72066822Q00096_RC ISP_Amendment No. 2_Fully Executed.pdf
PDF 450 KB Posted
- Attached to
- Wireless Internet Services Provider (ISP) for US Embassy Residential Compound (RC) Federal contract opportunity
- Solicitation number
- 72066822Q00096
About this file
This document contains answers to questions from vendors regarding solicitation number 72066822Q00096 for wireless internet services. The USAID Mission in Juba, South Sudan requires a fiber-based internet service provider to deliver 200/200 Mbps broadband to the US residential compound with an option for 300/300 Mbps. Acceptable packet loss is less than 1% and latency must not exceed 180 ms. Satellite solutions are not allowed except as backup. Equipment from other manufacturers besides Cisco may be considered. A seven-day extension was granted to the September 21, 2022 closing time of 17:00 Juba local time. Bandwidth and pricing options are clarified.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RC Wireless Internet Services Provider - Amendment 00001 SF30-fully executed.pdf | ||
| Final_SOL 72066822Q00096 RC ISP_8.31.2022.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Wireless Internet Services Provider (ISP) for US Embassy Residential Compound (RC)
RFQ No. 72066822Q00096
Questions and Answers
NO.
QUESTION
ANSWER
1. Please provide an acceptable packet loss rate for this requirement.
It should be less than 1%.
2. Please define the minimum latency requirements for this solution.
Depends on where the packet is destined to, but a properly designed and optimized infrastructure to reduce latency as much as possible is required. For such design, a maximum of 180 ms is acceptable.
3. Would USAID consider a satellite communications (Satcom) solution an option for this requirement?
No, unless as backup.
4. Given the significant global supply chain delays for Cisco equipment, would the USAID consider other equipment provider solutions?
This Question is unclear, as no specific equipment types have been itemized.
5. Would USAID consider a two (2) week extension for this requirement?
A 7-day extension is granted. The closing date of this solicitation is September 21, 2022, 17:00 Juba Time.
6. The cover page of the solicitation the bandwidth mentioned is 300/300Mbps, while in page 1 of attachment 1 USAID have requested for 200/200Mbps.
Kindly clarify if we should add
200/200Mbps in the cover page of the solicitation
As stated in Attachment 1, Section 3 b.
the Required Bandwidth is for
200/200mbps.
However, as stated under Section 3 c.
An Option Line Item of 300/300mbps may be ordered by USAID.
Therefore, 300/300mbps should be quoted as an option.