This is a Request for Quotation (RFQ) issued by the Indian Health Service, Office of Environmental Health & Engineering for the furnish and installation of a sewer service line and lift station in Sapulpa, Oklahoma.

The solicitation, numbered 75H71126Q00008, requires the contractor to supply and install a gravity sewer service line (4-inch SCH 40 PVC), an individual grinder pump lift station (minimum 70-gallon fiberglass basin with 1 HP Simplex pump and high water alarm system), pressurized sewer service line (1-1/2-inch SCH 40 PVC), two-way cleanout with plug and adapter, rock excavation, imported sand bedding, and all city permits and inspection fees. The work will be performed at 409 East Fern Avenue, Sapulpa, OK 74066, with a principal place of performance of the same address. The contract base performance period is 60 days after receipt of award. Payment will be made in accordance with Section B pricing schedule on a monthly basis as work proceeds, with invoices submitted electronically to OKCAPinvoices@ihs.gov. Payment will be made via electronic funds transfer (ACH) in accordance with FAR 52.232-33.

Quotations are due April 21, 2026, at 5:00 PM CST, submitted electronically in PDF format to Noleen.Powell@ihs.gov. The evaluation will use a Lowest Price Technically Acceptable (LPTA) approach, with price as the discriminating factor for award. All labor must comply with prevailing wage determinations outlined in Wage Determination WD OK20260030 dated 01.02.2026. The solicitation includes standard FAR and HHSAR clauses covering construction wage rates, labor standards, safety, subcontracting limitations for Indian Economic Enterprises, and various compliance requirements. No site visit has been scheduled. This is designated as a 100% Indian Small Business Economic Enterprise set-aside per HHSAR 352.226-5.

View the file

Other files

File Type Posted
IHS IEE Representation Form__508 Compliant_ BLANK.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDIAN HEALTH SERVICE

OFFICE OF ENVIRONMENTAL HEALTH & ENGINEERING

Solicitation Number: 75H71126Q00008

Sewer service line and lift station for G. Guinn SR #6861 in Sapulpa, OK (Creek, Co.)

SITE VISIT: None scheduled

QUOTE DUE DATE: April 21, 2026, at 5:00PM CST, unless changed by Amendment Proposals must set forth full, accurate, and complete information as required by this request for proposal (including Gres). The penalty for making false statements in proposals is prescribed in 18 U.S.C. 1001.

Proposals must set forth full, accurate, and complete information as required by this request for proposal (including Gres). The penalty for making false statements in proposals is prescribed in 18 U.S.C. 1001…………………………………………………………………………………………………………………….1

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS……………………………………………………………………………………………………………………………………….5

SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK……………………………………………………………………………………………………………………..7

SECTION D- -PACKING AND MARKING…………………………………………………………………………………………………………………………………………………………………………………………11

SECTION E – INSPECTION AND ACCEPTANCE……………………………………………………………………………………………………………………………………………………….12

SECTION F – DELIVERIES OR PERFORMANCE………………………………………………………………………………………………………………………………………………………..13

SECTION G – CONTRACT ADMINISTRATION DATA

SECTION H – SPECIAL CONTRACT REQUIREMENTS

SECTION I – CONTRACT CLAUSES

SECTION J – LIST OF ATTACHMENTS

SECTION K – REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS

SECTION L – INSTRUCTIONS, CONDITIONS, & NOTICES TO OFFERORS

SECTION M – EVALUATION FACTORS FOR AWARD

Table of Contents

(x)

75H71126Q00008 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Oklahoma City OK 73114 701 Market Drive Oklahoma City Area IHS

04/10/20260001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

04/08/2026

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

A. THE ABOVE CITED SOLICITATION IS HEREBY AMENDED TO EXTEND THE SOLICITATION CLOSING DATE.

THE DATE IS CHANGED FROM APRIL 16, 2026 TO APRIL 21, 2026 BY REASON OF THIS AMENDMENT #0001.

B. THE SOLICITATION CLOSING DATE HAS BEEN EXTENDED FROM APRIL 16, 2026 TO APRIL 21, 2026.

ALL OTHER TERMS AND CONDITIONS SHALL REMAIN THE SAME.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

SHELTON BRUCE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

,-./0123415./6 78192:15./6 .2 ;9<:52= >�

���$�)�@A�

BB

�CD

EFGGDHE

IDJKLFM

FM

KCD

HDNDHID

OPIK

QD

GPRRS

JFOTRDKDU

QS

FGGDHFHV

W�

�����X����� ���� Y� ��X� Z� ,[/483\9 :29:

4.\9= -̂ __̀-a -7__b=����c

�M IDdRDU

QLU

IFRLJLKdKLFMI

EFGGDHE

dMU

EFGGDHFHE

ODdM

EQLUE

dMU

EQLUUDHVE���

e��*f e���fghijklkmjjnopqrstq uvwx yz{q ghi|}j ~qzo{w �zv�{nopqrstq uvwx n� |�jjm �}� g��gy� h�y��h i���gu�y���� �n���� �n����|}j ~y���� ��g��n��yhn~y ug��� n� |�jjm�n����

�n���� m}k��kj���|k j}m�}��l}l�|kh|jjl��}}}}�

'�����X��� ������X���� )��$X����

,a51896 5\9/15��5/� /.�6 \:19= un���yu�n� ihy�� ����gih y�� g�i�y�� y i���� i���gu� �g�� y�� �g�� i�y�gn� �n�

��g�� i� ���j g� iy����y� n� ¡u���� un�¢ g� yuun��y�u� �g�h �h� y��yuh�� i�y��~��� n� �n�� y�� ��y�g�� ��n�g���� i�� i�u�gn� �n� ��n�y�gn� i�£~g��y� g�i���u�gn�i�

�hgi gi y� j}}¤ g��gy� i~y�� £�ig��ii �un�n~gu �������gi� i�� yig�� hhiy�

�kl�ll��k�

�hgi ��n¥�u� gi i�� yig�� �n��h y~��guy� g���i��� u�yiig�guy�gn� i�i��~

¡�ygui¢ un�� l�|jj}� �y��� y�� i���� �g�� y�� ���y��� i���u����i un�i���u�gn��

�h� yiinugy��� ig¦� i�y��y�� �n� �hgi ��nu���~��� gi §mk�} ~g��gn��

�©ª �«¬®Ȳ«® °©Y±± Zª²³¬ ́ª®µ«®¶Y¬̄ª ·³©³¬

>�Y� X$�� ������X���� ���X��� Y·Y®¹º ¬«³̄ª ́®«̄ªª¹�

�©ª ́ª®µ«®¶Y¬̄ª ́ª®³«¹ ³° ¶Y¬¹Y«®»

¬ª²«³YZ±ª�

e�ªª ̈̈ ¨̈¨̈¨̈¨̈¨̈¨̈¨̈¨̈¨̈¨̈¨̈¨̈¨̈¨̈¨̈¨̈¨̈¨̈¨̈¨̈¨̈¨̈¨̈�f>?� ��#$���X����¼Y� �ªY±ª¹ «µµª®° ³¬ «®³²³¬Y± Y¬¹ ³° ®ª½¾³®ª¹�³°º Z� «µµª® ²¾Y®Y¬ªª

«µµª®° Y®ª °¾Z¿ª̄ ©ª e>f ·«®À ®ª½¾³®ª¶ª¬°º Y¬¹ e�f «©ª® ́®«Á³°³«¬° Y¬¹ ̄±Y¾°ª° ³¬̄«®́«®Yª¹ ³¬ ©ª °«±³̄³Y³«¬ ³¬ µ¾±± ªÂ Z» ®ªµª®ª¬̄ª�

,\:19=� �µ ©³° ³° Y °ªY±ª¹ Z³¹ °«±³̄³Y³«¬º «µµª®° ·³±± Zª ́¾Z±³̄±» «́ª¬ª¹ Y ©Y ³¶ª�

�ªY±ª¹ ª¬Áª±«́ª° ̄«¬Y³¬³¬² «µµª®° °©Y±± Zª ¶Y®Àª¹ ©ª «µµª®«®Ã° ¬Y¶ª Y¬¹ Y¹¹®ª°°º ©ª °«±³̄³Y³«¬ ¬¾¶Zª®º Y¬¹ ©ª ¹Yª Y¬¹ ³¶ª «µµª®° Y®ª ¹¾ª�¹� �µµª®° ́®«Á³¹³¬² ±ª°° ©Y¬ >�Z� ÄÅ̀ bÄ6 5/\54:19 Æ51Ç5/ Ç.Æ È:/� 4:89/\:2 \:�0 :�192 :Æ:2\ 5/ [19È

ÉÊË�=

j}

Ȳ±ª¬¹Y® ¹Y»° Y¬¹ ̄«¶́ ±ªª ³ ·³©³¬ ¨̈¨̈¨̈¨̈¨̈¨̈¨̈¨̈ ¨̈¨̈¨̈¨̈¨̈¨̈¨̈¨̈ Ȳ±ª¬¹Y® ¹Y»° Yµª® ®ª̄ª³Á³¬² j|}}i�u�gn� �}m�j��l}l� ("!�Ì�>Ì>""Ì?�>�

   Â

«̄́³ª° ́ª®µ«®¶ ©ª ·«®À ®ª½¾³®ª¹ Y®ª ¹¾ª Y ©ª ́±Ȳª °́ª̄³µ³ª¹ ³¬ �ª¶ Z» ̈̈ ¨̈¨̈¨̈¨̈¨̈¨̈¨̈¨̈¨ ,Ç.32= ±«̄Y± ³¶ª Ȳ±ª¬¹Y® ¹Y»° µ«® '«Áª®¬¶ª¬ Ȳ ª̄́Y¬̄ª Yµª® ©ª ¹Yª «µµª®° Y®ª ¹¾ª ·³±± Zª ̄«¬°³¹ª®ª¹ Y¬¹ ·³±± Zª ®ª¿ª̄ª¹�

���X e�ªÁ� >�%����f�®ª°̄®³Zª¹ Z» '�����e!+ ���f "?��?�Ì>e¹f j

������������������
���
����
������������

�������� !"#$%&�'"(�")*+$%�$,)'-�&.�.%�/%$'&$%�&0'"�&0$�*1"1*)*%$,)1%$*$"&�#&'&$2�1"�1&$*�3425�6'1-)%$�&.�1"#$%&�'"(�")*+$%�*$'"#�&0$�.77$%.%�'88$9&#�&0$�*1"1*)*�1"�1&$*�3425:

�;��<=>?�=<@�=@@A?BB�CD�CDD?ACA� !"8-)2$�E!F�G.2$: �H���?I?JKC<?�<C�� !"8-)2$�'%$'�8.2$:�L��A?>M��=<N?�=@@A?BB� !"8-)2$�."-(�17�2177$%$"&�&0'"�1&$*�3O5:

NC@? D=NMIM�P�NC@?QRSTUVW�X������� �

��Y��=NZ<C[I?@�?>?<��CD�=>?<@>?<�B

S\\]̂ � _)#&�+$�7)--(�8.*9-$&$2�+(�.77$%.%:

̀0$�.77$%.%�'8a".b-$2/$#�%$8$19&�.7�'*$"2*$"&#�&.�&0$�#.-181&'&1."�cc�/1d$�")*+$%�'"2�2'&$�.7�$'80:=>?<@>?<��<C�@=�?�ef���<=>?�=<@��M�I?�CD�J?ABC<�=g�KCAMh?@��C�BM�<�CDD?A� ̀(9$�.%�9%1"&: ef���BM�<=�gA? ef���CDD?A�@=�?QiQ̂ j� ̀.�+$�8.*9-$&$2�+(�k.d$%"*$"&:e���M�?>B�=NN?J�?@l ee��=>Cg<� em��=NNCg<�M<��=<@�=JJACJAM=�MC<�@=�=e;��Bgn>M��M<oCMN?B��C�=@@A?BB�BKC[<�M<��������� O�8.91$#�)"-$##�.&0$%b1#$�#9$8171$2: M�?> eH��C�K?A��K=<�DgII�=<@�CJ?<�NC>J?�M�MC<�JgABg=<���C��K?�g<M�?@�B�=�?B�NC@?�=�eL��=@>M<MB�?A?@�nP NC@? e���J=P>?<��[MII�n?�>=@?�nP

Gpq̀ rsG̀ !qk�p66!Gtr�u!vv�Gp_Fvt̀ t�!̀t_�wx�pr�wy�sz�sFFv!Gs{vt G."&%'8&.%�1#�%$,)1%$2�&.�#1/"�&01#�2.8)*$"&� #.-181&'&1."�1#�0$%$+(�'88$9&$2�'#�&.�&0$�1&$*#�-1#&$25��̀01#�'b'%2�8."#)**'&$#�&0$�8."&%'8&|�b0180�8."#1#&#�.7� ':�&0$�k.d$%"*$"&�#.-181&'&1."�'"2�(.)%�.77$%|�'"2� +:�&01#�8."&%'8&�'b'%25�q.�7)%&0$%�8."&%'8&)'-�2.8)*$"&�1#�"$8$##'%(5mf���<=>?�=<@��M�I?�CD�NC<�A=N�CA�CA�J?ABC<�=g�KCAMh?@��C�BM�<� ̀(9$�.%�9%1"&: m����<=>?�CD�NC<�A=N�M<��CDDMN?A� ̀(9$�.%�9%1"&:mf���BM�<=�gA? mf���@=�? m����g<M�?@�B�=�?B�CD�=>?AMN= m����@=�?nP

}J=�? CD

���~���������~�����eX��<?�C�M=�?@�=�A??>?<� eY��=[=A@'"2�2$-1d$%�'--�1&$*#�.%�9$%7.%*�'--�b.%a�%$,)1%$*$"&#�12$"&171$2�."�&01#�7.%*�'"2�'"(�8."&1")'&1."�#0$$&#�7.%�&0$�8."#12$%'&1."�#&'&$2�1"�&01#�8."&%'8&5�̀0$�%1/0&#�'"2�.+-1/'&1."#�.7�&0$�9'%&1$#�&.�&01#�8."&%'8&�#0'--�+$�/.d$%"$2�+(� ':�&01#�8."&%'8&�'b'%2|� +:�&0$�#.-181&'&1."|�'"2� 8:�&0$�8-')#$#|�%$9%$#$"&'&1."#|8$%&1718'&1."#|�'"2�#9$81718'&1."#�1"8.%9.%'&$2�+(�%$7$%$"8$�1"�.%�'&&'80$2�&.�&01#�8."&%'8&5�8.91$#�&.�1##)1"/�.7718$5:�G."&%'8&.%�'/%$$#�&.�7)%"1#0�

�f�g�B�N��mef;�� ;��g�B�N��mmf;��

B�=<@=A@�DCA>��;;e��A?o���e¡efee �n=NZ

���'"2�%$&)%" � G."&%'8&.%�1#�".&�%$,)1%$2�&.�#1/"�&01#�2.8)*$"&5:�¥.)%�.77$%�."�&01#�

����������������� �
�������
�����
�����������

$� ��%&'%(()*+,,,,-��������./012/345�*,�.647�89:/3�8;63<��������./012/34�=>?6:1>@�A></5�B'CDE=8'DF8ABGH��������DE=8'DF8�ABGH�8IJ8�DKKBAJ��������%,(�F8IEJG�.IBLJ��������DE=8'DF8�ABGH�DE�%�((M�NC(�������ADOGI8AGDI�C'8==�KNIOBC'�8O.�BOCG8==�8�CJPJI�����������(�Q���������CJILBAJ�=BOJ�KDI�RSRNBOO�CIT*-*(�BO�C8UN=U8V�DE��������WAIJJE�ADSX�BO�8AADI.8OAJ�PBG'�G'J�8GG8A'J.��������CG8GJFJOG�DK�PDIE�8O.�.I8PBORYCJJ�CJAGBDO�ZV��������UIBABORS��������U/31><�>9�U/39>3[6@?/5�,M\�,\),)*�:>�,*\�,\),)*

����]̂_̀àbab̂cad̀e] ������ �������ffe� _ade��ghijhklm�no�$�

�� _d������̂f�bb̀

PART I, SECTION B – PRICING SCHEDULE

B.1. PRICING SCHEDULE

REQUEST FOR BID - SEWER SERVICE LINE

Okmulgee Field Office Office of Environmental Health & Engineering

All work shall be performed in accordance with contract specifications and drawings. Payment is to be made based on actual quantities installed.

PARTICIPANT ID# LOCATION PROJECT

Glenda Guinn 6861 Creek County OK25-Y65

SCHEDULE A QUANTITIES UNIT PRICE TOTAL

ITEM DESCRIPTION

Furnish & Install 4" SCH 40 PVC Sewer Service A Line and Fittings

LF.

Furnish & Install 4" Two-Way Cleanout with

B Plug and Adapter

EA.

Furnish & Install 70-Gallon Fiberglass Grinder Pump Station with High Water Alarm System, C Including Electrical Wiring and Conduit

LS.

Furnish & Install 1-1/2" SCH 40 PVC Pressure

D Sewer Service Line and Fittings

LF.

E Rock Excavation

CY

F Furnish & Install Imported Sand for Bedding

CY.

G City Permits & Inspection Fees

LS.

LINE 1 TOTAL:

B.2 Wage Determination: Construction wages shall be paid for all applicable labor categories for each price schedule line item and shall be included in all pricing in accordance with FAR 52.222-6, Construction Wage Rate Requirements. The applicable Wage Determination is included in Section J, Attachment J02.

END OF SECTION B

PART I, SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

STATEMENT OF WORK

1.01 SUMMARY OF WORK TO BE DONE BY CONTRACTOR

A. Furnish and install gravity sewer service line, an individual grinder pump lift station, buried electrical cabling, conduit, and connections as shown on the drawings.

1.02 SITE LOCATION

A. 409 East Fern Avenue, Sapulpa, OK 47066 B. Latitude: 36.0104246 Longitude: -96.1090811 C. Finding Directions: From 97th Street and Fern Avenue, go east on Fern Avenue for approximately 0.16 mile to home on the NSOR.

1.03 CONSTRUCTION SCHEDULE

A. Contact the Project Oversight three business days before the start of any work.

B. Failure to perform work on the date scheduled shall require 24-hour notice for rescheduling the work.

C. Leave all work exposed until inspected and approved. Work not inspected before it is covered shall be re-exposed at the Contractor’s expense.

D. All work shall be performed Monday – Friday ONLY between the hours of 8:00 a.m. –

5:00 p.m. No work is to be performed on the weekends and/or federal holidays unless other work schedule arrangements are approved by the Project Oversight to do otherwise.

E. IHS Project Oversight: Marcus Birdtail, Engineering Technician Office: (918) 586-8407

Cell: (405) 319-0512 Email: marcus.birdtail@ihs.gov

1.04 SUBMITTALS

A. Product Data

1. Grinder Pump.

2. Fiberglass Lift Station Basin.

3. PVC Pipe.

1.05 QUALITY ASSURANCE

A. Perform work under the direction of personnel licensed in the state of Oklahoma and City of Sapulpa for plumbing.

B. Contractor shall meet all City construction and contracting requirements and obtain all permitting from the City of Sapulpa prior to installation.

mailto:marcus.birdtail@ihs.gov

1.06 WARRANTY

A. Provide a minimum one-year warranty for all materials and labor, covering defects in the materials or workmanship.

1.07 GRAVITY SEWER SERVICE LINES

A. References (use latest versions)

1. ASTM D1785 Standard Specification for Rigid Poly(Vinyl Chloride) (PVC)

Plastic Pipe, Schedules 40, 80, and 120

2. ASTM D2466 Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe

Fittings, Schedule 40 B. PVC Pipe Material Requirements

1. ASTM D2241.

2. Nominal diameter: 4-inch.

3. Pressure rating: SCH40 (Class 200).

4. Twenty foot pipe lengths.

5. Solvent weld bell and spigot joints.

6. Recommended Manufacturer: Silver-Line Plastics Schedule 40.

C. Fittings:

1. Solvent welded SCH40.

1.08 PRESSURIZED SEWER SERVICE LINES

A. References (use latest versions)

1. ASTM D1785 Standard Specification for Rigid Poly(Vinyl Chloride) (PVC)

Plastic Pipe, Schedules 40, 80, and 120

2. ASTM D2466 Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe

Fittings, Schedule 40 B. PVC Pipe Material Requirements

1. ASTM D2241.

2. Nominal diameter: 1-1/2-inch.

3. Pressure rating: SCH40 (Class 200).

4. Twenty foot pipe lengths.

5. Solvent weld bell and spigot joints.

6. Recommended Manufacturer: Silver-Line Plastics Schedule 40.

C. Fittings:

1. Solvent welded SCH40.

1.09 INDIVIUDAL GRINDER PUMP LIFT STATION

A. Individual Grinder Pump Lift Station Requirements

1. Minimum 70 gallon fiberglass basin.

2. Minimum basin dimensions: 28-inch diameter and 52-inch depth.

3. 20-inch diameter access cover.

4. Simplex one-horsepower grinder pump.

a. 120-volt, 60 Hz single phase motor.

5. Shall be equipped with high water alarm, tethered float system.

a. Alarm shall be both audial and visual.

6. Influent inlet shall be 4-inch with a rubber grommet seal.

7. Discharge outlet shall be 1-1/2-inch.

8. Minimum 20-foot power cord.

9. Shall include backflow prevention structure (i.e. check valve) that prevents back siphonage of wastewater into basin.

10. Recommended Manufacturer: Septic Solutions Inc. 70 Gallon Pump Station with

1.0 HP Residential Grinder Pump (Little Giant Model 16G-F151-20).

1.10 INSTALLATION

A. Verify that all products supplied are in new condition and are without defect.

1. Defective, damaged, used, or unsound materials shall be rejected by IHS Project

Oversight and removed from site.

B. Locate all existing public utilities via OKIE 811 system. Avoid damage to public and private utilities.

C. Install basin level and to manufacturer’s specifications and/or recommendations.

D. Install risers (if necessary) and terminate access cover 2-inches above existing grade.

E. Install buried electrical cable to homeowner-provided dedicated breaker service. Install conduit above grade to connection to electrical panel/breaker box.

1. Contractor is responsible for making electrical connections to breaker service and lift station.

F. Install sewer service lines and appurtenances in the locations, sizes and materials shown on the drawings.

1. Minimum slope for gravity flow sewer service lines is 1/8-inch per foot (1%).

2. Fittings are incidental to the sanitary sewer piping and shall not be paid separately.

G. Install cleanouts at the location specified in the drawings.

1. Install two-way cleanouts such that the service can be rodded or snaked in either direction.

2. Install sanitary tee in the sanitary sewerage piping and connect riser pipe from the fitting to 12 inches above the ground surface.

3. Solvent seal the cleanout out plug to the end of the riser pipe.

H. Water and sewer service crossing and parallel installation.

1. Maintain a 48-inch horizontal separation between water and sewer services.

2. Maintain a 12-inch vertical separation for crossing water and sewer services. The water service is to be placed above the sewer service whenever possible.

3. Water service line splices or joints will not be permitted within 10 feet of a sewer line crossing.

I. Backfill trench in accordance with Section 1.12 Trenching. Take caution not to displace or damage piping during backfill.

1.11 TRENCH

A. Depth: Minimum 6 inches to the top of the pipe for gravity flow lines and 30 inches for force lines.

B. Bottom: Free from stones greater than 3 inch, large dirt clods, and any frozen material.

C. Backfill:

1. Initial Backfill

a. Work material under and around the pipe to ensure full pipe support.

b. Hand tamp to prevent movement of the pipe during placement of material, avoiding contact between the pipe and compaction equipment.

c. Compact in lifts not to exceed 6 inches in loose measurement until 12 inches of backfill covers the top of the pipe.

2. Final Backfill

a. Compact in lifts not to exceed 12 inches in loose measurement with mechanical compacting equipment.

b. Compact all backfill to a density not less than the density of the surrounding undisturbed soil.

c. Mound the trench 3 -6 inches above existing grade to provide for settling.

d. Surplus materials shall be disposed of as directed by the Project Oversight.

e. Any excessive settlement, exceeding 3 inches, shall be corrected by the contractor.

D. Rock Excavation

1. Definition:

a. Solid rock: large masses or rock which cannot be excavated without hammering, ripping with a dozer, or other specialized equipment, including specialized rock teeth.

b. Loose rock: boulders and/or detached stone having a volume of one cubic yard or more.

2. Execution:

a. Rock excavation may be accomplished by any or all of the following methods:

excavation with earthmoving equipment specialized for rock removal, ripping with a bull dozer, or jack hammering.

b. Remove excavated rock from site in accordance with city, state, and federal regulations unless the property owner has requested to keep on property.

1.12 TESTING

A. Obtain all permits and inspections from the City as required.

B. Before joints are covered, test pipe for leaks.

C. Visually inspect all connections and fittings for leaks in the presence of the Project

Oversight.

D. Repair all leaks before backfilling.

E. Test system operation to ensure functionality of installed facilities.

1.13 CLOSEOUT ACTIVITIES

A. Restore the site as close as is practical to its original condition.

ANDREW F. BANTA -S Digitally signed by ANDREW F. BANTA -S Date: 2026.03.04 09:23:53 -06'00'

PART I, SECTION D – PACKAGING AND MARKING

NOT APPLICABLE - BLANK

PART I, SECTION E – INSPECTION AND ACCEPTANCE

NNOTNOTNOT NOT APPLICABLE/BLANKTI

PART I, SECTION F – DELIVERIES OR PERFORMANCE

F.01 PERIOD OF PERFORMANCE

The contract base performance period will be 60 days after receipt of award.

F.02 PRINCIPAL PLACE OF PERFORMANCE

Delivery address on Statement of Work and OEH-8:

A. 409 East Fern Avenue Sapulpa, Creek County, OK 74066

END OF SECTION F

PART I, SECTION G – CONTRACT ADMINISTRATION DATA

G.01 INVOICING INSTRUCTIONS AND PAYMENT INFORMATION

(a)The Contractor shall submit a proper invoice for payment on a monthly basis as the work proceeds in accordance with the prices specified in Section B, Price Schedule.

(b)Payment will be made in accordance with Contract Clause FAR 52.212-4(i), Payment (Deviation Date)

(c) A proper invoice shall reflect the following information:

• Contractor Name, Address, Phone Number, billing contact name and e-mail address

• Invoice Date

• Unique invoice number

• Tax Identification Number (TIN)

• Contract Number as shown on the award document

• Modification Number (if applicable)

• Discount Terms, if applicable

• Banking information: Bank Routing Transit Number (nine digits) and last 4 digits of bank account number (for verification)

• Specific description of Work relating to invoice, including service period dates (if applicable)

• Invoice Amount

(d)In accordance with HHSAR 352.232-71, Electronic Submission of Payment Requests, Invoice will only be accepted if received in the following manner Submitted electronically to: OKCAPinvoices@ihs.gov

(e)Prompt payment clock will begin on the date finance receives a proper invoice.

G.02 CONTRACT PAYMENT METHOD

Payments will be made by electronic funds transfer using the Automated Clearing House (ACH) in accordance with Contract Clause FAR 52.232-33 Payment by Electronic Funds Transfer – System for Award Management (OCT 2018).

G.03 CONTRACTING OFFICER'S REPRESENTATIVE (COR)

(a)The Contracting Officers Representative is as follows:

Technical POC: As listed on Statement of Work, Part 1, Section C

The COR appointment letter will be provided at the time of award of the contract.

(b)The Contractor shall use the COR as the point of contact on technical matters, subject to the restrictions in Clause G.05, Technical Direction, of this section of the contract.

G.04 GOVERNMENT CONTACT FOR POST AWARD ADMINISTRATION

To promote timely and effective contract administration, correspondence shall include the contract number and title, and shall be subject to the following procedures:

(a)Technical Correspondence. Technical correspondence (as used herein, this term excludes technical correspondence where patent or technical data issues are involved and correspondence which proposes or otherwise involves waivers, deviations, or modifications to the requirements, terms, or conditions of this contract) shall be addressed to the Contracting Officer's Representative (COR).

(b)Other Correspondence. All correspondence, other than technical correspondence, shall be addressed to the Contract Specialist/ Contracting Officer (CO) as shown in paragraph (c). The Contract Specialist/CO is the focal point for all matters regarding this contract except for technical matters.

(c)The Contract Specialist/CO is as follows:

Ms. Noleen Powell – Contract Specialist Indian Health Services Oklahoma City Area Office 701 Market Drive Oklahoma City, OK 73114 Email: Noleen.Powell@ihs.gov 405-951-3975

G.05 TECHNICAL DIRECTION

(a)Performance of the work is subject to the technical direction of the COR.

(1) The term "technical direction" includes:

(i) Directions to the Contractor which redirect the contract effort, shift work emphasis between work areas or tasks, require pursuit of certain lines of inquiry, fill in details, or otherwise serve to accomplish items in the Statement of Work (Section C of the contract)

(ii)Written information to the Contractor which assists in the interpretation of drawings, specifications, or technical portions of the statement of work.

(iii)Review and, where required by the contract, approval of technical reports, drawings, specifications, and technical information delivered by the Contractor.

(b)Technical direction must be within the Contract's performance work statement. The COR may not issue any technical direction which:

(1) Constitutes an assignment of additional work outside the Performance Work Statement;

(2) Constitutes a change as defined in the Contract Clause FAR 52.212-4(d), Changes (Deviation Date)

(3) Causes an increase or decrease in the Contract price or the time of contract performance;

(4) Changes any of the terms, conditions, or specifications of the Contract; or

(5) Interferes with the Contractor's right to perform the terms and conditions of the Contract.

(c)All technical directions will be issued in writing by the COR.

(d)The Contractor shall proceed promptly with the performance of technical directions issued by the COR. If, in the opinion of the Contractor, any instruction or direction by the COR falls within one of the categories defined in (b)(1) through (5) above, the Contractor shall not proceed but shall notify the Contracting Officer in writing within five (5) calendar days after receipt of any such instruction or direction. Upon receiving the notification from the Contractor, the Contracting Officer shall:

(1) Advise the Contractor in writing within thirty (30) days after receipt of the Contractor's letter whether the technical direction is within the scope of the contract effort and whether it constitutes a change under Contract Clause, FAR 52.212-4(d), Changes and

(2) Advise the Contractor within a reasonable time that the Government will issue a written change order, if applicable.

(e)A failure of the Contractor and Contracting Officer to agree whether the technical direction is within the scope of the contract, or a failure to agree upon the contract action to be taken shall be subject to Contract Clause, FAR 52.212-4(e), Disputes (Deviation Date) located in Section I, Contract Clauses

END OF SECTION G

PART I, SECTION H - SPECIAL CONTRACT REQUIREMENTS

H.01 FEDERAL HOLIDAYS

(a) The Government only recognizes the following legal holidays established by federal statue:

New Year's Day January 1 Birthday of Martin Luther King, Jr. Third Monday in January Washington’s Birthday Third Monday in February Memorial Day Last Monday in May Juneteenth June 19 Independence Day July 4 Labor Day First Monday in September Columbus Day Second Monday in October Veteran’s Day November 11 Thanksgiving Day Fourth Thursday in November Christmas Day December 25

(b) Any of the legal holidays falling on Saturday will be observed on the preceding Friday; legal holidays falling on Sunday will be observed on the following Monday.

(c) The contractor should not perform work on observed legal holidays unless authorized by the

Contracting Officer. In the event work is authorized on observed legal holidays, the contractor shall pay all applicable overtime and/or holiday pay rates required by law.

H.02 SUBCONTRACTS

(a) Nothing contained in the contract shall be construed as creating any contractual relationship between any subcontractor and the Government. The divisions or sections of the specifications are not intended to control the contractor in dividing the work among subcontractors, or to limit the work performed by any trade.

(b) The contractor shall be responsible to the Government for acts and omissions of his own employees, and of subcontractors and their employees. He shall also be responsible for the coordination of the work of the trades, subcontractors, and suppliers.

(c) The Government will not undertake to settle any differences between or among the contractor and his subcontractors or suppliers.

(d) The contractor shall, without additional expense to the Government employ specialty subcontractors where required by the specifications. "Specialty Subcontractors," when specified as a requirement, means a subcontractor regularly engaged in the manufacture or installation of the contract items. The specialty subcontractor shall select and combine the materials involved, maintain and have available for the purpose, workmen skilled in the specified work. The specialty subcontractor shall be the manufacturer, be licensed by the manufacturer as an installer, or work under direct supervision of the manufacturer.

(e) In accordance with FAR 52.222-11 Subcontracts (Labor Standards) within 14 days after award of the contract, the Contractor shall deliver to the Contracting Officer a completed Standard Form

(SF) 1413, Statement and Acknowledgment, for each subcontract for construction within the United States, including the subcontractor’s signed and dated acknowledgment that the clauses set forth in paragraph (b) of this clause have been included in the subcontract.

(f) Within 14 days after the award of any subsequently awarded subcontract the Contractor shall deliver to the Contracting Officer an updated completed SF 1413 for such additional subcontract.

H.3 SUBCONTRACTING

(a) The contractor shall be responsible for the management and performance of all subcontracts.

The contractor shall ensure subcontractors are competent and capable of handling all assigned work. The contractor shall ensure contract is completed within the stated requirements.

(b) In connection with the performance of work under this contract, the contractor shall not subcontract with any subcontractor who, at the time of subcontract award, is listed on the current GSA's Lists of Parties Excluded from Procurement and Non-procurement Programs, unless otherwise authorized by the Government in accordance with Subpart 9.4 of the Federal Acquisition Regulations. Reference FAR 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment.

(c) The List of Parties Excluded from Procurement and Non-procurement Programs is available at https://www.sam.gov.

(d) In the event of the contractor's noncompliance with the foregoing requirements, the Government may terminate this contract for default or take other appropriate action, including, but not limited to, requiring the contractor to terminate any such subcontract and substitute an eligible subcontractor in lieu thereof, at no increase in the contract price or time for performance.

(e) The term "subcontractor," as used in this clause, shall mean the individual or firm with whom the contractor proposes to enter into a subcontract for manufacturing, fabricating, installing, or otherwise performing work under this contract.

(f) The contractor shall include the provisions of paragraphs a., b., and d. of this clause in every subcontract hereunder.

END OF SECTION H

https://www.sam.gov./

Part II, Section I – Contract Clauses I.1 FAR 52.252-2 - Clauses Incorporated by Reference (Feb 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the contracting officer will make their full text available.

Also, the full text of a clause may be accessed electronically at this/these address (es):

Federal Acquisition Regulation (FAR): https://www.acquisition.gov/browse/index/far (Clauses are located at FAR part 52 and begin with 52)

Department of Health and Human Services Acquisition Regulation (HHSAR) (48 CFR Chapter 3) Clauses:

http://www.hhs.gov/policies/hhsar/

Revolutionary FAR Overhaul Clauses (RFO): https://www.acquisition.gov/far-overhaul

Deviations to clauses may be viewed at: https://www.acquisition.gov/caac-letters

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1)

Number Title Date 52.203-17 Contractor Employee Whistleblower Rights Nov 2023 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or

Statements (DEVIATION) (RFO AUG 2025) Jan 2017

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards

(DEVIATION) (RFO AUG 2025)

Jun 2020

52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment

(DEVIATION) (RFO AUG 2025)

Jan 2025

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

(DEVIATION) (RFO AUG 2025)

Nov 2015

52.212-4 Terms and Conditions – Commercial Products and Commercial Services

(DEVIATION) (RFO NOV 2025)

Nov 2023

52.222-3 Convict Labor Jun 2003

52.222-6 Construction Wage Rate Requirements (DEVIATION) (RFO NOV 2025) Aug 2018

52.222-7 Withholding of Funds May 2014

52.222-8 Payrolls And Basic Records Jul 2021

52.222-9 Apprentices and Trainees (DEVIATION FEB 2025) Jul 2005

52.222-10 Compliance With Copeland Act Requirements Feb 1988

52.222-11 Subcontracts (Labor Standards) (DEVIATION) (RFO NOV 2025) May 2014

52.222-12 Contract Termination – Debarment May 2014

52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations.

May 2014

52.222-14 Disputes Concerning Labor Standards Feb 1988 52.222-15 Certification Of Eligibility May 2014 52.222-40 Notification of Employee Rights Under the National Labor Relations Dec 2010 52.222-50 Combating Trafficking In Persons Nov 2021 52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026 Jan 2022 52.222-62 Paid Sick Leave Under Executive Order 13706 Jan 2022 52.223-11 Ozone-Depleting Substances and High Global Warming Potential

Hydrofluorocarbons (DEVIATION) (RFO NOV 2025) May 2024 https://www.acquisition.gov/browse/index/far http://www.hhs.gov/policies/hhsar/ https://www.acquisition.gov/far-overhaul https://www.acquisition.gov/caac-letters

52.223-23 Sustainable Products and Services (DEVIATION FEB 2025) May 2024 52.225-9 Buy American-Construction Materials

(b)(2) NONE (DEVIATION) (RFO NOV 2025) Oct 2022

52.226-1 Utilization of Indian Organizations and Indian-Owned Economic Enterprises (DEVIATION) (RFO AUG 2025)

Jun 2000

52.226-7 Drug-Free Workplace (DEVIATION) (RFO AUG 2025) May 2024 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving

(DEVIATION) (RFO AUG 2025)

May 2024

52.227-1 Authorization and Consent (DEVIATION) (RFO SEP 2025) Jun 2020 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement

(DEVIATION) (RFO SEP 2025)

Jun 2020

52.227-4 Patent Indemnity-Construction Contracts (DEVIATION) (RFO SEP 2025) Dec 2007 52.232-5 Payments Under Fixed-Price Construction Contracts May 2014 52.232-33 Payment By Electronic Funds Transfer—System for Award Management Oct 2018 52.232-39 Unenforceability of Unauthorized Obligations Jun 2013 52.232-40 Providing Accelerated Payments To Small Business Subcontractors Mar 2023 52.233-4 Applicable Law For Breach Of Contract Claim (DEVIATION) (RFO AUG

2025) Oct 2004

52.236-5 Material And Workmanship (DEVIATION) (RFO JUL 2025) Apr 1984

52.236-7 Permits And Responsibilities (DEVIATION) (RFO JUL 2025) Nov 1991

52.236-17 Layout of Work (DEVIATION) (RFO JUL 2025) Apr 1984

52.240-91 Security Prohibitions and Exclusions (DEVIATION) (RFO Aug 2025) Aug 2025

52.240-93 Basic Safeguarding of Covered Contractor Information (DEVIATION) (RFO Aug 2025)

Aug 2025

52.253-1 Computer Generated Forms Jan 1991

I.1. HEALTH AND HUMAN SERVICES ACQUISITION REGULATION (HHSAR)

CLAUSES INCORPORATED BY REFERENCE

DEPARTMENT OF HEALTH AND HUMAN SERVICES ACQUISITION REGULATION (HHSAR) (48 CFR

CHAPTER 3) CLAUSES: http://www.hhs.gov/policies/hhsar/

Number Title Date 352.223-70 Safety and Health Dec 2015 352.226-3 Native American Graves Protection and Repatriation Act Dec 2015 352.232-71 Electronic Submission Of Invoice Payment Requests Feb 2022 http://www.hhs.gov/policies/hhsar/

CLAUSES INCORPORATED IN FULL TEXT

I.2. FAR 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020) (DEVIATION) (RFO OCT 2025)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.

(b) The use in this solicitation or contract of any HHSAR (48 CFR Chapter 3) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

(End of clause)

HHSAR 352.226-6 INDIAN ECONOMIC ENTERPRISE SUBCONTRACTING LIMITATIONS

(MAR 2022)

(a) Definitions as used in this clause.

(1) Indian Economic Enterprise means any business activity owned by one or more Indians or Indian Tribes that is established for the purpose of profit provided that: The combined Indian or Indian Tribe ownership must constitute not less than 51 percent of the enterprise; the Indians or Indian Tribes must, together, receive at least a majority of the earnings from the contract; and the management and daily business operations of an enterprise must be controlled by one or more individuals who are Indians. To ensure actual control over the enterprise, the individuals must possess requisite management or technical capabilities directly related to the primary industry in which the enterprise conducts business. The enterprise must meet these requirements throughout the following time periods:

(i) At the time an offer is made in response to a written solicitation;

(ii) At the time of the contract award; and

(iii) During the full term of the contract.

(2) Subcontract means any contract, as defined in FAR subpart 2.1, entered into by a subcontractor to furnish supplies or services for performance of the prime contractor or subcontractor. It includes, but is not limited to, purchase orders, and changes and modifications to purchase orders.

(3) Subcontractor means any supplier, distributor, vendor, or firm that furnishes supplies or services to or for a prime contractor or another subcontractor.

(b) Required Percentages of work by the concern. The contractor must comply with FAR 52.219-14, Limitations on Subcontracting clause in allocating what percentage of work to subcontract. The contractor shall not subcontract work exceeding the subcontract limitations in FAR 52.219-14 to a concern other than a responsible Indian Economic Enterprise.

(c) Any work that an IEE subcontractor does not perform with its own employee shall be considered subcontracted work for the purpose of calculating percentages of subcontract work in accordance with FAR 52.219-14 Limitations on Subcontracting.

(d) Cooperation. The contractor must:

(1) Carry out the requirements of this clause to the fullest extent; and

(2) Cooperate in any study or survey that the CO, Indian Health Service or its agents may conduct to verify the contractor's compliance with this clause.

(e) Incorporation in Subcontracts. The contractor must incorporate the substance of this clause, including this paragraph (e), in all subcontracts for general services, A&E services and construction awarded under this contract.

END OF SECTION I

SECTION J – LIST OF ATTACHMENTS

No. TITLE PAGES

1 OEH-8 1

2 WD OK20260030 Dated 01.02.2026 7

END OF SECTION J

��-%./01�"���#+2"#3���)+�4."#��5��

�6�!��&$�

7� ��������������������������������������8�5�9 ������!��&$�����(��(�����*�����*����������(8:

�� ��������������������������������������.<."����=�����>��?���������������������������������������+��������������@���(��.<."#+3"3/�----------------------A���-����������B-�CD>-?�================================================================�.��3���?=��E���������������������������������������������+��������������@���(��)�,.+�.F23):.�#��).+/#�+���������� ����---------------------A��>-�B�������������B-��������� ����---------------------A���-�E�������������B-��������� ����---------------------A���-E��������������B-��������� ���E---------------------A��E-�?�������������B-��������� ����---------------------A���->?�������������B-��������� ����---------------------A��?-���������������B-��)�,.+�.F23):.�#��).+/#�+���+�2)����/���"�����#$���.G������������� �����(�E���� *���"�����-���������+�2)����/���"�����#$���.G������������� ��$-�����+�2)����/���"�����#$���.G������������

��$-�"�����.G��������5��

�������������������������������������������������������������������������� �������������!�
����"#$��%&�'"()*+������,���-�����.�����!!������/���

��������!!�������������0��1�#��������2��������'�����"#$��3&�"�������(!4������������� �"#$��/�&#����5555555555555555555555555555555555555555555555555555555555555555�-"#)�67%5�/8��39�/9:�:%����������������������������������"���!����������;�����!-"#)�#"<*"��+���������=���"���

������=�����#��������
�����>�����6������������/3�7�5555555555555555555555555555555555555555555555555555555555555555��+$#<:�/:5��7��69/79:�/:����������������������������������"���!����������;�����!'*2*)?�2(+#)9'#)'"*?*�;-)-+�*"���>�/%������������������86��;#"2��#"<*"����������������������>�//�@@�������������������A(,#"*"&��'��������������������>�//�@7�������������:�@3��A(,#"*"&����4��������������������>�/:�8%�������������:�%:��#�*"(?#"&��,������9*B������������>�/3�3:���������������/���#�*"(?#"&��,�����C���������������>�/@�87�������������/�@6��#�*"(?#"&������������������������>�/@�/6���������������@7��#�*"(?#"&��������9,��������������>�/@�@3���������������7@��#�*"(?#"&��A�������;�����*��
����>�/%��/�������������������#�*"(?#"&��2���������������������>�/8�3/�������������8��8��#�*"(?#"&��+���4�����������������>�/3����������������/�66��#�*"(?#"&��?���������������������>�/7�6%�������������:�@7��?"$'<��"-D*"&����4�?������������>�/%�3%�������������/�@/5555555555555555555555555555555555555555555555555555555555555555�*A�*"+�5�"������������4��!�������

��4�� �� ����4��������������������������!������������

��������-������������������$����/�����.����0���1��2$����� ����3����'�� ����3'��.����-������������$�'������ ��.������������.�-��"���'����4���������$�'������ ��.���1�3'��.����3�������'��3�������������'������ ���5�������������$�3��.�3�3��������'������-�������"��$�3��.���������3'��.����-�������������(������������������������*����������������� ���5����$��������������������$��3�����������������$�3��.�3�3��������'������-�������"��$�3��.���������3'��.����-�������� ��3��$����3����

����� ��������������������"���1��,������������$��3�������� ������6����3���������-��"���'���� �������������'��77---1���1�� 7���� ���7-��7�� ���3���* ��1������� � �����������48���������.��''�������� �������-�����-���������������-���/�����.����0��4�����/�����.�09��0�00������������� ��������������-������� ��������������$����/�����.�����0�001�� � ����������48�����������''�.���� ���������������$�-�������.�-�����-�����12$��� �����������48����� ����3����'�.����� �����-��"�������������;��1���'����������������''�� �����-������������������������-��������3����������$���������������$��������������'����'��$��3���������� �����0�041��<����''�� �������3���3�3�-���������-���������(�������������.1���,�����������$��3��������� ������6����3���������-��"���'���� �����������48����� ����������---1���1�� 7-��7�� ��1=�������� ��������������3�.�����������$����-�������.����'�� �������09&%:�414���������������1****************************************************************<������.��$��� ��-���������3������������������

����������������������������������
������������������������������������������������
�����������������������������������������������������������������������������������
������������������������������������������������������������������������������
�������������������������� �������������������������������
��!!"�!!��!!��#$!!��%"�%����%"&%���������
���������������������������������
���������������������

�'(�����)*+�,-./0 --1�-23-.34-45

�*+�,���������������������
�������
��������������������������������������������
������������
�������������������

-./0������������ ��*��������+ ����-./0 ����(���������--1�����

���(�����������������������������������������������
�������������������

��������-23-.34-45�����

��������������������
���������������������������
������������������������������������������������������
���������������
�����������������678�����
����������������������������������&9�������������
��������������
������������������������������
������������������������������
������������������������
���.--:����
������������������
�������������������������������������

�';�,*+')��#$ <7 --.-�-.3-.34-45 �<7������������

���(����������������������������������������������
�������������������

��������-.3-.34-45����

������������������������������������������
�������������������������������
����#$���������������������������������������������=�����������������������
���������������
�������������� ����������������������������������4/�&>��.
4������
��������������������
������������
������������������������������������
������������������������������
�������������������
�������������
����������������
������������
���������������������������� ��� !"#�!#� �$������
��'�������������� !������������������������������������
������
�������%����
������������'���
����"#�!#� �$�����������������
���&����(��(�%��������������
��������������&&�
����������%����������

����.�/�0�1�", -,1-�������2 �0����3

���&����'���44�244��
���&�����
�������
����������%�������������������������,�����
��-����������%����

����.�/���0�1�5,�-�,�-�������������26�� �5� ! 1# 5#� �$���2���&��

��6���&������������������&�6������ �5�������������
�����%��
��'�������������� !������������������������������������
������
�������%����
�����������'���
����� 1# 5#� �$������������������&��

�������(�2(�� � ��&�������7�&&� ������������������������������������������������������������*28��+�'�06392'3:9�2;;�2���;0:/���1-�)������������ �� �� ������

�����������������(�'����
����������������-�����������
���������%����
����������������������-�������������������
����������
-����������*)+���������������&������������������%����
�����������������
-����������
�&����
����������:��������������
�����������������
���

��&�*�������������0�<������

���������!�������#�$�������������������%����������������������������������������������������!���&���������������'���������������'��������������������
�������������������������

����/��0$�1����#�2������/��0$�1����3,�$�&������ ��������%���������������������������������������������'�����������������������*��'��������������'���+������������ ���������!�������#�4�����&���������'���������������������� �''������������ ��������������������5��������������������� ���������.%���������������!����6���������������!����������������������'!�����,�����������&�������������������'�������������������7,�- ��������������� ����� �������������������� ������'�!�����������������������������'�������'��������� �������������$����%�������. �����'������ ���������!�������#��8888888888888888888888888888888888888888888888888888888888888888����������9"��)0�:9"9$ ���9�-

PART IV, SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER

STATEMENTS OF BIDDERS

K.1 FAR 52.204-19 Incorporation by Reference of Representations and Certifications

(DEVIATION) (RFO AUG 2025)

K.2 FAR 52.219-28 Post-Award Small Business Program Representation (Jan 2025) K.3 FAR 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products

(Feb 2021)

(a) Definition.

Forced or indentured child labor means all work or service-

(1) Exacted from any person under the age of 18 under the menace of any penalty for its nonperformance and for which the worker does not offer himself voluntarily; or

(2) Performed by any person under the age of 18 pursuant to a contract the enforcement of which can be accomplished by process or penalties.

(b) Listed end products. The following end product(s) being acquired under this solicitation is (are) included in the List of Products Requiring Contractor Certification as to Forced or Indentured Child Labor, identified by their country of origin. There is a reasonable basis to believe that listed end products from the listed countries of origin may have been mined, produced, or manufactured by forced or indentured child labor.

Listed End Product Listed Countries of Origin

(c) Certification. The Government will not make award to an offeror unless the offeror, by checking the appropriate block, certifies to either paragraph (c)(1) or paragraph (c)(2) of this provision.

☐ (1) The offeror will not supply any end product listed in paragraph (b) of this provision that was mined, produced, or manufactured in a corresponding country as listed for that end product.☐ (2) The offeror may supply an end product listed in paragraph (b) of this provision that was mined, produced, or manufactured in the corresponding country as listed for that product. The offeror certifies that it has made a good faith effort to determine whether forced or indentured child labor was used to mine, produce, or manufacture such end product. On the basis of those efforts, the offeror certifies that it is not aware of any such use of child labor.

(End of provision)

I.1 FAR 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Certification (Deviation DATE)

I.2 FAR 52.222-52, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Certification (Deviation DATE)

(a) The offeror must check the following certification:

Certification

The offeror □ does □ does not certify that-

(1) The services under the contract are offered and sold regularly to non-Governmental customers, and are provided by the offeror (or subcontractor in the case of an exempt subcontract) to the general public in substantial quantities in the course of normal business operations;

(2) The contract services are furnished at prices that are, or are based on, established catalog or market prices. An "established catalog price" is a price included in a catalog, price list, schedule, or other form that is regularly maintained by the manufacturer or the offeror, is either published or otherwise available for inspection by customers, and states prices at which sales currently, or were last, made to a significant number of buyers constituting the general public. An "established market price" is a current price, established in the usual course of ordinary and usual trade between buyers and sellers free to bargain, which can be substantiated from sources independent of the manufacturer or offeror;

(3) Each service employee who will perform the services under the contract will spend only a small portion of his or her time (a monthly average of less than 20 percent of the available hours on an annualized basis, or less than 20 percent of available hours during the contract period if the contract period is less than a month) servicing the Government contract; and

(4) The offeror uses the same compensation (wage and fringe benefits) plan for all service employees performing work under the contract as the offeror uses for these employees and for equivalent employees servicing commercial customers.

I.3 FAR 52.223-1, Biobased Product Certification (Deviation Date) I.4 FAR 52.240-90, Security Prohibitions and Exclusions Representations and Certifications

I.5…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .