751_22295.ABG_Advertisement.pdf
PDF 33 KB Posted
- Solicitation number
- RFQ - 171 - 230000000036
- Issued by
- Ionia County, Michigan
About this file
This document is a project advertisement for the Wyman Nursery Office Boiler Replacement project issued by the Michigan Department of Technology, Management and Budget State Facilities Administration Design & Construction Division. The project consists of the demolition of the existing boiler, air handling unit and associated components, patching of exterior walls, and installation of a new boiler, radiant tube heat, and louvers, as well as electrical work. The advertisement states the electronic bid due date is Wednesday, October 26, 2022, at 2:00 p.m., and a mandatory pre-bid meeting will be held at the project site on Tuesday, October 11, 2022, at 2:00 p.m. The project is located at 408 N Intake Park, Manistique, MI 49854.
The advertisement includes instructions for submitting bids through the SIGMA VSS system, as well as contact information for the SIGMA Help Desk and Design and Construction Contract Specialists. The required NIGP codes are listed, and questions are being accepted until Tuesday, October 18, 2022, at 12:00 p.m. The last addendum will be issued on October 19, 2022.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 751_22295.ABG_Plans.pdf | ||
| 751_22295.ABG_Technical Specifications.pdf | ||
| 751_22295.ABG_Addendum 1 Revised.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0415 (R 08/22)
PROJECT ADVERTISEMENT
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
DESIGN & CONSTRUCTION DIVISION
This form is required for the advertisement of all construction projects. (1984 PA 431)
TO:
MI DTMB
DATE
September 30, 2022
FROM:
DNR
PROJECT MANAGER
Alan Goschka
DTMB FILE NUMBER
751/22295.ABG
ADVERTISEMENT DATE
September 30, 2022
ELECTRONIC BID DUE DATE
Wednesday, October 26, 2022, at 2:00 p.m.
PROJECT NAME AND LOCATION (INCLUDE STREET ADDRESS)
Wyman Nursery Office Boiler Replacement 408 N Intake Park Manistique, MI 49854
WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION
A mandatory prebid meeting will be held at the project site on Tuesday, October 11, 2022, at 2:00 p.m.
Mandatory: Yes No
NOTE: An individual is only permitted to represent one bidder at a mandatory walk-through.
COVID 19 Precautions:
1. Depending on the project location, individuals may be required to wear masks to attend meetings and for a firm to be eligible to submit bids / quotations / proposals. Bring and be prepared to wear a mask if required upon arrival. Requirements may change at any time and any updated guidance must be followed
DESCRIPTION OF WORK:
The project consists of demolition of the existing boiler, air handling unit and associated components. Patching of exterior walls where equipment is being removed. Installation of new boiler, radiant tube heat and louvers.
Electrical work associated with the new equipment and emergency shut offs for boiler in boiler room.
Please NOTE:
• Bid responses and bid attachments MUST be uploaded to SIGMA VSS.
•• Please remember that individual attachments can be no larger than 6mb.
•• Please do not wait until just before the 2:00 p.m. solicitation deadline to submit your bid response. SIGMA VSS will not allow a proposal to be submitted after 2:00 p.m., even if a portion of the bid response has been uploaded.
•• If you experience issues or have questions regarding your electronic submission, you must contact the SIGMA Help Desk for assistance prior to the 2:00 p.m., solicitation deadline. You may contact the SIGMA Help Desk by telephone at 517.284.0540 or toll-free at 888.734.9749. You may also email the SIGMA Help Desk at sigma-procurement-helpdesk@michigan.gov
• Please email the Design and Construction Contract Specialists if you are having SIGMA VSS issues. Please include your SIGMA ticket number and any supporting documentation (i.e., screenshots) to Anne Watros (WatrosA@michigan.gov) and Don Klein (KleinD4@michigan.gov).
mailto:sigma-procurement-helpdesk@michigan.gov mailto:WatrosA@michigan.gov mailto:KleinD4@michigan.gov
• You may be asked by our contract specialists to email your bid response. Emailed submissions will require DCD approval and will be handled on a case-by-case basis.
• Approved emailed submissions MUST be received prior to 2:00 p.m. deadline to be considered responsive and responsible.
• Bid Responses should not be emailed to the Project Director.
5% Bid Security:
Required
Not Required
NIGP CODES: 91036, 91065, 91200,91075,91438,91450
ACCEPTING QUESTIONS UNTIL: Tuesday, October 18, 2022, at 12:00 p.m. (Last Addendum will be October 19, 2022.)
Documents may be obtained from:
https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfServi ce
PSC/Agency: OHM Advisors
Address: 424 Hancock Street, Hancock, MI 49930
Phone: (906) 482-0535
Email: courtney.babcock@ohm-advisors.com
Fax:
Approved by:
https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService mailto:courtney.babcock@ohm-advisors.com
File details come from the government source that posted it. Updated .