HHSAR 352.239-79 (FEB 2024) (DEVIATION) Information are applicable. However, due to ongoing Revolutionary FAR Overhaul and HHS Acquisition Regulation (HHSAR) Overhaul Initiative, some IT requirements and clauses may change in near future.
Metrics reporting and personnel Q29 Metrics baselines and data access Question: What historical metrics, baseline datasets, dashboards, report formats, and access mechanisms will support quarterly reporting? Will GAOS receive direct Joinder and ORS data access or software-partner extracts?
Answer: SOW Section 8 requires growth, utilization, institution, study, and other pertinent metrics with quarterly analysis, and Section 9.2 requires quarterly reports produced with the development and infrastructure operations partner.
Q30 Metric definitions and validation Question: How does NIH define an institution actively using the Authorization Agreement, a study using the agreement, and study size, and who validates those measures?
Answer: SOW Section 1.2 distinguishes joining the agreement from documenting reliance for specific research. Sections 8.2–8.3 require metrics on institutions using the Authorization Agreement for studies, numbers of studies, and study size as appropriate. Institutions must sign the Agreement available on the smartirb.org website.
Q31 Report templates and acceptance Question: Are there required templates, content specifications, acceptance criteria, or review timelines for monthly status reports, quarterly metrics, and the closeout report?
Answer: Under SOW Section 9, monthly status reports are due to the Federal task lead by the fifth of each month, quarterly metrics reports are produced with the development and infrastructure operations partner, and the closeout report is due after the performance period expires. The solicitation does not provide report templates, detailed acceptance criteria, review timelines, an exact quarterly due date, or a precise closeout deadline.
Q32 Key personnel and minimum qualifications Question: Which positions are key personnel, including the Project Manager, and are minimum degrees, years of experience, certifications such as Certified IRB Professional, or prior IRB or HRPP experience required?
Answer: Offerors should describe the proposed positions, responsibilities, qualifications, Project Manager supervision, and resource allocation sufficiently to address Attachment 2, without treating its evaluation factors as unstated minimum qualifications.
Q33 Resumes commitments and staffing documentation Question: Must offerors provide resumes for all staff or only key personnel, letters of commitment or proof of availability, position descriptions, and a staffing matrix? Are there length limits, and are consultant and subcontractor commitment letters acceptable, including for personnel not yet employed?
Answer: Offerors shall provide sufficient information to address Attachment 2; the solicitation does not expressly require resumes for all staff or key personnel only, commitment letters, proof of availability, position descriptions, a staffing matrix, current employment, or specific length limits. Evidence of supporting subcontractors, consultants, and business partners will be considered; any voluntarily submitted commitment letters should accurately state the proposed role, availability, and contingencies and do not alone establish that staffing meets the evaluation criteria.
Q34 Teaming responsibilities and experience Question: How should offerors identify work assigned to subcontractors, consultants, and business partners and substantiate their experience? Will their experience receive the same credit as the prime’s under Criterion 3?
Answer: Offerors should identify proposed team responsibilities and capabilities sufficiently to demonstrate the ability to perform the SOW. Under the Federal Acquisition Regulation (FAR), small business prime contractors are subject to the Limitations on Subcontracting rules (outlined in FAR 52.219-14), which restrict how much of the government contract payout can go to subcontractors that are not "similarly situated".
Location travel and commercial terms Q35 Contractor facility remote work and NIH presence Question. May work be remote or performed across contractor locations rather than at a single contractor facility, and is periodic NIH or NCATS on-site presence required?
Answer. SOW Section 11.1 states that the place of performance shall be at the contractor’s facility and not on-site presence is required.
Q36 United States location and personnel restrictions Question. Must tasks be performed within the United States or by U.S. persons, especially helpdesk, user administration, processing, and Government-system access? Would a proposed blended U.S./India model using an affiliated delivery company be permitted?
Answer: SOW Section 11.1 requires performance at the contractor’s facility. Proposed locations, roles, data access, and system permissions may require additional security review, but the preference would be given to domestic, U.S. only model.
Q37 Conference attendance and workshop travel Question: For up to four annual conferences, including PRIM&R and the NCATS CTSA Annual Meeting, how many contractor attendees and participation days should be assumed? Are registration fees reimbursable, and does workshop travel fall under SOW 11.2 in addition to the four conferences?
Answer: SOW Section 11.2 requires participation in up to four conferences annually, including PRIM&R and the NCATS CTSA Annual Meeting, with travel reimbursable should be consistent with FAR 31.205-46. For the estimation purposes please assume up to 4 staff members. Please submit the FFP based on your understanding of the SOW.
Q38 Late invoicing and payment rights Question: Does Attachment 3’s late-invoicing provision apply to monthly ongoing-services invoices, and is Contracting Officer excusal the exclusive process for invoices submitted after the stated 30-day period?
Answer: Attachment 3 requires ongoing-service invoices within 30 days after the billing period through IPP with the required copies, unless the CO authorizes alternate procedures in writing. Its late-invoice provision states that untimely submission waives payment rights and permits a request for written CO excusal.
Q39 Background intellectual property and licenses Question: Does offeror background intellectual property, including pre-existing software, designs, and know-how used to inform workflow or usability recommendations, remain the offeror’s property, with Government rights limited to any license expressly granted in the quote?
Answer: SOW 11.3 states that rights in data are governed by FAR 52.227-14, Rights in Data—General. Offerors should identify any background intellectual property proposed for incorporation into deliverables and any associated license terms or restrictions in their quotes.
Q40 Response format organization and length Question. What technical and price response formats, volumes or separate files, page limits, font sizes, margins, appendix exclusions, file types, and submission order apply? Should the technical response follow the three evaluation criteria, SOW Sections 3–9, or both?
Answer: The solicitation does not prescribe custom font sizes, margins and etc. However, please limit the proposal to 20 pages to make the review process more efficient. Word or pdf. files are preferred.
Q41 Technical merit price weighting and award method Question: How will price be weighted against technical merit, will options be evaluated, and is the award method a best-value tradeoff, lowest price technically acceptable, or another method?
Answer: Best-value/ tradeoff process will be used for this acquisition because it has been determined to be in the best interest of the Government to consider award to other than the lowest priced Offeror. All evaluation factors other than cost or price, when combined, are more important than cost or price. For this acquisition, the following considerations will be part of the trade-off process: Technical Evaluation Factors including Past Performance, and Total Price, inclusive Options (not scored factor). It is anticipated that any contract awarded from this solicitation will contain option periods. In accordance with FAR Clause 52.217-5, Evaluation of Options, (July 1990), the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement, except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests. Evaluation of option periods will not obligate the Government to exercise the options. An evaluation of this factor will only be conducted on offerors and quotes who have been determined to be technically acceptable.
Q42 Past performance and references Question: Will past performance be evaluated within relevant experience or separately? Is a separate Volume III or other submission required, and what reference count, recency, relevance, forms, or questionnaires apply?
Answer: RFQ identifies past performance as information that may be considered during the Technical evaluation but does not establish it as a separately scored factor. To strengthen the proposal, the Offeror shall demonstrate recent and relevant past performance. Recent is defined as within the last five years. Relevant is defined as work similar in complexity and magnitude of the work described in this Statement of Work. The Government may also consider information obtained through other sources, including CPARS. Past performance information will be utilized to determine the quality of the contractor’s past performance as it relates to the probability of success of the required effort.
Q43 Small business status and subcontracting plan Question. Does the HHS Small Business Subcontracting Plan apply to a small-business offeror under NAICS 541990? What size determination date and method apply, and is status assessed at prime or team level for subcontracted arrangements?
Answer: Small business subcontracting plans are not required from small business companies. Only other than small businesses should provide the subcontracting plan for this requirement IAW FAR Subpart 19.7. Commercial subcontracting plan is acceptable and should be provided with the proposal submission. RFQ requires business-size certification, UEI, and active SAM registration, where size-determination is usually listed.
Q44 Question and quotation deadlines and submission method Question. What exact time and time zone apply to the November 4, 2026 question deadline? Is November 13, 2026 at 12:00 PM Eastern Time the firm quotation deadline, and is email with read receipt to polina.klimenkova@nih.gov the sole accepted method, with no portal or hard-copy alternative?
Answer: Questions are due November 4, 2026 EST, by COB or 5pm. Quotes must be received at that address by November 13, 2026, at 12:00 PM Eastern Time, using the stated RFQ subject line. The RFQ requires electronic email submission only.
File details come from the government source that posted it. Updated .