Attachment 2-PWS draft.docx

DOCX document 39 KB Posted

Attached to
ISBEE/IEE: RPMS EHR ONC Certified Health IT: Certification/Consultation
Solicitation number
75H70427Q00007
Issued by

About this file

This is a Performance Work Statement (PWS) for ONC Certified Health IT testing, certification, and consultation services for the Indian Health Service's Resource Patient Management System (RPMS) Electronic Health Record (EHR). The contractor shall provide all necessary personnel, equipment, supplies, facilities, and services to support ONC certification and maintenance of the RPMS EHR system. The work encompasses maintaining annual certifications including the seven Conditions of Certification mandated by the 21st Century Cures Act (Real World Testing, Insights Conditions of Maintenance, Information Blocking, Assurances, Communications, Attestations, and APIs); performing laboratory testing through an authorized testing lab (ATL) partner; managing certified product listings on the ONC Certified Product List (CHPL); conducting ONC Health IT updates with attestations and testing; and providing optional pre-testing services, additional testing hours, and consultation support. The contract maintains specified existing criteria (170.315 designations) and future attested, tested, and certified criteria, with the contractor responsible for quarterly attestations, bi-annual ONC attestations, surveillance activities, Real World Test plan reviews, and complaint management.

The base period of performance runs December 1, 2026 through November 30, 2027, with four one-year option periods extending through November 30, 2030 (note: the PWS contains an apparent typo stating November 2021 for the final option year). The contract is structured as Firm Fixed Price with six task categories: ACB Maintenance Services and Fees (annual), ACB Certified Product Update Services including both ATL testing and ACB certification, Compliance ONC ACB-ATL Services, and three optional tasks (Pre-Certification Testing, Additional Testing Hours, and Consultation Hours). Work shall be performed at the contractor's facility. The related pre-solicitation notice indicates the contract will be set aside under the Buy Indian Act preference for Indian Economic Enterprises (IEEs) and Indian Small Business Economic Enterprises (ISBEEs), with NAICS Code 541380 (Testing Laboratories and Services) and a size standard of $19 million.

View the file

Other files

File Type Posted
Attachment 1-IEE Representation Form.pdf PDF
75H70427Q00007 SSN.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RPMS EHR ONC Certified Health IT

Certification/Consultation

Performance Work Statement RPMS EHR ONC Certified Health IT Certification, and Consultation General This is a non-personal services contract to provide testing, certification, and consultation. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

Description of Services The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform testing, certification, and consultation as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall meet the standards in this contract.

Background On July 28, 2010, Centers for Medicare and Medicaid (CMS) published a final rule that specifies the Stage 1 criteria order for eligible providers (EPs) and hospitals (EHs) to participate in the MU program. The first requirement is that they use a "certified electronic medical record (CEHR/CEMR)" per the Office of the National Coordinator (ONC) 2011 Edition. Indian Health Service (IHS) made changes to the Resource Patient Management System (RPMS) / Electronic Health Record (EHR) and in 2011, tested and achieved Office of National Coordinator (ONC) certification.

On September 4, 2012, CMS published a final rule that specifies the Stage 2 criteria that EPs and EHs must achieve in order to continue participating in the Medicare and Medicaid Electronic Health Record (EHR) Incentive Programs using the ONC 2104 Edition. Again, IHS OIT made changes to the RPMS CEHR and was successfully certified for an Ambulatory and Inpatient to the 2014 edition.

On October 16, 2015, CMS published a final rule that specifies the Stage 3 criteria that EPs and EHs must achieve in order to continue participate in various CMS programs using the ONC 2015 Edition. CMS allowed providers and facilities to participate in their programs using the 2014, 2015, or a combination of the 2014 and 2015 editions up until 2017. At the beginning of 2018, CMS required all EPs and EHs to use the 2015 Edition in order to participate in CMS programs. With the 2015 edition, ONC removed whole EHR certification in favor of modular certification. In 2018, IHS tested and successfully obtained certification for the electronic clinicalquality measure (eCQM) module to the 2015 edition. IHS is working towards testing and obtaining certification for the remaining 2015 Edition criteria so EPs and EHs are eligible to participate in CMS programs.

On May 1, 2020 the 21st Century Cures Act was signed into law as an update to the 2015 Edition for Certified Electronic Health Record Technology. The CURES Update supports seamless and secure access, exchange, use of electronic health information and finalizes certain modifications to the 2015 Edition health IT certification criteria and Program to advance interoperability, enhance health IT certification, and reduce burden and costs. The CURES Update consists of seven Conditions of Certification in which IHS as developer for the RPMS EHR CEHRT is required to participate and continue certification and testing including Real World Testing.

Objective The objective of this contract is for the authorized testing lab (ATL) to provide ONC Health and Information Technology testing services and upon successful testing, the authorized certification body (ACB) to provide certification for the IHS RPMS EHR. This will include assistance with meeting the seven Conditions of Certification for the IHS RPMS EHR: Real World Testing, Insights Conditions of Maintenance, Information Blocking, Assurances, Communications, Attestations, Application Programming Interfaces and new RPMS EHR reporting criteria.

Scope Maintenance, Support, Testing and Certification

1. Certified Product Listing(s) - CHPL Listing for RPMS EHR with CQM criteria.

2. Maintain annual certification(s) including maintaining the Conditions of Certification (CoC)

3. ONC Health IT Updates with Attestation and Testing and CHPL Updates for RPMS EHR

4. Additional Consultation Hours

5. Additional Testing Hours

6. Pre-Testing Services Period of Performance Base December 01, 2026 – November 30, 2027 Option Yr. 1 December 01, 2027 – November 30, 2028 Option Yr. 2 December 01, 2028 – November 30, 2029 Option Yr. 3 December 01, 2029 – November 30, 2030 Option Yr. 4 December 01, 2030 – November 30, 2021 The task orders are subdivided into the following CLIN categories:

1. TASK 001: ACB MAINTENANCE SERVICES AND FEE (ANNUAL)

2. TASK 002: ACB CERTIFIED PRODUCT UPDATE SERVICES

· ACB Certified Product Update: ONC-ATL Testing Services

· ACB Certified Product Update ONC-ACB Certification Services

· ACB Certified Product Update Scope

3. TASK 003: COMPLIANCE ONC ACB-ATL SERVICES. Certified Product Update ATL and ACB Services.

4. TASK004 Optional: PRE-CERTIFICATION TESTING SERVICE.

5. TASK 005 Optional: ADDITIONAL TESTING HOURS

6. TASK 006 Optional: CONSULTATION HOURS Contract Type Firm Fixed Price plus IHS DAP recommendation to include potential pre-testing, consulting and re-testing scenarios.

Place of Performance Work tasks are performed at the contractor’s facility.

Tasks The contractor shall provide services for:

1. ACB Certification including ATL - Lab testing

· ACB Maintenance Services for RPMS EHR certification tracking with timely maintenance services. Maintenance Services include Quarterly Attestations, ONC bi-annual attestations; review of developer communications; reactive surveillance; review of Real World Test plans and reports; ONC HTI Rules for new and revised criteria and standards updates; and managing complaints or concerns by users on a certified product.

· Maintenance of existing RPMS EHR certified criteria: 170.315(a)(1), (a)(2), (a)(3), (a)(4), (a)(5), (a)(12), (a)(14), (b)(1), (b)(2), (b)(3),(b)(7), (b)(8), (b)(10), (b)(11), (c)(1),(c)(2), (c)(3), (d)(1), (d)(2), (d)(3), (d)(4), (d)(5), (d)(6), (d)(7),(d)(8), (d)(9), (d)(12), (d)(13), (e)(1), (e)(3), (f)(1), (f)(2), (f)(3),(f)(5), (f)(6), (g)(2), (g)(3), (g)(4), (g)(5), (g)(6), (g)(7), (g)(9), (g)(10), (h)(1) and future attested, tested, certified criteria. For example: (b)(4), (g)(31)-(g)(33)

· ONC Health IT updates include new ONC HTI Criteria testing or attestation. HTI Rule new and revised criteria and standards updates, Attestation of updates. ONC HTI testing will also encompass the USCDI and Information Blocking criteria. Real World Testing planning and testing review including associated CHPL updates and review of “Insights” Condition and Maintenance of Certification reporting.

2. Compliance with ONC-ACB/ATL services and Certified Product Update for the RPMS EHR. Including Certified Product Update Processing Service.

· Indian Health Service (IHS) to test and certify for CQM criteria (c)(1)-(c)(3) + HTI Update criteria including ONC CHPL Listing for the RPMS EHR HTI Updates.

· Criteria are selected and method of verification for testing, attestation, and certification included.

· ATL Testing Process

· ACB Services including Certification, CHPL updates for the RPMS EHR

3. Compliance with ONC-ACB/ATL services and Certified Product Update for RPMS EHR.

Including Certified Product Update ATL and ACB Services.

· Indian Health Service (IHS) to test and certify for CQM criteria (c)(1)-(c)(3) + CURES Update criteria including ONC CHPL Listing for the RPMS EHR CURES Updates.

· Criteria are selected and method of verification for testing, attestation, and certification included.

· ATL Testing Process

· ACB Services including Certification, CHPL updates for the RPMS EHR

4. Health IT preparation: Optional Pre-certification testing services

· Pre-certification testing services on ONC approved for ONC Certified Health IT Edition and HTI Updated criteria. Optional

· ATL Pre-Test Preparation Activities

5. Additional testing hours as needed - optional

6. Consultation hours with ACB/ATL subject matter experts - optional

File details come from the government source that posted it. Updated .