Attachment J.1. QASP 75D301-24-Q-77789.docx
DOCX document 20 KB Posted
- Attached to
- CDC Ft Collins Animal Husbandry 2024-2025
- Solicitation number
- 75D301-24-Q-77789
About this file
This document is a Government Quality Assurance Surveillance Plan (QASP) for an animal care services contract at the Centers for Disease Control and Prevention (CDC) Fort Collins, CO facility. The QASP outlines the purpose, government roles and responsibilities, performance standards, quality surveillance methods, and performance evaluation process for the contract.
The key objectives of the contract are to provide routine animal and insect care services, including health surveillance, housing, feeding, handling, and facility sanitation, in support of the CDC's research operations at the Fort Collins facility. The contractor must comply with all applicable federal laws and regulations, including the Animal Welfare Act, Public Health Service Policy, and AAALAC standards. The government will monitor the contractor's performance through methods such as direct observation, management information systems, and periodic inspections. Contractor performance will be evaluated using the Contractor Performance Assessment Reporting System (CPARS).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Government Quality Assurance Surveillance Plan (QASP)
Animal Care Services – Fort Collins Facility Contract 75D301-24-Q-77789
1. PURPOSE.
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
· What will be monitored.
· How monitoring shall take place.
· Who will conduct the monitoring.
· How monitoring efforts and results shall be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
GOVERNMENT ROLES AND RESPONSIBILITIES.
The following personnel shall oversee and coordinate surveillance activities:
a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
b. Contracting Officer’s Representative (COR) – The COR will be located at the Joint Task Force National Capital Region – Medical (JTF CAPMED) office. The COR shall be responsible for technical administration of the contract, and shall assure proper Government surveillance of the contractor’s performance with the assistance of two Contracting Officer’s Technical Representatives (COTRs). The COR shall keep a quality assurance file. At the conclusion of the contract or when requested by the CO, the COR shall provide documentation to the CO. A COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The contractor shall refer any changes they deem may affect contract price, terms, or conditions to the CO for action.
c. Technical Monitor (TM) – The TM is responsible for assisting the COR in technical administration of the contract, and they shall assist the COR in assuring proper Government surveillance of the contractor’s performance. The TM shall provide input and documentation for the COR’s quality assurance file. A TM is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The contractor shall refer any changes they deem may affect contract price, terms, or conditions to the CO for action.
1. PERFORMANCE STANDARDS.
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets, or does not meet these standards.
The Performance Requirements Summary Matrix, shown in Table 1 below includes performance standards. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
0. Quality Level By monitoring the Contractor, the COR shall determine whether the performance levels set forth in the contract and each individual task order have been attained. Performance standards are specified in the Performance Standards Summary Matrix.
0. Frequency During performance of the contract, the COR shall take periodic measurements, as specified in the Method of Surveillance column of the Summary Matrix.
0. Surveillance Process The COR will perform random checks to assess the contractor’s quality and performance. The assessment shall consist of the COR/TM inspections, feedback from the end users, reviewing customer complaints, records of preventative maintenance reports, and other reports documenting the contractor’s level of service.
1. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The Government may use the surveillance methods listed below in the administration of this QAS. Regardless of the surveillance method, the Government shall always contact the contractor's task manager or on-site representative when a defect is identified and inform the manager of the specifics of the problem. The COR shall be responsible for monitoring the contractor’s performance in meeting specific performance standards.
1. DIRECT OBSERVATION. (Can be performed periodically or through 100% surveillance.)
1. MANAGEMENT INFORMATION SYSTEMS (MIS). (Evaluates outputs through the use of management information reports. Best used for general surveillance and may need to be supplemented by periodic inspections.)
1. PERIODIC INSPECTION. Uses a comprehensive evaluation of selected outputs. Inspections may be scheduled as required.
2. Analysis of contractor's progress reports. (Evaluate cost, schedule, etc.)
2. Performance reporting.
0. Surveillance results may be used as the basis for actions (to include payment deductions) against the contractor. In such cases, the Inspection of Services clause in the Contract becomes the basis for the CO’s actions.
1. PERFORMANCE EVALUATION PROCESS
The Contractor Performance Assessment Reporting System (CPARS) has been adopted by the agency to electronically capture assessment data and manage the evaluation process. CPARS is used to assess a contractor’s performance and provide a record, both positive and negative, on a given contract during a specific period of time. The CPARS process is designed with a series of checks and balances to facilitate the objective and consistent evaluation of contractor performance. Both government and contractor program management perspectives are captured on the CPAR form and together make a complete CPAR. Once the Assessing Official completes the proposed assessment for the period of performance, the CPARS is released to the appropriate Government Contractor Representative for their review and comments. User ID and Password will be provided to the designated Government Contractor Representative upon issuance of a contract or task order. There contractor has 30 days after the Government’s evaluation is completed to comment on the evaluation. The Government Contractor Representative must either concur or non-concur to each CPAR. If the contractor concurs with the proposed assessment and the Reviewing Official does not wish to see the CPAR, the Assessing Official may close out the CPAR. Otherwise, they must forward the CPAR to the Reviewing Official for them to review, enter comments if appropriate, and close out. The Reviewing Official may at their option direct the Assessing Official to forward every CPAR to them for review.