B01 75H70124Q00014.pdf

PDF 1001 KB Posted

Attached to
Warm Springs Building 108 HVAC Improvements in Warm Springs, OR
Solicitation number
75H70124Q00014
Issued by

About this file

This solicitation seeks proposals for the Warm Springs Building 108 HVAC Improvements project in Warm Springs, Oregon. The Indian Health Service requires replacing the building's HVAC system to meet fresh air requirements, securing the water heater, and updating the fire sprinkler valve. Offerors must provide HVAC and related construction services, including equipment removal and installation, ductwork replacement, and commissioning. The performance period is 30 calendar days from notice to proceed. The solicitation is set aside for small businesses under NAICS code 238220 with a $19 million size standard. Proposals are due by March 4, 2024 and must address technical capability, past performance, and price. The government will award a firm-fixed-price contract to the best-value offeror. The solicitation is subject to Tribal Employment Rights Ordinance requirements and requires on-site attendance at a February 13 pre-proposal site visit.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NO. 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NO.

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

RFQ IFB RFP

SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

29. AWARD OF CONTRACT: REF. OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NAICS:

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

8 (A)

EDWOSB

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

75H70124Q00014

Toby Hayden at toby.hayden@ihs.gov 503-414-5524 199 100

Warm Springs Building 108 1142 Warm Springs St., Warm Springs, OR 97761

Indian Health Service – Portland Area Office 1414 NW Northrup St., Suite 800 Portland, OR 97209

See Block 16

Warm Springs Building 108 HVAC Improvements

SEE SECTION B PRICE SCHEDULE

238220

$19M

02/01/2024

03/04/2024

2:00PM PT

Indian Health Service - DES Seattle 701 5th Avenue, Suite 1600 Seattle, WA 98104

STANDARD FORM 1449 (REV. 2/2012) BACK

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

40. PAID BY

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

PARTIAL FINAL

37. CHECK NUMBER

38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER

36. PAYMENT

COMPLETE PARTIAL FINAL

Warm Springs Building 108 HVAC Improvements

Solicitation No. 75H70124Q00014 3

SECTION B. PRICE SCHEDULE

B.1. PRICE SCHEDULE (Offeror fill-in)

CLIN DESCRIPTION QTY UNIT TOTAL PRICE

The contractor shall complete the Warm Springs Building

108 HVAC Improvements in accordance with Section C and the terms and conditions of this contract.

1 JOB

TOTAL FIRM FIXED PRICE

B.2 SECTION B NOTES TO OFFERORS

B.2.1 PRICE SCHEDULE NOTES

Offeror(s) must submit pricing for all line items in the above schedule to be considered responsive for award. The price for each line item shall include any and all associated costs; including but not limited to all applicable Tribal Employment Rights Ordinance

(TERO) taxes, State and local taxes, salaries, overhead, G&A, fringe benefits, insurance, bonding, profit, travel, per diem, lodging, labor, tools, material, equipment, all subcontracting costs, and any other costs necessary to perform the work herein. Failure on the part of the successful offeror to include these associated costs not constitute a request for an equitable adjustment to the contract price.

Travel expenses will not be reimbursed.

B.2.2. PRICING DATA SUBMISSION

In accordance with FAR 15.403-3(a)(ii), Requiring Data Other Than Certified Cost or Pricing Data, offerors/quoters may be requested to submit a breakdown of costs for the above line items so that the determination of a fair and reasonable price can be made by the

Contracting Officer.

B.2.3. SOLICITATION SPECIFIC TERMS AND CONDITIONS

Questions regarding the solicitation and project must be submitted in writing to Toby Hayden, Contract Specialist, via e-mail at toby.hayden@ihs.gov. Questions will be accepted up to 10 days before proposal due date. The Government is not obligated to answer any questions submitted after this date. All questions shall be submitted by the prime contractor(s) on behalf of their subcontractor(s) and supplier(s) to the Contract Specialist.

Proposals are to be submitted via e-mail to Toby Hayden at toby.hayden@ihs.gov by the date and time indicated in Block 8 of the

SF1449. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

B.2.4. PERIOD OF PERFORMANCE

The contractor shall proceed and complete the work within 30 days from the date of the Notice-to-Proceed (NTP). No work will be performed on Saturdays, Sundays, federal holidays, or Tribal holidays without the Government’s consent.

B.2.5. INCIDENTAL PAYMENT ITEMS

The intent of the contract is to provide for the complete work described in the contract. Unless otherwise provided, the contractor shall furnish all labor hours, materials, equipment, tools, transportation, and supplies, TERO requirements and perform all work required by the Section C Statement of Work (SOW). Payment for contract work will be made for and under those pay items included in the

Section B.1. Price Schedule (which is one firm fixed-price price for the contract). All other work, materials, and labor hours will be considered as incidental to and included in the payment for items shown.

B.2.6. WAGE DETERMATION

The Department of Labor Wage Determinations referenced as attachments in Section J are applicable to this solicitation and any resulting contract. The most up to date versions of the applicable Wage Determinations will be included at contract award.

B.2.7. OTHER IMPORTANT INFORMATION

Under no circumstances will any oral statements made be binding upon the Government unless such statements or agreements are issued in writing by the Contracting Officer.

Only a warranted Contracting Officer acting within their delegated limits has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract, you shall not proceed within the change and shall immediately notify the Contracting Officer.

END OF SECTION

Solicitation No. 75H70124Q00014 4

SECTION C. STATEMENT OF WORK

I. OVERVIEW

A. SITE LOCATIONS

Warm Springs Building 108: 1142 Warm Springs St. Warm Springs, OR 97761

(Sitemap is included as Attachment A)

B. PROBLEM STATEMENTS

Building #108 is a residential style building which is used for business functions, including office space and meetings.

1. The building contains a residential style 3.5 Ton HVAC Heat Pump system that does not provide any fresh air ventilation, as required by ASHRAE 62.1 for business occupancy (Occupancy Group B).

2. The ductwork configuration for the air handler’s filtration is not easy to access or maintain. The filters are not standard size and the rack is not designed properly for maintenance and access.

3. The water heater is not properly secured and does not have a drip pan.

4. The fire sprinkler backcheck valve does not have an inspection tag and is showing signs of leaking.

C. HAZARD STATEMENT

An environmental survey conducted in June 2008 identified Asbestos Containing Materials (ACB) and Lead Based

Paint (LBP) hazards within building 108. See Attachments C and D for detailed information. This project will follow NESHAP and EPA guidelines to test for ACB’s and LBP in areas where work is performed.

D. EXISTING HVAC SYSTEM INFORMATION

Goodman Air Handler:

Model # ARUF364216BA

Serial # 0911743367

HKR-20C Heat Kit

See Attachment B

Goodman Heat Pump

Model # GSZ130421AB

Serial # 1006185426

See Attachment B

E. OBJECTIVE

This project will result in a building that meets the fresh air requirements in ASHRAE 62.1, secure the water heater with straps and a drain pan, and update and inspect the fire sprinkler valve.

F. WORK SUMMARY

1. Provide submittal documenting the method and path for the installation of Heat Recovery Ventilators (HRV).

2. Perform testing for ABC and LBP in areas where work is performed.

3. Replace interior air handler and filter rack ductwork in the equipment room.

4. Replace exterior heat pump and air handler coil.

5. Perform startup and test on the HVAC and HRV systems.

6. Secure the water heater with earthquake straps and install a drip pan.

7. Replace the fire sprinkler backcheck valve and provide inspection testing.

Solicitation No. 75H70124Q00014 5

II. TECHNICAL REQUIREMENTS

G. CODES, REFERENCES, AND STANDARDS

Work under this contract shall be performed in compliance with the codes, references, and standards listed below.

Current version of all codes and standards shall be used.

1. ASHRAE 62.1

2. NFPA 70, National Electric Code

3. International Building Code (IBC)

4. International Mechanical Code (IMC)

5. Oregon Plumbing Specialty Code

6. Environmental Protection Agency (EPA) requirements for:

a. Asbestos Containing Materials

b. Lead Based Paint

c. Refrigerant handling and disposal

H. SUBMITTALS

The Contractor shall provide submittals on the items listed below. COR approval is required before proceeding with the portion of work the submittal applies to.

1. Pre-Construction

a. Project Schedule

b. Safety and Accident Prevention Plan / Asbestos Inspection / Hazardous Waste Management and

Disposal

c. HRV installation locations and ductwork paths

2. Equipment

a. Exterior HVAC system

b. Interior Air Handler

c. Auxiliary Heater Kit

d. Heat Recovery Ventilators

e. HRV Ductwork and Ceiling Terminals

f. Filter housing, including filter & rack size and airflow capacity.

g. Electrical Wire

h. Refrigerant data

i. Water Heater Straps

j. Water heater pan

k. Fire sprinkler valve

3. Post Construction

a. HVAC Startup Report

b. Ventilation Report

c. Maintenance and Care information for new equipment

d. Warranty Information

e. Fire sprinkler valve certification / inspection results

I. EQUIPMENT SPECIFICATIONS

Heat Pump Exterior Units:

a. Heating and cooling capacity shall meet or exceed existing unit.

b. Compressors must be scroll style, have a minimum two-speed or variable/modulating speed capacity.

c. Minimum SEER rating of 16.

d. Minimum 10-year manufacturer warranty.

Solicitation No. 75H70124Q00014 6

Indoor Units:

a. Multi speed unit which matches the airflow characteristics of the existing.

Heat Recovery Ventilators:

a. 150 CFM minimum capacity

b. Auto defrost capable

c. 0.78 minimum effectiveness

d. Minimum 5-year manufacturer warranty

Refrigerant and Plumbing:

a. This system must use a widely available EPA approved refrigerant that is locally supported and has no expectation for phase out. If a blend refrigerant is proposed, it must be azeotropic.

The following equipment shall be reused.

a. Condensate Pump

J. QUALITY ASSURANCE

1. All work involving refrigerant must be performed by an EPA 608 certified technician.

2. Electrical and HVAC work shall be monitored at all times by a journeyman with a 06a electrical license.

3. All HVAC equipment must be listed by the Underwriters Laboratory (UL) and maintain an Air-

Conditioning, Heating, & Refrigeration Institute (AHRI) ARI Performance Certification.

4. Only mid-grade (standard) or premium labeled equipment will be considered for installation. Low grade or budget equipment will be rejected.

K. WORK EXECUTION REQUIREMENTS

1. Kickoff Meeting:

a. An onsite kickoff meeting with the COR is required to evaluate and understand the building layout and project needs.

2. Interim Life Safety Measures Plan

a. The Contractor is responsible for notifying and gaining advance approval from the COR for any modifications or disabling of life safety systems as necessary to complete this work.

Examples include temporary modification of exit paths or temporarily disabling an alarm system. In such instances, the Contractor shall implement interim measures acceptable to the

COR.

3. Hazard Inspection

a. Construction will take place in a facility constructed in 1962. An environmental survey conducted in June 2008 identified Asbestos Containing Materials (ACB) and Lead Based

Paint (LBP) hazards within this building.

b. As part of preparing the Safety and Accident Prevention Plan, the Contractor shall inspect work areas for the presence of potential safety hazards and hazardous materials consistent with the health and safety regulations applicable to this Contract. This includes inspecting for the presence of Asbestos Containing Materials (ACM’s) in affected areas prior to any renovation or demolition work.

c. The asbestos inspection shall be completed by a State Licensed Asbestos Inspector consistent with 40 CFR Part 61, Subpart M (Asbestos National Emission Standards for Hazardous Air

Pollutants (NESHAP).

d. The outcome of the Contractor’s inspection of the work area shall be included with the Safety and Accident Prevention Plan submittal. In the event that new suspected or confirmed

Solicitation No. 75H70124Q00014 7 hazardous materials are found during the Contractor’s inspection and must be disturbed, a contract modification will be negotiated to assure the requirements of applicable health and safety regulations are met.

4. Demolition:

a. Evacuate refrigerant system and dispose or recycle according to EPA guidelines.

b. Demolish refrigerant lines, interior air handler, exterior heat pump, and filter housing ductwork. Dispose via an EPA approved method.

c. Disconnect the condensate pump and plan for reuse.

5. Exterior Units:

a. Evaluate outside condenser location to ensure compatibility with new equipment (see

Attachment F). Notify COR immediately if any discrepancies are found that will impede installation.

b. Install and wire new units according to manufacturer guidelines.

6. Refrigerant Plumbing:

a. Install new refrigerant plumbing based on the refrigerant type, flow rates, and manufacturer requirements.

b. Install insulation on all suction and hot gas lines. Use the least amount of joints possible.

c. Provide refrigerant piping support per the IMC.

7. Indoor Units:

a. Install new units according to manufacturer instructions and the IMC.

b. Reinstall condensate pumps in accordance with the air handler manufacturer instructions and the IMC.

8. Heat Recovery Ventilators (HRV)

Upstairs

a. Discuss attic installation location for one HRV with the COR. This location shall be accessible for routine maintenance.

b. Install HRV in the approved attic location. Use mounting methods that are approved by the manufacturer and the IMC.

c. Provide manufacturer recommended ductwork and terminals and route for ceiling installation to the rooms detailed in Attachment E: Floorplan & terminal layout.

d. Provide new wiring and connect HRV to the main electrical panel.

e. Install and connect new air terminals to ductwork.

f. Test and record airflow rates. Total ventilation rate should be within +/- 10% of 150 CFM.

Downstairs

g. Install one HRV in furnace/mechanical room. Use appropriate mounting methods that are approved by the manufacturer and the IMC. Provide manufacturer recommended ductwork and two diffused terminals. Route and install to the location shown in Attachment E:

Floorplan & terminal layout.

h. Provide new wiring and connect HRV to the main electrical panel.

i. Test and record airflow rates. Total ventilation rate should be within +/- 10% of 150 CFM.

9. Ductwork:

a. After equipment installation, inspect accessible ductwork for air tightness per the IRC and seal as necessary. There is no requirement to inspect or repair ductwork in concealed locations.

10. Closeout Procedures:

a. Perform equipment startup and checklists per the manufacturer’s instructions and procedures.

Provide Startup reports to the COR.

b. Operation and Maintenance (O&M) Manual

Solicitation No. 75H70124Q00014 8

c. Submit copies of Operation and Maintenance Manuals in advance of applicable demonstrations and trainings.

11. Warranty

a. Provide warranty information. If the manufacturer requires registration for warranty tracking or offers upgrades as a result of registration, provide all registration information and instructions on how to submit.

12. Closeout Meeting

a. The Contractor shall coordinate a closeout meeting with the COR and Facility Manager.

b. Provide Operation and Maintenance (O&M) Training

III. SCOPE OF WORK ATTACHMENTS

A. Site Map

B. Mechanical Nameplates and Site Photos

C. Lead Based Paint Inspection Report

D. Asbestos Survey Report

E. Floorplan & Terminal Layout

F. Outside Condenser Photo

Solicitation No. 75H70124Q00014 9

SECTION D. PACKAGING AND MARKING

All shipments of materials, equipment and/or supplies to the project site must be addressed to the contractor and not the Indian Health

Service. Preservation, packaging and packing must be in accordance with industry standard packaging appropriate for the item(s) involved. The Indian Health Service is not responsible in any manner for deliveries intended for the project that are not generated by the Indian Health Service.

Equipment and materials provided by the contractor must be new and, where appropriate, must arrive on-site sealed in original manufacturer’s containers. The Government reserves the right to refuse any items it determines to not meet these requirements.

Solicitation No. 75H70124Q00014 10

SECTION E. INSPECTION AND ACCEPTANCE

The following clauses are incorporated by reference (see FAR 52.252-2):

FEDERAL ACQUISITION REGULATION (FAR)

CLAUSE

NUMBER

TITLE DATE

52.246-1 Contractor Inspection of Requirements APR 1984

52.246-4 Inspection of Services – Fixed Price AUG 1996

Solicitation No. 75H70124Q00014 11

SECTION F. DELIVERIES OF PERFORMANCE

Period of Performance (PoP) is 30 days from the date of the Notice-to-Proceed (NTP).

Solicitation No. 75H70124Q00014 12

SECTION G. CONTRACT ADMINISTRATION DATA

G.1. CONTRACTING OFFICER’S AUTHORITY

The Contracting Officer is the only person authorized to make or approve any changes in any of the requirements of this contract, and, notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely in the Contracting Officer. In the event the contractor makes any changes at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract terms and conditions, including price.

G.2. CONTRACTING OFFICER’S REPRESENTATIVE

(a) [TO BE ASSIGNED BY SEPARATE LETTER AT CONTRACT AWARD] is hereby designated as the Contracting Officer’s

Representative (COR). The COR may be changed at any time by the government without prior notice to the contractor by a unilateral modification to the contract. The COR appointment letter is located at: see separate letter at contract award

(b) The responsibilities and limitations of the COR are as follows:

(1) The COR is responsible for the technical aspects of the contract and serves as technical liaison with the contractor. The COR is also responsible for the final inspection and acceptance of all deliverables and such other responsibilities as may be specified in the contract.

The COR is not authorized to make any commitments or otherwise obligate the Government or authorize any changes which affect the contract price, terms or conditions. Any contractor request for changes shall be referred to the Contracting Officer directly or through the COR. No such changes shall be made without the express written prior authorization of the Contracting Officer. The Contracting

Officer may designate assistant or alternate COR(s) to act for the COR by naming such assistant/alternate(s) in writing and transmitting a copy of such designation to the Contractor.

G.3. CERTIFICATION OF PAYMENTS – RELEASE OF CLAIMS (ROC)

The Contractor, when submitting final payment under this contract, shall submit to the Contracting Officer:

(a) A certification that the Contractor has made payment from proceeds of prior payments, or that he will make timely payment from the proceeds of the progress or final payment then due him, to any subcontractors and suppliers in accordance with established contractual arrangements; and

(b) A properly executed Contractor's Release. The Release of Claims form is available from the Contracting Officer. Failure to submit this completed release will result in a delay of final payment.

G.4. INVOICE REQUIREMENTS

(a) Invoices must be prepared and submitted and will be paid in accordance with the following FAR clauses specified in Section I:

(1) FAR 52.232-1, Payments (April 1984)

(2) FAR 52.232-8, Discounts for Prompt Payment (Feb 2002)

(3) FAR 52.232-33, Payment by Electronic Funds Transfer-- System for Award Management (Oct 2018)

(4) FAR 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023)

(b) The Designated Billing Office for this contract is the same as the address for correspondence, sent to the attention of the

Contracting Officer. Invoices for payment shall be sent via e-mail to the COR and CO for processing and approval.

(c) Progress payments will be authorized for this project.

(d) The final invoice must be marked “Final” and be accompanied by a Release of Claims form, which states the final payment as outstanding, in the Remarks field. The Release of Claims form is available from the CO. Final payment will be made within 30

Calendar days upon receipt of a properly executed invoice.

(e) The contractor will contact the Designated Billing Office with any payment issues or concerns.

Note: In accordance with FAR 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Dec 2013)—Upon receipt of accelerated payments from the Government, the contractor shall make accelerated payments to its small business subcontractors under this contract, to the maximum extent practicable and prior to when such payment is otherwise required under the applicable contract or subcontract, after receipt of a proper invoice and all other required documentation from the small business subcontractor. This applies to all small business subcontractors at all tier levels.

Solicitation No. 75H70124Q00014 13

G.5. ADDRESS FOR CORRESPONDENCE

It is the intent of the Government to use electronic means as much as possible while administering this contract.

Most correspondence should be sent via email directly to the Contracting Officer and COR. If sending documents via postal mail, include the Contract Number on all correspondence. Overnight Mail and U.S. Mail must be sent to the Contracting Officer, unless otherwise specified, at the following address:

Indian Health Service – Portland Area Office

1414 NW Northrup St., Suite 800

Portland, OR 97209

G.6. IDENTIFICATION OF CONTRACTOR EMPLOYEES

Identification (ID) Badges. The contractor shall provide each employee with an ID badge on contract start date or on employment start date. The ID badge shall be made of non-metallic material. The badge shall be easily readable and include the employee's name, the contractor's name, functional area of assignment, and a color photograph. The Contracting Officer or their designee will approve the

ID badge template before the contract start date.

Display of ID Badges. Contractor personnel shall wear the ID badge at all times when performing work under this contract on site and when attending Government meetings and conferences off-site. Unless otherwise specified, each contractor employee shall wear the

ID badge in a conspicuous place on the front of exterior clothing and above the waist except when safety or health reasons prohibit such placement.

Utilizing Electronic Mail (e-mail). When prime contractor or subcontractor personnel send e-mail messages as part of contract performance or otherwise relating to contract matters, each sender shall include his/her name (both first and last names), e-mail address and the name of the individual’s employer.

G.7. TEST RESULTS

The contractor must submit all results of test(s) required by the contract to the COR for review.

G.8. PERMITS AND CERTIFICATES

The contractor must submit a copy of all permits and certificates as required by the contract to the COR.

G.9. CERTIFICATION OF PAYMENTS - RELEASE OF CLAIM (ROC)

The contractor, when submitting final payment under this contract, shall submit to the Contracting Officer:

(a) A certification that the contractor has made payment from proceeds of prior payments, or that he will make timely payment from the proceeds of the progress or final payment then due him, to any subcontractors and suppliers in accordance with established contractual arrangements; and

(b) A properly executed Contractor's Release. The Release of Claims form is available from the Contracting Officer (to be provided at award). Failure to submit this completed release will result in a delay of final payment.

Solicitation No. 75H70124Q00014 14

SECTION H. SPECIAL CONTRACT REQUIREMENTS

H.1. SUBCONTRACTS

(a) Nothing contained in the contract shall be construed as creating any contractual relationship between any subcontractor and the

Government. The divisions or sections of the specifications are not intended to control the contractor in dividing the work among subcontractors, or to limit the work performed by any trade.

(b) The contractor shall be responsible to the Government for acts and omissions of his own employees, and of subcontractors and their employees. He shall also be responsible for the coordination of the work of the trades, subcontractors, and suppliers.

(c) The Government will not undertake to settle any differences between or among the contractor and his subcontractors or suppliers.

(d) The contractor shall, without additional expense to the Government employ specialty subcontractors where required by the specifications. “Specialty Subcontractors,” when specified as a requirement, means a subcontractor regularly engaged in the manufacture or installation of the contract items. The specialty subcontractor shall select and combine the materials involved, maintain and have available for the purpose, workmen skilled in the specified work. The specialty subcontractor shall be the manufacturer, be licensed by the manufacturer as an installer, or work under direct supervision of the manufacturer.

H.2. SUBCONTRACTING

(a) In connection with the performance of work under this contract, the contractor shall not subcontract with any subcontractor who, at the time of subcontract award, is listed as an excluded party within the System for Award Management (SAM) unless otherwise authorized by the Government in accordance with Subpart 9.4 of the Federal Acquisition Regulations.

(b) The List of Parties Excluded from Procurement and Non-Procurement Programs is available at: https://www.sam.gov/

(c) In the event of the contractor’s noncompliance with the foregoing requirements, the Government may terminate this contract for default or take other appropriate action, including, but not limited to, requiring the contractor to terminate any such subcontract and substitute an eligible subcontractor in lieu thereof, at no increase in the contract price or time for performance.

(d) The term “subcontractor,” as used in this clause, shall mean the individual or firm with whom the contractor proposes to enter into a subcontract for manufacturing, fabricating, installing, or otherwise performing work under this contract.

(e) Within ten days after contract award, the contractor shall furnish to the Contracting Officer in writing a list of all subcontractors scheduled to perform work under the contract on Form SF-1413.

(f) The contractor shall include the provisions of paragraphs a., b., and d. of this clause in every subcontract hereunder.

H.3. WORK HOURS AND ACTIVE GOVERNMENT OPERATIONS

Normal work days and hours are Monday through Friday, 7:00 am to 5:00pm excluding federal holidays for occupied facilities and no set times or days for unoccupied spaces. The contractor shall notify the COR a minimum of 72 hours in advance of arriving on site to complete work and check in with the COR upon arrival. A minimum of 48 hours of advance notice is required for special request to work outside of normal work hours.

H.4. EMPLOYEE APPEARANCE

The contractor must ensure that all employees present a professional appearance that is appropriate for their position. The Contracting

Officer reserves the right to determine the acceptability of any clothing worn. All contractor/subcontractor employees working under this contract must be identified by a distinctive nameplate, emblem, or patch attached in a prominent place on an outer garment.

H.5. REMOVAL OF EMPLOYEES/SUBCONTRACTORS

All work under this contract must be performed in a skillful and workmanlike manner. The Contracting Officer may require in writing that the contractor immediately remove from the work site any employee of the contractor, and employee of the subcontractor, or the subcontractor, if the Contracting Officer deems that a person or company is incompetent, careless, or otherwise objectionable. The use of, or possession of any alcohol or illegal drugs, is cause for immediate removal from the project.

H.6. RESERVATION REGULATIONS

(a) The Contractor, its employees and subcontractors shall become familiar with and obey the regulations of the applicable Indian

Reservation including fire, traffic, safety and security regulations while on the Reservation or installation. Those individuals driving motor vehicles shall observe and obey all speed limits posted throughout the reservation. Personnel should not enter restricted areas unless required to do so and only upon prior approval. All contractor employees and subcontractors shall carry proper personal identification with them at all times.

Solicitation No. 75H70124Q00014 15

(b) Contractor equipment shall be conspicuously marked for identification purposed and parked or placed within approved areas only, out of the way of driveways, emergency access roads, and traffic.

H.7. TRIBE REQUIREMENTS – CONFEDERATED TRIBES OF WARM SPRINGS

(a) Contractors are notified that this project is subject to local Tribal Employment Rights Ordinance (TERO) requirements.

Contractors are required to contact the TERO Office upon receipt of notification of award. Compliance with the tribal employment ordinance is required prior to starting work on any project performed on Tribal Land including payment of associated TERO fees/permits. Utilization of Tribal individuals will be a requirement of hiring goals for a set craft or skill level.

(b) The Contractor is responsible to pay all applicable tribe fees and/or taxes, or applicable requirements that may be incurred as a result of this project and must be included in the firm fixed price offered. Failure to include applicable tribal fees and/or taxes in the firm fixed-price shall not constitute grounds for an equitable adjustment after award.

(c) Contractor shall obtain a business license, permits (if required by the tribe) and pay the required fees to the appropriate office. The general contractor and each subcontractor are required to obtain the business license on each project prior to starting work.

(d) TERO Contact(s): https://warmsprings-nsn.gov/program/tribal-employment-rights-office/ https://warmsprings-nsn.gov/program/tribal-employment-rights-office/

Solicitation No. 75H70124Q00014 16

SECTION I. CONTRACT CLAUSES

CLAUSE

NUMBER

TITLE DATE

52.204-13 System for Award Management Maintenance Oct 2018

52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance or Equipment Nov 2021

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance or

Equipment Nov 2021

52.212-4 Contract Terms and Conditions – Commercial Items Nov 2023

52.223-6 Drug-Free Workplace May 2001

52.226-1 Utilization of Indian Organizations and Indian-Owned Economic Enterprises Jun 2000

52.232-1 Payments Apr 1984

52.232-8 Discounts for Prompt Payment Feb 2002

52.232-39

232-39

Unenforceability of Unauthorized Obligations Jun 2013

52.232-40 Providing Accelerated Payments to Small Business Subcontractors Mar 2023

52.233-1 Disputes May 2014

52.237-2 Protection of Government Buildings, Equipment, and Vegetation Apr 1984

52.242-15 Stop-Work Order Aug 1989

52.243-1 Changes – Fixed-Price, Alt I Apr 1984

52.253-1 Computer Generated Forms Jan 1991

HEALTH AND HUMAN SERVICES ACQUISITION REGULATION

CLAUSE

NUMBER TITLE DATE

352.222-70 Contractor Cooperation in Equal Employment Opportunity Investigations December 18, 2015 352.223-70 Safety and Health December 18, 2015 352.226-1 Indian Preference December 18, 2015 352.226-3 Native American Graves Protection and Repatriation Act December 18, 2015 352.239-73 Electronic & Information Technology Accessibility Notice December 18, 2015

FAR 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE

ORDERS – COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (DEC 2023)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab

Covered Entities (DEC 2023) (Section 1634 of Pub. L. 115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or

Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).

(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) ( 31 U.S.C. 3903 and 10

U.S.C. 3801).

(6) 52.233-3, Protest After Award (AUG 1996) ( 31 U.S.C. 3553).

(7) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78

( 19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

[Contracting Officer check as appropriate.]

__ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with Alternate I (NOV

2021) ( 41 U.S.C. 4704 and 10 U.S.C. 4655).

https://www.acquisition.gov/far/part-52#FAR_52_203_19 https://www.acquisition.gov/far/part-52#FAR_52_204_23 https://www.acquisition.gov/far/part-52#FAR_52_204_25 https://www.acquisition.gov/far/part-52#FAR_52_209_10 https://www.acquisition.gov/far/part-52#FAR_52_232_40 https://www.govinfo.gov/link/uscode/31/3903 https://www.govinfo.gov/link/uscode/10/3801 https://www.govinfo.gov/link/uscode/10/3801 https://www.acquisition.gov/far/part-52#FAR_52_233_3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_233_4 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_203_6 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.govinfo.gov/link/uscode/10/4655

Solicitation No. 75H70124Q00014 17

__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (NOV 2021) ( 41 U.S.C. 3509)).

__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN

2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

X (4) 52.203-17, Contractor Employee Whistleblower Rights (NOV 2023) ( 41 U.S.C. 4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community—see FAR 3.900(a).

__ (5) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109-282)

( 31 U.S.C. 6101 note).

__ (6) [Reserved].

__ (7) 52.204-14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111-117, section 743 of Div. C).

__ (8) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (OCT 2016) (Pub. L. 111-117, section 743 of Div. C).

__ (9) 52.204-27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section 102 of Division R of Pub. L. 117-

328).

__ (10) 52.204-28, Federal Acquisition Supply Chain Security Act Orders—Federal Supply Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts. (DEC 2023) ( Pub. L. 115–390, title II).

__ (11)

(i) 52.204-30, Federal Acquisition Supply Chain Security Act Orders—Prohibition. (DEC 2023) ( Pub. L. 115–390, title

II).

__ (ii) Alternate I (DEC 2023) of 52.204–30.

__ (12) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or

Proposed for Debarment. (NOV 2021) ( 31 U.S.C. 6101 note).

__ (13) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (OCT

2018) ( 41 U.S.C. 2313).

X (14) [Reserved].

__ (15) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (OCT 2022) ( 15 U.S.C. 657a).

__ (16) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) ( 15 U.S.C. 657a).

__ (17) [Reserved]

__ (18)

(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2020) ( 15 U.S.C. 644).

__ (ii) Alternate I (MAR 2020) of 52.219-6.

__ (19)

(i) 52.219-7, Notice of Partial Small Business Set-Aside (NOV 2020) ( 15 U.S.C. 644).

__ (ii) Alternate I (MAR 2020) of 52.219-7.

__ (20) 52.219-8, Utilization of Small Business Concerns (SEP 2023) ( 15 U.S.C. 637(d)(2) and (3)).

__ (21)

(i) 52.219-9, Small Business Subcontracting Plan (SEP 2023) ( 15 U.S.C. 637(d)(4)).

__ (ii) Alternate I (NOV 2016) of 52.219-9.

__ (iii) Alternate II (NOV 2016) of 52.219-9.

__ (iv) Alternate III (JUN 2020) of 52.219-9.

__ (v) Alternate IV (SEP 2023) of 52.219-9.

X (22)

(i) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) ( 15 U.S.C. 644(r)).

__ (ii) Alternate I (MAR 2020) of 52.219-13.

__ (23) 52.219-14, Limitations on Subcontracting (OCT 2022) ( 15 U.S.C. 637s).

__ (24) 52.219-16, Liquidated Damages—Subcontracting Plan (SEP 2021) ( 15 U.S.C. 637(d)(4)(F)(i)).

__ (25) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (OCT 2022) ( 15 U.S.C. 657f).

__ (26)

(i) 52.219-28, Post Award Small Business Program Rerepresentation (SEP 2023)( 15 U.S.C. 632(a)(2)).

__ (ii) Alternate I (MAR 2020) of 52.219-28.

X (27) 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged Women-Owned Small

Business Concerns (OCT 2022) ( 15 U.S.C. 637(m)).

X (28) 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns Eligible

Under the Women-Owned Small Business Program (OCT 2022) ( 15 U.S.C. 637(m)).

X (29) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) ( 15 U.S.C. 644(r)).

X (30) 52.219-33, Nonmanufacturer Rule (SEP 2021) ( 15U.S.C. 637(a)(17)).

X (31) 52.222-3, Convict Labor (JUN 2003) (E.O.11755).

X (32) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (NOV 2023) .

X (33) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

X (34) https://www.acquisition.gov/far/part-52#FAR_52_203_13 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_203_15 https://www.acquisition.gov/far/part-52#FAR_52_203_17 https://www.govinfo.gov/link/uscode/41/4712 https://www.acquisition.gov/far/part-3#FAR_3_900 https://www.acquisition.gov/far/part-52#FAR_52_204_10 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_204_14 https://www.acquisition.gov/far/part-52#FAR_52_204_15 https://www.acquisition.gov/far/part-52#FAR_52_204_27 https://www.acquisition.gov/far/part-52#FAR_52_204_28 https://www.govinfo.gov/link/plaw/115/public/390 https://www.acquisition.gov/far/part-52#unique_70991182 https://www.govinfo.gov/link/plaw/115/public/390 https://www.acquisition.gov/far/part-52#FAR_52_209_6 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_209_9 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section2313&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_219_3 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637a&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_219_4 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_6 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_6 https://www.acquisition.gov/far/part-52#FAR_52_219_7 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_7 https://www.acquisition.gov/far/part-52#FAR_52_219_8 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_9 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://www.acquisition.gov/far/part-52#FAR_52_219_13 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_13 https://www.acquisition.gov/far/part-52#FAR_52_219_14 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_16 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_27 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_28 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_28 https://www.acquisition.gov/far/part-52#FAR_52_219_29 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_30 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_32 https://www.govinfo.gov/content/pkg/USCODE-2018-title15/html/USCODE-2018-title15-chap14A-sec644.htm https://www.acquisition.gov/far/part-52#FAR_52_219_33 https://www.govinfo.gov/content/pkg/USCODE-2018-title15/html/USCODE-2018-title15-chap14A-sec637.htm https://www.acquisition.gov/far/part-52#FAR_52_222_3 https://www.acquisition.gov/far/part-52#FAR_52_222_19 https://www.acquisition.gov/far/part-52#FAR_52_222_21

Solicitation No. 75H70124Q00014 18

(i) 52.222-26, Equal Opportunity (SEP 2016) (E.O.11246).

__ (ii) Alternate I (FEB 1999) of 52.222-26.

X (35)

(i) 52.222-35, Equal Opportunity for Veterans (JUN 2020) ( 38 U.S.C. 4212).

__ (ii) Alternate I (JUL 2014) of 52.222-35.

__ (36)

(i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) ( 29 U.S.C. 793).

__ (ii) Alternate I (JUL 2014) of 52.222-36.

__ (37) 52.222-37, Employment Reports on Veterans (JUN 2020) ( 38 U.S.C. 4212).

__ (38) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496).

__ (39)

(i) 52.222-50, Combating Trafficking in Persons (NOV 2021) ( 22 U.S.C. chapter 78 and E.O. 13627).

__ (ii) Alternate I (MAR 2015) of 52.222-50 ( 22 U.S.C. chapter 78 and E.O. 13627).

__ (40) 52.222-54, Employment Eligibility Verification (MAY 2022) (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)

__ (41)

(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008)

( 42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (ii) Alternate I (MAY 2008) of 52.223-9 ( 42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

X (42) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Jun 2016) (E.O.

13693).

__ (43) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (JUN

2016) (E.O. 13693).

X (44)

(i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and 13514).

__ (ii) Alternate I (OCT 2015) of 52.223-13.

__ (45)

(i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (JUN 2014) (E.O.s 13423 and 13514).

__ (ii) Alternate I (Jun2014) of 52.223-14.

__ (46) 52.223-15, Energy Efficiency in Energy-Consuming Products (MAY 2020) ( 42 U.S.C. 8259b).

__ (47)

(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).

__ (ii) Alternate I (JUN 2014) of 52.223-16.

__ (48) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) (E.O. 13513).

__ (49) 52.223-20, Aerosols (JUN 2016) (E.O. 13693).

__ (50) 52.223-21, Foams (Jun2016) (E.O. 13693).

X (51)

(i) 52.224-3 Privacy Training (JAN 2017) (5 U.S.C. 552 a).

__ (ii) Alternate I (JAN 2017) of 52.224-3.

__ (52)

(i) 52.225-1, Buy American-Supplies (OCT 2022) ( 41 U.S.C. chapter 83).

__ (ii) Alternate I (OCT 2022) of 52.225-1.

__ (53)

(i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (NOV 2023) ( 19 U.S.C. 3301 note, 19 U.S.C.

2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, 19 U.S.C. chapter 29 (sections 4501-4732), Public Law 103-182, 108-77, 108-

78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

__ (ii) Alternate I [Reserved].

__ (iii) Alternate II (DEC 2022) of 52.225-3.

__ (iv) Alternate III (NOV 2023) of 52.225-3.

__ (v) Alternate IV (Oct 2022) of 52.225-3.

__ (54) 52.225-5, Trade Agreements (NOV 2023) ( 19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

__ (55) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

__ (56) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. Subtitle A, Part V, Subpart G Note).

__ (57) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) ( 42 U.S.C. 5150).

X (58) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov2007) ( 42 U.S.C. 5150).

__ (59) 52.229-12, Tax on Certain Foreign Procurements (FEB 2021).

https://www.acquisition.gov/far/part-52#FAR_52_222_26 https://www.acquisition.gov/far/part-52#FAR_52_222_26 https://www.acquisition.gov/far/part-52#FAR_52_222_35 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_222_35 https://www.acquisition.gov/far/part-52#FAR_52_222_36 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title29-section793&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_222_36 https://www.acquisition.gov/far/part-52#FAR_52_222_37 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_222_40 https://www.acquisition.gov/far/part-52#FAR_52_222_50 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_222_50 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_222_54 https://www.acquisition.gov/far/part-22#FAR_22_1803 https://www.acquisition.gov/far/part-52#FAR_52_223_9 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_223_9 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_223_11…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .