751_25246_RLO_Drawings_Marsh Creek.pdf

PDF 17 MB Posted

Attached to
751/25246. RLO; St Helen Bridge - Removal/New Culvert
Solicitation number
RFQ 171 260000000439 1
Issued by
Michigan

About this file

This is a construction drawing set for a bridge replacement project issued by the Michigan Department of Technology, Management and Budget (DTMB) and the Department of Natural Resources (DNR). The project involves the removal of an existing bridge structure over Marsh Creek on the St. Helen-Geels ORV Trail in Richfield Township, Roscommon County, Michigan (File No. 751/25246.RLO), and the construction of a new segmental precast concrete box culvert measuring 44 feet by 8 feet. The drawings were prepared by OHM Advisors and issued for construction on August 5, 2026. The project includes approach work, guardrail installation, riprap placement for slope protection, and site grading. The structure is designed to HL-93 Modified loading standards with deflection not exceeding 1/800 of span length. The existing structure, a railcar frame bridge with wood deck, will be removed prior to construction. A temporary steel multi-beam bridge overlay will be removed by MDNR before construction begins. The project requires stream diversion methods, debris prevention and removal measures, and immediate slope protection and seeding upon abutment completion.

Design specifications reference the Michigan Department of Transportation 2020 Standard Specifications for Construction. The culvert is designed for a 100-year water surface elevation of 1177.34 feet with a proposed stream bed elevation of 1172.50 feet. Soil boring investigations have been conducted at two locations with results documented on the boring logs sheet. The project includes guardrail approach terminals (Type 2M, Modified) with 28.1-foot height transitions and Type T guardrail with 96-inch posts on both approach sections. All work must comply with concrete clear cover requirements (3 inches for concrete cast against earth, 2 inches for all other applications), and exposed concrete corners must be beveled with triangular moldings. The structure has been evaluated using FAA obstruction evaluation pre-screening tools for a 150-foot height above ground level, and no FAA permits are required. Road traffic closure will be maintained by MDNR throughout the construction duration, and all construction must account for potential water level variations subject to regulatory approval by the Land and Water Management Division of the Michigan Department of Environment, Great Lakes, and Energy.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

© 2025 Microsoft Corporation © 2025 TomTom © 2025 Zenrin AREA LOCATION

MAP

CHICAGO

MILWAUKEE LAKE

MICHIGAN

DETROIT

LAKE

HURON

SAULT

STE

MARIE

MARQUETTE

HOUGHTON

LAKE

SUPERIOR

DULUTH

MINNEAPOLIS

GREEN BAY

ESCANABA

TRAVERSE

CITY

GRAND RAPIDS

LANSING

PROJECT

LOCATION

AREA LOCATION

MAP

GENERAL NOTES:

I Certify That The Plans Were Prepared Under My Direct Supervision

PROJECT LOCATION MAP

OHM PROJECT No.

DATE:

7136.25.0050 2026/08/05

ISSUED FOR CONSTRUCTIONOWNER:

DTMB

RONDA OSGA

PH: 989-619-6426

osgar@michigan.gov

PROJECT CONTACT

DNR

SEAN DUPERRON

PH: 989-370-1907

duperrons@michigan.gov

ARCHITECT/ENGINEER:

OHM ADVISORS

300 EAST MITCHELL STREET, SUITE 2

PETOSKEY, MI 49770

231.344.1150

PROJECT CONTACT

AMANDA PORATH

ST. HELEN BRIDGE OVER MARSH CREEK

ST. HELEN-GEELS ORV TRAIL

DEPARTMENT OF NATURAL RESOURCES

FILE NO.: 751/25246.RLO

RICHFIELD TOWNSHIP, ROSCOMMON COUNTY

P:\7

_72 00\

0_S tHe len

Brid geo ver Ma rsh Cre ek\ Dra win gs\

Civ il\M isc\

CO

V.D

WG

Aug

, 2

- 2

:38 pm

D R

AW

IN

G P

AT

H

OHM-ADVISORS.COM

ARCHITECTS ENGINEERS PLANNERS

CO

PY

RI

G

HT

O

HM

A

DV

IS

O

RS

. A

LL

D

RA

W

IN

G

S

AN

D W

RI

TT

EN

M

AT

ER

IA

LS

A

PP

EA

RI

NG

H

ER

EI

N

CO

NS

TI

TU

TE

T

HE

O

RI

G

IN

AL

A

ND

U

NP

UB

LI

SH

ED

W

O

RK

O F

O

HM

A

DV

IS

O

RS

A

ND

T

HE

S

AM

E

M

AY

N O

T

BE

D

UP

LI

CA

TE

D, D

IS

TR

IB

UT

ED

, O R

DI

SC

LO

SE

D W

IT

HO

UT

P

RI

O

R W

RI

TT

EN

C

O

NS

EN

T

O F

O

HM

A

DV

IS

O

RS

R

RE

VI

SI

ON

DA

TE

DE

SC

RI

PT

IO

N

PM

PR

OJ

EC

T

NU

MB

ER

IS

SU

ED

F

OR

D

TM

B/ D

N R

ST

H

EL

EN

B R

ID

G

E O

VE

R

M

AR

SH

C

R

EE

K

RO

SC

OM

MO

N

CO

UN

TY

, M

I

CO

VE

R

.25 .00

AP

DT

MB

F

ILE

N O.

: 7

/25

6.R

LO

/08 /05

CO

NS

TR

UC

TI

ON

PL

UR

IB

U

E S

U N U

M

C I

R C

U M

S P

I C

E

SI

Q

U E R

E I S

PE

NI

N

SU

LA

M

AM

OE

NA

M

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A C

IL

IT

IE

S

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

Sheet List Table Sheet Number Sheet Title http://www.ohm-advisors.com AutoCAD SHX Text

PROJECT LOCATION

./250050COV.DWG#,Cover AutoCAD SHX Text

./250050COV.DWG#,Cover AutoCAD SHX Text

COVER

AutoCAD SHX Text

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

AutoCAD SHX Text

TYPICAL SECTIONS

AutoCAD SHX Text

AutoCAD SHX Text

GENERAL PLAN OF SITE

AutoCAD SHX Text

AutoCAD SHX Text

SOIL BORING LOGS

AutoCAD SHX Text

AutoCAD SHX Text

GENERAL PLAN OF STRUCTURE

AutoCAD SHX Text

AutoCAD SHX Text

GUARDRAIL PLAN

AutoCAD SHX Text

AutoCAD SHX Text

GRADING PLAN

AutoCAD SHX Text

1. THE DESIGN OF THIS STRUCTURE IS BASED ON 1.2 TIMES THE CURRENT AASHTO LRFD BRIDGE THE DESIGN OF THIS STRUCTURE IS BASED ON 1.2 TIMES THE CURRENT AASHTO LRFD BRIDGE DESIGN SPECIFICATION HL-93 LOADING WITH THE EXCEPTION THAT THE DESIGN TANDEM PORTION OF THE HL-93 LOAD DEFINITION IS REPLACED BY A SINGLE 60 KIP AXLE LOAD BEFORE APPLICATION OF THIS 1.2 FACTOR. THE RESULTING LOAD IS DESIGNATED HL-93 MOD. LIVE LOAD PLUS DYNAMIC LOAD ALLOWANCE DEFLECTION DOES NOT EXCEED 1/800 OF SPAN LENGTH. 2. EXCEPT WHERE OTHERWISE INDICATED ON THESE PLANS, OR IN THE PROPOSAL AND EXCEPT WHERE OTHERWISE INDICATED ON THESE PLANS, OR IN THE PROPOSAL AND SUPPLEMENTAL SPECIFICATIONS CONTAINED HEREIN, PERFORM ALL WORK ACCORDING TO THE MICHIGAN DEPARTMENT OF TRANSPORTATION 2020 STANDARD SPECIFICATIONS FOR CONSTRUCTION. 3. THE REGULATED WASTE ACTIVITY IDENTIFICATION NUMBERS FOR THIS PROJECT ARE AS THE REGULATED WASTE ACTIVITY IDENTIFICATION NUMBERS FOR THIS PROJECT ARE AS FOLLOWS: CONTROL SECTION NUMBER: 4. BEVEL ALL EXPOSED CONCRETE CORNERS SHOWN SQUARE ON THE PLANS WITH ½” BEVEL ALL EXPOSED CONCRETE CORNERS SHOWN SQUARE ON THE PLANS WITH ½” TRIANGULAR MOLDINGS EXCEPT AS OTHERWISE NOTED. 5. OLD PLANS DO NOT EXIST FOR THIS STRUCTURE. OLD PLANS DO NOT EXIST FOR THIS STRUCTURE. 6. THE BRIDGE PAINT MAY CONTAIN LEAD. THE BRIDGE PAINT MAY CONTAIN LEAD. 7. UNLESS OTHERWISE SHOWN ON THE PLANS, PROVIDE MINIMUM CONCRETE CLEAR COVER FOR UNLESS OTHERWISE SHOWN ON THE PLANS, PROVIDE MINIMUM CONCRETE CLEAR COVER FOR REINFORCEMENT ACCORDING TO THE FOLLOWING: CONCRETE CAST AGAINST EARTH: 3 IN. ALL OTHER UNLESS SHOWN ON PLANS: 2 IN. 8. THIS PROJECT HAS BEEN EVALUATED USING THE FAA OBSTRUCTION EVALUATION THIS PROJECT HAS BEEN EVALUATED USING THE FAA OBSTRUCTION EVALUATION PRE-SCREENING TOOL FOR A STRUCTURE HEIGHT OF 150 FEET ABOVE A GROUND LEVEL ELEVATION OF 1185 FEET AND NO PERMITS ARE REQUIRED.

AutoCAD SHX Text 9-21

AutoCAD SHX Text

STANDARD DETAILS

AutoCAD SHX Text Registration No.

AutoCAD SHX Text Date

AutoCAD SHX Text 2026-08-05

AutoCAD SHX Text

JAMES E. RINTALA, P.E.

AutoCAD SHX Text 6201044654

DR

AW

IN

G

PA

TH

P

:\7

1_

\71

_S tH ele nB rid ge ov er

Ma rsh

Cr ee k\D ra wi ng s\C ivi l\P lan s_ Co ns t\2

0C

ON

.dw g

A ug us t 1

0, 1:1 3 P

M

CO

PY

RI

G

HT

O

HM

. A

LL

D

RA

W

IN

G S

AN

D

W

RI

TT

EN

M

AT

ER

IA

LS

A

PP

EA

RI

NG

H

ER

EI

N

CO

NS

TI

TU

TE

T

HE

O

RI

G

IN

AL

A

ND

U

NP

UB

LI

SH

ED

W O

RK

O

F O

HM

A

ND

T

HE

S

AM

E

M

AY

N O

T

BE

D

UP

LI

CA

TE

D, D

IS

TR

IB

UT

ED

, O R

DI

SC

LO

SE

D W

IT

HO

UT

P

RI

O

R W

RI

TT

EN

C

O

NS

EN

T

O F

O

HM

RE

VI

SI

ON

DA

TE

DE

SC

RI

PT

IO

N

PM

PR

OJ

EC

T

NU

MB

ER

IS

SU

ED

F

OR

ARCHITECTS ENGINEERS PLANNERS

OHM-ADVISORS.COM

R

D

TM

B/ D

N R

ST

H

EL

EN

B R

ID

G

E O

VE

R

M

AR

SH

C

R

EE

K

RO

SC

OM

MO

N

CO

UN

TY

, M

I

LE

GE

ND

.25 .00

AP

.08 .05

CO

NS

TR

UC

TI

ON

1/2

.R

LO

PL

UR

IB

U E

S U

N U M

C I

R C

U M

S P

I C

E

SI

Q

U

ER

EI

S

P E N

IN

SU

L

AM

A M

OE

N

A M

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O F

M

IC

H

IG

A N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A C

IL

IT

IE

S

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

AutoCAD SHX Text

CURB AND GUTTER, REM

AutoCAD SHX Text

ADA SIDEWALK RAMP

AutoCAD SHX Text

FLAMMABLE MATERIAL

AutoCAD SHX Text

HAZARDOUS OR

AutoCAD SHX Text

%%UREAL ESTATE SYMBOLS

AutoCAD SHX Text

CONTIGUOUS PROPERTY SYMBOL

AutoCAD SHX Text

PARCEL NUMBER BOX

AutoCAD SHX Text

XXXX

AutoCAD SHX Text

%%UMISCELLANEOUS UTILITY SYMBOLS

AutoCAD SHX Text

GUY WIRE

AutoCAD SHX Text C

AutoCAD SHX Text

CABLE TV RISER

AutoCAD SHX Text

CONIFEROUS TREE

AutoCAD SHX Text

CONIFEROUS SHRUB

AutoCAD SHX Text

DECIDUOUS TREE

AutoCAD SHX Text

DECIDUOUS SHRUB

AutoCAD SHX Text E

AutoCAD SHX Text

ELECTRIC RISER

AutoCAD SHX Text E

AutoCAD SHX Text

ELECTRIC METER

AutoCAD SHX Text

FP

AutoCAD SHX Text

FLAG POLE

AutoCAD SHX Text

FLOOD LIGHT

AutoCAD SHX Text G

AutoCAD SHX Text

GAS METER

AutoCAD SHX Text

GAS RISER

AutoCAD SHX Text

GAS VALVE

AutoCAD SHX Text

GP

AutoCAD SHX Text

GUY POLE

AutoCAD SHX Text

HAND HOLE

AutoCAD SHX Text

IRON ROD/PIPE

AutoCAD SHX Text

LIGHT/DECOR LAMP POLE

AutoCAD SHX Text

MAIL/NEWSPAPER BOX

AutoCAD SHX Text G

AutoCAD SHX Text

GAS VENT

AutoCAD SHX Text

MON

AutoCAD SHX Text

MONUMENT

AutoCAD SHX Text W

AutoCAD SHX Text

MONITORING WELL

AutoCAD SHX Text

PB

AutoCAD SHX Text

PHONE BOOTH

AutoCAD SHX Text

PK

AutoCAD SHX Text

PK NAIL

AutoCAD SHX Text

POST

AutoCAD SHX Text U

AutoCAD SHX Text

SOIL BORING

AutoCAD SHX Text

SECTION CORNER

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

STUMP

AutoCAD SHX Text

TRAFFIC SIGNAL

AutoCAD SHX Text E

AutoCAD SHX Text

TRANSFORMER PAD

AutoCAD SHX Text

TRAVERSE POINT

AutoCAD SHX Text

UNDERGROUND MARKER

AutoCAD SHX Text U

AutoCAD SHX Text

PRIVATE UTILITY MANHOLE

AutoCAD SHX Text

UTILITY POLE

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text

RAILROAD CROSSING

AutoCAD SHX Text

%%UMISCELLANEOUS SYMBOLS

AutoCAD SHX Text

RIPRAP

AutoCAD SHX Text

WETLAND

AutoCAD SHX Text

BENCHMARK

AutoCAD SHX Text

USED WITH UNDERGROUND GAS &

AutoCAD SHX Text

ELECTRICAL LINES

AutoCAD SHX Text

USED WITH TELEPHONE &

AutoCAD SHX Text

%%UUTILITY PATTERN

AutoCAD SHX Text

ELECTRICAL *

AutoCAD SHX Text

GAS\OIL

AutoCAD SHX Text

WATER

AutoCAD SHX Text

FIBER OPTIC *

AutoCAD SHX Text

%%UROW PATTERN

AutoCAD SHX Text

ROW

AutoCAD SHX Text

SECTION

AutoCAD SHX Text

ROW

AutoCAD SHX Text

%%UTOPO PATTERN

AutoCAD SHX Text

HEDGE/TREE

AutoCAD SHX Text

FENCE

AutoCAD SHX Text

GUARDRAIL

AutoCAD SHX Text

CENTERLINE OF DITCH

AutoCAD SHX Text

GRADING LIMIT

AutoCAD SHX Text

RAILROAD

AutoCAD SHX Text

%%UREMOVAL LEGEND

AutoCAD SHX Text

SALVAGE

AutoCAD SHX Text

BULKHEAD

AutoCAD SHX Text

ABANDON

AutoCAD SHX Text

CLEARING

AutoCAD SHX Text

REMOVE

AutoCAD SHX Text

SALVAGE

AutoCAD SHX Text

BULKHEAD

AutoCAD SHX Text

ABANDON

AutoCAD SHX Text

REMOVE

AutoCAD SHX Text

ADJUST

AutoCAD SHX Text

RELOCATE

AutoCAD SHX Text

ADJUST BY OTHERS

AutoCAD SHX Text

RELOCATE BY OTHERS

AutoCAD SHX Text

SANITARY

AutoCAD SHX Text

STORM

AutoCAD SHX Text

PROPERTY/PARCEL

AutoCAD SHX Text

(SLOPE STAKE)

AutoCAD SHX Text

UNDERGROUND UTILITY

AutoCAD SHX Text

CAUTION - CRITICAL

AutoCAD SHX Text

%%USPECIAL LEGEND

AutoCAD SHX Text

NO ROW IMPACTS

AutoCAD SHX Text

XXXX

AutoCAD SHX Text

FLOW DIRECTION

AutoCAD SHX Text

REMOVE BY OTHERS

AutoCAD SHX Text

SIDEWALK REMOVAL

AutoCAD SHX Text

COLD MILLING HMA SURFACE

AutoCAD SHX Text

PAVEMENT REMOVAL

AutoCAD SHX Text

HMA BASE CRUSHING AND SHAPING

AutoCAD SHX Text

HMA SURFACE REMOVAL

AutoCAD SHX Text

WETLAND/EDGE OF WATER

AutoCAD SHX Text

CENTERLINE OF DITCH

AutoCAD SHX Text

GUARDRAIL

AutoCAD SHX Text

FENCE

AutoCAD SHX Text

%%UPROPOSED

AutoCAD SHX Text

%%UEXISTING

AutoCAD SHX Text

ROW

AutoCAD SHX Text

ROW

AutoCAD SHX Text

%%UPROPOSED

AutoCAD SHX Text

%%UEXISTING

AutoCAD SHX Text

12" STM

AutoCAD SHX Text

12" SAN

AutoCAD SHX Text

12" WM

AutoCAD SHX Text

*O.H. = OVERHEAD , U.G. = UNDERGROUND

AutoCAD SHX Text

6" (COMPANY) GAS

AutoCAD SHX Text

FIBER OPTIC

AutoCAD SHX Text

ELEC

AutoCAD SHX Text

CABLE/TELEPHONE *

AutoCAD SHX Text

(COMPANY) CABLE/TEL

AutoCAD SHX Text

%%UEXISTING

AutoCAD SHX Text

%%UPROPOSED

AutoCAD SHX Text

STORM/SANITARY/WATER

AutoCAD SHX Text 12"

AutoCAD SHX Text

RIPRAP

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

AutoCAD SHX Text

FLOW DIRECTION

AutoCAD SHX Text

FIBER OPTIC LINES

AutoCAD SHX Text

STRUCTURE NUMBER

AutoCAD SHX Text

WM

AutoCAD SHX Text

SAN

AutoCAD SHX Text

STM

AutoCAD SHX Text

%%UEXISTING

AutoCAD SHX Text

%%UPROPOSED

AutoCAD SHX Text

%%UEXISTING

AutoCAD SHX Text U

AutoCAD SHX Text

UTILITY POLE W/LIGHT

AutoCAD SHX Text F

AutoCAD SHX Text

PEDESTRIAN RISER

AutoCAD SHX Text P

AutoCAD SHX Text

TS

AutoCAD SHX Text

TRAFFIC SIGNAL CONTROLLER

AutoCAD SHX Text T

AutoCAD SHX Text

TELEPHONE RISER

AutoCAD SHX Text

%%UWATER & SEWER UTILITY SYMBOLS

AutoCAD SHX Text

%%UEXISTING

AutoCAD SHX Text

ST

AutoCAD SHX Text

STORM MANHOLE

AutoCAD SHX Text

ROUND CATCH BASIN

AutoCAD SHX Text

SQUARE CATCH BASIN

AutoCAD SHX Text S

AutoCAD SHX Text

SANITARY MANHOLE

AutoCAD SHX Text

FIRE HYDRANT

AutoCAD SHX Text

INLET/CATCH BASIN

AutoCAD SHX Text

STORM MANHOLE

AutoCAD SHX Text

SANITARY MANHOLE

AutoCAD SHX Text

CULVERT

AutoCAD SHX Text

GW

AutoCAD SHX Text

GATE VALVE & WELL

AutoCAD SHX Text

METER PIT

AutoCAD SHX Text

CULVERT END SECTION

AutoCAD SHX Text

GATE VALVE & WELL

AutoCAD SHX Text

CO

AutoCAD SHX Text

CLEAN OUT

AutoCAD SHX Text

MP

AutoCAD SHX Text

CULVERT W/O END SECTION

AutoCAD SHX Text

SH

AutoCAD SHX Text

SPRINKLER HEAD

AutoCAD SHX Text

WATER METER

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text

IRRIGATION VALVE

AutoCAD SHX Text

CULVERT W/END SECTION

AutoCAD SHX Text

WATER STOP BOX

AutoCAD SHX Text

GATE VALVE & BOX

AutoCAD SHX Text

%%UPROPOSED

AutoCAD SHX Text

GATE VALVE & BOX

AutoCAD SHX Text

TAPPING SLEEVE VALVE & WELL

AutoCAD SHX Text

TAPPING SLEEVE VALVE & BOX

AutoCAD SHX Text

FIRE HYDRANT

AutoCAD SHX Text G

AutoCAD SHX Text

RELOCATE

AutoCAD SHX Text

RECONSTRUCT

AutoCAD SHX Text

RELOCATE BY OTHERS

AutoCAD SHX Text

ADJUST BY OTHERS

AutoCAD SHX Text

%%UIF NECESSARY FOR CLARITY

AutoCAD SHX Text

BM#

AutoCAD SHX Text

SB#

AutoCAD SHX Text

TP#

AutoCAD SHX Text

XX

AutoCAD SHX Text

XX

AutoCAD SHX Text

XXX

AutoCAD SHX Text

GV&W

AutoCAD SHX Text

GV&B

AutoCAD SHX Text

TSV&W

AutoCAD SHX Text

TSV&B

AutoCAD SHX Text S

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text

REL

AutoCAD SHX Text

REC

AutoCAD SHX Text

REL B/O

AutoCAD SHX Text

ADJ B/O

AutoCAD SHX Text 12"

AutoCAD SHX Text PRIMARY UTILITY WILL HAVE A CONTINUOUS LINESTYLE, WITH THE SECONDARY UTILITY MATCHING ITS RESPECTIVE EXISTING UTILITY LINESTYLE

AutoCAD SHX Text

CL 1

AutoCAD SHX Text

CL 2

AutoCAD SHX Text

CL 3

AutoCAD SHX Text

1" TO 5"

AutoCAD SHX Text

6" TO 17"

AutoCAD SHX Text

18" TO 35"

AutoCAD SHX Text

CL 4

AutoCAD SHX Text

36" AND UP

AutoCAD SHX Text

EXCAVATION, EARTH, MODIFIED

AutoCAD SHX Text

RECONSTRUCT

AutoCAD SHX Text

XXXXXX

AutoCAD SHX Text

XXXXXX

AutoCAD SHX Text

XXXXXX

AutoCAD SHX Text

XXXXXX

AutoCAD SHX Text

XXXXXX

AutoCAD SHX Text

XXXXXX

AutoCAD SHX Text

XXXXXX

AutoCAD SHX Text

XXXXXX

AutoCAD SHX Text

XXXXXX

AutoCAD SHX Text

XXXXXX

AutoCAD SHX Text R-

AutoCAD SHX Text A-

AutoCAD SHX Text B-

AutoCAD SHX Text

ADJ-

AutoCAD SHX Text

ADJ B/O-

AutoCAD SHX Text

REL B/O-

AutoCAD SHX Text S-

AutoCAD SHX Text

REL-

AutoCAD SHX Text

REC-

AutoCAD SHX Text R B/O-

TREE, REM

CULVERT W/O END SECTION

Know what's below.

before you dig.Call

R

DR

AW

IN

G

PA

TH

P

:\7

1_

\71

_S tH ele nB rid ge ov er

Ma rsh

Cr ee k\D ra wi ng s\C ivi l\T yp ica ls\

TY

P.

dw g A ug us t 1 0, 1:1

3 P M

CO

PY

RI

O

HM

. A

LL

D

RA

W

IN

G S

AN

D

W

RI

TT

EN

M

AT

ER

IA

LS

A

PP

EA

RI

NG

H

ER

EI

N

CO

NS

TI

TU

TE

T

HE

O

RI

G

IN

AL

A

ND

U

NP

UB

LI

SH

ED

W O

RK

O

F O

HM

A

ND

T

HE

S

AM

E

M

AY

N O

T

BE

D

UP

LI

CA

TE

D, D

IS

TR

IB

UT

ED

, O R

DI

SC

LO

SE

D W

IT

HO

UT

P

RI

O

R W

RI

TT

EN

C

O

NS

EN

T

O F

O

HM

RE

VI

SI

ON

DA

TE

DE

SC

RI

PT

IO

N

PM

PR

OJ

EC

T

NU

MB

ER

IS

SU

ED

F

OR

ARCHITECTS ENGINEERS PLANNERS

OHM-ADVISORS.COM

R

D

TM

B/ D

N R

ST

H

EL

EN

B R

ID

G

E O

VE

R

M

AR

SH

C

R

EE

K

RO

SC

OM

MO

N

CO

UN

TY

, M

I

TY

PI

CA

L S

EC

TI

ON

S

.25 .00

AP

.08 .05

CO

NS

TR

UC

TI

ON

1/2

.R

LO

PL

UR

IB

U

E S

U N U

M

C I

R C

U M

S P

I C

E

SI

Q

U

ER

E I S

PE

N

IN

SU

LA

M

A M

OE

N

A M

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O F

M

IC

H

IG

A N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A C

IL

IT

IE

S

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

AutoCAD SHX Text

AGGREGATE SURFACE CSE, 12 INCH

AutoCAD SHX Text

PROPOSED TYPICAL SECTION

AutoCAD SHX Text 7.0'

AutoCAD SHX Text

2 (TYP)

AutoCAD SHX Text

AutoCAD SHX Text 7.0'

AutoCAD SHX Text 14.0'

AutoCAD SHX Text

HINGE POINT, TYP

AutoCAD SHX Text

2%%% TYP

AutoCAD SHX Text

SLOPE STAKE LINE, TYP

AutoCAD SHX Text 2.0'

AutoCAD SHX Text

EX GROUND

AutoCAD SHX Text

TO APPLY: STA 0+40.11 (POB) TO STA 1+24.87 STA 1+71.87 TO STA 2+68.95 (POE)

AutoCAD SHX Text

CONST

AutoCAD SHX Text

PROP GUARDRAIL. SEE PLAN FOR LOCATIONS (TYP)

AutoCAD SHX Text

PROPOSED TYPICAL SECTION

AutoCAD SHX Text

TO APPLY: STA 1+24.87 TO STA 1+71.87

AutoCAD SHX Text

PROP GUARDRAIL (TYP). SEE PLAN

AutoCAD SHX Text

PROP BOX CULVERT. SEE CULVERT PLANS

AutoCAD SHX Text

CONST

14.0'

R

60402010

PL

UR

IB

U

E S

U N U

M

C I

R C

U M

S P

I C

E

S I

Q U

E R E I

S

PE

NI

N

SU

LA

M A

M

OE

N A

M

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O F

M

IC

H

IG

A N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A C

IL

IT

IE

S

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

DR

AW

IN

G

PA

TH

P

:\7

1_

\71

_S tH ele nB rid ge ov er

Ma rsh

Cr ee k\D ra wi ng s\C ivi l\P lan s_ Co ns t\2

0C

ON

.dw g

A ug us t 1

0, 1:1 3 P

M

CO

PY

RI

O

HM

. A

LL

D

RA

W

IN

G S

AN

D

W

RI

TT

EN

M

AT

ER

IA

LS

A

PP

EA

RI

NG

H

ER

EI

N

CO

NS

TI

TU

TE

T

HE

O

RI

G

IN

AL

A

ND

U

NP

UB

LI

SH

ED

W O

RK

O

F O

HM

A

ND

T

HE

S

AM

E

M

AY

N O

T

BE

D

UP

LI

CA

TE

D, D

IS

TR

IB

UT

ED

, O R

DI

SC

LO

SE

D W

IT

HO

UT

P

RI

O

R W

RI

TT

EN

C

O

NS

EN

T

O F

O

HM

RE

VI

SI

ON

DA

TE

DE

SC

RI

PT

IO

N

PM

PR

OJ

EC

T

NU

MB

ER

IS

SU

ED

F

OR

ARCHITECTS ENGINEERS PLANNERS

OHM-ADVISORS.COM

R

D

TM

B/ D

N R

ST

H

EL

EN

B R

ID

G

E O

VE

R

M

AR

SH

C

R

EE

K

RO

SC

OM

MO

N

CO

UN

TY

, M

I

GE

NE

RA

L P

LA

N

OF

S

IT

E

.25 .00

AP

.08 .05

CO

NS

TR

UC

TI

ON

1/2

.R

LO

AutoCAD SHX Text

SB#1

AutoCAD SHX Text

SB#2

AutoCAD SHX Text

STATE FOREST RD

AutoCAD SHX Text

MARSH CREEK

AutoCAD SHX Text feet

AutoCAD SHX Text

GRAPHIC SCALE: FULL

AutoCAD SHX Text

AutoCAD SHX Text feet

AutoCAD SHX Text

HALF

AutoCAD SHX Text JOB BENCHMARK #200 COTTON SPINDLE IN THE EAST FACE OF 16" RED OAK ON THE WEST SIDE OF TRAIL +/- 740' NORTH OF CENTERLINE OF MARSH CREEK ELEV 1183.24

AutoCAD SHX Text JOB BENCHMARK #201 COTTON SPINDLE IN WEST FACE OF 9" PINE +/- 100' NORTH OF CENTERLINE OF MARSH CREEK ON EAST SIDE OF TRAIL ELEV 1177.03

AutoCAD SHX Text JOB BENCHMARK #202 COTTON SPINDLE IN WEST FACE OF 6" PINE +/- 75' SOUTH OF CENTERLINE OF MARSH CREEK ON THE EAST SIDE OF TRAIL ELEV 1178.50

AutoCAD SHX Text

TRAVERSE POINT #102 N 390355.31 E 19681581.38 ELEV 1177.20

AutoCAD SHX Text

TRAVERSE POINT #101 N 390801.66 E 19681559.93 ELEV 1177.21

AutoCAD SHX Text

TRAVERSE POINT #100 N 391467.88 E 19681619.11 ELEV 1183.82

AutoCAD SHX Text

FLOW

AutoCAD SHX Text THE WORK COVERED BY THESE PLANS INCLUDES REMOVAL OF THE WORK COVERED BY THESE PLANS INCLUDES REMOVAL OF THE WORK COVERED BY THESE PLANS INCLUDES REMOVAL OF THE COVERED BY THESE PLANS INCLUDES REMOVAL OF THE COVERED BY THESE PLANS INCLUDES REMOVAL OF THE BY THESE PLANS INCLUDES REMOVAL OF THE BY THESE PLANS INCLUDES REMOVAL OF THE THESE PLANS INCLUDES REMOVAL OF THE THESE PLANS INCLUDES REMOVAL OF THE PLANS INCLUDES REMOVAL OF THE PLANS INCLUDES REMOVAL OF THE INCLUDES REMOVAL OF THE INCLUDES REMOVAL OF THE REMOVAL OF THE REMOVAL OF THE OF THE OF THE THE THE EXISTING BRIDGE, CONSTRUCTION OF THE PROPOSED BRIDGE, BRIDGE, CONSTRUCTION OF THE PROPOSED BRIDGE, BRIDGE, CONSTRUCTION OF THE PROPOSED BRIDGE, CONSTRUCTION OF THE PROPOSED BRIDGE, CONSTRUCTION OF THE PROPOSED BRIDGE, OF THE PROPOSED BRIDGE, OF THE PROPOSED BRIDGE, THE PROPOSED BRIDGE, THE PROPOSED BRIDGE, PROPOSED BRIDGE, PROPOSED BRIDGE, BRIDGE, BRIDGE, APPROACH WORK AND MAINTAINING TRAFFIC AND PLACING RIPRAP TO WORK AND MAINTAINING TRAFFIC AND PLACING RIPRAP TO WORK AND MAINTAINING TRAFFIC AND PLACING RIPRAP TO AND MAINTAINING TRAFFIC AND PLACING RIPRAP TO AND MAINTAINING TRAFFIC AND PLACING RIPRAP TO MAINTAINING TRAFFIC AND PLACING RIPRAP TO MAINTAINING TRAFFIC AND PLACING RIPRAP TO TRAFFIC AND PLACING RIPRAP TO TRAFFIC AND PLACING RIPRAP TO AND PLACING RIPRAP TO AND PLACING RIPRAP TO PLACING RIPRAP TO PLACING RIPRAP TO RIPRAP TO RIPRAP TO TO TO THE LIMITS SHOWN. ALL OTHER WORK IS INCLUDED IN THE BRIDGE LIMITS SHOWN. ALL OTHER WORK IS INCLUDED IN THE BRIDGE LIMITS SHOWN. ALL OTHER WORK IS INCLUDED IN THE BRIDGE SHOWN. ALL OTHER WORK IS INCLUDED IN THE BRIDGE SHOWN. ALL OTHER WORK IS INCLUDED IN THE BRIDGE ALL OTHER WORK IS INCLUDED IN THE BRIDGE ALL OTHER WORK IS INCLUDED IN THE BRIDGE OTHER WORK IS INCLUDED IN THE BRIDGE OTHER WORK IS INCLUDED IN THE BRIDGE WORK IS INCLUDED IN THE BRIDGE WORK IS INCLUDED IN THE BRIDGE IS INCLUDED IN THE BRIDGE IS INCLUDED IN THE BRIDGE INCLUDED IN THE BRIDGE INCLUDED IN THE BRIDGE IN THE BRIDGE IN THE BRIDGE THE BRIDGE THE BRIDGE BRIDGE BRIDGE PLANS THAT ARE A PART OF THIS CONTRACT. THE STEEL MULTI-BEAM TEMPORARY BRIDGE WILL BE REMOVED BY THE STEEL MULTI-BEAM TEMPORARY BRIDGE WILL BE REMOVED BY THE STEEL MULTI-BEAM TEMPORARY BRIDGE WILL BE REMOVED BY THE MULTI-BEAM TEMPORARY BRIDGE WILL BE REMOVED BY THE MULTI-BEAM TEMPORARY BRIDGE WILL BE REMOVED BY THE TEMPORARY BRIDGE WILL BE REMOVED BY THE TEMPORARY BRIDGE WILL BE REMOVED BY THE BRIDGE WILL BE REMOVED BY THE BRIDGE WILL BE REMOVED BY THE WILL BE REMOVED BY THE WILL BE REMOVED BY THE BE REMOVED BY THE BE REMOVED BY THE REMOVED BY THE REMOVED BY THE BY THE BY THE THE THE MDNR PRIOR TO CONSTRUCTION. LOCATE ALL ACTIVE UNDERGROUND UTILITIES PRIOR TO STARTING ALL ACTIVE UNDERGROUND UTILITIES PRIOR TO STARTING ALL ACTIVE UNDERGROUND UTILITIES PRIOR TO STARTING ACTIVE UNDERGROUND UTILITIES PRIOR TO STARTING ACTIVE UNDERGROUND UTILITIES PRIOR TO STARTING UNDERGROUND UTILITIES PRIOR TO STARTING UNDERGROUND UTILITIES PRIOR TO STARTING UTILITIES PRIOR TO STARTING UTILITIES PRIOR TO STARTING PRIOR TO STARTING PRIOR TO STARTING TO STARTING TO STARTING STARTING STARTING WORK AND CONDUCT OPERATIONS IN SUCH A MANNER AS TO ENSURE AND CONDUCT OPERATIONS IN SUCH A MANNER AS TO ENSURE AND CONDUCT OPERATIONS IN SUCH A MANNER AS TO ENSURE CONDUCT OPERATIONS IN SUCH A MANNER AS TO ENSURE CONDUCT OPERATIONS IN SUCH A MANNER AS TO ENSURE OPERATIONS IN SUCH A MANNER AS TO ENSURE OPERATIONS IN SUCH A MANNER AS TO ENSURE IN SUCH A MANNER AS TO ENSURE IN SUCH A MANNER AS TO ENSURE SUCH A MANNER AS TO ENSURE SUCH A MANNER AS TO ENSURE A MANNER AS TO ENSURE A MANNER AS TO ENSURE MANNER AS TO ENSURE MANNER AS TO ENSURE AS TO ENSURE AS TO ENSURE TO ENSURE TO ENSURE ENSURE ENSURE THAT THOSE UTILITIES NOT REQUIRING RELOCATION WILL NOT BE THOSE UTILITIES NOT REQUIRING RELOCATION WILL NOT BE THOSE UTILITIES NOT REQUIRING RELOCATION WILL NOT BE UTILITIES NOT REQUIRING RELOCATION WILL NOT BE UTILITIES NOT REQUIRING RELOCATION WILL NOT BE NOT REQUIRING RELOCATION WILL NOT BE NOT REQUIRING RELOCATION WILL NOT BE REQUIRING RELOCATION WILL NOT BE REQUIRING RELOCATION WILL NOT BE RELOCATION WILL NOT BE RELOCATION WILL NOT BE WILL NOT BE WILL NOT BE NOT BE NOT BE BE BE DISTURBED. MDNR WILL CLOSE ROAD TRAFFIC DURING THE DURATION OF WILL CLOSE ROAD TRAFFIC DURING THE DURATION OF WILL CLOSE ROAD TRAFFIC DURING THE DURATION OF CLOSE ROAD TRAFFIC DURING THE DURATION OF CLOSE ROAD TRAFFIC DURING THE DURATION OF ROAD TRAFFIC DURING THE DURATION OF ROAD TRAFFIC DURING THE DURATION OF TRAFFIC DURING THE DURATION OF TRAFFIC DURING THE DURATION OF DURING THE DURATION OF DURING THE DURATION OF THE DURATION OF THE DURATION OF DURATION OF DURATION OF OF OF CONSTRUCTION. PLAN ELEVATIONS REFER TO NAVD 83 DATUM. WATER LEVEL IS SUBJECT TO CHANGE. MAKE A DETERMINATION OF LEVEL IS SUBJECT TO CHANGE. MAKE A DETERMINATION OF LEVEL IS SUBJECT TO CHANGE. MAKE A DETERMINATION OF IS SUBJECT TO CHANGE. MAKE A DETERMINATION OF IS SUBJECT TO CHANGE. MAKE A DETERMINATION OF SUBJECT TO CHANGE. MAKE A DETERMINATION OF SUBJECT TO CHANGE. MAKE A DETERMINATION OF TO CHANGE. MAKE A DETERMINATION OF TO CHANGE. MAKE A DETERMINATION OF CHANGE. MAKE A DETERMINATION OF CHANGE. MAKE A DETERMINATION OF MAKE A DETERMINATION OF MAKE A DETERMINATION OF A DETERMINATION OF A DETERMINATION OF DETERMINATION OF DETERMINATION OF OF OF WATER LEVELS THAT MAY EXIST DURING CONSTRUCTION. IMPLEMENT MEASURES TO PREVENT DEBRIS FROM FALLING FROM THE MEASURES TO PREVENT DEBRIS FROM FALLING FROM THE MEASURES TO PREVENT DEBRIS FROM FALLING FROM THE TO PREVENT DEBRIS FROM FALLING FROM THE TO PREVENT DEBRIS FROM FALLING FROM THE PREVENT DEBRIS FROM FALLING FROM THE PREVENT DEBRIS FROM FALLING FROM THE DEBRIS FROM FALLING FROM THE DEBRIS FROM FALLING FROM THE FROM FALLING FROM THE FROM FALLING FROM THE FALLING FROM THE FALLING FROM THE FROM THE FROM THE THE THE STRUCTURE. IF DEBRIS FALLS INTO THE WATERWAY, REMOVE IT IF DEBRIS FALLS INTO THE WATERWAY, REMOVE IT IF DEBRIS FALLS INTO THE WATERWAY, REMOVE IT IF DEBRIS FALLS INTO THE WATERWAY, REMOVE IT DEBRIS FALLS INTO THE WATERWAY, REMOVE IT DEBRIS FALLS INTO THE WATERWAY, REMOVE IT FALLS INTO THE WATERWAY, REMOVE IT FALLS INTO THE WATERWAY, REMOVE IT INTO THE WATERWAY, REMOVE IT INTO THE WATERWAY, REMOVE IT THE WATERWAY, REMOVE IT THE WATERWAY, REMOVE IT WATERWAY, REMOVE IT WATERWAY, REMOVE IT REMOVE IT REMOVE IT IT IT WITHIN 24 HOURS. SINCE DISTURBANCE OF THE WATERWAY BOTTOM 24 HOURS. SINCE DISTURBANCE OF THE WATERWAY BOTTOM 24 HOURS. SINCE DISTURBANCE OF THE WATERWAY BOTTOM HOURS. SINCE DISTURBANCE OF THE WATERWAY BOTTOM HOURS. SINCE DISTURBANCE OF THE WATERWAY BOTTOM SINCE DISTURBANCE OF THE WATERWAY BOTTOM SINCE DISTURBANCE OF THE WATERWAY BOTTOM SINCE DISTURBANCE OF THE WATERWAY BOTTOM DISTURBANCE OF THE WATERWAY BOTTOM DISTURBANCE OF THE WATERWAY BOTTOM OF THE WATERWAY BOTTOM OF THE WATERWAY BOTTOM THE WATERWAY BOTTOM THE WATERWAY BOTTOM WATERWAY BOTTOM WATERWAY BOTTOM BOTTOM BOTTOM MAY BE AS HARMFUL AS THE DEBRIS ITSELF, THE PREVENTATIVE BE AS HARMFUL AS THE DEBRIS ITSELF, THE PREVENTATIVE BE AS HARMFUL AS THE DEBRIS ITSELF, THE PREVENTATIVE AS HARMFUL AS THE DEBRIS ITSELF, THE PREVENTATIVE AS HARMFUL AS THE DEBRIS ITSELF, THE PREVENTATIVE HARMFUL AS THE DEBRIS ITSELF, THE PREVENTATIVE HARMFUL AS THE DEBRIS ITSELF, THE PREVENTATIVE AS THE DEBRIS ITSELF, THE PREVENTATIVE AS THE DEBRIS ITSELF, THE PREVENTATIVE THE DEBRIS ITSELF, THE PREVENTATIVE THE DEBRIS ITSELF, THE PREVENTATIVE DEBRIS ITSELF, THE PREVENTATIVE DEBRIS ITSELF, THE PREVENTATIVE ITSELF, THE PREVENTATIVE ITSELF, THE PREVENTATIVE THE PREVENTATIVE THE PREVENTATIVE PREVENTATIVE PREVENTATIVE MEASURES MUST BE EFFECTIVE. REMOVAL OF DEBRIS IS INCLUDED MUST BE EFFECTIVE. REMOVAL OF DEBRIS IS INCLUDED MUST BE EFFECTIVE. REMOVAL OF DEBRIS IS INCLUDED BE EFFECTIVE. REMOVAL OF DEBRIS IS INCLUDED BE EFFECTIVE. REMOVAL OF DEBRIS IS INCLUDED EFFECTIVE. REMOVAL OF DEBRIS IS INCLUDED EFFECTIVE. REMOVAL OF DEBRIS IS INCLUDED REMOVAL OF DEBRIS IS INCLUDED REMOVAL OF DEBRIS IS INCLUDED REMOVAL OF DEBRIS IS INCLUDED OF DEBRIS IS INCLUDED OF DEBRIS IS INCLUDED DEBRIS IS INCLUDED DEBRIS IS INCLUDED IS INCLUDED IS INCLUDED INCLUDED INCLUDED IN RELATED ITEMS OF WORK. IMMEDIATELY AFTER THE CONSTRUCTION OF AN ABUTMENT IS AFTER THE CONSTRUCTION OF AN ABUTMENT IS AFTER THE CONSTRUCTION OF AN ABUTMENT IS THE CONSTRUCTION OF AN ABUTMENT IS THE CONSTRUCTION OF AN ABUTMENT IS CONSTRUCTION OF AN ABUTMENT IS CONSTRUCTION OF AN ABUTMENT IS OF AN ABUTMENT IS OF AN ABUTMENT IS AN ABUTMENT IS AN ABUTMENT IS ABUTMENT IS ABUTMENT IS IS IS COMPLETED, PLACE SLOPE PROTECTION AND SEEDING OR SODDING ON PLACE SLOPE PROTECTION AND SEEDING OR SODDING ON PLACE SLOPE PROTECTION AND SEEDING OR SODDING ON SLOPE PROTECTION AND SEEDING OR SODDING ON SLOPE PROTECTION AND SEEDING OR SODDING ON PROTECTION AND SEEDING OR SODDING ON PROTECTION AND SEEDING OR SODDING ON AND SEEDING OR SODDING ON AND SEEDING OR SODDING ON SEEDING OR SODDING ON SEEDING OR SODDING ON OR SODDING ON OR SODDING ON SODDING ON SODDING ON ON ON THE ADJACENT EMBANKMENT SLOPES.

AutoCAD SHX Text

NOTES:

AutoCAD SHX Text

EX BRIDGE AND TEMP BRIDGE TO BE REMOVED

AutoCAD SHX Text

%%UEXISTING STRUCTURES

AutoCAD SHX Text THE EXISTING STRUCTURE IS A RAILCAR FRAME WITH TRANSVERSE WOOD DECK WITH THE STEEL FRAME BEARING ON THE GRADE AT BOTH ENDS OF THE BRIDGE. THE RAILCAR BRIDGE HAS BEEN OVERLAID WITH A STEEL MULTI-BEAM TEMPORARY BRIDGE WITH WOOD DECK AND STEEL TUBE RAILINGS. THE STEEL MULTI-BEAM TEMPORARY BRIDGE WILL BE REMOVED BY THE MDNR PRIOR TO CONSTRUCTION. THE DATE OF CONSTRUCTION OF THE EXISTING BRIDGE IS UNKNOWN.

AutoCAD SHX Text

SITE PLAN

AutoCAD SHX Text

PROFILE

AutoCAD SHX Text

HORIZ: 1" = 20' VERT: 1" = 4'

AutoCAD SHX Text

EX GROUND EL AT CONST

AutoCAD SHX Text

PROP GROUND GRADE AT CONST

AutoCAD SHX Text

OBS WTR SFC EL = 1174.72 (09/11/2025)

AutoCAD SHX Text 100-yr WTR SFC EL = 1177.34

AutoCAD SHX Text

EXISTING GROUND

AutoCAD SHX Text

EDGE OF WATER

AutoCAD SHX Text

EDGE OF WATER

AutoCAD SHX Text

EX BRIDGE TO BE REMOVED

AutoCAD SHX Text

WETLAND BOUNDARY

AutoCAD SHX Text

WETLAND BOUNDARY

AutoCAD SHX Text

RIPRAP, PLAIN ON GEOTEXTILE LINER, TYP

AutoCAD SHX Text

REF PT A

AutoCAD SHX Text

REF PT B

AutoCAD SHX Text

CULV, SEGMENTAL PRECAST CONC BOX, 44 FOOT BY 8 FOOT, SPECIAL

AutoCAD SHX Text

REF LINE A STA 1+24.87

AutoCAD SHX Text 47.0'

AutoCAD SHX Text

REF LINE B STA 1+71.87

AutoCAD SHX Text

B/CULV BEDDING EL: 1168.00

AutoCAD SHX Text

B/CULV EL: 1169.00

AutoCAD SHX Text

CULV IE EL: 1170.50

AutoCAD SHX Text

B/PROP STREAM EL: 1172.50±

AutoCAD SHX Text 2.0'

AutoCAD SHX Text 14.0'

AutoCAD SHX Text 25.0'

AutoCAD SHX Text 14.0'

AutoCAD SHX Text 25.0'

AutoCAD SHX Text

PROP GRAVEL SURFACE

AutoCAD SHX Text

SSL (TYP)

AutoCAD SHX Text

SSL (TYP)

AutoCAD SHX Text

STREAMBED FILL

AutoCAD SHX Text

CULV, BEDDING, BOX CULV

CLEARING LIMIT (TYP)

R

DR

AW

IN

G

PA

TH

P

:\7

1_

\71

_S tH ele nB rid ge ov er

Ma rsh

Cr ee k\D ra wi ng s\C ivi l\M isc

\25

BO

R.

dw g A ug us t 1 0, 1:1

3 P M

CO

PY

RI

O

HM

. A

LL

D

RA

W

IN

G S

AN

D

W

RI

TT

EN

M

AT

ER

IA

LS

A

PP

EA

RI

NG

H

ER

EI

N

CO

NS

TI

TU

TE

T

HE

O

RI

G

IN

AL

A

ND

U

NP

UB

LI

SH

ED

W O

RK

O

F O

HM

A

ND

T

HE

S

AM

E

M

AY

N O

T

BE

D

UP

LI

CA

TE

D, D

IS

TR

IB

UT

ED

, O R

DI

SC

LO

SE

D W

IT

HO

UT

P

RI

O

R W

RI

TT

EN

C

O

NS

EN

T

O F

O

HM

RE

VI

SI

ON

DA

TE

DE

SC

RI

PT

IO

N

PM

PR

OJ

EC

T

NU

MB

ER

IS

SU

ED

F

OR

ARCHITECTS ENGINEERS PLANNERS

OHM-ADVISORS.COM

R

D

TM

B/ D

N R

ST

H

EL

EN

B R

ID

G

E O

VE

R

M

AR

SH

C

R

EE

K

RO

SC

OM

MO

N

CO

UN

TY

, M

I

SO

IL

BO

RI

NG

LO

GS

.25 .00

AP

.06 .19

CO

NS

TR

UC

TI

ON

1/2

.R

LO

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O F

M

IC

H

IG

A N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A C

IL

IT

IE

S

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

AutoCAD SHX Text NOTES: 1. BLOW COUNTS DENOTE NUMBER OF BLOWS BLOW COUNTS DENOTE NUMBER OF BLOWS REQUIRED TO DRIVE A 2" O.D. SPLIT SPOON SAMPLER THROUGH 3 SUCCESSIVE 6-INCH INCREMENTS USING A 140# HAMMER FALLING 30 INCHES. WHERE THE SAMPLER IS DRIVEN DISTANCES OTHER THAN 6 INCH INCREMENTS, THE NUMBER OF BLOWS AND THE DISTANCE ARE SHOWN IN THE FORM OF A FRACTION. 2. CONSISTENCY WAS DETERMINED BY CONSISTENCY WAS DETERMINED BY INSPECTION OF SAMPLES AND SUBSTANTIATED BY SOILS RESISTANCE TO DRILLING TOOLS. 3. THE SOIL BORING LOGS REPRESENT POINT THE SOIL BORING LOGS REPRESENT POINT INFORMATION. PRESENTATION OF THIS INFORMATION IN NO WAY INFERS THAT SUBSURFACE CONDITIONS ARE THE SAME AT LOCATIONS OTHER THAN EXACT LOCATION OF THE BORINGS. 4. LOCATION OF SOIL BORINGS ARE ALSO LOCATION OF SOIL BORINGS ARE ALSO SHOWN ON THE GENERAL PLAN OF SITE SHEET. 5. WATER LEVELS MAY BE INFLUENCED BY WATER LEVELS MAY BE INFLUENCED BY RESIDUAL BORING WATER.

AutoCAD SHX Text P

AutoCAD SHX Text L

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text B

AutoCAD SHX Text U

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text U

AutoCAD SHX Text M

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text M

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text Q

AutoCAD SHX Text U

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text

B/CULV BEDDING EL: 1168.00

AutoCAD SHX Text

B/CULV EL: 1169.00

AutoCAD SHX Text

CULV IE EL: 1170.50

AutoCAD SHX Text

B/PROP STREAM EL: 1172.50±

AutoCAD SHX Text

B/CULV BEDDING EL: 1168.00

AutoCAD SHX Text

B/CULV EL: 1169.00

AutoCAD SHX Text

CULV IE EL: 1170.50

B/PROP STREAM EL: 1172.50±

R

PL

UR

IB

U

E S

U N U

M

C I

R C

U M

S P

I C

E

SI

Q

U

ER

E I S

PE

N

IN

SU

LA

M

A M

OE

N

A M

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O F

M

IC

H

IG

A N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A C

IL

IT

IE

S

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

DR

AW

IN

G

PA

TH

P

:\7

1_

\71

_S tH ele nB rid ge ov er

Ma rsh

Cr ee k\D ra wi ng s\C ivi l\P lan s_ Co ns t\2

0C

ON

.dw g

A ug us t 1

0, 1:1 3 P

M

CO

PY

RI

O

HM

. A

LL

D

RA

W

IN

G S

AN

D

W

RI

TT

EN

M

AT

ER

IA

LS

A

PP

EA

RI

NG

H

ER

EI

N

CO

NS

TI

TU

TE

T

HE

O

RI

G

IN

AL

A

ND

U

NP

UB

LI

SH

ED

W O

RK

O

F O

HM

A

ND

T

HE

S

AM

E

M

AY

N O

T

BE

D

UP

LI

CA

TE

D, D

IS

TR

IB

UT

ED

, O R

DI

SC

LO

SE

D W

IT

HO

UT

P

RI

O

R W

RI

TT

EN

C

O

NS

EN

T

O F

O

HM

RE

VI

SI

ON

DA

TE

DE

SC

RI

PT

IO

N

PM

PR

OJ

EC

T

NU

MB

ER

IS

SU

ED

F

OR

ARCHITECTS ENGINEERS PLANNERS

OHM-ADVISORS.COM

R

D

TM

B/ D

N R

ST

H

EL

EN

B R

ID

G

E O

VE

R

M

AR

SH

C

R

EE

K

RO

SC

OM

MO

N

CO

UN

TY

, M

I

GE

NE

RA

L P

LA

N

OF

S

TR

UC

TU

RE

.25 .00

AP

.08 .05

CO

NS

TR

UC

TI

ON

1/2

.R

LO

AutoCAD SHX Text

SB#1

AutoCAD SHX Text

SB#2

AutoCAD SHX Text

STATE FOREST RD

AutoCAD SHX Text

MARSH CREEK

AutoCAD SHX Text

FLOW

AutoCAD SHX Text

PLAN

AutoCAD SHX Text

ELEVATION

AutoCAD SHX Text

OBS WTR SFC EL = 1174.72 (09/11/2025)

AutoCAD SHX Text

EXISTING GROUND

AutoCAD SHX Text

EDGE OF WATER

AutoCAD SHX Text

EDGE OF WATER

AutoCAD SHX Text

WETLAND BOUNDARY

AutoCAD SHX Text

WETLAND BOUNDARY

AutoCAD SHX Text JOB BENCHMARK #200 COTTON SPINDLE IN THE EAST FACE OF 16" RED OAK ON THE WEST SIDE OF TRAIL +/- 740' NORTH OF CENTERLINE OF MARSH CREEK ELEV 1183.24

AutoCAD SHX Text JOB BENCHMARK #201 COTTON SPINDLE IN WEST FACE OF 9" PINE +/- 100' NORTH OF CENTERLINE OF MARSH CREEK ON EAST SIDE OF TRAIL ELEV 1177.03

AutoCAD SHX Text JOB BENCHMARK #202 COTTON SPINDLE IN WEST FACE OF 6" PINE +/- 75' SOUTH OF CENTERLINE OF MARSH CREEK ON THE EAST SIDE OF TRAIL ELEV 1178.50

AutoCAD SHX Text

TRAVERSE POINT #102 N 390355.31 E 19681581.38 ELEV 1177.20

AutoCAD SHX Text

TRAVERSE POINT #101 N 390801.66 E 19681559.93 ELEV 1177.21

AutoCAD SHX Text

TRAVERSE POINT #100 N 391467.88 E 19681619.11 ELEV 1183.82

AutoCAD SHX Text

2'-0" RIPRAP, PLAIN ON GEOTEXTILE LINER, TYP

AutoCAD SHX Text

REF PT A STA 1+24.87 N 390572.472 E 19681571.607

AutoCAD SHX Text

REF PT B STA 1+71.87 N 390619.471 E 19681571.311

AutoCAD SHX Text

REF LINE A

AutoCAD SHX Text

REF LINE B

AutoCAD SHX Text 90°

AutoCAD SHX Text 100-yr WTR SFC EL = 1177.34

AutoCAD SHX Text

B/CULV BEDDING EL: 1168.00

AutoCAD SHX Text

B/CULV EL: 1169.00

AutoCAD SHX Text

CULV IE EL: 1170.50

AutoCAD SHX Text

B/PROP STREAM EL: 1172.50±

AutoCAD SHX Text 47'-0"

AutoCAD SHX Text

REF LINE A STA 1+24.87

AutoCAD SHX Text

REF LINE B STA 1+71.87

AutoCAD SHX Text

SECTION - CULVERT

AutoCAD SHX Text

CULV IE UP AND DOWN STREAM EL: 1170.50

AutoCAD SHX Text

B/PROP STREAM EL: 1172.50±

AutoCAD SHX Text

B/CULV BEDDING EL: 1168.00

AutoCAD SHX Text

B/CULV EL: 1169.00

AutoCAD SHX Text

OBS WTR SFC EL = 1174.72 (09/11/2025)

AutoCAD SHX Text 100-yr WTR SFC EL = 1177.34

AutoCAD SHX Text

14'-0" CLR

AutoCAD SHX Text

PROP GUARDRAIL OVER BOX OR SLAB CULVERTS, MODIFIED, TYP

AutoCAD SHX Text

20'-0" CLR

AutoCAD SHX Text 24'-0"

AutoCAD SHX Text

FLOW

AutoCAD SHX Text

2'-0" RIPRAP, PLAIN ON GEOTEXTILE LINER

AutoCAD SHX Text

10'-0" TYP

AutoCAD SHX Text 11'-7"

AutoCAD SHX Text 10'-0"

AutoCAD SHX Text

10'-0" TYP

AutoCAD SHX Text 13'-9"

AutoCAD SHX Text

SSL (TYP)

AutoCAD SHX Text

SSL (TYP)

AutoCAD SHX Text

STREAMBED FILL

AutoCAD SHX Text

CULV, BEDDING, BOX CULV

AutoCAD SHX Text

3'-0" MIN TYP

AutoCAD SHX Text 5'-0"

AutoCAD SHX Text

14'-0" CLEAR

AutoCAD SHX Text 5'-0"

AutoCAD SHX Text

135° TYP UNO

AutoCAD SHX Text 100°

AutoCAD SHX Text 10'-0"

AutoCAD SHX Text 25'-0"

AutoCAD SHX Text

STREAMBED FILL

AutoCAD SHX Text

CULV, BEDDING, BOX CULV

AutoCAD SHX Text

4'-0" TYP 3 QUADS

AutoCAD SHX Text 8'-0"

AutoCAD SHX Text

T/WALL EL: 1182.50

AutoCAD SHX Text

T/WALL EL: 1182.50

AutoCAD SHX Text

T/WALL EL: 1182.50

AutoCAD SHX Text

T/WALL EL: 1177.00

AutoCAD SHX Text

T/WALL EL: 1175.00 (3 QUADS)

AutoCAD SHX Text

LOW CORD EL: 1178.50

AutoCAD SHX Text

CULV, SEGMENTAL PRECAST CONC BOX, 44 FOOT BY 8 FOOT, SPECIAL

AutoCAD SHX Text

CULV, SEGMENTAL PRECAST CONC BOX, 44 FOOT BY 8 FOOT, SPECIAL

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

PROPOSED

AutoCAD SHX Text

FLOOD DATA

AutoCAD SHX Text

DISCHARGE (CFS)

AutoCAD SHX Text

WATER SURFACE ELEV AT U/S FACE OF STRUCTURE

AutoCAD SHX Text

VELOCIIY IN D/S CHANNEL IN (FPS)

AutoCAD SHX Text

WATER SURFACE ELEVATON AT U/S FACE OF STRUCTURE

AutoCAD SHX Text

VELOCITY IN D/S CHANNEL N (FPS)

AutoCAD SHX Text

WATERWAY AREA (SFT) AT D/S FACE

AutoCAD SHX Text

CHANGE IN WS EL 0 FT UPS OF PROPOSED STRUCTURE

AutoCAD SHX Text

50—YEARYEAR

AutoCAD SHX Text

AutoCAD SHX Text 1177.08

AutoCAD SHX Text 2.01

AutoCAD SHX Text 1177.06

AutoCAD SHX Text 1.52

AutoCAD SHX Text 189.64

AutoCAD SHX Text -0.02

AutoCAD SHX Text

100—YEARYEAR

AutoCAD SHX Text

AutoCAD SHX Text 1177.35

AutoCAD SHX Text 1.97

AutoCAD SHX Text 1177.34

AutoCAD SHX Text 1.66

AutoCAD SHX Text 189.64

AutoCAD SHX Text -0.01

AutoCAD SHX Text

THE PROPOSED BRIDGE AREA BELOW LOW CHORD IS 189.64 SQUARE FT

AutoCAD SHX Text NARRATIVE Marsh Creek at ORV Trail, Section 13, T23N, R1W, Richfield Township, Roscommon County, has a total drainage area of 9.2 square miles and a contributing drainage area of 8.9 square miles. The 50%, 20%, 10%, 4%, 2%, 1%, 0.5%, and 0.2% chance peak flood discharges are estimated to be 10 cubic feet per second (cfs), 25 cfs, 50 cfs, 110 cfs, 180 cfs, 280 cfs, 390 cfs, and 600 cfs, respectively. (Watershed No. 02 Au Sable).

AutoCAD SHX Text THE WATER SURFACE AND/OR ENERGY GRADE ELEVATIONS SHOWN ON THE ABOVE HYDRAULIC TABLE ARE TO BE USED FOR COMPARISON PURPOSES ONLY AND ARE NOT TO BE USED FOR ESTABLISHING A REGULATORY FLOODPLAIN. THE ELEVATIONS MAY BE USED, PROVIDED THEY ARE VERIFIED WITH THE LAND AND WATER MANAGEMENT DIVISION, MICHIGAN DEPARTMENT OF ENVIRONMENT, GREAT LAKES, AND ENERGY.

AutoCAD SHX Text

EL 1176 MIN

AutoCAD SHX Text

EL 1176 MIN

AutoCAD SHX Text

EL 1176 MIN

AutoCAD SHX Text

EL 1176 MIN

NOTES 1. THE DESIGN OF THIS STRUCTURE IS BASED ON 1.2 THE DESIGN OF THIS STRUCTURE IS BASED ON 1.2 TIMES THE CURRENT AASHTO LRFD BRIDGE DESIGN SPECIFICATION HL-93 LOADING WITH THE EXCEPTION THAT THE DESIGN TANDEM PORTION OF THE HL-93 LOAD DEFINITION IS REPLACED BY A SINGLE 60 KIP AXLE LOAD BEFORE APPLICATION OF THIS 1.2 FACTOR. THE RESULTING LOAD IS DESIGNATED HL-93 MOD. LIVE LOAD PLUS DYNAMIC LOAD ALLOWANCE DEFLECTION DOES NOT EXCEED 1/800 OF SPAN LENGTH. 2. EXCEPT WHERE OTHERWISE INDICATED ON THESE EXCEPT WHERE OTHERWISE INDICATED ON THESE PLANS, OR IN THE PROPOSAL AND SUPPLEMENTAL SPECIFICATIONS CONTAINED HEREIN, PERFORM ALL WORK ACCORDING TO THE MICHIGAN DEPARTMENT OF TRANSPORTATION 2020 STANDARD SPECIFICATIONS FOR CONSTRUCTION. 3. BEVEL ALL EXPOSED CONCRETE CORNERS SHOWN BEVEL ALL EXPOSED CONCRETE CORNERS SHOWN SQUARE ON THE PLANS WITH ½” TRIANGULAR TRIANGULAR MOLDINGS EXCEPT AS OTHERWISE NOTED. 4. OLD PLANS DO NOT EXIST FOR THIS STRUCTURE. OLD PLANS DO NOT EXIST FOR THIS STRUCTURE. 5. THE BRIDGE PAINT MAY CONTAIN LEAD. THE BRIDGE PAINT MAY CONTAIN LEAD. 6. UNLESS OTHERWISE SHOWN ON THE PLANS, PROVIDE UNLESS OTHERWISE SHOWN ON THE PLANS, PROVIDE MINIMUM CONCRETE CLEAR COVER FOR REINFORCEMENT ACCORDING TO THE FOLLOWING: CONCRETE CAST AGAINST EARTH: 3 IN. ALL OTHER UNLESS SHOWN ON PLANS: 2 IN. 7. WHEN CASTING ITEMS INTO STRUCTURAL PRECAST CONCRETE TO WHEN CASTING ITEMS INTO STRUCTURAL PRECAST CONCRETE TO FACILITATE CONSTRUCTION (FORMING, FINISHING, ETC.) USE ITEMS THAT ARE GALVANIZED IN ACCORDANCE WITH ASTM B633, SERVICE CONDITION 4 OR EPOXY COATED. CAST INSERTS WITH THE PRECAST ELEMENTS. DO NOT FIELD INSTALL INSERTS. 8. A COFFERDAM HAS NOT BEEN PROVIDED FOR THIS STRUCTURE. A COFFERDAM HAS NOT BEEN PROVIDED FOR THIS STRUCTURE. SUBMIT METHODS OF STREAM DIVERSION TO THE ENGINEER FOR APPROVAL. 9. CONTACT THE SOILS ENGINEER TO PERFORM A FOOTING CHECK AT CONTACT THE SOILS ENGINEER TO PERFORM A FOOTING CHECK AT LEAST 48 HOURS PRIOR TO EXCAVATING TO THE BOTTOM OF THE EXCAVATION.

R

PL

UR

IB

U

E S

U N U

M

C I

R C

U M

S P

I C

E

SI

Q

U

ER

E I S

PE

N

IN

SU

LA

M

A M

OE

N

A M

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O F

M

IC

H

IG

A N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A C

IL

IT

IE

S

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

DR

AW

IN

G

PA

TH

P

:\7

1_

\71

_S tH ele nB rid ge ov er

Ma rsh

Cr ee k\D ra wi ng s\C ivi l\P lan s_ Co ns t\2

0C

ON

.dw g

A ug us t 1

0, 1:1 3 P

M

CO

PY

RI

O

HM

. A

LL

D

RA

W

IN

G S

AN

D

W

RI

TT

EN

M

AT

ER

IA

LS

A

PP

EA

RI

NG

H

ER

EI

N

CO

NS

TI

TU

TE

T

HE

O

RI

G

IN

AL

A

ND

U

NP

UB

LI

SH

ED

W O

RK

O

F O

HM

A

ND

T

HE

S

AM

E

M

AY

N O

T

BE

D

UP

LI

CA

TE

D, D

IS

TR

IB

UT

ED

, O R

DI

SC

LO

SE

D W

IT

HO

UT

P

RI

O

R W

RI

TT

EN

C

O

NS

EN

T

O F

O

HM

RE

VI

SI

ON

DA

TE

DE

SC

RI

PT

IO

N

PM

PR

OJ

EC

T

NU

MB

ER

IS

SU

ED

F

OR

ARCHITECTS ENGINEERS PLANNERS

OHM-ADVISORS.COM

R

D

TM

B/ D

N R

ST

H

EL

EN

B R

ID

G

E O

VE

R

M

AR

SH

C

R

EE

K

RO

SC

OM

MO

N

CO

UN

TY

, M

I

GU

AR

DR

AI

L P

LA

N

.25 .00

AP

.08 .05

CO

NS

TR

UC

TI

ON

1/2

.R

LO

AutoCAD SHX Text

SB#1

AutoCAD SHX Text

SB#2

AutoCAD SHX Text

STATE FOREST RD

AutoCAD SHX Text

MARSH CREEK

AutoCAD SHX Text

FLOW

AutoCAD SHX Text

PLAN

AutoCAD SHX Text

ELEVATION

AutoCAD SHX Text

EXISTING GROUND

AutoCAD SHX Text JOB BENCHMARK #200 COTTON SPINDLE IN THE EAST FACE OF 16" RED OAK ON THE WEST SIDE OF TRAIL +/- 740' NORTH OF CENTERLINE OF MARSH CREEK ELEV 1183.24

AutoCAD SHX Text JOB BENCHMARK #201 COTTON SPINDLE IN WEST FACE OF 9" PINE +/- 100' NORTH OF CENTERLINE OF MARSH CREEK ON EAST SIDE OF TRAIL ELEV 1177.03

AutoCAD SHX Text JOB BENCHMARK #202 COTTON SPINDLE IN WEST FACE OF 6" PINE +/- 75' SOUTH OF CENTERLINE OF MARSH CREEK ON THE EAST SIDE OF TRAIL ELEV 1178.50

AutoCAD SHX Text

TRAVERSE POINT #102 N 390355.31 E 19681581.38 ELEV 1177.20

AutoCAD SHX Text

TRAVERSE POINT #101 N 390801.66 E 19681559.93 ELEV 1177.21

AutoCAD SHX Text

TRAVERSE POINT #100 N 391467.88 E 19681619.11 ELEV 1183.82

AutoCAD SHX Text

SSL (TYP)

AutoCAD SHX Text

SSL (TYP)

AutoCAD SHX Text GUARDRAIL APPROACH TERMINAL, TYPE 2M, MODIFIED (INCLUDES 28.1' HEIGHT TRANSITION)

AutoCAD SHX Text GUARDRAIL APPROACH TERMINAL, TYPE 2M, MODIFIED (INCLUDES 28.1' HEIGHT TRANSITION)

AutoCAD SHX Text

GUARDRAIL APPROACH TERMINAL, TYPE 2M, MODIFIED (INCLUDES 28.1' TRANSITION)

AutoCAD SHX Text GUARDRAIL APPROACH TERMINAL, TYPE 2M, MODIFIED (INCLUDES 28.1' HEIGHT TRANSITION)

AutoCAD SHX Text 62.5' GUARDRAIL, TYPE T, 96 INCH POST, MODIFIEDGUARDRAIL, TYPE T, 96 INCH POST, MODIFIED

AutoCAD SHX Text 62.5' GUARDRAIL, TYPE T, 96 INCH POST, MODIFIEDGUARDRAIL, TYPE T, 96 INCH POST, MODIFIED

AutoCAD SHX Text

PROPOSED PLAN GRADE

AutoCAD SHX Text 38 "34"

AutoCAD SHX Text 31"

AutoCAD SHX Text

INVERTED ASYMMETRICAL THRIE BEAM TRANSITION

AutoCAD SHX Text

INVERTED ASYMMETRICAL THRIE BEAM TRANSITION

AutoCAD SHX Text

7 EA GUARDRAIL POST, CULV

AutoCAD SHX Text

7 EA GUARDRAIL POST, CULV

AutoCAD SHX Text 31"

AutoCAD SHX Text 62.5' GUARDRAIL, TYPE T, 96 INCH POST, MODIFIEDGUARDRAIL, TYPE T, 96 INCH POST, MODIFIED

AutoCAD SHX Text

GUARDRAIL APPROACH TERMINAL, TYPE 2M, MODIFIED (INCLUDES 28.1' TRANSITION)

AutoCAD SHX Text

GUARDRAIL APPROACH TERMINAL, TYPE 2M, MODIFIED (INCLUDES 28.1' TRANSITION)

AutoCAD SHX Text

28.1' TRANSITION

AutoCAD SHX Text

28.1' TRANSITION

AutoCAD SHX Text

7 EA GUARDRAIL POST, CULV

AutoCAD SHX Text

28.1' HEIGHT TRANSITION

28.1' TRANSITION

R

PL

UR

IB

U

E S

U N U

M

C I

R C

U M

S P

I C

E

SI

Q

U

ER

E I S

PE

N

IN

SU

LA

M

A M

OE

N

A M

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O F

M

IC

H

IG

A N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A C

IL

IT

IE

S

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

DR

AW

IN

G

PA

TH

P

:\7

1_

\71

_S tH ele nB rid ge ov er

Ma rsh

Cr ee k\D ra wi ng s\C ivi l\G ra din g\2

0G

RA

D.

dw g A ug us t 1 0, 1:1

3 P M

CO

PY

RI

O

HM

. A

LL

D

RA

W

IN

G S

AN

D

W

RI

TT

EN

M

AT

ER

IA

LS

A

PP

EA

RI

NG

H

ER

EI

N

CO

NS

TI

TU

TE

T

HE

O

RI

G

IN

AL

A

ND

U

NP

UB

LI

SH

ED

W O

RK

O

F O

HM

A

ND

T

HE

S

AM

E

M

AY

N O

T

BE

D

UP

LI

CA

TE

D, D

IS

TR

IB

UT

ED

, O R

DI

SC

LO

SE

D W

IT

HO

UT

P

RI

O

R W

RI

TT

EN

C

O

NS

EN

T

O F

O

HM

RE

VI

SI

ON

DA

TE

DE

SC

RI

PT

IO

N

PM

PR

OJ

EC

T

NU

MB

ER

IS

SU

ED

F

OR

ARCHITECTS ENGINEERS PLANNERS

OHM-ADVISORS.COM

R

D

TM

B/ D

N R

ST

H

EL

EN

B R

ID

G

E O

VE

R

M

AR

SH

C

R

EE

K

RO

SC

OM

MO

N

CO

UN

TY

, M

I

GR

AD

IN

G

PL

AN

.25 .00

AP

.08 .05

CO

NS

TR

UC

TI

ON

1/2

.R

LO

AutoCAD SHX Text

SB#1

AutoCAD SHX Text

SB#2

AutoCAD SHX Text

STATE FOREST RD

AutoCAD SHX Text

MARSH CREEK

AutoCAD SHX Text

FLOW

AutoCAD SHX Text

PLAN

AutoCAD SHX Text JOB BENCHMARK #200 COTTON SPINDLE IN THE EAST FACE OF 16" RED OAK ON THE WEST SIDE OF TRAIL +/- 740' NORTH OF CENTERLINE OF MARSH CREEK ELEV 1183.24

AutoCAD SHX Text JOB BENCHMARK #201 COTTON SPINDLE IN WEST FACE OF 9" PINE +/- 100' NORTH OF CENTERLINE OF MARSH CREEK ON EAST SIDE OF TRAIL ELEV 1177.03

AutoCAD SHX Text JOB BENCHMARK #202 COTTON SPINDLE IN WEST FACE OF 6" PINE +/- 75' SOUTH OF CENTERLINE OF MARSH CREEK ON THE EAST SIDE OF TRAIL ELEV 1178.50

AutoCAD SHX Text

TRAVERSE POINT #102 N 390355.31 E 19681581.38 ELEV 1177.20

AutoCAD SHX Text

TRAVERSE POINT #101 N 390801.66 E 19681559.93 ELEV 1177.21

AutoCAD SHX Text

TRAVERSE POINT #100 N 391467.88 E 19681619.11 ELEV 1183.82

AutoCAD SHX Text

SSL (TYP)

AutoCAD SHX Text

SSL (TYP)

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SOIL EROSION AND SEDIMENTATION CONTROL ITEMS

AutoCAD SHX Text

(SEE STANDARD PLAN R-96-SERIES FOR DETAILS)

AutoCAD SHX Text

KEY NO

AutoCAD SHX Text

NAME

AutoCAD SHX Text

PERMANENT/TEMPORARY SEEDING

AutoCAD SHX Text

RIPRAP

AutoCAD SHX Text

SILT FENCE

AutoCAD SHX Text

MULCH BLANKET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

TURBIDITY CURTAIN

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

Sheets and Views
1 COVER
2 LEGEND
3 TYPICAL SECTIONS
4 GENERAL PLAN OF SITE
5 SOIL BORING LOGS
6 GENERAL PLAN OF STRUCTURE
7 GUARDRAIL PLAN
8 GRADING PLAN

File details come from the government source that posted it. Updated .