This document is Addendum #2 for the Michigan Department of Natural Resources' Au Train River Bridge Superstructure Removal project in Alger County, Michigan, issued by U.P. Engineers & Architects, Inc. in May 2025. The addendum clarifies and modifies the original bidding documents, providing a detailed response to a bidder's question about the bridge's weight (approximately 60 tons, with 30 tons of timber decking potentially removable to lighten the load) and updating specifications related to asbestos abatement attestation and certified payroll submission requirements.
The addendum introduces significant changes to payroll reporting procedures, specifically noting that contractors and subcontractors must register with the Labor and Economic Opportunity (LEO) Wage and Hour department and obtain a State Project Registration (SPR) by April 2, 2025, at an annual fee of $500. Starting on this date, certified payrolls must be submitted directly to the LEO Wage and Hour database via the internet, and no longer to the Department of Technology, Management, and Budget (DTMB). Failure to have a valid SPR will result in bids being deemed non-responsive, and contractors must immediately notify the owner of any changes in subcontractor registration status.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
100 Portage Street Houghton, MI 49931
906-482-4810 • 800-562-7684 • Fax: 906-482-9799
Office also in:
Iron Mountain
Ishpeming Marinette Marquette
Sault Ste Marie
U.P. Engineers & Architects, Inc. www.UPEA.com
ADDENDUM # 2
File No. 751/24434.JBB
Michigan Department of Natural Resources
Au Train River Bridge Superstructure Removal
Alger County, Michigan
This ADDENDUM NO. 2, issued on May, 2025 is to clarify, modify and/or change the original plans and specifications issued by U.P. Engineers & Architects, Inc. and is hereby made a part of the bidding documents.
Bidders are required to acknowledge receipt of this ADDENDUM NO. 2 on the appropriate place on the Bid Form.
Bidder Questions and Answers
1. Q: Can we verify the weight of the bridge?
A: The center span superstructure has an approximate weight of 60 tons. Approximately
30 tons consists of timber decking that potentially could be removed prior to lifting in order to lighten the load.
Specifications
1. Replace the Asbestos Abatement Attestation Submission (page 6 of the PDF) with the attached revised sheet.
2. Replace the following portion of 00700-2.5.1:
Contractor must submit certified payrolls for both Contractor and subcontractors not later than 10 days after the end of a pay period to DTMB via email at DTMB-
DCDCertPay@michigan.gov. Files are to be 20mb or less and follow the naming convention provided by the Project Director to include the following information:
[CP###] [CH]-[Client]-[Vendor] [CN] [SFN] [ProjectID] – [County],pdf
CP###: A 3-digit ID of the Certified Payroll and the sequential order that it is for this specific project
CH: Contract Holder – this would be ‘DTMB’.
Client: Acronym of the agency the project is for
Vendor: Abbreviated Contractor name
CN: DTMB Contract Number – Y#####
SFN: The 4th through 8th number of this project file number ###/#####.AAA
ProjectID: Project name or abbreviated description
County: The county the work is taking place
ADDENDUM NO. 1
751-24434.JBB Au Train River Bridge Superstructure Removal – Addendum #2 May 9, 2025
Contractor will cease the submitting process of Certified Payroll to DTMB via the email on or about April 2, 2026, when the Department of Labor and Economic Opportunity requires that all certified payrolls be submitted directly to the Department of Labor and
Economic Opportunity database via the internet, 2023 PA 10 as amended, MCL
408.1122. Certified Payroll will continue to be required to be submitted to DTMB as an attachment to the Contractor’s regular payment request.
With:
Contractor is to submit certified payrolls, including contractor and subcontractor, not later than 10-days after the end of a pay period to the Department of Labor and
Economic Opportunity database via the internet through the Online Certified
Payroll Submission process the Contractor signed up for to receive their State
Project Registration, 2023 PA 10 as amended, MCL 408.1122. State certified payroll is not to be submitted to DTMB at any time.
END OF ADDENDUM NO. 2
Attachments:
- Revised DTMB-SFA- Asbestos Abatement Attestation Submission and DESIGN AND CONSTRUCTION Frequently Asked Questions for Recent Law Changes
Bidding and Contract Document (R 03/25) Project Name: Au Train River Bridge File No. 751/24434.JBB
ASBESTOS ABATEMENT ATTESTATION
SUBMISSION REQUIRED WITH ALL BIDS
Pursuant to the Public Entity Asbestos Removal Verification Act, PA 59 of 2024, MCL 338.3371 et seq. (“the Act”), the Owner will conduct the background investigation as required of any asbestos abatement contractor, or a general contractor that contracts with an asbestos abatement contractor, for the abatement of asbestos. Under the Act, an "Asbestos abatement contractor" means a business entity that is licensed under the asbestos abatement contractors licensing act, 1986 PA 135, MCL 338.3101 to 338.3319, and that carries on the business of asbestos abatement on the premises of another business entity and not on the asbestos abatement contractor's premises. Asbestos abatement contractor includes an individual or person with an ownership interest in a business entity described in MCL 338.3373(b).
(INSTRUCTIONS: Professional to select one of these two statements, then delete the not selected statement and instructions.)
THE SCOPE OF WORK TO BE COVERED UNDER THIS CONTRACT CONTAINS ASBESTOS ABATEMENT AND THIS
ATTESTATION MUST BE COMPLETED.
THE SCOPE OF WORK TO BE COVERED UNDER THIS CONTRACT DOES NOT CONTAINS ASBESTOS
ABATEMENT AND THIS ATTESTATION IS TO BE LEFT BANK.
Contractor attests that: (check one:)
1. The Contractor will self-perform all asbestos abatement project work and attests that Contractor has not been issued 5 or more notices of violation of environmental regulations (State and/or Federal), nor has been subject to an administrative consent order or a consent judgment involving environmental regulations.
2. The Contractor will self-perform all asbestos abatement project work; however, Contractor has been issued 5 or more notices of violation of environmental regulations (State and/or Federal), or has been subject to an administrative consent order or a consent judgment involving environmental regulations, requiring Owner to conduct a background investigation and a public hearing pursuant to PA 59 of 2024, MCL 338.3371 et seq.
3. The Contractor nominates the following Sub-contractor for all asbestos abatement project work and attests that the nominated Sub-contractor has not been issued 5 or more notices of violation of environmental regulations (State and/or Federal), nor has been subject to an administrative consent order or a consent judgment involving environmental regulations:
Nominated Sub-contractor: _______________________________________________________________________
4. The Contractor nominates the following Sub-contractor for all asbestos abatement project work; however, the nominated Sub-contractor has been issued 5 or more notices of violation of environmental regulations (State and/or Federal), or has been subject to an administrative consent order or a consent judgment involving environmental regulations, requiring Owner to conduct a background investigation and a public hearing pursuant to PA 59 of 2024, MCL 338.3371 et seq.
Nominated Sub-contractor: _______________________________________________________________________
DTMB-SFA- DESIGN AND CONSTRUCTION
Frequently Asked Questions for Recent Law Changes April 8, 2025
Prevailing Wage Law Q: What has changed in the prevailing wage laws?
A: Per Public Act 10 of 2023, amended per PA110 of 2024, all contractors and subcontractors performing work for the State of Michigan as a construction mechanic must register with Labor and Economic Opportunity (LEO) Wage and Hour and receive a State Project Registration (SPR) and pay the associated annual fee to be able to submit bids for state work and submit certified payroll during the project.
Q: When did the change become effective?
A: April 2, 2025.
Q: Does this change apply to projects bid and/or already under a contract before April 2, 2025?
A: No, the change applies to all projects with bids due on or after April 2, 2025.
Q: How do I get a State Project Registration (SPR) register with LEO Wage and Hour?
A: Instructions can be found on the LEO Wage and Hour Prevailing Wage website for attaining the required State Project Registration (SPR) for all contractors and subcontractors.
Q: How much does it cost and how do I pay the annual fee?
A: The fee will be determined by LEO Wage and Hour and is currently $500. The fee is paid directly to LEO Wage and Hour through their website. Please contact LEO Wage and Hour for any assistance or questions relating to issues for registration or payment.
Q: What happens if I submit a bid without the required SPR?
A: As the law requires, the bid will be determined not responsive and cannot be awarded a contract.
Q: Do I have to provide a SPR for every subcontractor that I provide with post bid submittals when I am being considered for award of a contract?
A: No, but the SPR’s must be available if requested. If it is not able to be provided, the contract may be terminated.
Q: What happens if I need to change a subcontractor after the work begins?
A: The General Contractor must immediately notify the Owner of any change in registration status for themselves and any subcontractor and is required to ensure that all subcontractors maintain a SPR with LEO Wage and Hour.
Q: How do I submit the required certified payroll?
A: Certified payroll for both the contract and subcontractors is required to be submitted directly to LEO Wage and Hour with the access provided at the time of paying for your SPR. Certified payroll for projects with State of Michigan Prevailing Wages are not to be submitted to DTMB at any time.
Q: Who do I ask for assistance with determining the appropriate wage rate?
A: LEO Wage and Hour.
For additional information please see 2024-PA-0110.pdf.
END
https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.legislature.mi.gov%2Fdocuments%2F2023-2024%2Fpublicact%2Fpdf%2F2024-PA-0110.pdf&data=05%7C02%7Charlanp%40michigan.gov%7C176e4f87397847fde62208dd76d9de3b%7Cd5fb7087377742ad966a892ef47225d1%7C0%7C0%7C638797400292882830%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=F4JjZSz87XByaI70Z%2FFo7vHX%2BLV%2FWEXnPc8iqh684mo%3D&reserved=0
File details come from the government source that posted it. Updated .