Att 6 Add Technical and Business Proposal Inst.pdf

PDF 268 KB Posted

Attached to
Strong Heart Study (SHS) Renewal - Coordinating Center (CC)
Solicitation number
75N92026R00010
Issued by

About this file

This document provides supplemental technical and business proposal instructions for the Strong Heart Study (SHS) Coordinating Center contract opportunity, administered by the National Heart, Lung, and Blood Institute (NHLBI).

The technical proposal must address Task Area A (Core Study Operations and Community Engagement), including Subtasks A.1 (Community-Based Pilot Research Projects) and A.2 (Summer Immersion Research Experience), with sufficient information demonstrating capability to perform Task Areas B through E. Offerors must describe existing relationships with Tribal/Native Serving Organizations (T/NSOs) and present documented evidence that proposed study activities have been reviewed by applicable T/NSO governments, with final approvals required within two years of award. The proposal shall detail study coordination activities, database maintenance, data distribution, field center support, clinical examination coordination, quality assurance/quality control oversight, scalability capacity for ancillary studies, training and mentoring, data analysis, and study closeout planning. For clinical examinations, offerors must describe preparation, staffing, training, implementation, quality control, and closeout approaches, identifying any anticipated challenges and mitigation strategies.

The business proposal shall use the Section J Excel Cost Proposal Template and address severable Task Area A (12-month base period plus nine 12-month option periods for 120 months total) and non-severable Task Areas B through E structured as multiple task orders. Task Area A costs for base and option periods are evaluated for award; estimated costs for other task areas are for planning purposes. Offerors must exclude ancillary study costs and budget up to $10,000 annually for research capacity-building support. Personnel requirements are estimated at 545% effort for Task Area A, with detailed allocations provided across labor categories including Principal Investigators (40%), Administrative personnel (100%), Communication Managers (100%), and Other Personnel (300%). Travel cost assumptions are provided for mandatory meetings including OSMB (annually, Bethesda), Steering Committee (twice yearly), Community Advisory Board (one in-person every two years), and site visits (up to ten), with virtual attendance options encouraged. Participant planning estimates include approximately 1,965 Legacy Cohort participants and up to 5,000 New Cohort participants for clinical events follow-up.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 6

ADDITIONAL TECHNICAL PROPOSAL INSTRUCTIONS

Strong Heart Study (SHS) – Coordinating Center

1. GENERAL INSTRUCTIONS

These instructions supplement Section L of the RFP and provide Coordinating Center-specific information for preparation of the Technical Proposal. Offerors shall also comply with all applicable Technical Proposal Instructions outlined in Section L.

The Technical Proposal shall address Task Area A, including Subtasks A.1 and A.2, and shall provide sufficient information for the Government to evaluate the Offeror’s capability to perform Task Areas B, C, D, and E. Separate Technical Proposals for Task Areas B, C, D, and E are not required.

The Technical Proposal should be organized in the same order as the technical evaluation factors identified in Section M of the RFP. The supplemental instructions below identify Coordinating Center-specific information that should be addressed, as applicable. They do not replace the requirements of Sections L or M.

2. TRIBAL/NATIVE SERVING ORGANIZATIONS (T/NSOs) ENGAGEMENT AND APPROVALS

Participating T/NSOs serve as active partners in the design, conduct, and oversight of the study.

Successful performance of this requirement depends on maintaining strong T/NSO relationships and obtaining appropriate approvals at all stages of the study.

The Offeror shall describe its existing relationships and experience working with the T/NSOs applicable to the Coordinating Center for which it is proposing and its approach for obtaining and maintaining required T/NSO reviews and approvals throughout contract performance.

The proposal shall include available documentation demonstrating that the proposed study activities have been presented to the applicable T/NSO government(s) or review body for review and/or approval. The Offeror shall identify the current status of applicable T/NSO reviews.

The SOW requires the Contractor to provide documentation of final T/NSO reviews/approvals within two (2) years after contract award. The Offeror shall describe its approach and anticipated schedule for obtaining and maintaining the required approvals, including approvals necessary to support the Phase VIII and Phase IX clinical examinations for the Legacy Cohort, the baseline clinical examination for the New Cohort, Community-Based Pilot Research Projects, Summer Immersion Research Experience, and other applicable study activities.

3. COORDINATING CENTER-SPECIFIC TECHNICAL PROPOSAL INSTRUCTIONS

The following Coordinating Center-specific information should be addressed under the corresponding technical evaluation factors in Section M, as applicable.

A. Approach In addition to the information required by Sections L and M, the proposal shall address the following Coordinating Center-specific information, as applicable.

• study coordination activities;

• maintenance of databases and repositories;

• distribution of research-ready data to approved users;

• support for field centers’ participant follow-up;

• support for field centers’ clinical events ascertainment;

• data analysis and program evaluation;

• T/NSO engagement;

• data collection, management, quality control, and transmission;

• coordinate the components of the Phase VIII and Phase IX clinical examinations of the

Legacy Cohort carried out at multiple field centers/sites;

• coordinate the components of the baseline clinical examination of the New Cohort carried out at multiple field centers/sites;

• provide oversite on exam activities including QA/QC and data entry;

• a capacity for “scalability” to capably manage a wide and uncertain array of exam components that may arise from the separate and independent fundings of to be determined number of ancillary studies;

• Community-Based Pilot Research Projects under Subtask A.1;

• the Summer Immersion Research Experience under Subtask A.2;

• training and mentoring of junior and early-career investigators;

• data analysis, publications, and dissemination; and

• study closeout and/or transition planning, if required.

For all clinical examinations, the Offeror shall describe its approach to examination preparation, staffing and training, examination implementation, quality control, and closeout. If the Offeror anticipates any challenges, the proposal shall identify those challenges and describe proposed mitigation strategies.

B. Personnel In addition to the personnel information required by Section L of the RFP, the proposal shall address, as applicable to the proposed role, responsibilities, qualifications, relevant experience, and proposed level of effort.

C. Resource Management No additional Coordinating Center-specific information is required. See Sections L and M of the RFP.

D. Resource Sharing Under the Resource Sharing factor, the Offeror should address its approach to alternative data-sharing mechanisms when storage or distribution through NIH databases is not agreed upon by T/NSO research partners.

E. Organization and Facilities No additional Coordinating Center-specific information is required. See Sections L and M of the RFP.

4. PROGRAM AND PROPOSAL PLANNING INFORMATION

The following information is provided to assist Offerors in preparing their proposals. Participant estimates and other planning information are provided for proposal-development purposes and do not represent guaranteed quantities unless otherwise stated in the solicitation. Detailed performance requirements, periods of performance, and task order structure are provided in the SOW and other applicable solicitation sections.

Task Area A – Core Study Operations and Community Engagement: For planning purposes, approximately 1,965 participants from the SHS Legacy Cohort are anticipated to be available for clinical events follow-up when the study is funded and up to 5,000 participants from the New Cohort will be available for clinical events follow-up during the last two (2) years of contract funding.

Because Medicare data may not be redistributed, the Offeror may propose one or more strategies to enable use of the Medicare-linked cohort data housed at the Coordinating Center by interested outside investigators. Include a description of the plan, timeline for implementation, proposed staff with appropriate expertise, and separate budget.

Subtask A.1 – Community-Based Pilot Research Projects: Offerors shall assist the Field Centers in application development, review and selection, applicable regulatory approvals, and project implementation, as described in the SOW.

Subtask A.2 – Summer Immersion Research Experience: Offerors will assist the Field Centers in program development and implementation activities, as described in the SOW.

Task Area B – Phase VIII Exam of the SHS Legacy Cohort: No additional Coordinating Center-specific information is required. See Sections L and M of the RFP.

Task Area C – New Cohort Exam: No additional Coordinating Center-specific information is required. See Sections L and M of the RFP.

Task Area D – Phase IX Exam of the Legacy Cohort: No additional Coordinating Center-specific information is required. See Sections L and M of the RFP.

Task Area E – Study Closeout and/or Transition Planning: Offerors should consider the potential study closeout and/or transition activities described in the SOW when developing their proposed technical approach. Task Area E will be performed if determined necessary by the Government.

If requested by the NHLBI and mutually agreed upon by T/NSO partners and the NHLBI, the task order will also involve contract closeout activities, which may include, but are not limited to:

smooth transfer of all study documents and biological samples and data, including data files, scans and images, and assurances of confidentiality and security of all data as necessary.

ADDITIONAL BUSINESS PROPOSAL INSTRUCTIONS

Strong Heart Study (SHS) – Coordinating Center

1.0 Objective

These instructions supplement the Business Proposal Instructions in Section L of the RFP and provide Coordinating Center-specific cost and pricing assumptions for preparation of the Business/Cost Proposal. Offerors shall also comply with all applicable Business Proposal Instructions in Section L, the Section J Cost Proposal Template, and the Statement of Work

(SOW).

2.0 Task Area Structure and Evaluation

The SHS Coordinating Center requirement is organized into Task Areas A through E, as described in Attachment 3, Statement of Work (SOW). Task Area A also includes Subtasks A.1 and A.2. The Business Proposal shall be organized to correspond to the SOW structure and the Section J Cost Proposal Template.

Task Area A – Core Study Operations and Community Engagement (severable services):

12-month base period followed by nine (9), 12-month option periods, for a total potential period of performance of 120 months.

Subtask A.1 – Community-Based Pilot Research Projects (non-severable): four (4) task orders, each with an estimated period of performance of 2.5 years (30 months). The task orders overlap by six (6) months, for a maximum total duration of 102 months.

Subtask A.2 – Summer Immersion Research Experience (non-severable): ten (10) task orders, each for a period of 12 months, for a total potential duration of 120 months.

Task Area B – Phase VIII Examination of the Legacy Cohort (non-severable):

approximately 40 months in total duration and will be issued as two (2) task orders structured as follows:

B.1 for exam preparation activities with an estimated period of performance of 9 months.

B.2 for continued conduct of the Phase VIII exam and exam closeout activities, with an estimated period of performance of 31 months.

Task Area C – New Cohort Baseline Examination (non-severable): approximately 60 months in total duration and will be issued as two (2) task orders structured as follows:

C.1 for recruitment, exam preparation activities, and pilot testing, with an estimated period of performance of 18 months.

C.2 for conduct of the New Cohort exam and exam closeout activities, with an estimated period of performance of 42 months.

Task Area D – Phase IX Examination of the Legacy Cohort (non-severable): approximately 24 months in total duration and will be issued as two (2) task orders structured as follows:

D.1 for the Phase IX exam preparation and planning activities, with an estimated period of performance of 9 months.

D.2 for the conduct of the re-examination for Phase IX and exam closeout activities, with an estimated period of performance of 15 months.

Task Area E – Study Closeout and/or Transition Planning (non-severable): approximately 12 months in total duration and will be issued as one (1) task order, if deemed necessary, as described in the SOW.

3.0 Cost/Price Proposal Submission Instructions

Offerors shall submit the Business/Cost Proposal using the Excel Cost Proposal Template provided in Section J of the RFP. The proposal shall contain sufficient information and supporting documentation to permit the Government to evaluate the proposed cost/price in accordance with the solicitation.

Task Area A – Core Study Operations and Community Engagement (severable services):

Offerors shall submit detailed cost estimates for the 12-month base period and each of the nine (9), 12-month option periods, together with the supporting cost documentation required by the solicitation. The base and option periods will be evaluated as part of the award evaluation.

Budget up to $10,000/year to provide technical support for data and/or biospecimen preparation and distribution activities for approved requests for research activities for community members, junior and early career investigators, fellows, and students (Task Area A).

Subtasks A.1 and A.2: Offerors shall complete the applicable portions of the Section J Cost Proposal Template for the research capacity-building activities described in the SOW.

Supporting detail shall be provided to the extent required by the Cost Proposal Template and solicitation instructions.

Task Areas B, C, D, and E: Offerors shall provide estimated costs using the applicable portions of the Section J Cost Proposal Template. Unless otherwise stated in the solicitation, these estimates are provided for acquisition planning and informational purposes and are not separately evaluated for award of the initial Task Area A task order. The Government may request clarification regarding the basis of the estimates.

The Business Proposal shall identify, as applicable, direct labor, fringe benefits, travel, materials and supplies, subcontracts, consultants, other direct costs, indirect costs and rates, and proposed fee. The Offeror shall provide the supporting information required by the solicitation to permit evaluation of cost reasonableness, realism, and completeness.

Offerors shall not include ancillary study costs in their proposed SHS contract costs. For all years, costs for providing data, materials, or other research and administration services to ancillary studies should not be supported by the contract. Furthermore, when new exam procedures, assays or genotyping in an ancillary study reveals potentially clinically actionable conditions, the costs associated with participant notifications must come from the ancillary study and not the contract.

4.0 Estimated Level of Effort

For proposal planning and cost estimating purposes, the Government provides the following estimated personnel levels of effort, based on historical data under previous SHS operations.

These estimates are informational and do not intend to prescribe or restrict the Offeror's staffing approach. Offerors shall propose the labor categories, staffing mix, and levels of effort they consider necessary to successfully perform the Statement of Work (SOW) and shall explain the basis for their proposed staffing approach.

For proposal purposes, Offerors shall include labor and travel, as applicable, for each Task Area and Subtask included in the Cost Proposal Template. The proposed level of effort shall be consistent with the Offeror's Technical Proposal and staffing plan.

Note: Offerors shall ensure that the Principal Investigator and all other personnel proposed will not be committed on Federal grants and contracts for more than a total of 100% of their time. If the situation arises where it is determined that a proposed individual is committed for more than 100% of his or her time, the Government will require action on the part of the Offeror to adjust the time commitment.

Labor Category

Task Area

A

SubCLIN A1

SubCLIN A2

Task Area B

Task Area C

Task Area D

Task Area E

Principal Investigators (PIs) and co- Principal Investigators (co-PIs)

40% 2% 2% 10% 20% 10% 5%

Administrative (Program Manager)

100% 1% 1% 20% 20% 20% 10%

Communication Manager

100% __ __ 50% 50% 50% __

Community Champion or Community Support

5% __ __ 5% 5% 5% __

Other Personnel

300% __ __ 200% 400% 175% 10%

Total 545% 3% 3% 285% 495% 260% 25%

5.0 Travel Cost Assumptions

Offerors shall include reasonable travel costs necessary to perform the applicable SOW requirements. The following assumptions are provided for cost-proposal planning purposes. The SOW identifies the required meetings, training, and other activities; this section provides the travel assumptions Offerors should use when estimating the associated costs.

Travel requirements:

Name of Meeting

Location Number and timing of in-person meetings

Duration of

Meeting

Number of Travelers

Additional Notes

Observational Study Monitoring Board

(OSMB)

Bethesda, MD

Annually;

additional remote meetings may be convened as deemed necessary.

1 day Up to 3 Virtual options for meeting are encouraged.

(Task A)

Steering Committee

Bethesda, MD and rotating study locations

Twice per year

1.5 days Up to 5 Virtual options for meeting are encouraged.

(Task A)

Community Advisory Board

Rotating study locations

One in-person meeting every 2 years;

maximum of five during the contract.

1 day Up to 2 Remaining CAB meetings will be conducted using video/audio conferencing.

(Task A)

Community Symposiums

Rotating study locations

Up to five during the contract

1.5 days Up to 2 Additional T/NSO or community representatives may participate via video/audio conferencing.

(Task A)

Central Training

TBD Three 4 days Up to 6 (Tasks B, C, and D)

Site Visit TBD Up to ten 2 days Up to 2 (Tasks A, B, C, and D)

Scientific Conferences for PIs, co- PIs, and key staff

TBD Every year of contract funding

4 days Up to 2 (Task A)

Scientific Conferences, Meetings, or Workshops for Junior or Early Stage Investigators

TBD Every year of contract funding

4 days Up to 2 (Task A)

Health or Scientific Meetings, Workshops, or Conferences for Community Investigators or Trainees

TBD Every year of contract funding

4 days Up to 2 (Task A)

Att 6 Add Technical Proposal Inst
A. Approach
B. Personnel
C. Resource Management
D. Resource Sharing

Att 6 Add Business Proposal Inst

File details come from the government source that posted it. Updated .