75N91024Q00047_SOW.pdf
PDF 278 KB Posted
- Solicitation number
- 75N91024Q00047
About this file
This notice solicits maintenance services for a government-owned Oxford Nanoimaging, Inc. (ONI) Nanoimager. The National Cancer Institute requires preventative maintenance and emergency services to maintain optimal performance of this specialized benchtop super-resolution microscope, which is critical to research. Services include calibration, repairs, software updates and technical support. Oxford Nanoimaging, Inc. is considered the sole source as they produce the proprietary equipment and software, and exclusively authorize service of the device. Interested parties may submit capability statements by March 26, 2024 to be considered for the sole-source award, which will be made pursuant to FAR 13.106-1(b)(1). The North American Industry Classification System code is 811210 with a small business size standard of $34 million.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 75N91024Q00047_Pre-Sol Notice_final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1.0 TITLE
Maintenance Services for one (1) Oxford Nanoimaging, Inc. (ONI) Nanoimager and Associated Equipment
2.0 BACKGROUND
The Translational Nanobiology Section within the Laboratory of Pathology (LP) at the National Institutes of Health (NIH), National Cancer Institute (NCI), Center for Cancer Research (CCR), combines leading edge technologies and new methods in a cohesive translational pipeline. In support of these efforts, the section utilizes an Oxford Nanoimaging Inc (ONI) Nanoimager to investigate extracellular vesicles and other extracellular biomarkers in translational cancer research assays, to gain valuable insights into tumors and immune responses.
The ONI Nanoimager is a benchtop-sized, super-resolution microscope capable of visualizing, tracking, and imaging individual molecules in living cells with precise resolution. This highly advanced instrument is based upon a recently developed technology. It provides specialized resolution imaging for nanoparticle analysis and allows investigators to monitor subcellular processes and biological structures in real time. As such, ONI Nanoimager became a crucial part of the Translational Nanobiology Section’s extracellular vesicle production and analysis pipeline.
3.0 SCOPE
The Contractor shall provide all labor, material and equipment necessary to maintain and provide preventive maintenance for the following equipment and its associated components:
• One (1) Oxford Nanoimaging Inc (ONI) Nanoimager, inclusive of the following components: ONI light engine, objective for fluorescence microscopy, sample plate, wireless controller, power supplies, NanoImager computer, and NimOS software
Serial Number: N5339C8B
All maintenance services shall be performed on-site in accordance with the Original Equipment Manufacturer’s (OEM) most current standard commercial maintenance practices. Onsite and emergency services shall be provided during standard business hours (defined as 8:00 am – 5:00 pm EST, Monday through Friday, excluding Federal Holidays found at www.opm.gov/policy-data-oversight/pay-leave/federal-holidays and extended hours (5:00 pm – 9:00pm EST, Monday through Friday) for any issues not able to be resolved remotely, or during normal business hours.
Software updates/services may be provided remotely as applicable. All travel, labor, materials, and related charges shall be included in the purchase order price.
4.0 SPECIAL ORDER REQUIREMENTS
The Contractor shall provide all labor, materials, and equipment required to perform the following tasks:
http://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays http://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays
4.1 PREVENTIVE MAINTENANCE
The Contractor shall perform one (1) planned preventive maintenance visit during the contract period. Technically qualified factory-trained personnel shall perform this service. The service shall consist of a thorough cleaning, calibration, adjusting, inspection, and testing of all equipment in accordance with the manufacturer’s latest established service procedures.
The Contractor shall replace the fast-track light source of the instrument at no additional cost to the Government. All reagents used for failed runs resulting from hardware malfunctions shall be replaced by the Contractor at no additional cost to the Government.
All equipment shall be operationally tested through at least one (1) complete operating cycle at the end of the preventive maintenance inspection to assure optimum and efficient performance.
A report indicating the work performed shall be provided to NCI’s Technical Point of Contact (TPOC) within three (3) business days of completion. The report shall be provided in electronic format (Word or PDF file).
4.2 EMERGENCY SERVICE
On-site, emergency repair service visit shall be provided during the term of this contract at no additional cost to the Government. Emergency service shall be provided during normal working hours, Monday through Friday excluding Federal Holidays (see Section 3.0). Upon receipt of notice that any part of the equipment is not functioning properly, the Contractor shall provide an initial response within one (1) hour, and an on-site response within fourty-eight (48) hours a qualified factory-trained service representative to inspect the equipment and perform all repairs and adjustments necessary to restore the equipment to normal and efficient operating condition.
Emergency service calls shall not replace the necessity for planned preventative maintenance.
All labor, travel, and OEM parts shall be included. All reagents used for failed runs resulting from hardware malfunctions shall be replaced by the Contractor at no additional cost to the Government.
Within three (3) days of the completion of any emergency repair services performed, the contractor shall provide a brief emergency service report to the TPOC stating the equipment malfunction that occurred, the repair efforts, and the duration that was required to restore the equipment to operation. The emergency service report shall be provided in electronic format (Word or PDF file).
4.3 REPLACEMENT PARTS
The Contractor shall furnish all required replacement parts at no additional cost to the Government, with the exception of consumables. All parts shall meet original equipment manufacturer (OEM) specifications. Upon identification of required parts, they shall be delivered within 24 hours, or the following business day should the request fall on a Friday, or preceding a Federal Holiday. If parts will take longer than 24 hours to be delivered for any reason, the Contractor must provide the TPOC with a notification stating the reason and estimated delivery timeframe immediately upon identification of delivery delay.
See Section 4.2 above for the annual replacement of the fast-track light source.
If parts will take longer than 24 hours to be delivered for any reason, the Contractor must provide the TPOC with a notification stating the reason and estimated delivery timeframe immediately upon identification of delivery delay.
4.4 SOFTWARE UPDATES/SERVICE
The Contractor shall provide Software Service and updates in accordance with the manufacturer’s latest established service procedures, to include telephone access to technical support for use of program software and troubleshooting of the operating systems, at no additional cost to the Government. The Contractor shall receive advance approval for the installation of all software updates and revisions from the Government. Software service shall include all major software versions, upgrades, updates and Mandatory Safety Releases, installing the most recent version of the covered software. Software service shall include all maintenance release/service pack updates. Defective software shall be replaced at no additional cost to the Government. Software services shall be conducted remotely to the greatest extend possible.
The Contractor shall provide an electronic report to the TPOC per the within one (1) day after successful performance of software updates. This report must also include the reason for the updates, and any effect it may have on equipment operation.
4.5 TECHNICAL SUPPORT
The Contractor shall provide unlimited remote clinical technical and application support over phone, via secure remote access internet portal, and email (M-F 9am-5pm), excluding Federal holidays.
4.6 SERVICE EXCLUSIONS
The Contractor shall not be responsible for any repairs necessitated by abuse, neglect, vandalism, Acts of God, fire or water. Should damage occur as a result of the aforementioned events, the Government reserves the right to obtain repairs needed as a result of such events via a modification to the purchase order, under a separate purchase order, or any other method deemed appropriate and in accordance with Federal Acquisition Regulations.
4.7 PERSONNEL QUALIFICATIONS
Only technically qualified factory-trained personnel shall perform service on the ONI Nanoimager at NIH, as covered by this purchase order. All primary service personnel shall have at least one backup support person with at least the same level of expertise on the equipment covered under this purchase order.
5.0 TYPE OF ORDER
This shall be a firm fixed-price purchase order.
5.1 SEVERABLE SERVICES
The services acquired under this purchase order are severable services. Funds are only available for use for the line item to which they are obligated. Unused funds from one period (line item) may not roll over for use in other periods.
6.0 PERIOD OF PERFORMANCE
The Period of Performance shall consist of one (1) 12-month base period and three (3) 12-month option periods as follows:
Base Period: May 24, 2024 – May 23, 2025 Option Period 1: May 24, 2025 – May 23, 2026 Option Period 2: May 24, 2026 – May 23, 2027 Option Period 3: May 24, 2027 – May 23, 2028
7.0 PLACE OF PERFORMANCE
Onsite services shall be performed at the following location:
[TBD upon award]
Note that access to the NIH campus is restricted. As such all contractor personnel will be required to access campus via designated entrances where they are subject to security screening.
Please refer to the NIH Security and Access site for more details: (www.nih.gov/about-nih/visitor-information/campus-access-security).
8.0 INSPECTION AND ACCEPTANCE
Pursuant to FAR clause 52.212-4, all work described in the SOW to be delivered under this purchase order is subject to final inspection and acceptance by an authorized representative of the Government. The authorized representative of the Government is the NCI Technical Point of Contact (POC) who is responsible for inspection and acceptance of all services, materials, or supplies to be provided by the Contractor.
Regardless of format, all digital content or communications materials produced as a deliverable under this purchase order, shall conform to applicable Section 508 Standards to allow Federal employees and members of the public with disabilities to have access to and use of information and data that is comparable to the access to and use of information and data by Federal employees or by members of the public who are not individuals with disabilities. Remediation of any materials that do not comply with the applicable Section 508 requirements as set forth below, shall be the responsibility of the Contractor.
HHS guidance regarding accessibility of documents can be found at:
https://www.hhs.gov/web/section-508/making-files-accessible/create-accessiblepdfs/index.html.
https://www.nih.gov/about-nih/visitor-information/campus-access-security https://www.nih.gov/about-nih/visitor-information/campus-access-security
Federal Government-wide guidance regarding accessibility of documents can be found at https://www.section508.gov/, including the documents describing the preferred method of authoring and testing documents produced in Microsoft Word 2013 or later, Microsoft Excel, and files formatted as PDF.
9.0 TECHNICAL POINT OF CONTACT
The Technical Point of Contact (TPOC) is responsible for inspection and acceptance of all work in relation to this requirement, and will serve as the Governments primary point of contact throughout the duration of the requirement. All efforts must be coordinated with this individual.
The TPOC for this requirement is:
[TBD upon Award]
Note: The TPOC has limited authority as defined within this Statement of Work. They do not have the authority to commit or obligate Government funds, or make changes to the terms and conditions of the purchase order. As such, any changes to the purchase order must be performed by a warranted Government Contracting Officer with appropriate delegated authority to do so.
10.0 DELIVERABLES AND DELIVERY SCHEDULE
DELIVERABLE REQUIRED FORMAT DUE DATE
Preventive Maintenance Service Report (Section 4.1)
Electronic, Word or PDF format
3 business days after completion of service
Emergency Maintenance
Service Report (Section 4.2)
Electronic, Word or PDF format
3 business days after completion of service
Delayed Delivery
Notification (Section 4.3)
Electronic, Word or PDF format
Immediately upon identification of delayed deliveries
Software Updates/Revisions
(Section 4.4)
Electronic, Word or PDF format
1 business days after completion of service
11.0 PAYMENT
Payment shall be made in quarterly in arrears. Payment authorization requires submission and approval of invoices to the Technical Point of Contact and NIH OFM, in accordance with the payment provisions listed below:
The following clause is applicable to all Purchase Orders, Task or Delivery Orders, and Blanket Purchase Agreement (BPA) Calls: Prompt Payment (Jan 2017) FAR 52.232-25.
Highlights of this clause and NIH implementation requirements follow:
I. Invoice Requirements
A. An invoice is the Contractor's bill or written request for payment under the contract for supplies delivered or services performed. A proper invoice is an "Original" which must include the items listed in subdivisions 1 through 12, below, in addition to the requirements of FAR 32.9. If the invoice does not comply with these requirements, the Contractor will be notified of the defect within 7 days after the date the designated billing office received the invoice (3 days for meat, meat food products, or fish, and 5 days for perishable agricultural commodities, dairy products, edible fats, or oils) with a statement of the reasons why it is not a proper invoice. (See exceptions under II., below.) Untimely notification will be considered in the computation of any interest penalty owed the Contractor.
1. Vendor/Contractor: Name, Address, Point of Contact for the invoice (Name, title, telephone number, e-mail and mailing address of point of contact).
2. Remit-to address (Name and complete mailing address to send payment).
3. Remittance name must match exactly with name on original order/contract. If the Remittance name differs from the Legal Business Name, then both names must appear on the invoice.
4. Invoice date.
5. Unique invoice #s for all invoices per vendor regardless of site.
6. NBS document number formats must be included for awards created in the NBS: Contract
Number; Purchase Order Number; Task or Delivery Order Number and Source Award Number (e.g., Indefinite Delivery Contract number; General Services Administration number); or, BPA Call Number and BPA Parent Award Number.
7. Unique Entity Identifier (UEI) which is in the System for Award Management (SAM) and replaces the Dun & Bradstreet Data Universal Numbering System (DUNS) number.
8. Federal Taxpayer Identification Number (TIN). In those rare cases where a contractor does not have a UEI number or TIN, a Vendor Identification Number (VIN) must be referenced on the invoice. The VIN is the number that appears after the contractor’s name on the face page of the award document.
9. Identify that payment is to be made using a three-way match.
10. Description of supplies/services that match the description on the award, by line billed.*
11. Freight or delivery charge must be billed as shown on the award. If it is included in the item price do not bill it separately. If identified in the award as a separate line item, it must be billed separately.
12. Quantity, Unit of Measure, Unit Price, Extended Price of supplies delivered or services performed, as applicable, and that match the line items specified in the award.*
NOTE: If your invoice must differ from the line items on the award, please contact the Contracting Officer before submitting the invoice. A modification to the order or contract may be needed before the invoice can be submitted and paid.
Shipping costs will be reimbursed only if authorized by the Contract/Purchase Order. If authorized, shipping costs must be itemized. Where shipping costs exceed $100, the invoice must be supported by a bill of lading or a paid carrier's receipt.
B. The Contractor shall submit invoices to the Department of Treasury’s Invoice Processing
Platform (IPP) at https://www.ipp.gov with a copy to the approving official, as directed below.
The Contractor shall submit a copy of the electronic invoice to the following Approving Official (Technical Point of Contact):
Approving Official: Technical Point of Contact
Name: TBD
II. Invoice Payment A. Except as indicated in paragraph B., below, the due date for making invoice payments by the designated payment office shall be the later of the following two events:
1. The 30th day after the designated billing office has received a proper invoice.
2. The 30th day after Government acceptance of supplies delivered or services performed.
B. The due date for making invoice payments for meat and meat food products, perishable agricultural commodities, dairy products, and edible fats or oils, shall be in accordance with the Prompt Payment Act, as amended.
III. Interest Penalties
A. An interest penalty shall be paid automatically, if payment is not made by the due date and the conditions listed below are met, if applicable.
1. A proper invoice was received by the designated billing office.
2. A receiving report or other Government documentation authorizing payment was processed and there was no disagreement over quantity, quality, or contractor compliance with a term or condition.
3. In the case of a final invoice for any balance of funds due the contractor for supplies delivered or services performed, the amount was not subject to further settlement actions between the Government and the Contractor.
B. Determination of interest and penalties due will be made in accordance with the provisions of the Prompt Payment Act, as amended, the Contract Disputes Act, and regulations issued by the Office of Management and Budget.
https://www.ipp.gov/
IV. PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS
SUBCONTRACTORS, FAR 52.232-40 (MAR 2023)
(a) Upon receipt of accelerated payments from the Government, the Contractor shall make accelerated payments to its small business subcontractors under this contract, to the maximum extent practicable and prior to when such payment is otherwise required under the applicable contract or subcontract, after receipt of a proper invoice and all other required documentation from the small business subcontractor.
(b) The acceleration of payments under this clause does not provide any new rights under the Prompt Payment Act.
(c) Include the substance of this clause, including this paragraph (c), in all subcontracts with small business concerns, including subcontracts with small business concerns for the acquisition of commercial products or commercial services.
(End of Clause)
V. HHSAR 352.232-71 Electronic Submission of Payment Requests (February 2, 2022)
(a) Definitions. As used in this clause—
Payment request means a bill, voucher, invoice, or request for contract financing payment with associated supporting documentation. The payment request must comply with the requirements identified in FAR 32.905(b), ‘‘Content of Invoices’’ and the applicable Payment clause included in this contract.
(b) Except as provided in paragraph (c) of this clause, the Contractor shall submit payment requests electronically using the Department of Treasury Invoice Processing Platform (IPP) or successor system. Information regarding IPP, including IPP Customer Support contact information, is available at www.ipp.gov or any successor site.
(c) The Contractor may submit payment requests using other than IPP only when the Contracting Officer authorizes alternate procedures in writing in accordance with HHS procedures.
(d) If alternate payment procedures are authorized, the Contractor shall include a copy of the Contracting Officer’s written authorization with each payment request.
(End of Clause)
FAR 52.217-8 – OPTION TO EXTEND SERVICES (NOV 1999)
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 30 days.
http://www.ipp.gov/
FAR 52.217-9 – OPTION TO EXTEND THE TERMS OF THE CONTRACT (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 15 days of purchase order expiration; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 30 days before the contract expires.
The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 48 months.
| 1.0 TITLE |
| 2.0 BACKGROUND |
| 3.0 SCOPE |
| 4.0 SPECIAL ORDER REQUIREMENTS |
| 5.0 TYPE OF ORDER |
| 6.0 PERIOD OF PERFORMANCE |
| 7.0 PLACE OF PERFORMANCE |
| 8.0 INSPECTION AND ACCEPTANCE |
| 9.0 TECHNICAL POINT OF CONTACT |
| 10.0 DELIVERABLES AND DELIVERY SCHEDULE |
| 11.0 PAYMENT |
| I. Invoice Requirements |
| II. Invoice Payment |
| III. Interest Penalties |
| IV. PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS SUBCONTRACTORS, FAR 52.232-40 (MAR 2023) |
| V. HHSAR 352.232-71 Electronic Submission of Payment Requests (February 2, 2022) |
File details come from the government source that posted it. Updated .