This is a bid tabulation document for the City of Salem, Oregon's Center Street Brick Sewer Rehabilitation project (Contract #256092, Project #724110). The project involves comprehensive rehabilitation of brick sewer infrastructure along Center Street, including mainline video inspection of 1,824 linear feet of 26x36-inch egg-shaped sewer, CIPP liner installation, sewer bypass pumping, manhole rehabilitation covering 1,400 square feet, lateral connection work, and associated preparation activities. Additional scope items include erosion control measures, temporary work zone traffic control, utility cross bore relocation, and lateral status verification. The bid closing date was January 20, 2026, with five contractors submitting proposals for the project.

Five bidders submitted proposals with the following total bids: Iron Horse, LLC (low bidder) at $1,318,730.00; Allied Plumbing & Pumps LLC (second low) at $1,040,968.00; Whitaker Construction Company (third low) at $1,172,600.00; SAK Construction, LLC at $1,247,144.00; and Insituform Technologies, LLC at $1,316,739.00. The engineer's estimate ranged from $1,200,000 to $1,400,000. Significant pricing variations appeared across bidders, particularly in major line items such as CIPP liner work (ranging from $240 to $500 per linear foot) and sewer bypass pumping (ranging from $60,000 to $350,000). Ben Haney, PE, Engineering Program Manager, oversaw the bid evaluation process.

View the file

Other files

File Type Posted
724110-Project Manual.pdf PDF
724110-Plans.pdf PDF
724110 Addendum 1.pdf PDF
724110-Bid Register with Rank.pdf PDF
256092 Bid Opening Zoom - Teams Link.pdf PDF
724110 Intent to Award Letter 2.17.26- Executed.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TABULATION OF BIDS FOR:

Average of 3

(*) figures changed to reflect accurate extension or addition 2 nd

Low Bidder 3 rd

Low Bidder Lowest Bidders

NO. QUANTITY

UNIT OF

MEASURE UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE UNIT PRICE UNIT PRICE

1 Mobilization All Req'd Lump Sum 120,000.00 120,000.00 95,000.00 95,000.00 100,000.00 125,000.00 106,666.67

2 Erosion Control Measures a Erosion Control All Req'd Lump Sum 8,500.00 8,500.00 5,000.00 5,000.00 25,000.00 5,000.00 11,666.67 b Catch Basin and Inlet Protection 5 Each 150.00 750.00 1,000.00 5,000.00 500.00 500.00 666.67

Temporary Work Zone Traffic Control, Complete All Req'd Lump Sum 60,000.00 60,000.00 95,000.00 95,000.00 20,000.00 68,000.00 61,000.00

4 Utility Cross Bore Relocation All Req'd Lump Sum 20,000.00 20,000.00 35,000.00 35,000.00 30,000.00 40,000.00 35,000.00

Mainline Video Inspection, 26x36-inch

Egg Shaped Sewer 1824 Lin. Ft. 20.00 36,480.00 7.00 12,768.00 10.00 6.00 7.67

Lateral Status Verification/Video

Inspection 3 Each 500.00 1,500.00 500.00 1,500.00 500.00 2,500.00 1,166.67

7 CIPP Liner, 26x36-inch, UV Cure 1824 Lin. Ft. 500.00 912,000.00 250.00 456,000.00 240.00 300.00 263.33

8 Sewer Bypass Pumping All Req'd Lump Sum 60,000.00 60,000.00 145,000.00 145,000.00 350,000.00 260,000.00 251,666.67

9 Manhole Rehabilitation 1400 Sq. Ft. 50.00 70,000.00 48.00 67,200.00 104.00 90.00 80.67

Mainline Lateral Connection Brim-Style

Liner (6-inch) 1 Each 7,500.00 7,500.00 8,500.00 8,500.00 10,000.00 5,000.00 7,833.33

Mainline Connecting Mainline

Connection Brim-Style Liner (10-inch) 2 Each 8,500.00 17,000.00 12,500.00 25,000.00 10,000.00 5,000.00 9,166.67

Cleaning, Grouting, and Pipe

Preparation All Req'd Lump Sum 5,000.00 5,000.00 90,000.00 90,000.00 12,000.00 40,000.00 47,333.33

Total 1,318,730.00 1,040,968.00

2nd Low Bidder 1,172,600.00

3rd Low Bidder 1,247,144.00

1,316,739.00

1,649,631.00

#2 Allied Plumbing & Pumps LLC

#3 Whitaker ConstrucCon Company

1/20/2026

#4 SAK Construction, LLC

#5 Insituform Technologies, LLC

Center Street Brick Sewer Rehabilitation

Iron Horse, LLC

PO Box 1472

Low Bidder

Fairview, OR 97024

Project Number:

Bid/Contract Number:

Closing Date:

724110

256092 Ben Haney, PE

Engineering Program Manager

#2 Allied

Plumbing &

Pumps LLC

#3 Whitaker

Construction

CompanyEngineer's Estimate

Remaining Bidders

C:\Users\FMora\Downloads\724110-aba-master (1).xlsm\Bid Tabulation Page 1 of 1 Tabulation of Bids