Attachment J.2 EMMP Template.docx

DOCX document 34 KB Posted

Attached to
USAID Alternatives to Charcoal Activity - Amendment I Federal contract opportunity
Solicitation number
72061120R00001
Issued by
US Agency for International Development Zambia

About this file

This document includes an Environmental Mitigation and Monitoring Plan (EMMP) template and information on a related federal contract opportunity with the US Agency for International Development in Zambia. The EMMP template provides guidance on tracking project data, organizational responsibilities, and developing a table to outline environmental risks, mitigation measures, monitoring indicators, methods, and frequencies. The federal contract opportunity is a Request for Proposals for the USAID Alternatives to Charcoal Activity, with a maximum estimated cost of $20-30 million and period of performance of up to five years. Proposals are due on specified dates in Phase I and Phase II of the advisory phased procurement, with the North American Industry Classification System code of 541990 and authorized geographic code of 935 for the prime contractor.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENVIRONMENTAL MITIGATION AND MONITORING PLAN (EMMP)

PROJECT/ACTIVITY DATA

Project/ Activity Name:

Implementation Start/End:

Contract/Award Number:

Implementing Partner(s):

Geographic Location(s):

EMMP Tracking ID/link:

Tracking ID/link of Related IEE:

Tracking ID/link of Other, Related Analyses:

ORGANIZATIONAL/ADMINISTRATIVE DATA

Implementing Operating Unit(s):

(e.g. Mission or Bureau or Office)

Lead BEO Bureau:

Prepared by:

Date Prepared:

Submitted by:

Date Submitted:

ENVIRONMENTAL COMPLIANCE REVIEW DATA

Analysis Type:
EMMP
Additional Analyses/Reporting Required:
EMMR

PURPOSE

Environmental Mitigation and Monitoring Plans (EMMPs) are required for USAID-funded projects when the 22CFR216 documentation governing the project (e.g., the Initial Environmental Examination [IEE]) imposes mitigation measures on at least one project or activity. EMMPs ensure that the ADS 204.3 requirements for incorporating and monitoring appropriate mitigative measures into project or activity design. Responsibility for developing the EMMP lies with USAID, but EMMPs are usually prepared by the Implementing Partner (IP). EMMPs are typically conducted after the IEE is complete, though they may be completed as part of the IEE. EMMPs are a vehicle for translating IEE conditions and mitigation measures into specific, implementable, and verifiable actions.

An EMMP is an action plan that clearly defines:

1. Mitigation measures. Actions that reduce or eliminate potential negative environmental impacts resulting directly or indirectly from a particular project or activity, including environmental limiting factors that constrain development.

2. Monitoring indicators. Criteria that demonstrate whether mitigation measures are suitable and implemented effectively.

3. Monitoring/reporting frequency. Timeframes for appropriately monitoring the effectiveness of each specific action.

4. Responsible parties. Appropriate, knowledgeable positions assigned to each specific action.

USAID Approval of EMMP

Approval:

COR

Date

Clearance:

Mission Environmental Officer

Date

Clearance:

Date

DISTRIBUTION:

1. Project/Activity Summary

1.1 Background (Implementing Partner, contractual information, duration, location (with graphics, i.e. maps). Include sub-activities if any

1.2 Applicable USAID, US, and Zambian Regulations

1.3 Overall Site Selection Methodology

2. Summary of Baseline Conditions

3. Human Safety Concerns

4. Environmental Considerations

4.1 Potential environmental impacts

4.2 Environmental impacts Mitigation Measures

4.3 Potential climate change impacts on the activity

4.4 Climate change adaption or mitigation measures

5. Monitoring system

5.1 Monitoring plan

5.2 Staffing - responsibilities

5.3 Budget – environmental compliance activities should be allocated about 2-5% of the total budget depending on the activity

6. EMMP

2.1.1 EMMP table

Environmental Risks or Potential Adverse Impacts
Environment and Climate Mitigation Measure(s) [adapted from EDEV/Environment IEE Conditions]
Monitoring Indicator(s)
Monitoring Method
Monitoring and Reporting Frequency
Responsible Parties

File details come from the government source that posted it. Updated .