About this file

This document is an addendum to a state and local contract opportunity for the Donken Tapiola North End Bridge Replacement project in Elm River Township, Houghton County, Michigan. The addendum revises the bid forms to reflect the correct bid date, project/file number, and riprap specification. It also provides additional details on the excavation and culvert foundation design in the event soft clay is encountered. The addendum also adds MDOT and EGLE permits that have been issued for the project. The bid opening date remains Wednesday, September 28, 2022, at 2:00 pm ET. The project requires the removal and disposal of an existing timber bridge structure and replacement with a 4-sided aluminum box culvert. The work includes excavation, backfill, bedding/foundations, groundwater control, bypass pumping, new wing walls and head walls, object marker signs, a new gravel road surface, slope restoration, traffic control, and erosion control measures. The project will be a lump sum contract.

The bid schedule includes items such as removals, excavation, machine grading, backfill, dewatering, soil erosion control, subbase, aggregate surface course, aluminum box culvert, culvert bedding, object marker signs, traffic control, riprap, slope restoration, contractor staking, and contractor testing. The contract has a substantial completion date of July 28, 2023 and a final completion date of August 28, 2023.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum 2 Cover Page 1 of 1

ADDENDUM NO. 2

DATE: September 21, 2022

PROJECT: 751/22023.TAP Donken Tapiola North End Bridge Replacement

OWNER: MI DTMB

BID DATE: Wednesday, September 28, 2022 **THIS ADDENDUM DOES NOT CHANGE THE BID

DATE**

The following shall be incorporated into the Contract Documents dated 10 AUG 2022.

PROJECT MANUAL

BID SUMMARY / BID SCHEDULE:

Revised and reissued the bid forms to depict the correct bid date, project/file number, and Riprap.

SECTION 31 20 00 – EARTH MOVING:

Revised and reissued the specification to change the Riprap from Plain to Special Class II (as defined by MDOT in a special provision). The Riprap, Special, Class II is described in Section 2.1.K and details for installation were added in section 3.17.

SECTION 33 41 00 – STORM UTILITY DRAINAGE PIPING:

Add item C to Section 3.3 CULVERT DESIGN as follows:

C. During excavation, if the soft clay is encountered that is shown on soil boring B-2 about 12’ below grade, you can expect the clay will have a bearing capacity of approximately 500 psf. This bearing capacity has the potential to be increased to about 1500 psf by tamping in and installing a bedding of AASHTO #1 stone into the top of the clay.

1. In a case of encountering clay, if the 4-sided culvert is used as shown on the plans, the bedding shown on the plans will be revised by the Engineer in a bulletin to accommodate for the lower bearing capacity.

2. In a case of encountering clay, if the 3-sided culvert is elected to be used by the contractor, the engineer of record for the foundations will need to ensure their foundation design accounts for this bearing capacity.

APPENDIX V – PERMITS:

Added MDOT and EGLE permits that have been issued for the project.

DRAWINGS

Sheet 5 of 8 - PROPOSED PLAN:

Revised and reissued the sheet to change the Riprap, Plain to Riprap, Special, Class II. Also slightly adjusted the limits of the Riprap.

Sheet 6 of 8 - PROPOSED PROFILE:

Revised and reissued the sheet to add detail 4 showing the typical riprap section.

End of Addendum No. 2

Bidding and Contract Document (R 03/22) Donken Tapiola North End Bridge Replacement File No. 751/22023.TAP

BID SUMMARY

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

STATE FACILITIES ADMINISTRATION

DESIGN AND CONSTRUCTION DIVISION

3111 W. St. Joseph Street Lansing, Michigan 48917

Bids must be submitted electronically through the SIGMA VSS website at https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService

FILE NUMBER

751/22023.TAP

FUNDING CODE

N/A

DEPARTMENT/AGENCY

DTMB/DNR

CONTRACT TIME(S)

Substantial Completion: 7/28/2023 Final Completion: 8/28/2023

PROJECT NAME

Donken Tapiola North End Bridge Replacement

LOCATION

Elm River Township Houghton County, MI

BID OPENING DATE

Wednesday, September 28, 2022, at 2:00 pm ET

FOR AN EXAMINATION OF THE SITE CONTACT:

Attend Mandatory Prebid Meeting

SEE SECTION 00100 INSTRUCTIONS TO BIDDERS AND SECTION 00700 GENERAL CONDITIONS PROVIDED WITH THE BIDDING DOCUMENTS.

BID: WE PROPOSE TO FURNISH, PERFORM AND COMPLETE THE ENTIRE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS IN

CONSIDERATION OF THE BID PRICE (S) STATED BELOW.

FIRM NAME AND COMPLETE ADDRESS TELEPHONE NUMBER and E-MAIL ADDRESS

□ Qualified Disabled Veteran

SIGMA VENDOR NUMBER

(protected information required for processing payments)

BIDDER'S SIGNATURE AND TITLE DATE

WITNESS' SIGNATURE DATE

By signing this bid above, bidder certifies their enclosed Qualified Disabled Veteran and Michigan-Based Business Certifications.

BASE BID FROM BID SCHEDULE (Include specified Allowances):

____________________________________________________________________________Dollars $____________________ (use words) (in figures)

Alternate1: (Add/Subtract) ______________________________________________________ Dollars $ ____________________ (use words) (in figures)

Alternate 2: (Add/Subtract) ______________________________________________________Dollars $ ____________________ (use words) (in figures)

Alternate 3: (Add/Subtract) ______________________________________________________Dollars $ ____________________ (use words) (in figures)

A PERFORMANCE BOND AND A PAYMENT BOND ARE REQUIRED FOR ALL BIDS OVER $50,000.00. EACH BID MUST BE ACCOMPANIED BY A FIVE (5) PERCENT BID GUARANTEE. BUILDERS RISK INSURANCE IS REQUIRED TO BE PROVIDED BY THE

CONTRACTOR UNLESS OTHERWISE INDICATED IN THE BID DOCUMENTS.

BIDDERS ARE ALSO CAUTIONED TO FAMILIARIZE THEMSELVES WITH ALL OF THE OTHER CONDITIONS OF THE CONTRACT.

Project Scope of Work:

Remove and dispose of an existing timber bridge structure and timber abutments. The existing timber structure spans roughly 12’ and is 25' wide. The structure is located on the headwaters of the Misery River, adjacent to M-26, on the Donken Tapiola Road. The structure will be replaced with a 4-sided aluminum box culvert. The complete work scope will include all associated work such as excavation, backfill, bedding/foundations, groundwater control, bypass pumping or a diversion channel of the stream, new wing walls and head walls, object marker signs, a new gravel road surface over the bridge/culvert, slope restoration, traffic control, and erosion control measures.

The project will be a lump sum contract. Work items to be included in the lump sum are further defined below.

Bidding and Contract Document (R 03/22) Donken Tapiola North End Bridge Replacement File No. 751/22023.TAP

Removals: This item covers the cost for all equipment, materials, and labor to remove bridges, wingwalls, abutments, signs, fire water fill stations, and miscellaneous items to be removed to allow for installation of the proposed construction as shown on the plans. Removals shall be per the plans, section 203 of the 2020 MDOT Standard Specifications for Construction, and the technical specifications.

Excavation: This item covers the cost for all equipment, materials, and labor to excavate existing, salvage, and/or remove soils from the site, to proposed grades as shown on the plans, per section 205 and 206 of the 2020 MDOT Standard Specifications for Construction, and the technical specifications.

Machine Grading: This item covers the cost for all equipment, materials, and labor to perform machine grading of the gravel road surface per the plans, section 205 of the 2020 MDOT Standard Specifications for Construction, and the technical specifications.

Backfill, Structure, CIP: This item covers the cost for all equipment, materials, and labor for backfill around the culvert up to the bottom of the subbase course. Backfill, Structure, CIP shall be placed and compacted per the plan details, section 206 of the 2020 MDOT Standard Specifications for Construction, the technical specifications, and the culvert manufacturer’s recommendations.

Dewatering and Bypassing: This item covers the cost for all equipment, materials, and labor to provide dewatering services in the work area as required to install the culvert, bedding, backfill, riprap, 6A, and any other items below the water table. This item includes any necessary piping and/or channels to the discharge location and protection of the stream and vegetation for release of the water back into the channel/stream.

Soil Erosion Control and Sedimentation Control: This item covers the cost for all equipment, materials and labor to provide and maintain a diversion channel, construction dams/sand bags, silt fence, filter bags, sediment traps, straw wattles, and any other measures necessary to protect the work from erosion, per the plans, technical specifications, the DTMB SESC permit, and section 208 of the 2020 MDOT Standard Specifications for Construction.

Subbase, CIP: This item covers the cost for all equipment, materials, and labor to place the trail/road subbase per the plans, section 301 of the 2020 MDOT Standard Specifications for Construction and technical specifications.

Aggregate Surface Cse, 6 inch: This item covers the cost for all equipment, materials & labor to place & compact a 6” gravel trail/ road cover as shown on the plans per section 306 of the 2020 MDOT Standard Specifications for Construction & the technical specifications.

Aluminum Box Culvert (ALBC), 3 or 4 Sided: This item covers the cost for all equipment, materials and labor to provide the premanufactured aluminum box culvert and it’s footings/foundations, headwalls, and wingwalls per the spans/heights/lengths shown on the plans. This includes fasteners, gaskets, sealant, and any field assembly as necessary per the plans, manufacturer requirements, sections 401 and 909 of the 2020 MDOT Standard Specifications for Construction, and the technical specifications.

Culv Bedding, Box Culvert: This item covers the cost for all equipment, materials, and labor to place and compact 6A and 34R bedding with geotextile per the plans, section 406 of the 2020 MDOT Standard Specifications for Construction, and per the technical specifications.

Object Marker Sign: This item covers the cost for all equipment, materials, and labor to provide object marker signs and posts, with bases, as shown on the plans, per section 810 of the 2020 MDOT Standard Specifications for Construction, and per the technical specifications.

Traffic Control: This item covers the cost for all equipment, materials, and labor to provide temporary detour and closure signs, temporary barricades, cones, barrels/drums, caution tape/ribbon, and temporary fencing around the work area during construction. Traffic control items shall be installed and maintained per section 812 of the 2020 MDOT Standard Specifications for Construction and per the plans.

Riprap, Special, Class II: This item covers the cost for all equipment, materials, and labor to provide riprap, special, class II with geotextile, as shown on the plans, per section 813 of the 2020 MDOT Standard Specifications for Construction, and per the technical specifications.

Slope Restoration: This item covers the cost for all equipment, materials, and labor to provide topsoil, finish grade, seed, and mulch blankets and maintain restoration areas as shown on the plans, per section 816 of the 2020 MDOT Standard Specifications for Construction, and the technical specifications.

Object Marker Signs and Posts: This item covers the cost for all equipment, materials, and labor to provide the wood posts and reflective object marker signs as shown on the plans, per sections 804 and 810 of the 2020 MDOT Standard Specifications for Construction, and the technical specifications.

Contractor Staking: This item covers the cost for all equipment, materials, and labor to provide layout staking for the project.

Contractor staking shall be performed in accordance with section 824 of the 2020 MDOT Standard Specs for Construction.

Contractor Testing: This item covers the cost for all equipment, materials, and labor to provide construction testing as identified in the technical specifications. Testing shall comply with the ASTM standards.

In case of discrepancies between the 2020 MDOT standard specifications and the technical specifications, the technical specifications control.

Bidding and Contract Document (R 03/22) Donken Tapiola North End Bridge Replacement File No. 751/22023.TAP

The Bidder must figure its Base Bid on the specified, or Addendum-approved, materials and equipment only. No “or equal” or substitution proposals will be permitted after Bid opening, except as provided in the General Conditions.

Addenda: Bidder acknowledges receipt of Addenda: No. ___ dated: ________, No. ___ dated: ________ No. ___ dated: ________

FIRM NAME TELEPHONE NUMBER and E-MAIL ADDRESS

BID SCHEDULE

Base Bid Schedule - The Bidder will complete the Work and accept as full payment, for the Work items listed, the following Unit Prices and/or Item Bid Prices, as applicable:

Base Bid Item No.

Bid Quantity

Description

Unit Price

Item Bid Price

1 1 LSUM Project Scope of Work

2 ALLOWANCE AMOUNT $5,000 $5,000

TOTAL (This amount should equal the Base Bid amount on the Bid Summary Form) $

Base Bid (Sum of Item Bid Prices for all Base Bid Items):

__________________________________________________________________ Dollars $__________________________ (use words) (in figures)

Bidding and Contract Document (R 03/22) Donken Tapiola North End Bridge Replacement File No. 751/22023.TAP

FIRM NAME TELEPHONE NUMBER and E-MAIL ADDRESS

Schedule of Unit Prices or Contingent Change Order Prices - The Bidder shall use this “Schedule” to quote unit prices identified in the bid documents or propose other contingent Change Order prices. The proposed Unit Prices or contingent Change Order prices set forth in this schedule, at the sole discretion of the Owner, may, or may not be incorporated into the Contract Documents. The Owner reserves the right to negotiate Unit Prices or contingent Change Order prices set forth herein prior to their possible incorporation into the Contract Documents.

Item No. Bid Quantity Description

Bidder’s Unit Price Bidder’s Total Price

1 20 CY Remove Unsuitable Soils and replace with

Class II Sand or 6A.

Bidding and Contract Document (R 03/22) Donken Tapiola North End Bridge Replacement File No. 751/22023.TAP

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration

Design & Construction Division

Qualified Disabled Veteran (QDV) Business Representation

‘Qualified Disabled Veteran,’ means a business entity that is 51% or more owned by one or more veterans with a service-connected disability.

‘Qualified Disabled,’ means a business entity that is 51% or more owned by one or more with a service-connected disability.

The vendor represents that it IS _____, a qualified disabled veteran.

The contractor represents and warrants that the company meets the above (when checked) and has attached supporting documentation per the following:

Each bid requesting the Qualified Disabled Veterans (QDV) preference, in accordance with Public Act 22 of 2010, MCL 18.1241.3 shall include a DD214 Proof of Service and Discharge, a Veterans Administration rating decision letter, proof of disability (if the disability is not indicated on the DD214), and appropriate legal documents setting forth the 51% natural persons QDV ownership.

Fraudulent Certification as a Qualified Disabled Veteran may result in debarment under MCL 18.264.

Certification of a Michigan Based Business

(Information Required Prior to Contract Award for Application of State Reciprocity Provisions)

To qualify as a Michigan Based Business:

Vendor must have, during the 12 months immediately preceding this bid deadline:

or If the business is newly established, for the period the business has been in existence, it has:

(Check all that apply):

Filed a Michigan single business tax return showing a portion, or all the income tax base allocated or apportioned to the State of Michigan pursuant to the Michigan Single Business Tax Act, 1975 PA 228, MCL 208.1 – 208.145:

or

Filed a Michigan income tax return showing income generated in or attributed to the State of Michigan; or

Withheld Michigan income tax from compensation paid to the bidder’s owners and remitted the tax to the Department of Treasury; or

I certify that I have personal knowledge of such filing or withholding, that it was more than a nominal filing for the purpose of gaining the status of a Michigan business, and that it indicates a significant business presence in the state, considering the size of the business and the nature of its activities.

I authorize the Michigan Department of Treasury to verify that the business has or has not met the criteria for a Michigan business indicated above and to disclose the verifying information to the procuring agency.

Bidder shall also indicate one of the following:

Bidder qualifies as a Michigan business (provide zip code: ________________)

Bidder does not qualify as a Michigan business (provide name of State: _____________).

Principal place of business is outside the State of Michigan, however service/commodity provided by a location within the State of Michigan (provide zip code: (___________).

Fraudulent Certification as a Michigan business is prohibited by MCL 18.1268 § 268. A BUSINESS THAT PURPOSELY OR WILLFULLY SUBMITS A FALSE CERTIFICATION THAT IT IS A MICHIGAN BUSINESS OR FALSELY INDICATES THE STATE IN WHICH IT HAS ITS PRINCIPAL PLACE OF BUSINESS IS GUILTY OF A FELONY, PUNISHABLE BY A FINE OF NOT LESS THAN $25,000 and subject to debarment under MCL 18.264.

Bidding and Contract Document (R 03/22) Donken Tapiola North End Bridge Replacement File No. 751/22023.TAP

BID BOND

BID SUBMITTED ON the _______ day of ________________, 20____.

Bid Security is in the form of a Bid Bond _______ Bid Bond form has been duly executed _______; or

A Bank Certified or Cashier's check ___ or Money Order ___ is attached to this page ____ (If Bid Security is by Check or Money Order, the original check or money order must be delivered to the issuing office before Bid Due Time. ALL other SIGMA bid submittals are also still to be made).

If the Bidder is an Individual:

Name of Individual: _________________________________________________________

Name & Title of Person Authorized to sign: ___________________________________________

Signature: _________________________________________________________ (If not the Individual, Attach Power of Attorney) Date

Doing Business as: _________________________________________________________

Business Address: _________________________________________________________

County of registration _________________________

Telephone: _________________________ FAX: ______________________

If the Bidder is a Partnership:

By: _________________________________________________________ (True Name of the Partnership)

Partner Authorized to Sign Date

Signature: _________________________________________________________ (Attach evidence of Authority to sign) Date

Business Address: _________________________________________________________

County of registration _________________________

Telephone: _________________________ FAX _______________________

If the Bidder is a Corporation:

By: _________________________________________________________ (Legal Corporation Name)

Name & Title of Authorized Officer: __________________________________________________

Signature: _________________________________________________________ (Attach evidence of Authority to sign) Date

Name & Title of Officer Attesting: __________________________________________________

Signature: _________________________________________________________ Date

Business Address: _________________________________________________________

Telephone: _________________________ FAX _______________________

(State of Incorporation): _________________________________________________________

If The Bidder is A Joint Venture: JOINT VENTURE SIGNATURES MUST BE AS PROVIDED IN INSTRUCTIONS TO BIDDERS.

EACH JOINT VENTURER SIGNING THE BID MUST SIGN IN THE MANNER INDICATED FOR AN INDIVIDUAL, A PARTNERSHIP OR A CORPORATION. IF MORE THAN TWO JOINT VENTURERS OF THE SAME TYPE ARE INCLUDED, USE ADDITIONAL PAGES. JOINT VENTURE STATE OF INCORPORATION ___________________ OR COUNTY OF REGISTRATION

Bidding and Contract Document (R 03/22) Donken Tapiola North End Bridge Replacement File No. 751/22023.TAP

POST-BID SUBMITTALS

The PSC will request this submittal after bid opening. Complete and submit these items within two business days after the request.

BIDDER’S EXPERIENCE MODIFICATION RATING (EMR) ____________

Attach letter of explanation if the Bidder does not have an EMR.

PROPOSED PROJECT SUPERINTENDENT _______________________________

Attach brief resume or list of similar successful projects.

LIST OF SIMILAR PROJECTS COMPLETED BY THE BIDDER

Please list at least three completed projects of similar size and complexity to the project being bid, with reference contact information

REFERENCE #___

Owner: _____________________________________________________________________________________

Project/Contract Name: ________________________________________________________________________

Location of Project/Contract: ____________________________________________________________________

Contract Price: _______________________ Project/Contract Started: ____________ Completed: ____________

Owner's Representative (Name and Telephone): _____________________________________________________

Scope of Project/Contract: ______________________________________________________________________

REFERENCE #___

Owner: _____________________________________________________________________________________

Project/Contract Name: ________________________________________________________________________

Location of Project/Contract: ____________________________________________________________________

Contract Price: _______________________ Project/Contract Started: ____________ Completed: ____________

Owner's Representative (Name and Telephone): _____________________________________________________

Scope of Project/Contract: ______________________________________________________________________

REFERENCE #___

Owner: _____________________________________________________________________________________

Project/Contract Name: ________________________________________________________________________

Location of Project/Contract: ____________________________________________________________________

Contract Price: _______________________ Project/Contract Started: ____________ Completed: ____________

Owner's Representative (Name and Telephone): _____________________________________________________

Scope of Project/Contract: ______________________________________________________________________

Bidding and Contract Document (R 03/22) Donken Tapiola North End Bridge Replacement File No. 751/22023.TAP

POST BID SUBMITTALS: LIST OF SUBCONTRACTORS

The Apparent Low Bidder shall nominate for each Division of Specification and/or trade category, the Subcontractor to be awarded Sub-agreements, including the apparent Low Bidder if work is to be self-performed. Nominated subcontractors shall not be removed, replaced, or added to except by written request for good reason, subject to Owner acceptance.

Division, Specification Section Nominated Amount of Subcontract and/or Trade Subcontractor(s)

1.________________________ _________________________ __________________

2.________________________ _________________________ __________________

3.________________________ _________________________ __________________

4.________________________ _________________________ __________________

5.________________________ _________________________ __________________

6.________________________ _________________________ __________________

7.________________________ _________________________ __________________

8.________________________ _________________________ __________________

9.________________________ _________________________ __________________

10._______________________ _________________________ __________________

11._______________________ _________________________ __________________

12._______________________ _________________________ __________________

13._______________________ _________________________ __________________

14._______________________ _________________________ __________________

The undersigned Apparent Low Bidder _____________________________________________________________ certifies that all the information and data furnished in this List of Subcontractors are current, accurate and complete as of the date stated below.

Signed by:____________________________Name_______________________________ Title ________________________ on this __________ day of ____________________, 20_______.

Bidding and Contract Document (R 03/22) Donken Tapiola North End Bridge Replacement File No. 751/22023.TAP

PERFORMANCE BOND

SURETY COMPANY REFERENCE No. __________________________________

That "the Contractor," ___________________________________________________, a corporation ___, individual ___, partnership ___, joint venture ___ of the State of __________________, qualified to do business in the State of Michigan, as Principal, and "the Surety," ____________________________________________________________________, of the State of _________________, as surety, are held and bound unto the State of Michigan, "the Owner," as Obligee, in the amount of __________________________________________________________________________ Dollars ($_________________), for the payment of which the Contractor and Surety bind themselves, their respective heirs, successors, legal representatives and assigns, jointly and severally, in compliance with 1963 PA 213, as amended, MCL 129.201 et seq.

The Contractor has entered into "the Contract" with the Owner for _______________________________________________ _______________, "the Work," covered by the Contract Documents, which are incorporated into this Performance Bond by this reference.

If the Contractor faithfully performs and fulfills all the undertakings, covenants, terms, conditions, warranties, indemnifications and agreements of the Contract Documents within the Contract Time (including any authorized changes, with or without notice to the Surety) and during the Correction Period, and if the Contractor also performs and fulfills all the undertakings, covenants, terms, conditions, warranties, indemnifications and agreements of any and all duly authorized modifications of the Contract Documents, then THIS

OBLIGATION IS VOID, OTHERWISE TO REMAIN IN FULL

FORCE AND EFFECT.

A. No change in Contract Price or Contract Time, "or equal" or substitution or modification of the Contract Documents (including addition, deletion, or other revision) releases the Surety of its obligations under this Section 00610 Performance Bond. The Surety expressly waives notice of any such change in Contract Price or Contract Time, "or equal" or substitution or modification of the Contract Documents (including addition, deletion, or other revision).

B. This Performance Bond must be solely for the protection of the Owner and its successors, legal representatives or assigns.

C. It is the intention of the Contractor and Surety that they must be bound by all terms and conditions of the Contract Documents (including, but not limited to General Conditions and this Performance Bond). However, this Performance Bond is executed pursuant to 1963 PA 213, as amended, MCL 129.201 et seq., and if any provision(s) of this Performance Bond is/are illegal, invalid, or unenforceable, all other provisions of this Performance Bond must nevertheless remain in full force and effect, and the Owner must be protected to the full extent provided by 1963 PA 213, as amended, MCL 129.201 et seq.

IMPORTANT: The Surety must be authorized to do business in the State of Michigan by the Department of Licensing and Regulatory Affairs − Insurance Bureau, must be listed on the current U.S. Department of the Treasury Circular 570, and, unless otherwise authorized by the Owner in writing, must have at least an A− Best's rating and a Class VII or better financial size category per current A. M. Best Company ratings.

Name, Address and Telephone of the Surety:

Address and Telephone of Agent, who is either a resident of, or whose principal office is maintained in, the State of Michigan

Signed and sealed this __________ day of _______________________, 20_____.

THE CONTRACTOR: (Print Full Name and Sign) By:___________________________________________________________

WITNESS ______________________________ Name & Title: __________________________________________________

Telephone No. _________________________________________________

THE SURETY: (Print Full Name and Sign) Agent: ________________________________________________________

WITNESS ______________________________ Attorney-in-Fact: ________________________________________________

Telephone No. _______________________________________________

Bidding and Contract Document (R 03/22) Donken Tapiola North End Bridge Replacement File No. 751/22023.TAP

PAYMENT BOND

SURETY COMPANY REFERENCE No.___________________________________

"the Contractor," ___________________________________________________, a corporation ___, individual ___, partnership ___, joint venture ___ of the State of __________________, qualified to do business in the State of Michigan, as Principal, and "the Surety," ____________________________________________________________________, of the State of _________________, as surety, are held and bound unto the State of Michigan, "the Owner," as Obligee, in the amount of __________________________________________________________________________ Dollars ($_________________), for the payment of which the Contractor and Surety bind themselves, their respective heirs, successors, legal representatives and assigns, jointly and severally, in compliance with 1963 PA 213, as amended, MCL 129.201 et seq.

The Contractor has entered into "the Contract" with the Owner for _____________________________________________ __________________, "the Work," covered by the Contract Documents, which are incorporated into this Payment Bond by this reference.

If the Contractor promptly pays all claimants supplying labor or materials to the Contractor or to the Contractor's Subcontractors in the prosecution of the Work, then THIS

OBLIGATION IS VOID, OTHERWISE TO REMAIN IN FULL

FORCE AND EFFECT.

A. All rights and remedies on this Payment Bond are solely for the protection of all claimants supplying labor and materials to the Contractor or the Contractor's Subcontractors in the prosecution of the Work and must be determined in accordance with Michigan Law.

B. No change in Contract Price or Contract Time, "or equal" or substitution or modification of the Contract Documents (including addition, deletion, or other revision) must release the Surety of its obligations under this Payment Bond. The Surety hereby expressly waives notice of any such change in Contract Price or Contract Time, "or equal" or substitution or modification of the Contract Documents (including addition, deletion, or other revision).

C. It is the intention of the Contractor and Surety that they must be bound by all terms and conditions of the Contract Documents (including, but not limited to this Payment Bond). However, this Payment Bond is executed pursuant to 1963 PA 213, as amended, MCL 129.201 et seq., and if any provision(s) of this Payment Bond is/are illegal, invalid, or unenforceable, all other provisions of this Payment Bond must nevertheless remain in full force and effect, and the Owner must be protected to the full extent provided by 1963 PA 213, as amended, MCL 129.201 et seq.

IMPORTANT: The Surety must be authorized to do business in the State of Michigan by the Department of Licensing and Regulatory Affairs − Insurance Bureau, must be listed on the current U.S. Department of the Treasury Circular 570, and, unless otherwise authorized by the Owner in writing, must have at least an A− Best's rating and a Class VII or better financial size category per current A. M. Best Company ratings.

Name, Address and Telephone of the Surety:

Address and Telephone of Agent, who is either a resident of, or whose principal office is maintained in, the State of Michigan

Signed and sealed this __________ day of _______________________, 20_____.

THE CONTRACTOR: (Print Full Name and Sign) By:___________________________________________________________

WITNESS ______________________________ Name & Title: __________________________________________________

Telephone No. _________________________________________________

THE SURETY: (Print Full Name and Sign) Agent: ________________________________________________________

WITNESS ______________________________ Attorney-in-Fact: ________________________________________________

Telephone No. ____________________________________________________

DTMB/DNR

DTMB File No. 751/22023.TAP

OHM PROJECT # 7136-22-0020

EARTH MOVING

31 20 00 - Page 1 of 9

ADDENDUM 2: 09/21/2022

Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Donken Tapiola North End Bridge Replacement ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(19447)

SECTION 31 20 00 - EARTH MOVING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Excavating and filling for rough grading the Site.

2. Preparing subgrades for roads, box culverts, and turf and grasses .

3. Excavating and backfilling for structures.

4. Bedding and leveling course for box culverts.

5. Subbase course and base course for roads.

6. Aggregate surface course for multi-use trails and roads.

7. Riprap for erosion and scour protection.

B. Related Requirements:

1. Section 31 10 00 "Site Clearing" for site stripping, grubbing, stripping and stockpiling topsoil, and removal of above- and below-grade improvements and utilities.

2. Section 32 92 00 "Turf and Grasses" for finish grading in turf and grass areas, including preparing and placing planting soil for turf areas.

1.3 DEFINITIONS

A. Backfill: Soil material or controlled low-strength material used to fill an excavation.

1. Initial Backfill: Backfill placed beside and over pipe in a trench, including haunches to support sides of pipe.

2. Final Backfill: Backfill placed over initial backfill to fill a trench.

B. Base Course: Aggregate layer placed between the subbase course and surface course or under structures.

C. Bedding Course: Aggregate layer placed on the excavated subgrade, supporting the box culvert.

D. Borrow Soil: Satisfactory soil imported from off-site for use as fill or backfill.

E. Drainage Course: Aggregate layer that minimizes upward capillary flow of pore water.

F. Excavation: Removal of material encountered above subgrade elevations and to lines and dimensions indicated.

1. Authorized Additional Excavation: Excavation below subgrade elevations or beyond indicated lines and dimensions as directed by Engineer. Authorized additional excavation and replacement material will be paid for according to Contract provisions for changes in the Work.

2. Bulk Excavation: Excavation more than 10 feet in width and more than 30 feet in length.

3. Unauthorized Excavation: Excavation below subgrade elevations or beyond indicated lines and dimensions without direction by Engineer. Unauthorized excavation, as well as remedial work directed by Architect, shall be without additional compensation.

DTMB File No. 751/22023.TAP

OHM PROJECT # 7136-22-0020

EARTH MOVING

31 20 00 - Page 2 of 9

Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Donken Tapiola North End Bridge Replacement ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(19447)

G. Fill: Soil materials used to raise existing grades.

H. Leveling Course: Aggregate layer placed over the bedding course in a trench before laying pipe or setting structures.

I. Structures: Buildings, footings, bridges, box culverts, foundations, retaining walls, slabs, tanks, curbs, mechanical and electrical appurtenances, or other man-made stationary features constructed above or below the ground surface.

J. Subbase Course: Aggregate layer placed between the subgrade and base course, or aggregate layer placed between the subgrade and aggregate surface course.

K. Subgrade: Uppermost surface of an excavation or the top surface of a fill or backfill immediately below subbase, bedding course, drainage fill, drainage course, or topsoil materials.

L. Multi-Use Surface Course: Aggregate layer placed on top of base or subbase serving as the finished/top surface on trails and roads.

M. Foot Path Surface Course: Aggregate layer placed on top of base or subbase serving as the finished/top surface on foot paths and walks.

N. Utilities: On-site underground pipes, conduits, ducts, and cables as well as underground services within buildings.

1.4 ACTION SUBMITTALS

A. Product Data: For each type of the following manufactured products required:

1. Geotextiles.

2. Controlled low-strength material, including design mixture.

3. Particle size distribution (gradation) according to ASTM D6913.

1.5 INFORMATIONAL SUBMITTALS

A. Material Test Reports: For each borrow soil material proposed for fill and backfill as follows:

1. Classification according to ASTM D2487.

2. Density/compaction field testing results.

1.6 FIELD CONDITIONS

A. Traffic: Minimize interference with adjoining roads, streets, walks, and other adjacent occupied or used facilities during earth-moving operations.

1. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction.

2. Provide alternate routes around closed or obstructed traffic ways if required by Owner or authorities having jurisdiction.

B. Improvements on Adjoining Property: Authority for performing earth moving indicated on property adjoining Owner's property will be obtained by Owner before award of Contract.

1. Do not proceed with work on adjoining property until directed by Engineer.

C. Utility Locator Service: Notify Miss Dig for area where Project is located before beginning earth-moving operations.

DTMB File No. 751/22023.TAP

OHM PROJECT # 7136-22-0020

EARTH MOVING

31 20 00 - Page 3 of 9

Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Donken Tapiola North End Bridge Replacement ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(19447)

D. Do not commence earth-moving operations until temporary site fencing and erosion- and sedimentation-control measures specified in 31 25 00 "Erosion and Sedimentation Controls" are in place.

PART 2 - PRODUCTS

2.1 SOIL MATERIALS

A. General: Provide borrow soil materials when sufficient satisfactory soil materials are not available from excavations.

B. Satisfactory Soils: Soil Classification Groups GW, GP, GM, SW, SP, and SM according to ASTM D2487 , or a combination of these groups; free of rock or gravel larger than 3 inches in any dimension, debris, waste, frozen materials, vegetation, and other deleterious matter.

C. Unsatisfactory Soils: Soil Classification Groups GC, SC, CL, ML, OL, CH, MH, OH, and PT according to ASTM D2487 , or a combination of these groups.

1. Unsatisfactory soils also include satisfactory soils not maintained within 2 percent of optimum moisture content at time of compaction.

D. Subbase Material: MDOT Class II Sand or naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D2940/D2940M; with at least 90 percent passing a1-1/2-inch sieve and not more than 12 percent passing a No. 200 sieve.

E. Base Course: MDOT 22A, or naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D2940/D2940M; with at least 95 percent passing a1-1/2-inch sieve and not more than 8 percent passing a No. 200 sieve.

F. Engineered Fill: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D2940/D2940M; with at least 90 percent passing a 1-1/2-inch sieve and not more than 12 percent passing a No. 200 sieve.

G. Leveling Course: MDOT 34R, or naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D2940/D2940M; except with 100 percent passing a1/2-inch sieve and not more than 3 percent passing a No. 200 sieve.

H. Bedding Course: MDOT 6A or narrowly graded mixture of washed crushed stone, or crushed or uncrushed gravel; ASTM D448; coarse-aggregate grading Size 57; with 100 percent passing a 1-1/2-inch sieve and zero to 2 percent passing a No. 8 sieve.

I. Drainage Course: MDOT 6A or narrowly graded mixture of washed crushed stone, or crushed or uncrushed gravel; ASTM D448; coarse-aggregate grading Size 57; with 100 percent passing a 1-1/2-inch sieve and zero to 5 percent passing a No. 8 sieve.

J. Filter Material: Narrowly graded mixture of natural or crushed gravel, or crushed stone and natural sand; ASTM D448; coarse-aggregate grading Size 67; with 100 percent passing a 1-inch sieve and zero to 5 percent passing a No. 4 sieve.

K. Riprap: Stone meeting the requirements of MDOT Riprap, Special, Class II. Crushed concrete is not permitted for use. The gradation for Riprap, Special, Class II can be found in MDOT's Special Provisions, but is generally as follows: 100% passing 24", 85% passing 20", 50% passing 16", and 15% passing 8", L. Sand: MDOT Class II, or ASTM C33/C33M; fine aggregate.

DTMB File No. 751/22023.TAP

OHM PROJECT # 7136-22-0020

EARTH MOVING

31 20 00 - Page 4 of 9

Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Donken Tapiola North End Bridge Replacement ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(19447)

M. Multi-Use Surface Course: MDOT 23A, or naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D2940/D2940M; with 100 percent passing a 1-inch sieve and not more than 16 percent passing a No. 200 sieve.

N. Impervious Fill: Clayey gravel and sand mixture capable of compacting to a dense state.

2.2 GEOTEXTILES

A. Subsurface Drainage Geotextile: Nonwoven needle-punched geotextile, manufactured for subsurface drainage applications, made from polyolefins or polyesters; with elongation greater than 50 percent; complying with AASHTO M 288 and the following, measured per test methods referenced:

1. Survivability: Class 2; AASHTO M 288.

2. Survivability: As follows:

a. Grab Tensile Strength: 90 lbf; ASTM D4632.

b. Sewn Seam Strength: 142 lbf; ASTM D4632.

c. Tear Strength: 45 lbf; ASTM D4533.

d. Puncture Strength: 45 lbf; ASTM D4833.

3. Apparent Opening Size: No. 70 sieve, maximum; ASTM D4751.

4. Permittivity: 0.5 per second, minimum; ASTM D4491.

5. UV Stability: 50 percent after 500 hours' exposure; ASTM D4355.

B. Separation Geotextile: Woven geotextile fabric, manufactured for separation applications, made from polyolefins or polyesters; with elongation less than 50 percent; complying with AASHTO M 288 and the following, measured per test methods referenced:

1. Survivability: Class 2; AASHTO M 288.

2. Survivability: As follows:

a. Grab Tensile Strength: 247 lbf; ASTM D4632.

b. Sewn Seam Strength: 222 lbf; ASTM D4632.

c. Tear Strength: 90 lbf; ASTM D4533.

d. Puncture Strength: 90 lbf; ASTM D4833.

3. Apparent Opening Size: No. 40 sieve, maximum; ASTM D4751.

4. Permittivity: 0.02 per second, minimum; ASTM D4491.

5. UV Stability: 50 percent after 500 hours' exposure; ASTM D4355.

2.3 CONTROLLED LOW-STRENGTH MATERIAL

A. Produce low-density, controlled low-strength material with the following physical properties:

1. Compressive Strength: 140 psi , when tested according to ASTM C495/C495M.

PART 3 - EXECUTION

3.1 PREPARATION

A. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by earth-moving operations.

B. Protect and maintain erosion and sedimentation controls during earth-moving operations.

C. Protect subgrades and foundation soils from freezing temperatures and frost. Remove temporary protection before placing subsequent materials.

DTMB File No. 751/22023.TAP

OHM PROJECT # 7136-22-0020

EARTH MOVING

31 20 00 - Page 5 of 9

Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Donken Tapiola North End Bridge Replacement ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(19447)

3.2 DEWATERING

A. Provide dewatering system of sufficient scope, size, and capacity to control hydrostatic pressures and to lower, control, remove, and dispose of ground water and permit excavation and construction to proceed on dry, stable subgrades.

B. Prevent surface water and ground water from entering excavations, from ponding on prepared subgrades, and from flooding Project site and surrounding area.

C. Protect subgrades from softening, undermining, washout, and damage by rain or water accumulation.

1. Reroute surface water runoff away from excavated areas. Do not allow water to accumulate in excavations. Do not use excavated trenches as temporary drainage ditches.

D. Dispose of water removed by dewatering in a manner that avoids endangering public health, property, and portions of work under construction or completed. Dispose of water and sediment in a manner that avoids inconvenience to others.

3.3 EXPLOSIVES

A. Explosives: Do not use explosives.

3.4 EXCAVATION, GENERAL

A. Classified Excavation: Excavate to subgrade elevations. Material to be excavated will be classified as earth and rock. Do not excavate rock until it has been classified and cross sectioned by Engineer. The Contract Sum will be adjusted for rock excavation according to the Contract Documents. Changes in the Contract Time may be authorized for rock excavation.

1. Earth excavation includes excavating pavements and obstructions visible on surface;

underground structures, utilities, and other items indicated to be removed; and soil, boulders, and other materials not classified as rock or unauthorized excavation.

a. Intermittent drilling; blasting, if permitted; ram hammering; or ripping of material not classified as rock excavation is earth excavation.

3.5 EXCAVATION FOR STRUCTURES

A. Excavate to indicated elevations and dimensions within a tolerance of plus or minus 1 inch. If applicable, extend excavations a sufficient distance from structures for placing and removing concrete formwork, for installing services and other construction, and for inspections.

1. Excavations for Footings and Foundations: Do not disturb bottom of excavation. Excavate by hand to final grade just before placing concrete reinforcement. Trim bottoms to required lines and grades to leave solid base to receive other work.

2. Excavation for Underground Tanks, Basins, and Mechanical or Electrical Utility Structures:

Excavate to elevations and dimensions indicated within a tolerance of plus or minus 1 inch.

Do not disturb bottom of excavations intended as bearing surfaces.

3.6 EXCAVATION FOR ROADS

A. Excavate surfaces under roads to indicated lines, cross sections, elevations, and subgrades.

DTMB File No. 751/22023.TAP

OHM PROJECT # 7136-22-0020

EARTH MOVING

31 20 00 - Page 6 of 9

Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Donken Tapiola North End Bridge Replacement ". A valid, current MasterSpec license is required for editing and use of this document for any other project.(19447)

3.7 UNAUTHORIZED EXCAVATION

A. Fill unauthorized excavation under foundations or wall footings by extending bottom elevation of concrete foundation or footing to excavation bottom, without altering top elevation. Lean concrete fill, with 28-day compressive strength of 2500 psi, may be used when approved by Engineer.

1. Fill unauthorized excavations under other construction, pipe, or conduit as directed by

Engineer.

3.8 STORAGE OF SOIL MATERIALS

A. Stockpile borrow soil materials and excavated satisfactory soil materials without intermixing.

Place, grade, and shape stockpiles to drain surface water. Cover to prevent windblown dust.

1. Stockpile soil materials away from edge of excavations. Do not store within drip line of remaining trees.

3.9 BACKFILL

A. Place and compact backfill in excavations promptly, but not before completing the following:

1. Construction below finish grade including, where applicable, subdrainage, dampproofing, waterproofing, and perimeter insulation.

2. Surveying locations of underground utilities for Record Documents.

3. Testing and inspecting underground utilities.

4. Removing concrete formwork.

5. Removing trash and debris.

6. Removing temporary shoring, bracing, and sheeting.

7. Installing permanent or temporary horizontal bracing on horizontally supported walls.

B. Place backfill on subgrades free of mud, frost, snow, or ice.

3.10 UTILITY TRENCH AND BOX CULVERT BACKFILL

A. Place backfill on subgrades free of mud, frost, snow, or ice.

B. Place and compact bedding course on trench bottoms and where indicated. Shape bedding course to provide continuous support for bells, joints, and barrels of pipes and for joints, fittings, and bodies of conduits.

C. Backfill voids with satisfactory soil while removing shoring and bracing.

D. Initial Backfill:

1. Soil Backfill: Place and compact initial backfill of subbase material , free of particles larger than 1-1/2 inches in any dimension, to a height of 12 inches over the pipe or conduit.

a. Carefully compact initial backfill under pipe haunches and compact evenly up on both sides and along the full length of piping or conduit to avoid damage or displacement of piping or conduit. Coordinate backfilling with utilities testing.

E. Final Backfill:

1. Soil Backfill: Place and compact final backfill of satisfactory soil to final subgrade elevation.

3.11 SOIL FILL

A. Plow, scarify, bench, or break up sloped surfaces steeper than 1 vertical to 4 horizontal so fill material will bond with existing material.

DTMB File No. 751/22023.TAP

OHM PROJECT # 7136-22-0020

EARTH MOVING

31 20 00 - Page 7 of 9

Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "OHM Advisors" for "Donken Tapiola North End Bridge Replacement ".