7214_Maitland_Lane_CombinedBidDocuments.pdf
PDF 9 MB Posted
- Attached to
- 7214 Maitland Lane Project
- Solicitation number
- 487-MCSWS 7214 Maitland Lane
- Issued by
- Mecklenburg County, North Carolina
About this file
This Combined Bid Documents file pertains to the 7214 Maitland Lane Project in North Carolina, involving the repair of a sinkhole caused by a failed storm drainage system. The project requires contractors to address the failed drainage infrastructure and remediate the resulting sinkhole damage at the specified location. The bid documents establish the framework for soliciting proposals from qualified contractors, with detailed specifications and requirements outlined for the completion of this infrastructure repair work.
The file contains the consolidated bidding materials necessary for contractors to prepare and submit competitive proposals for the sinkhole repair project. Specific pricing terms, contract duration, site visit requirements, bid submission deadlines, and any set-asides or contractor qualifications are detailed within the bid documents. Additional information regarding funding sources, project specifications, scope of work, and any special conditions or requirements for project execution would be contained in the supporting exhibits and technical specifications included in this combined document package.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL
INCLUDING SPECIFICATIONS FOR CONSTRUCTION OF
7214 MAITLAND LANE PROJECT
MECKLENBURG COUNTY
NORTH CAROLINA
Mecklenburg County Storm Water Services 2145 Suttle Avenue Charlotte, NC 28208
980-721-3571 Heather S. Davis
Mecklenburg County Storm Water Repair Contract 7214 Maitland Lane Project- Tax ID 11133155
1 | P a g e
Table of Contents
NOTICE TO BIDDERS 2
INSTRUCTION TO BIDDERS 4
1. SCOPE OF WORK 4
2. FAMILIARITY WITH WORK AND CONDITIONS 4
3. FAMILIARITY WITH LAWS, ETC. 4
INDEMNIFICATION 5
INDEMNITY AND INSURANCE 6
INSURANCE REQUIREMENTS 6
REQUIRED BID DOCUMENTS 8
FORMS 9
ATTACHMENT 1 – FORM OF PROPOSAL 9
BID TAB (PART OF ATTACHMENT 1) 9
BID BOND (PART OF ATTACHMENT 1) 9
INSURANCE CERTIFICATE (PART OF ATTACHMENT 1) 9
PROJECT EXPERIENCE (PART OF ATTACHMENT 1) 9
CONTRACTOR E-VERIFY DECLARATION (PART OF ATTACHMENT 1) 9
NON-DISCRIMINATION IN EMPLOYMENT (PART OF ATTACHMENT 1) 9
REFERENCED MATERIALS 9
ATTACHMENT 2 – 7214 MAILAND LANE_PLANS_09-26-2025 9
ATTACHMENT 3 – SPECIFICATION FOR CORRUGATED METAL PIPE (CMP), ALUMINIZED STEEL TYPE 2 9
ATTACHMENT 4 – CMP DESIGN GUIDE 9
ATTACHMENT 5 – CMP INSTALLATION GUIDE 9
ATTACHMENT 6 – SPL-1 SEEDING AND MULCHING 9
ATTACHMENT 7 – SP-1 PUMP AROUND OPERATION 9
ATTACHMENT 8 9
EXAMPLE CONTRACT 9
2 | P a g e
Notice to Bidders Sealed proposals will be received until 11:00 AM on Thursday, January 7, 2027, in the office of Charlotte-Mecklenburg County Storm Water Services, 2145 Suttle Avenue, Charlotte, NC 28208 for the construction of the 7214 Maitland Lane Project – Tax ID 11133155 at which time and place, all properly submitted Bids will be opened and read aloud on the Fourth Floor, LUE-Woods Conference Room. Proposals must be made on standard forms furnished by the County. No verbal or electronic bids will be accepted.
Bidders or their authorized agents and other interested parties are invited to attend.
An electronic version of the plans and specifications was emailed out to the contractors and listed on the NC eProcurement Website.
Interested bidders are advised to submit contact information to the County’s Project Manager:
For information regarding this project contact:
Heather Davis, Project Manager Charlotte-Mecklenburg Storm Water Services 2145 Suttle Avenue Charlotte, NC 28208 980-721-3571 mobile Heather.Davis@MeckNC.gov
If a contractor obtains a set of Contract Documents (plans and specifications) from any source other than the County’s Authorized personnel, it will be that contractor’s responsibility to obtain any addenda. If a contractor bids any portion of these plans without receiving the full and complete set of plans and specifications, they will do so at their own risk. If such bid is accepted by the County, the Contractor is liable for all work as described in the Plans, Specifications, and Addenda.
Bid, Performance, and Payment & Material bonds shall be required for this project.
Each bid that equals or exceeds $50,000.00 shall be accompanied by a corporate bid bond or a bid deposit of a certified or cashier’s check in the amount of at least 5% of the total amount bid for the contract. When a bid is secured by a bid deposit (certified check or cashier’s check), the execution of a bid bond will not be required.
When the bid security is in the form of a bid bond, that bid bond shall be executed by a corporate surety.
The laws of North Carolina and applicable regulations of various Licensing Boards and BDI provisions will be observed in receiving bids and awarding contracts.
https://eprocurement.nc.gov/ mailto:Heather.Davis@MeckNC.gov
3 | P a g e
A non-mandatory pre-bid meeting shall be held at 11:00 AM on Thursday, December 3, 2026, across the street from 7214 Maitland Lane, Charlotte, NC 28215, Tax ID 11133155.
Mecklenburg County reserves the right to reject any or all proposals and to waive informalities or technicalities, as it may deem to be in its best interest.
Upon request, this information will be made available in an alternative format for persons with disabilities. Please call 980-314-3324 for assistance.
Bidders will provide North Carolina General Contract License Number, Classification(s), and Limits in the space provided in the signature page of the bid.
Bids may be held by the County for a period not to exceed one hundred twenty (120) days from the date of the bid opening for the purpose of reviewing bids and investigating qualifications of bidders.
The itemized proposal form and Project Manual provided by the County shall be used in its entirety. All entries, including signatures, shall be in ink.
Delivery of Bids: Each proposal must be complete and independent including bid proposal forms, bid security, and all other required forms listed in the Project Manual. Each proposal must be submitted in (2) opaque adhesively sealed envelopes, to conceal its contents as follows:
a. Inner Envelope-The inner Envelope shall contain all bidding documents indicated in INSTRUCTIONS TO BIDDERS, 8. PROPOSAL FORMS with the exception of the Bid Bond. The name of the Bidder, their address and license number shall be marked on the outside of the Inner Envelope.
b. Outer Envelope- The Outer Envelope shall contain the sealed Inner Envelope and the Bid Bond. The Project Name and Bid Date shall be marked on the outside of the sealed Outer Envelope as well as the address for submission as indicated in the NOTICE TO BIDDERS.
BID FOR: ____________________________________________________________________
Project Name (Enter the project name as shown on the Bid Documents)
BIDDER’S NAME: ____________________________________________________________
Contractor’s Name (Full name of Contractor submitting the bid)
DO NOT OPEN UNTIL: ________________________________________________________
Bid Opening Date & Time (Enter the date & time as shown on the Bid Documents)
4 | P a g e
Instruction to Bidders
1. SCOPE OF WORK
This project shall consist of furnishing all labor, materials, and equipment, and performing all work necessary to support the 7214 Maitland Lane Project in Mecklenburg County, North Carolina. Work shall be conducted in accordance with the enclosed documents and on-site instructions provided by the Engineer (also referred to as County), Owner (County) and/or their representative and will include, but may not be limited to: Mobilization, temporary construction entrance, Erosion Control and Sediment Control measures, demolition/removal of failed pipe, clearing/grading, storm drainage installation, foundation conditioning, catch basin/masonry drainage structures, backfill/select material, restore pit gravel trail, etc. For the purposes of these documents, the “Owner” is assumed to be a representative of Mecklenburg County.
2. FAMILIARITY WITH WORK AND CONDITIONS
Before preparing Bids, Bidders are urged to visit the site to inform and familiarize themselves with all site conditions under which the project will be constructed and apparatus erected and installed. The Owner will not be responsible for payments to the Contractor other than as detailed in the Construction Contract. Should construction conditions be different from those assumed or contemplated by the Contractor. The Contractor is required to satisfy himself, prior to bidding, as to the correctness of the site as indicated by the Contract Documents.
3. FAMILIARITY WITH LAWS, ETC.
The Bidder shall be familiar with all Federal, State and Local Laws, and ordinances and regulations, which may in any manner affect those engaged or employed in Work, or the materials or equipment in or upon the Work, or in any way affect the conduct of the Work. No pleas of misunderstanding will be considered because of the ignorance thereof. If the Bidder or Contractor shall discover any provisions in the plans, specifications or Construction Contract (hereinafter sometimes referred to as “Contract”) which are contrary to, or inconsistent with, any such law, ordinance, or regulation, he shall immediately report it to the County in writing before the bid opening.
The Contractor, and his subcontractors performing work at the worksite, will be required to comply with the Occupational Safety and Health Standards and the Safety and Health Regulations for Construction.
5 | P a g e
Indemnification To the fullest extent permitted by law, the contractor shall indemnify, defend and hold harmless each of the “Indemnities” (as defined below) from and against any and all “Charges” (as defined below) paid or incurred any of them as a result of any claims, demands, lawsuits, actions, or proceedings: (i) alleging violation, misappropriation or infringement of any copyright, trademark, patent, trade secret or other proprietary rights with respect to the Work or any products or deliverables provided to the County pursuant to this contract (“Infringement Claims”); (ii) seeking payment for labor or materials purchased or supplied by the Contractor or its subcontractors in connection with this Contract; or (iii) arising from the Contractor’s failure to perform its obligations under this Contract, or from any act of negligence or willful misconduct by the Contractor or any of its agents, employees or subcontractors relating to this Contract, including but not limited to any liability caused by an accident or other occurrence resulting in bodily injury, death, sickness or disease to any person(s) or damage or destruction to any property, real personal, tangible or intangible; or (iv) alleging violation of any federal, state or local law or regulation by the Contractor or any of the Contractor’s subcontractors; or (v) alleging that an employee or subcontractor of the Contractor is an employee of the County, including but not limited to claims relating to worker’s compensation, failure to withhold taxes and the like. For purposes of this Section: (a) the term “Indemnities” means the County and each of the County’s officers, officials, employees, agents and independent contractors (excluding the Contractor); and (b) the term “Charges” means any and all losses, damages, costs, expenses (including reasonable attorneys’ fees), obligations, duties, fines, penalties, royalties, interest charges and other liabilities (including settlement amounts). If an Infringement Claim occurs, the Contractor shall either: (i) procure for the County the right to continue using the affected product or service; or (ii) repair or replace the infringing product or service so that it becomes non-infringing, provided that the performance of the overall product(s) and service(s) provided to the County shall not be adversely affected by such replacement or modification.
If the Contractor is unable to comply the preceding sentence within thirty days (30) after the County is directed to cease use of a product or service, the Contractor shall promptly refund to the County all amounts paid under this Contract.
6 | P a g e
Indemnity and Insurance INDEMNITY & INSURANCE: The Contractor shall indemnify and save harmless the Owner, its agents and employees and assigns from and against all loss, cost, damages, expense, and liability caused by an accident or other occurrence resulting in bodily injury, including death, sickness, and disease to any person; or damage or destruction to property, real or personal; arising directly or indirectly from operations, products, or services rendered under this Contract. The Contractor further agrees to purchase and maintain during the life of this Contract with an insurance company acceptable to the Owner authorized to do business in the State of North Carolina the following insurance:
INSURANCE REQUIREMENTS
Contractor’s Liability and Other Insurance: The Contractor shall purchase and maintain with a company acceptable to the County and authorized to do business in the State of North Carolina, such insurance as will protect him from claims under workers’ compensation laws, disability benefit laws or other similar employee benefit laws; from claims of damages because of bodily injury, occupational sickness or disease, or death of his employees; from claims for damages because of bodily injury and personal injury; and from claims for damage and destruction of tangible property, including loss of use resulting there-from – any or all of which may arise out of or result from the Contractor’s operations under the Contract Documents, whether such operations be by himself or any subcontractor or anyone directly or indirectly employed by any of them or for whose acts any of them may be legally liable.
When certain work is performed inside rights-of-way owned by railroads, North Carolina Department of Transportation or other agencies, both the Contractor and any subcontractors may be required to furnish individual insurance certificates made in favor by the controlling agency, with limits established by that agency. See Insurance Requirements for other agencies in permits included at the end of this section under Other Insurance Requirements.
SUPPLEMENTARY CONDITIONS. Contractor is responsible for obtaining any additional, necessary insurance.
The insurance shall be written for not less than the limits of liability specified below.
Automobile: Bodily injury and property damage liability covering all owned, non-owned, and hired automobiles for limits of not less than $1,000,000 each person, $1,000,000 each occurrence bodily injury liability, and $1,000,000 each occurrence property damage liability.
7 | P a g e
Comprehensive General Liability: Bodily injury and property damage liability insurance as shall protect the Contractor and any Subcontractor performing Work under this Contract from claims of bodily injury or property damage which arise from operations of this Contract whether such operations be performed by the Contractor, any Subcontractor, or anyone directly or indirectly employed by either. The amounts of such insurance shall not be less than $1,000,000 bodily injury and property damage liability for each occurrence/aggregate. This insurance shall include coverage for products/completed operations, and contractual liability assumed under the indemnity provision of this Contract. To be included in Comprehensive General Liability is the Broad Form Property Damage. On the policy, list “Mecklenburg County” as an "Additional Insured".
Workman's Compensation & Occupational Disease Insurance:
Meeting the statutory requirements of the State of North Carolina including employer’s liability insurance for an amount of not less than $500,000 for each accident, $500,000 for disease each employee, and $500,000 for policy limit.
Professional Errors & Omissions: Insurance with a limit of not less than $1,000,000 per claim occurrence as shall protect the contractor and the contractor’s employees for negligent acts, errors or omissions in performing the professional services under this contract.
Builder's Risk Insurance: The Owner shall purchase and maintain "all risk" Builder's Risk Insurance, including, without duplication of coverage, theft, vandalism, and malicious mischief. This insurance shall cover the entire Work at the site to which the Contract applies, to the full insurable value thereof and shall be for the benefit of the Owner and Contractor as their interest may appear, except that any loss not covered because of deductible clauses or policy exclusions shall be the sole responsibility of the Contractor.
The Owner’s Builder’s Risk Insurance shall not cover the Contractor’s:
1. Tools
2. Equipment
3. Storage shed or office
4. Vehicles
Other Insurance Requirements:
a) The Owner shall be exempt from and in no way liable for any sums of money which may represent a deductible in any insurance policy. The payment of such deductible shall be the sole responsibility of the Contractor and/or subcontractor providing such insurance;
b) Mecklenburg County shall be named as an additional insured under the general and automobile liability insurance policies;
c) The contractor shall be responsible for notifying Mecklenburg County of any material changes (including renewals) to or cancellation of the insurance
8 | P a g e coverages required above. Notice to Mecklenburg County must be completed in writing within 48 hours of the changes;
d) Should any of the required insurance coverages be self-insured by the contractor, a copy of the Certificate of Self-Insurance or other documentation from the North Carolina Department of Insurance shall be furnished to the owner;
e) If any part of the work under the Agreement is sublet, the subcontractor shall be required to meet all insurance requirements set forth in the Agreement. Nothing contained herein shall relieve the Contractor from meeting all insurance requirements or otherwise being responsible for the subcontractor
Certificates of such insurance shall be furnished to the Owner and shall contain the provision that should any of the above described polices be cancelled before the expiration date thereof, the issuing insurance company will endeavor to mail thirty (30) days written notice to “Mecklenburg County”. The Contractor agrees to notify the Owner by telephone and by providing written notice within two (2) days after receipt of information that the insurance company either intends to amend or terminate a policy or has amended or terminated any insurance policy providing the coverage referred to above.
Required Bid Documents All forms included in the bidding documents shall be completed in ink or be typewritten.
Both words and figures shall be indicated on the bid proposal form. If there is a discrepancy between the wording and the figures, the wording shall govern. With each bid, the contractor shall include: Bid Proposal Form, Execution of Bid, Certification of Non- Discrimination in Employment (ADA Compliance), Contractor E-Verify Declaration, and Insurance Certificate.
**END OF GENERAL CONDITIONS OF CONTRACT**
9 | P a g e
FORMS
Attachment 1 – Form of Proposal
Bid Tab (part of attachment 1)
Bid Bond (part of attachment 1)
Insurance certificate (part of attachment 1)
Project Experience (part of attachment 1)
Contractor E-Verify declaration (part of attachment 1)
Non-Discrimination in employment (part of attachment 1)
REFERENCED MATERIALS
Attachment 2 – 7214 Mailand Lane_Plans_09-26-2025
Attachment 3 – Specification for Corrugated Metal Pipe (CMP), Aluminized Steel Type 2
Attachment 4 – CMP Design Guide
Attachment 5 – CMP Installation Guide
Attachment 6 – SPL-1 Seeding and Mulching
Attachment 7 – SP-1 Pump Around Operation
Attachment 8
EXAMPLE CONTRACT
FORM OF PROPOSAL
F O R M OF P R O P O S A L
7214 Maitland Lane Project – Tax ID 11133155 Bidder:
Mecklenburg County, North Carolina Date:
The undersigned, as bidder, hereby declares that the only person or persons interested in this proposal as principal or principals is or are named herein and that no other person than herein mentioned has any interest in this proposal or in the contract to be entered into; that this proposal is made without connection with any other person, company or parties making a bid or proposal; and that it is in all respects fair and in good faith without collusion or fraud. The bidder further declares that he has examined the site of the work and the contract documents relative thereto and has read all special provisions furnished prior to the opening of bids; that he has satisfied himself relative to the work to be performed.
The Bidder proposes and agrees if this proposal is accepted to contract with Mecklenburg County in the form of contract specified below, to furnish all necessary materials, equipment, machinery, tools, apparatus, means of transportation and labor necessary to complete the construction of:
7214 Maitland Lane Project – Tax ID 11133155 in full in complete accordance with the plans, specifications, and contract documents, to the full and entire satisfaction of Mecklenburg County with a definite understanding that no money will be allowed for extra work except as set forth in the Contract Documents, for the sum of:
Time of Completion and Liquidated Damages:
Bidder hereby agrees to fully complete the project within 120 consecutive calendar days after the Notice to Proceed. Bidder also agrees to pay $250.00 as liquidated damages for each consecutive day beyond the date of completion.
CONTRACT:
Base Bid (not including contingency):
Dollars($)
Total Bid, Base (including contingency):
Dollars($) vangtb Text Box
ATTACHMENT 1
General Subcontractor:
Name:
License No.
UN T PRICES
Unit prices quoted and accepted shall apply throughout the life of the contract, except as otherwise specifically noted. Unit prices shall be applied, as appropriate, to compute the total value of changes in the scope of the work all in accordance with the contract documents.
The bidder further proposes and agrees hereby to commence work under this contract on a date to be specified in a written order of the designer and shall fully complete all work there under within the time specified in the Supplementary General Conditions.
Proposal Signature Page
The undersigned further agrees that in the case of failure on his part to execute the said contract and the bonds within ten (10) days after being given written notice of the award of contract, the certified check, cash or bid bond accompanying this bid shall be paid into the funds of the owner's account set aside for the project, as liquidated damages for such failure;
otherwise the certified check, cash or bid bond accompanying this proposal shall be returned to the undersigned.
Respectfully submitted this day of (date)
(Name of firm or corporation making bid)
WITNESS:
ATTEST:
(Proprietorship or Partnership)
By:
Signature
Name:
Print or type
Title:
(Owner/Partner/Pres.N.Pres)
Address:
By:
Title:
(Corp. Sec. or Asst. Sec. only)
(CORPORATE SEAL)
Addendum received and used in computing bid:
Federal I.D. No.
Addendum No. 1
Addendum No. 2
Addendum No. 3
Addendum No. 4
Addendum No.5 Addendum No. 7
Addendum No.6 Addendum No. 8
BID TABULATION FOR
7214 MAITLAND LANE – PROJECT
– Tax ID 11133155
MECKLENBURG COUNTY, NORTH
CAROLINA MECKLENBURG COUNTY STORM
WATER SERVICES 8/14/2026
Item Section ITEM DESCRIPTION Qty Unit Unit Price Amount
1 800 Mobilization 1 LS
2 226 Comprehensive Grading 1 LS
3 230 Borrow Excavation 150 CY
4 265 Select Granular Material 110 TN
5 300 Foundation Conditioning Material, Minor Structures 60 TN
6 300 Foundation Conditioning Geotextile 90 SY
7 310 66” Spiral Rib Pipe (0.109” thick), Aluminized Steel Type 2 20 LF
8 840 Masonry Drainage Structures, NCDOT Std. 840.32 17 CY
9 840 Manhole Frame and Cover, NCDOT Std. 840.54 2 EA
10 876 Geotextile for Drainage, Type 2 (Construction Entrance) 100 SY
11 1610 Stone for Erosion Control, Type 2 (Construction Entrance) 100 SY
12 SPL-1 Seeding and Mulching 90 SY
13 SP-1 Pump-Around Operation 10 DA
15 SUBTOTAL
16 10% Contingency
17 TOTAL BASE BID
PROJECT EXPERIENCE
APPLICANT’S LICENSES, CERTIFICATES, and/or RELEVANT COURSE WORK
Provide information on licenses, certificates, or relevant course work necessary for the type of work the applicant company will perform.
Type of License, Certificate, or Course Work
Firm or Individual’s Name
Expiration Date
EXPERIENCE ON SIMILAR COMPLETED PROJECTS
List at least three (3) projects that involved similar stream restoration and/or enhancement work successfully completed in the past (5) five years. Provide project name, location, owner/client contact information, restored length and/or a brief explanation of scope of work. Indicate what level of effort was provided by your own forces. It is preferable that listed projects be located in the NC Piedmont or a similar hydro physiographic region.
PROJECT NAME PROJECT INFO & DESCRIPTION
PROJECT NAME PROJECT INFO & DESCRIPTION
STATE OF NORTH CAROLINA
COUNTY OF MECKLENBURG
CONTRACTOR E-VERIFY DECLARATION
I, (the individual attesting below), being duly authorized by and on behalf of
(the entity contracting with the County, hereinafter "Employer/Contractor") AFFIRMS AND DECLARES as follows:
1. Employer/Contractor understands that E-Verify is a federal program operated by the United States Department of
Homeland Security and other federal agencies, or any successor or equivalent program used to verify the work authorization of newly hired employees pursuant to federal law in accordance with NCGS §64-25(5).
2. Pursuant to NCGS §l53A-449(b) and NCGS § 64-26(a), any Employer/Contractor that transacts business in this State and employs 25 or more employees in this State entering into a contract with the County is required to verify the work eligibility status of all newly hired employees through the E-verify program.
3 Employer/Contractor is a person, business entity, or other organization that transacts business in this
State and employs 25 or more employees in this State. (check Yes or No)
a. YES , or
b. NO
4. For Employers/Contractors who employ 25 or more employees in the State and are therefore subject
E-Verify, the undersigned verifies the Employer’s/Contractor’s compliance with the requirements of
Article 2 of Chapter 64 of the North Carolina General Statutes.
5. Employer's subcontractors on this County Project that employ 25 or more employees in this State must also comply with E-Verify, and if Employer is the successful contractor on this Project, Employer agrees that it will ensure compliance with E-Verify by any subcontractors used by Employer/Contractor on this
County Project.
6. I hereby declare under penalty of perjury that the foregoing is true and correct.
This day of , 20
Signature of Declarant
Print or Type Name:
CERTIFICATION OF NON-DISCRIMINATION IN EMPLOYMENT
The undersign, being a licensed Contractor in North Carolina, do hereby certify that we will not discriminate against employee or applicant for employment because of race, color, religion, sex, or national origin. We will take affirmative action to ensure that applicants are employed, and that employees are treated equal during employment without regard to race, color, or religion, or handicap. Such action shall include, but not be limited to, the following: employment, upgrading, demotion, or transfer' recruitment or recruitment advertising, layoff or termination; rates of pay or other forms of compensation' and selection for training, including apprenticeship. We will agree to post in conspicuous places, available to employees and applicants for employment, notices to be provided by the Local Public Agency setting forth the provisions of this non-discrimination clause.
Signed
Print or Type Name of Signing Official
Title
Firm
Address
L1
L1
L1
L1
LINE L1 - PROFILE VIEW
PL
A
N
PR
O
FI
LE
D R
A
IN
A G
E
IM
PR
O
VE
M
EN
TS
M A
IT
LA
N D
LA
N
E
9/26/2025 vangtb
ATTACHMENT 2
NAME SYMBOL
NAME SYMBOL
Proposed Rip Rap Ditch
Proposed Full Depth Asphalt Pavement
Proposed Gravel
Tree Protection
Guy Wire
Existing Water Meter
Existing Unknown Utility
Proposed Edge of Pavement
Existing Drop Inlet
Existing Utility Pole ........................................................ /
Existing Storm Drainage
Existing Fiber Optic
Existing Property Line
Existing Gas Line
Existing Underground Telecom
Existing Sanitary Sewer
Proposed Storm Drainage
Existing Water Line
Existing Sanitary Sewer Manhole
Existing Water Valve
Existing Storm Drain Manhole
Proposed Junction Box
Existing/Proposed Telephone Manhole ..................... /
Existing Catch Basin
Proposed Catch Basin
Existing/Proposed Light Pole ........................................ /
Temporary Construction Easement
Proposed Drop Inlet
Iron Pin
Existing Structures
Existing Underground Electric
Existing/Proposed Electric Manhole ......................... /
Existing Tree
Proposed Sanitary Sewer Manhole
Proposed Storm Drainage Easement
Proposed R/W Line
D
T
WM
S
GV
WV
T
E E
S
Proposed Curb & Gutter
Silt Fence
Asphalt Milling
Proposed Concrete Drive
Accessible Ramp
Existing Top of Bank
Existing Gas Service
CIPP Pipe Liner
Existing Overhead Electric
Vertical Utility Location
Maintained as R/W Line
Existing Bottom of Bank
Existing Water Service
N O
TE
S
D
ET
A
IL
S
D R
A
IN
A G
E
IM
PR
O
VE
M
EN
TS
M A
IT
LA
N D
LA
N
E N
/A
9/26/2025
11/9/2016
SPECIFICATION FOR CORRUGATED METAL PIPE
ALUMINIZED STEEL TYPE 2
1.0 GENERAL
1.1 This specification covers the manufacture and installation of the Aluminized Steel Type 2 corrugated steel pipe or pipe-arch (CSP) detailed in the project plans.
2.0 DESIGN STANDARDS
2.1 The CSP meets the design parameters of the American Association of State Highway and Transportation Officials (AASHTO) Standard Specification for Highway Bridges, AASHTO LRFD Bridge Design, and/or the American Iron and Steel Institute (AISI).
3.0 MATERIAL
3.1 The Aluminized Steel Type 2 coils shall conform to the applicable requirements of AASHTO M 274 or ASTM A929.
4.0 PIPE
4.1 The CSP shall be manufactured in accordance with the applicable requirements of AASHTO M 36 or ASTM A760. The pipe sizes, gauges and corrugations shall be as shown on the project plans.
4.2 All fabrication of the product shall occur within the United States.
5.0 COUPLING BANDS
5.1 Coupling bands for the CSP shall be made of the same base metal and coatings as the CSP to a minimum of 18 gauge.
5.2 Ends of the CSP are rerolled with annular corrugations for proper indexing.
5.3 Connection fasteners will be provided.
6.0 HANDLING & ASSEMBLY
6.1 Refer to the recommendations of the National Corrugated Steel Pipe Association’s (NCSPA).
7.0 INSTALLATION
7.1 The installation shall be in accordance with AASHTO Standard Specifications for Highway Bridges, LRFD Section 26, Division II, NCSPA, or ASTM A798 and in conformance with the project plans and specifications. If there are any inconsistencies or conflicts, the contractor must bring them to the attention of the project engineer.
7.2 It is always the contractor’s responsibility to follow OSHA guidelines for safe practices.
8.0 CONSTRUCTION LOADS
8.1 Construction loads may be greater than design loads. The contractor shall follow the recommendations for additional compacted material per manufacturer's or NCSPA guidelines.
vangtb
ATTACHMENT 3
Corrugated Metal Pipe Design Guide
ENGINEERED SOLUTIONS
PIPE SOLUTIONS
vangtb
ATTACHMENT 4
Drainage Pipe Selection Introduction Environment & Abrasion Guidelines / Reference Specifications Usage Guide for Drainage Products Product Dimensions and Hydraulics
HEL-COR® Corrugated Steel Pipe Height of Cover Tables Handling Weights
CORLIX® Corrugated Aluminum Pipe Height of Cover Tables Handling Weights
ULTRA FLO®
Height of Cover Tables Handling Weights
Installation of CMP
Miscellaneous Smooth Cor™ QUICK STAB® Joint End Sections
Corrugated Metal Pipe (CMP) Design Guide Table of Contents
ENGINEERED SOLUTIONS
Durability Design Guide Proper design of culverts and storm sewers requires structural, hydraulic and durability considerations. While most designers are comfortable with structural and hydraulic design, the mechanics of evaluating abrasion, corrosion and water chemistry to perform a durability design are not commonly found in most civil engineering handbooks.
The durability and service life of a drainage pipe installation is directly related to the environmental conditions encountered at the site and the type of materials and coatings from which the culvert is fabricated. Two principle causes of reduced service life in drainage pipe materials are corrosion and abrasion.
Service life can be affected by the corrosive action of the backfill in contact with the outside of a drainage pipe or more commonly by the corrosive and abrasive action of the flow in the invert of the drainage pipe. The design life analysis should include a check for both the water side and soil side environments to determine which is more critical— or which governs service life.
The potential for metal loss in the invert of a drainage pipe due to abrasive flows is often overlooked by designers and its effects are often mistaken for corrosion. An estimate for potential abrasion is required at each pipe location in order to determine the appropriate material and gage.
This manual is intended to guide specifiers through the mechanics of selecting appropriate drainage products to meet service life requirements. The information contained in the following pages is a composite of several national guidelines.
Using the CMP Design Guide The choice of material, gage and product type can be extremely important to service life. The following steps describe the procedure for selecting the appropriate drainage product, material and gage to meet a specific service life requirement.
Design Sequence
1. Select pipe or structure based on hydraulic and clearance requirements. Use Tables 5 and 6 as reference for size limits and hydraulic properties of all drainage products.
2. Use Height of Cover tables for the chosen pipe or structure to determine the material gage required for the specific loading condition.
3. Use Table 1 to select the appropriate material for the site-specific environmental conditions. Whenever possible, existing installations of drainage structures along the same water course offer the most reliable estimate of long-term performance for specific environment conditions.
In many cases, there will be more than one material that is appropriate for the project environmental conditions.
Generally speaking, the metal material types increase in price as you move from top down on Table 1. Please contact your local Contech Sales Representative for pricing.
4. Use Table 2 to determine which abrasion level most accurately describes the typical storm event (2 year storm).
The expected stream velocity and associated abrasion conditions should be based on a typical flow and not a 10 or 50-year design flood.
5. Use Table 3 to determine whether the structural gage for the selected material is sufficient for the design service life.
If the structural gage is greater than or equal to the gage required for a particular abrasion condition and service life, use the structural gage. Conversely, if the structural gage is less than the gage required for a particular abrasion condition and service life, use the gage required by Table 3.
Note:
Both Contech round pipe and pipe-arch are available with either helical or annular corrugations. Contech HEL-COR pipe (helical corrugations) is furnished with continuous lock seams and annular re-rolled ends or non-rerolled ends. For 3”x1” and 5”x1” HEL-COR pipe-arch, we recommend non-rerolled ends with flat or dimpled bands and flat gaskets. Contech riveted pipe is furnished with annular corrugations only. The height of cover tables in this guide are helical corrugations only. Consult your Contech representative for Height of Cover tables on riveted pipe.
Table 2 — FHWA Abrasion Guidelines Abrasion Level Abrasion Condition Bed Load Flow Velocity (fps)
1 Non-Abrasive None Minimal 2 Low Abrasion Minor < 5 3 Moderate Abrasion Moderate 5 - 15 4 Severe Abrasion Heavy > 15
“Interim Direct Guidelines on Drainage Pipe Alternative Selection.” FHWA, 2005.
Table 1 — Recommended Environments
Material Type Soil* and Water pH Resistivity (ohm-cm)
3 4 5 6 7 8 9 10 11 12 Minimum Maximum
Galvanized Steel* 2,000 10,000
Aluminized Steel Type 2
(ALT2)
1,500 N/A
Polymer-Coated 250 N/A
Aluminum Alloy 500 N/A
*Appropriate pH range for Galvanized Steel is 6.0 to 10
Table 3 – Drainage Product Usage Guide
Application Culverts, Storm Drain, Cross Drain, Median Drain, Side Drain
Roadway Classification Rural Minor Major Urban Rural Minor Major Urban Rural Minor Major Urban
Design Service Life 25 50 75 100 25 50 75 100 25 50 75 100
Abrasion Level Abrasion Level 1 & 2 Abrasion Level 3 Abrasion Level 4
CMP (1/2” & 1” deep corrugations), ULTRA FLO® & Smooth Cor™ Minimum gage required to meet design service life, assuming that structural design has been met.
Galvanized (2 oz.) 16 12 10 84 14 10 8 N/A 145 105 85 N/A
Galvanized and Asphalt Coated 16 14 10 8 14 12 8 N/A 145 125 85 N/A
Galv., Asphalt Coated & Paved Invert 16 16 14 10 16 14 12 8 14 12 10 N/A
Aluminized Type 2 (ALT2) 16 16 16 14 14 14 14 12 146 146 146 126
Polymer-Coated 16 16 168 169 16 16 168 169 147 147 147,8 147,9
Aluminum Alloy 16 16 16 16 14 14 14 14 145 145 145 145
1. Based on Table 1 - Recommended Environments.
2. Smooth Cor™ Steel Pipe combines a corrugated steel exterior shell with a hydraulically smooth interior liner.
3. Service life estimates for ULTRA FLO® and Smooth Cor™ Pipe assume a storm sewer application. Storm sewers rarely achieve abrasion levels 3 or 4.
For applications other than storm sewers or abrasion conditions above Abrasion Level 2, please contact your Contech Sales Representative for gage and coating recommendations.
4. Design service life for 8 GA galvanized is 97 years.
5. Invert protection to consist of velocity reduction structures.
6. Asphalt coated and paved invert or velocity reduction structures are needed.
7. Requires a field applied concrete paved invert with minimum thickness 1” above corrugation crests.
8. 75 year service life for polymer-coated is based on a pH range of 4-9 and resistivity greater than 750 ohm-cm.
9. 100 year service life for polymer-coated is based on a pH range of 5-9 and resistivity greater than 1500 ohm-cm.
Table 4 - AASHTO Reference Specifications
Material Type Material Pipe Design* Installation*
P ip e
P ip e -A rc h
CMP (1/2” or 1” deep corrugations)
Galvanized (2 oz.) M218 M36 Section 12 Section 26
Asphalt Coated M190 M36 Section 12 Section 26
Asphalt Coated and Paved Invert M190 M36 Section 12 Section 26
Aluminized Type 2 M274 M36 Section 12 Section 26
Polymer-Coated M246 M36 & M245 Section 12 Section 26
Aluminum Alloy M197 M196 Section 12 Section 26
ULTRA FLO® (3/4” x 3/4” x 7-1/2” corrugation)
Galvanized (2 oz.) M218 M36 Section 12 Section 26
Aluminized Type 2 M274 M36 Section 12 Section 26
Polymer-Coated M246 M36 & M245 Section 12 Section 26
Aluminum Alloy M197 M196 Section 12 Section 26
Smooth Cor™
Polymer-Coated M246 M36 & M245 Section 12 Section 26
* AASHTO LRFD Bridge Design Specification and AASHTO Standard Specification for Highway Bridges
Table 5 - Product Dimensions
Drainage Product Common Uses Size Limits* Manning’s “n”
ValueMinimum Maximum
R o u n d
P ip e
Corrugated Steel (1/2” deep corrugation)
Culverts, small bridges, storm water detention/ retention systems, conduits, tunnels, storm sewers.
12” 84” 0.011 - 0.021
Corrugated Steel with Paved Invert (1/2” deep corrugation) 12” 84” 0.014 - 0.020
Corrugated Steel (1” deep corrugation) 54” 144” 0.022 - 0.027
Corrugated Steel with Paved Invert (1” deep corrugation) 54” 144” 0.019 - 0.023
Corrugated Aluminum (1/2” deep corrugation) 12” 72” 0.011 - 0.021
Corrugated Aluminum (1” deep corrugation) 30” 120” 0.023 - 0.027
ULTRA FLO® Steel Storm sewers, culverts, storm water detention/ retention systems.
18” 102” 0.012
ULTRA FLO® Aluminum 18” 84” 0.012
Smooth Cor™ Steel (1/2” deep corrugation) 18” 66” 0.012
Smooth Cor™ Steel (1” deep corrugation) 48” 126” 0.012
P ip e -A rc h
Corrugated Steel (1/2” deep corrugation)
Culverts, small bridges, storm water detention/ retention systems, conduits, tunnels, storm sewers.
17” x 13” 83” x 57” 0.011 - 0.021
Corrugated Steel with Paved Invert (1/2” deep corrugation) 17” x 13” 83” x 57” 0.014 - 0.019
Corrugated Steel (1” deep corrugation) 53” x 41” 142” x 91” 0.023 - 0.027
Corrugated Steel with Paved Invert (1” deep corrugation) 53” x 41” 142” x 91” 0.019 - 0.022
Corrugated Aluminum (1/2” deep corrugation) 17” x 13” 71” x 47” 0.011 - 0.021
Corrugated Aluminum (1” deep corrugation) 60” x 46” 112” x 75” 0.023 - 0.027
ULTRA FLO® Steel Storm sewers, culverts, storm water detention/ retention systems.
20” x 16” 66” x 51” 0.012
ULTRA FLO® Aluminum 20” x 16” 66” x 51” 0.012
Smooth Cor™ Steel (1/2” deep corrugation) 21” x 15” 77” x 52” 0.012
Smooth Cor™ Steel (1” deep corrugation) 53” x 41” 137” x 87” 0.012
* For sizes outside of these limits, please contact your Contech representative.
Table 6 — Corrugated Steel Pipe—Values of Coefficient of Roughness (Manning's "n")
Helical* Corrugation – 2 2/3" x 1/2” 1-1/2” x 1/4” Annular
2 2/3” x 1/2” 12 in. 15 in. 18 in. 24 in. 36 in. 48 in. 60 in. + 8 in. 10 in. All Diameters
Unpaved 0.011 0.012 0.013 0.015 0.018 0.020 0.021 0.012 0.014 0.024
Paved Invert 0.014 0.017 0.020 0.019 0.021
Smooth Cor™ 0.012 0.012 0.012 0.012 0.012 N/A
Helical*– 3” x 1”
3” x 1” 36 in. 42 in. 48 in. 54 in. 60 in. 66 in. 72 in. 78 in. + All Diameters
Unpaved 0.022 0.022 0.023 0.023 0.024 0.025 0.026 0.027 0.027
Paved Invert 0.019 0.019 0.020 0.020 0.021 0.022 0.022 0.023 0.023
Smooth Cor™ 0.012 0.012 0.012 0.012 0.012 0.012 N/A
Helical* – 5” x 1”
All Diameters5” x 1” 48 in. 54 in. 60 in. 66 in. 72 in. 78 in. +
Unpaved 0.022 0.022 0.023 0.024 0.024 0.025 N/A
Paved Invert 0.019 0.019 0.020 0.021 0.021 0.022 N/A
ULTRA FLO® 3/4” x 3/4” x 7-1/2” All diameters n = 0.012 N/A
* Tests on helically corrugated pipe demonstrate a lower coefficient of roughness than for annularly corrugated steel pipe. Pipe-arches have approximately the same roughness characteristics as their round equivalent pipes.
Area and Hydraulic Radius for Corrugated Steel Pipe Flowing Full
Round Pipe – Area & Hydraulic Radius
Diameter (in.)
Area (Ft²)
Hydraulic Radius (ft.)
12 0.8 0.250
15 1.2 0.312
18 1.8 0.375
21 2.4 0.437
24 3.1 0.500
30 4.9 0.625
36 7.1 0.750
42 9.6 0.875
48 12.6 1.000
54 15.9 1.125
60 19.6 1.250
66 23.8 1.375
72 28.1 1.500
78 33.2 1.625
84 38.5 1.750
90 44.2 1.875
96 50.3 2.000
102 56.8 2.125
108 63.6 2.250
114 70.9 2.375
120 78.5 2.500
126 86.6 2.625
132 95.0 2.750
138 103.9 2.875
144 113.1 3.000
Pipe-Arch – Area & Hydraulic Radius
2 2/3” x 1/2” Corrugated Steel Pipe
Diameter (in.)
Pipe-Arch Equivalent Size (in.)
Waterway Area (Ft²)
Hydraulic Radius A/πD (ft.)
15 17 x 13 1.1 0.280
18 21 x 15 1.6 0.340
21 24 x 18 2.2 0.400
24 28 x 20 2.4 0.462
30 35 x 24 4.5 0.573
36 42 x 29 6.5 0.690
42 49 x 33 8.9 0.810
48 57 x 38 11.6 0.924
54 64 x 43 14.7 1.040
60 71 x 47 18.1 1.153
66 77 x 52 21.9 1.268
72 83 x 57 26.0 1.380
Pipe-Arch – Area & Hydraulic Radius
3” x 1” or 5” x 1” Corrugated Steel Pipe Diameter
(in.)
Pipe-Arch Equivalent
Size (in.)
Waterway Area
(Ft²) Hydraulic Radius
A/πD (ft.)
54 60 x 46 15.6 1.104
60 66 x 51 19.3 1.230
66 73 x 55 23.2 1.343
72 81 x 59 27.4 1.454
78 87 x 63 32.1 1.573
84 95 x 67 37.0 1.683
90 103 x 71 42.4 1.800
96 112 x 75 48.0 1.911
102 117 x 79 54.2 2.031
108 128 x 83 60.5 2.141
114 137 x 87 67.4 2.259
120 142 x 91 74.5 2.373
ULTRA FLO® Pipe-Arch – Area & Hydraulic Radius
2 2/3” x 1/2 “ Corrugated Steel Pipe Diameter
(in.)
Pipe-Arch Equivalent
Size (in.)
Waterway Area
(Ft²) Hydraulic Radius
A/πD (ft.)
18 20 x 16 1.7 0.36
21 23 x 19 2.3 0.42
24 27 x 21 3.0 0.48
30 33 x 26 4.7 0.60
36 40 x 31 6.7 0.71
42 46 x 36 9.2 0.84
48 53 x 41 12.1 0.96
54 60 x 46 15.6 1.10
60 66 x 51 19.3 1.23
Notes:
| 1. | Listed pipe arch dimensions do not include tolerance. |
| 2. | For additional detail, please reference the hydraulic radius |
tables (Figure 4.32 and 4.33) found in the NCSPA CSP Design Manual, 2018.
Heights of Cover
2 2/3” x 1/2” Height of Cover Limits for Corrugated Steel Pipe
Heights of Cover Notes:
1. These tables are for lock-seam or welded-seam construction. They are not for riveted construction. Consult your Contech Sales Representative for Height of Cover tables on riveted pipe.
2. These values, where applicable, were calculated using a load factor of K=0.86 as adopted in the NCSPA CSP Design Manual, 2018.
3. The haunch areas of a pipe-arch are the most critical zone for backfilling. Extra care should be taken to provide good material and compaction to a point above the spring line.
| 4. | E 80 minimum cover is measured from top of pipe to bottom of tie. |
| 5. | H 20 and H 25 minimum cover is measured from top of pipe to bottom |
of flexible pavement or top of rigid pavement.
6. The pipe-arch tables are based on the corner bearing pressures as shown. These values may increase or decrease with changes in allowable corner bearing pressures. Consider the use of a round pipe in cases where the height of cover exceeds 8’.
| 7. | For construction loads, see Page 15. |
| 8. | 1-1/2” x 1/4” corrugation. H 20, H 25 and E 80 loading. |
| 9. | Smooth Cor™ has same Height of Cover properties as corrugated steel |
pipe. The exterior shell of Smooth Cor™ is manufactured in either 2 2/3” x 1/2” or 3" x 1" corrugations; maximum exterior shell is 12 GA.
HEL-COR® Corrugated Steel Pipe
H 20 and H 25 Live Loads
Diameter (in.)
Minimum Cover (in.)
Maximum Cover(2) (ft.)
Specified Thickness (in.) and Gage
(0.052)
(0.064)
(0.079)
(0.109)
(0.138)
(0.168) 8
6(8) 12 388 486 8(8) 12 291 365 10(8) 12 233 292 12 12 197 248 310 15 12 158 198 248 18 12 131 165 206 21 12 113 141 177 248 24 12 98 124 155 217 30 12 99 124 173 36 12 83 103 145 186 42 12 71 88 124 159 195 48 12 62 77 108 139 171 54 12 67 94 122 150 60 12 80 104 128 66 12 68 88 109 72 12 75 93 78 12 79 84 12 66
E 80 Live Loads
Diameter (in.)
Minimum Cover (in.)
Maximum Cover(2) (ft.)
Specified Thickness (in.) and Gage
(0.052) 18 (0.064)
(0.079) 14 (0.109) 12 (0.138) 10 (0.168) 8
12 12 197 248 310 15 12 158 198 248 18 12 131 165 206 21 12 113 141 177 248 24 12 98 124 155 217 30 12 99 124 173 36 12 83 103 145 186 42 12 71 88 124 159 195 48 12 62 77 108 139 171 54 18 67 94 122 150 60 18 80 104 128 66 18 68 88 109 72 18 75 93 78 24 79 84 24 66
H 20 and H 25 Live Loads, Pipe-Arch
Size Minimum Thickness
(in.)
Minimum Cover (in.)
Maximum Cover (ft.)
Round Equivalent (in.)
Span x Rise (in.)
2 Tons/Ft.2 Corner Bearing Pressure
15 17 x 13 0.064 12 16 18 21 x 15 0.064 12 15 21 24 x 18 0.064 12 15 24 28 x 20 0.064 12 15 30 35 x 24 0.064 12 15 36 42 x 29 0.064 12 15 42 49 x 33 0.064* 12 15 48 57 x 38 0.064* 12 15 54 64 x 43 0.079* 12 15 60 71 x 47 0.109* 12 15 66 77 x 52 0.109* 12 15 72 83 x 57 0.138* 12 15
E 80 Live Loads, Pipe-Arch
Size Minimum
Thickness (in.)
Minimum Cover
(in.)
Maximum Cover (ft.)
Round Equivalent (in.) Span x Rise (in.) 3 Tons/Ft.2 Corner
Bearing Pressure
15 17 x 13 0.079 24 22 18 21 x 15 0.079 24 22 21 24 x 18 0.109 24 22 24 28 x 20 0.109 24 22 30 35 x 24 0.138 24 22 36 42 x 29 0.138 24 22 42 49 x 33 0.138* 24 22 48 57 x 38 0.138* 24 22 54 64 x 43 0.138* 24 22 60 71 x 47 0.138* 24 22
* These values are based on the AISI Flexibility Factor limit (0.0433 x 1.5) for pipe-arch.
Heights of Cover Notes:
1. These tables are for lock-seam or welded-seam construction. They are not for riveted construction. Consult your Contech Sales Representative for Height of Cover tables on riveted pipe.
2. These values, where applicable, were calculated using a load factor of K=0.86 as adopted in the NCSPA CSP Design Manual, 2018.
3. The span and rise shown in these tables are nominal. Typically the actual rise that forms is greater than the specified nominal. This actual rise is within the tolerances as allowed by the AASHTO & ASTM specifications.
The minimum covers shown are more conservative than required by the AASHTO and ASTM specifications to account for this anticipated increase in rise. Less cover height may be tolerated depending upon actual rise of supplied pipe-arch.
4. The haunch areas of a pipe-arch are the most critical zone for backfilling.
Extra care should be taken to provide good material and compaction to a point above the spring line.
| 5. | E 80 minimum cover is measured from top of pipe to bottom of tie. |
| 6. | H 20 and H 25 minimum cover is measured from top of pipe to bottom of |
flexible pavement or top of rigid pavement.
7. The pipe-arch tables are based on the corner bearing pressures as shown.
These values may increase or decrease with changes in allowable corner bearing pressures. Consider the use of a round pipe in cases where the height of cover exceeds 8’.
| 8. | For construction loads, see Page 15. |
| 9. | Smooth Cor™ has same Height of Cover properties as corrugated steel |
pipe. The exterior shell of Smooth Cor™ is manufactured in either 2 2/3” x 1/2” or 3” x 1” corrugations; maximum exterior shell is 12 GA.
5” x 1” or 3” x 1” Height of Cover Limits for Corrugated Steel Pipe
5” x 1” Pipe-Arch Height of Cover Limits for Corrugated Steel Pipe
Heights of Cover
H 20 and H 25 Live Loads
Size Minimum
Thickness (in.)
Minimum Cover (in.)
Maximum Cover (ft.)
Round Equivalent
(in.)
Nominal 2 Tons/Ft.2 Corner Bearing PressureMin. Span
(in.)
Max. Rise
(in.)
54 60 -2.7 46 +2.7 0.109 18 21 60 66 -3.0 51 +3.0 0.109 18 21 66 73 -3.3 55 +3.3 0.109 18 21 72 81 -3.6 59 +3.6 0.109 18 21 78 87 -4.4 63 +4.4 0.109 18 20 84 95 -4.8 67 +4.8 0.109 18 20 90 103 -5.2 71 +5.2 0.109 18 20 96 112 -5.6 75 +5.6 0.109 21 20 102 117 -5.9 79 +5.9 0.109 21 19 108 128 -6.4 83 +6.4 0.109 24 19 114 137 -6.9 87 +6.9 0.109 24 19 120 142 -7.1 91 +7.1 0.138 24 19
Larger sizes are available in some areas of the United States. Check with your local Contech representative. Negative and positive numbers listed with span and rise dimensions are negative and positive tolerances, no tolerance in opposite direction.
E 80 Live Loads, Pipe-Arch
Size Minimum
Thickness (in.)
Minimum Cover (in.)
Maximum Cover (ft.)
Round Equivalent (in.)
Nominal 2 Tons/Ft.2 Corner Bearing PressureMin. Span
(in.)
Max. Rise
(in.)
54 60 -2.7 46 +2.7 0.109 30 21 60 66 -3.0 51 +3.0 0.109 30 21 66 73 -3.3 55 +3.3 0.109 30 21 72 81 -3.6 59 +3.6 0.109 30 21 78 87 -4.4 63 +4.4 0.109 30 18 84 95 -4.8 67 +4.8 0.109 30 18 90 103 -5.2 71 +5.2 0.109 36 18 96 112 -5.6 75 +5.6 0.109 36 18 102 117 -5.9 79 +5.9 0.109 36 17 108 128 -6.4 83 +6.4 0.109 42 17 114 137 -6.9 87 +6.9 0.109 42 17 120 142 -7.1 91 +7.1 0.138 42 17
Some 3” x 1” and 5” x 1” minimum gages shown for pipe-arch are due to manufacturing limitations. Negative and positive numbers listed with span and rise dimensions are negative and positive tolerances, no tolerance in opposite direction.
H 20 and H 25 Live Loads
Diameter (in.)
Minimum Cover (in.)
Maximum Cover (ft.)
Specified Thickness (in.) and Gage
(0.064)
(0.079) 14 (0.109) 12 (0.138) 10 (0.168)
54 12 56 70 98 127 155 60 12 50 63 88 114 139 66 12 46 57 80 103 127 72 12 42 52 74 95 116 78 12 39 48 68 87 107 84 12 36 45 63 81 99 90 12 33 42 59 76 93 96 12 31 39 55 71 87
102 18 29 37 52 67 82 108 18 35 49 63 77 114 18 32 45 58 72 120 18 30 42 54 66 126 18 39 50 61 132 18 36 46 58 138 18 33 43 53 144 18 39 49
Maximum cover heights shown are for 5” x 1”.
To obtain maximum cover for 3” x 1”, increase these values by 12%.
E 80 Live Loads
Diameter or Span (in.)
Minimum Cover (in.)
Maximum Cover (ft.)
Specified Thickness (in.) and Gage
(0.064)
(0.079) 14 (0.109) 12 (0.138) 10 (0.168) 8
54 18 56 70 98 127 155 60 18 50 63 88 114 139 66 18 46 57 80 103 127 72 18 42 52 74 95 116 78 24 39 48 68 87 107 84 24 36 45 63 81 99 90 24 33(1) 42 59 76 93 96 24 31(1) 39 55 71 87 102 30 29(1) 37 52 67 82 108 30 35 49 63 77 114 30 32(1) 45 58 72 120 30 30(1) 42 54 66 126 36 39 50 61 132 36…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .