A00002.pdf

PDF 351 KB Posted

Attached to
CROW/NORTHERN CHEYENNE HOSPITAL UNDERGROUND STORAGE TANK REMOVAL
Solicitation number
75H701-21-R-00053
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 2

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

75H701-21-R-00053

9B. DATED (SEE ITEM 11)

07/14/2021

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable) 2. AMENDMENT/MODIFICATION NUMBER

A00002 08/10/2021

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

Indian Health Service Division of Engineering Services 701 Fifth Ave, Ste. 600 Seattle, WA 98104

Same as Block 6

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

SUMMARY OF CHANGES:

The purpose of Amendment A00002 is to:

1. Incorporate the IHS' response to the Pre-Proposal Inquiry.

2. The proposal due date remains unchanged.

(END SUMMARY OF CHANGES)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Andrew E. Hart, Contracting Officer

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

8/10/2021 Previous edition unusable STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Amendment of Solicitation Amendment A00002 under Solicitation 75H701-21-R-00053 Project No. BI21CR201C6, Crow/NC Hospital Underground Storage Tank Removal

INDIAN HEALTH SERVICE

DIVISION OF ENGINEERING

SERVICE

PRE-PROPOSAL INQUIRIES

Solicitation 75H701-21-R-00053

PROJECT: Crow/NC Hospital UST Removal LOCATION: Crow Agency, MT

PROJECT NO: BI21CR201C6

DOCUMENT

OWNER: Rita Langager PHONE: (406) 998-7220 DOCUMENTS:

DATE: 08/10/2021 DEPARTMENT: IHS/OEHE/DFM

Item No.

Reference Drawing, Spec, Page COMMENTS POC IHS Approved Response

Amendment A00002 dated 08/10/21

1. Section C

In Section C of the SOW: Contractor Experience Requirements: / also shown in Sections L and M in Factor 1: It states that offerors are required to be currently licensed in the State of Montana as a UST Remover.

Does the prime contractor have to carry this license or can we use our licensed sub-contractor to pull the required permit and inspect the work?

TR

A prime contractor can use a licensed subcontractor, however, the subcontractor will be considered the responsible party by the EPA and will need to sign off on all analyses, work plans, and other documentation required by the specifications and the EPA.

2.

3.

File details come from the government source that posted it. Updated .