B01 Att J09 - Price Schedule Price Breakdown.pdf

PDF 286 KB Posted

Attached to
Blackfeet Apartment Complex, Browning MT Federal contract opportunity
Solicitation number
75H70122R00068
Issued by
Department of Health and Human Services Indian Health Service

About this file

This document includes a presolicitation notice and price schedule for a construction project. The Indian Health Service intends to award a firm fixed price construction contract to build a 14-unit apartment complex in Browning, Montana, to address a lack of housing. The project scope involves constructing eight one-bedroom apartments, two two-bedroom apartments, and two four-bedroom dormitory style apartments in a two-story building, totaling approximately $10 million. The facility will include common areas and accessibility features. The performance period is 730 calendar days from notice to proceed. The solicitation will be posted on July 25, 2022 at SAM.gov under NAICS code 236116 with a size standard of $39.5 million. The IHS encourages early SAM registration and will use LPTA evaluation criteria for this 100% unrestricted solicitation.

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B01 ATTACHMENT J07

Price Schedule / Price Breakdown

PRICE SCHEDULE / PRICE BREAKDOWN

All offerors shall fill out and submit a completed Pricing Sheet with their proposal. The pricing sheet is not contractually binding; however, it will be used in the analysis for price reasonableness

CLIN 0001:

Section# Section Title Materials Labor Total

1 PROJECT OVERHEAD $ $ $

2 EXISTING CONDITIONS $ $ $

3 CONCRETE $ $ $

4 MASONRY $ $ $

5 METALS $ $ $

6 WOODS/PLASTICS $ $ $

7 THERMAL/ MOISTURE PROTECT $ $ $

8 DOORS & WINDOWS $ $ $

9 FINISHES $ $ $

10 SPECIALTIES $ $ $

11 EQUIPMENT $ $ $

12 FURNISHINGS $ $ $

13 SPECIAL CONSTRUCTION $ $ $

14 CONVEYING SYSTEMS $ $ $

21 FIRE PROTECTION $ $ $

22 PLUMBING $ $ $

23 MECHANICAL $ $ $

26 ELECTRICAL $ $ $

27/28 LOW VOLTAGE $ $ $

31 SITE CONSTRUCTION $ $ $

Subtotal $ Profit % $ Bonds % $ TERO Fees % $ Taxes % $

Subtotal $

PROJECT TOTAL (sum of subtotals) $ _________________

This total should match block 17 of the SF1442

(end of attachment)

File details come from the government source that posted it. Updated .