Sol_75H71025Q00199_Amd_0001.pdf

PDF 88 KB Posted

Attached to
GSU THC Workstation / furniture install
Solicitation number
75H71025Q00199
Issued by

About this file

This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for Solicitation 75H71025Q00199 issued by Tohatchi Health CTR. The amendment extends the response date from 08/15/2025 at 02:00 PM MDT to 08/19/2025 at 02:00 PM MDT and includes clarifications about electrical and data work for the project. The key details specify that facility and IT staff will handle electrical and data connections, with the contractor providing electrical flexible raceways, wire, receptacles, and data jack plates. The workstations will come with electrical pigtails to terminate facility power, and the delivery will be to a single-level floor with a loading dock. The area is currently open with no furniture, and the period of performance is set for 09/01/2025 to 12/31/2025.

View the file

Other files

File Type Posted
75H71025Q00199 GSU THC WORKSTATION INSTALL.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

75H71025Q00199 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Tohatchi NM 87325 P.O. Box 142 Tohatchi Health CTR

08/08/20250001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/08/2025

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Solicitation 75H71025Q00199 0001 has the following changes:

1) Extend the response date from 08/15/2025 at 02:00 PM MDT to 08/19/2025 at 02:00 PM MDT.

2) Questions and Answers:

a)Who is to do the electrical work of running power and data thru the poles and connecting the electrical to those workstations?

Facility staff and IT staff will be responsible for the electrical and data work. Staff will need instruction on removal of raceway covers and contractor will provide any special

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

JERLYN R. BEGAY

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

75H71025Q00199/0001 plates or installation pieces to complete the system.

b) In section 7d it states that facility staff will terminate power to workstations and IT staff will provide data lines and jacks but I want to make sure that means they will handle all the electrical and data connections.

Workstations will come with electrical pigtails to terminate the facility power. Within the workstation raceway contractor will provide the electrical flexible raceways complete with wire and receptacles.

IT staff will lay data lines in the raceways provided in all workstations. IT will provide jacks but the data jack plates will be provided by the contractor

3) What floor is the delivery to and what is the building access (freight elevator, loading dock)?

Tohatchi is a single level floor. We have a loading dock.

4) Will the area be free and clear of furniture or is there furniture that needs to be removed?

The area is open with no furniture.

Period of Performance: 09/01/2025 to 12/31/2025

ALL OTHER TERMS AND CONDITIONS REMAIN UNCHNAGED.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .