B05 Amendment 2.pdf

PDF 194 KB Posted

Attached to
Big Bend Sewer Renovation Federal contract opportunity
Solicitation number
75H70123R00068
Issued by
Department of Health and Human Services Indian Health Service

About this file

This amendment to solicitation 75H70123R00068 provides responses to contractor questions regarding the Big Bend Sewer Renovation project for the Department of Health and Human Services Indian Health Service. The responses clarify that Fernco couplings cannot be used and require Romac 501 couplings instead. All existing sanitary sewer pipes are PVC. Eight-inch pipes will connect manholes except for the line between MH-7 and MH-8, which is four inches. At least ten feet of pipe must be replaced at each manhole inlet connection, including nine additional inlets requiring replacement of approximately ninety feet of eight-inch and four-inch pipe beyond what is indicated on drawings. Exterior joint collars for manhole installation must be Cretex External Chimney Seal or approved equal. The proposal due date of November 3, 2023 remains unchanged.

View the file

Other files for this federal contract opportunity

Other files attached to Big Bend Sewer Renovation, newest first.
File Type Posted
B05 Amendment 1.pdf PDF
Attachment 5 Self Performed Calculation Sheet.docx DOCX document
Attachment 7 Key Personnel Resume Form.docx DOCX document
Attachment 6 Specialized Experience Form.docx DOCX document
Attachment 3 Drawings.pdf PDF
Attachment 4 Project Location Map.pdf PDF
Attachment 1 Wage Determination SD20230015.pdf PDF
Attachment 2 Specifications.pdf PDF
Attachment 8 Past Performance Questionnaire.docx DOCX document
B01 23R00068.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

A00002

Andrew Hart, Contracting Officer

The purpose of amendment 2 to solicitation 75H70123R00068 is the following:

1. Incorporate RFI responses 1-5.

2. The proposal due date remains unchanged at 12:00pm Pacific Time on 11/3/2023.

3. All other terms and conditions remain unchanged.

4. See SF30 Continuation Page.

Indian Health Service - DES Seattle 701 5th Avenue, Suite 1600 Seattle, WA 98104

See Item 6

75H70123R00068

See Block 14

1 2

10/30/2023

10/04/2023

SF30 Continuation Page Page 2 of 2

RFI Response:

1. For connections to existing sanitary, can Ferncos be used instead of the Romac 501 couplings specified? If any of the existing is clay, I’m not sure how well that would hold up with a heavy duty coupling style such as this. Typically for gravity sewer pipe, Ferncos are all I ever see to use in specs. I can send submittals if needed.

Ferncos are not permitted on IHS projects. Sewer Transition Couplings must be Romac Industries 501 Straight and Transition Coupling for Sewer or Approved Equal per Section 02530 – Sanitary Sewer of IHS CSI Specifications.

The offeror shall provide the brand name product referenced in the solicitation. If offering an “equal”, the offeror shall provide a second proposal, in addition to the brand name proposal, clearly indicating the product being offered is an “equal”. The offeror shall include information sufficient to evaluate “equal” products.

2. Is it known what kind of material the existing sanitary pipe is? PVC or possibly clay?

All existing material is PVC.

3. Are all the existing sewer main sizes expected to be 8” for the connections?

All existing sewer mains are expected to be 8-inch with the exception of the sewer line that runs between MH-7 and MH-8 – it is 4-inch. MH-7 is slated to be replaced, however, existing MH-7 was poured with an 8-inch inlet and fitted with a boot that reduces the inlet to 4-inch.

4. Anytime a manhole is replaced, will every invert need to have at least 10’ of PVC pipe stubbed out and then connect to existing? Or just where the plans show a darkened black line signifying new pipe? Just trying to determine the number of connections to existing sewer main there will be. I came up with 4, when only going off of darkened lines being shown.

It is approximated that at least 10 L.F. of pipe will need to be replaced for each invert/connection. The dark lines (proposed sewer pipe) indicate the pipe that needs replacement due to the pipe itself being in poor condition – not pipe that is part of the manhole replacement. There are nine (9) additional inlets that are incidental to manhole replacement; therefore, there is approximately 90 L.F. (80 L.F. of 8-inch and 10 L.F. of 4-inch) of replacement that is not called out on the drawings (8-inch: MH-2 x2, MH-4 x2, MH-5 x1, MH-9 x2, MH-10 x1; 4-inch: MH-7 x1).

5. Do sanitary manholes need chimney seals?

Yes. Exterior joint collars must be Cretex External Chimney Seal or Approved Equal per Section 02532 – Sanitary Sewer Manholes of IHS CSI Specifications.

B05 Amendment 2
RFI's 1-5