SAFE_WATER_RFP_72049219R00004_Amendment_No.1.pdf
PDF 3 MB Posted
- Attached to
- SAFE WATER ACTIVITY Federal contract opportunity
- Solicitation number
- 72049219R00004
About this file
RFP Amendment No.1 to disseminate responses to questions and post the revised RFP on Safe Water
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SAFE_WATER_RFP_FINAL.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x) x
720492 See Block 16C
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing Items 8 and 15, and returning _____1______ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE
PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers x is extended,
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE
2. AMENDMENT/MODIFICATION NO.
6. ISSUED BY
USAID Philippines
5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
9A. AMENDMENT OF SOLICITATION
NO.
72049219R00004
9B. DATED (SEE ITEM 11)
X
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return _________1_________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Nathan Hilgendorf
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
D. OTHER (Specify type of modification and authority)
Amendment 1 to RFP No. 72049219R00004
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purposes of this amendment are to provide USAID responses to the questions raised by the prospective Offerors, and issue the corresponding revised RFP. This amendment consists of two parts:
1. Part I - USAID Responses to Questions Received.
2. Part II - Revised Solicitation No. 72049219R00004 – RFP for SAFE Water Activity Revisions to the RFP are in blue font.
/s/
X
PART 1 of RFP Amendment
Page | 1
Response to Questions Received to the Safe Water Activity (RFP No. 72049219R00004)
General Questions
1. For consistency, would USAID please insert “calendar” days for all Deliverables & Reporting Requirements, where applicable, for example, Branding and Marking Plan on page 20 (first paragraph), etc.
USAID: The word “day,” wherever it appears in the RFP, refers to “calendar day” unless otherwise specified.
2. Section L.4 (p. 119), USAID states “multiple emails may be sent to accommodate the proposal size and content…” but does not mention the max size limitation that the USAID email server supports. Could USAID confirm that a limitation of 20MB per email is acceptable?
USAID: The maximum allowable size per email is 25MB.
Section B - Supplies or Services and Price/Costs
3. The RFP’s cover letter describes the award as a hybrid with both CPFF and IDIQ portions.
Although it is clear that the duration of the CPFF portion is five years, would USAID confirm that the estimated total cost of $15,000,000 to $19,000,000 covers both CLIN 0001 and CLIN 0002?
USAID: The estimated total cost of $15,000,000 to $19,000,000 covers both CLIN 0001 and
CLIN 0002.
4. Can USAID confirm that CLIN 0002 is not part of the cost reimbursement completion portion of the contract, as indicated in B.2, second paragraph?
USAID: USAID confirms that CLIN 0002 is not part of the cost reimbursement completion portion of the contract. B.2
5. Sections B.2 and B.6, Pages 3 and 4-5. In Section B.2, USAID states that “Under the IDIQ portion of the contract (CLIN 2), the Contractor must furnish additional technical assistance arising out of or related to the completion portion of the contract…” (italics added). This suggests that IDIQ task orders will be structured as CPFF Completion type contracts. However, Section B.6 (b) states that “…the Contractor will provide up to a maximum of 3,000 professional/technical person-days for the entire life of the project,” which suggests a CPFF Term type contract. Also, Section B.6 (c) states that “The contract type and fee for each Task Order shall be negotiated and will be based on the nature of the work and associated risks,” which suggests that each Task Order type will be considered during the period of performance. Please clarify the expected contract type for CLIN 2 IDIQ task orders.
Page | 2
USAID: The mention of LOE is indicative and does not dictate a certain contract type. The instrument type to be utilized for CLIN 002 will be negotiated with the successful Offeror at a later date.
6. Section B.5 of the RFP, Payment of Fixed Fee for CLIN 0001 and CLIN 0002, seems to only address the fixed fee under CLIN 0001. Would USAID confirm that Section B.5 only relates to
CLIN 0001?
USAID: Section B.5 applies only to CLIN 0001.
7. Section B.7, Indirect Rate, please close the parenthesis after the effective date for FAR 52.216-7 in the first sentence and update to reflect (Aug 2018).
USAID: Correction has been made.
Section F - Deliveries or Performance
8. The qualifications listed for the Deputy Chief of Party position in Section F4 (pages 12 and 13) do not align with the evaluation criteria listed in Section M.2 (page 133). Please clarify the minimum requirements for the DCOP position.
USAID: See Part II of this Amendment for the revised RFP with the updated qualifications of the Deputy Chief-of-Party (DCOP).
9. Section F: 4, Key Personnel, DCOP, Required Qualifications: Would USAID consider deleting the end of fifth bullet “…and report directly to USAID” and leave it to the Offeror’s discretion and/or corporate policies to whom the DCOP reports?
USAID: The DCOP is not required to report directly to USAID. This responsibility is with the Chief of Party. See Part II of this Amendment for the revised RFP with the updated requirements for the Deputy Chief-of-Party (DCOP).
10. Section F.4, Key Personnel, states that the deputy chief of party reports directly to USAID.
However, in a standard organizational chart, the chief of party would be responsible for supervising the team and being accountable for project results. Would USAID confirm the required supervision structure for the deputy chief of party position, including whether the deputy chief of party should report to the chief of party, who then reports to USAID?
USAID: Please see response to Question No. 9.
11. Section F.4, Page 13. A Master’s Degree is listed as a Required Qualification of the Senior Technical Advisors positions. Will USAID consider additional years of experience as a substitute for a Master’s Degree?
Page | 3
USAID: No, a Master’s Degree is required and USAID will not consider additional years of experience as a substitute.
12. Section F.9, table on page 17 and Report on Foreign Taxes on page 21, please clarify that the preceding one-year period for reporting purposes is the prior fiscal year (October 1 – September 30).
USAID: The preceding one-year period for reporting purposes is the prior fiscal year. See Part II of this Amendment for the revised RFP with the corrected period for reporting foreign taxes.
Section H - Special Contract Requirements
13. Per Sections H.8(b)(1) and L.6(C)(3)(3)(B), offerors shall submit salary ranges and a compensation plan when negotiating salaries. We request that the requirement to use salary ranges be removed from both sections of the RFP because it appears inconsistent with AIDAR 752.7007, Personnel Compensation, incorporated into the contract under Section H.7 and stipulating that staff compensation be in line with the contractor’s established policies, procedures, and practices, with reimbursement subject only to USAID’s contract salary threshold.
This requirement may preclude contractors from following their established policies, procedures, and practices, as required by AIDAR 752.7007.
USAID: USAID will not remove Sections H.8(b)(1) and L.6(C)(3)(3)(B).
14. Sections H.8(b)(3) states that labor costs for third-country nationals (TCNs) and cooperating-country nationals (CCNs) shall not exceed the thresholds in the U.S. Embassy’s local employee compensation plan in Manila. This restriction may preclude offerors from complying with AIDAR 752.7007, incorporated in Section H.7, which states that “direct compensation of the Contractor’s personnel will be in accordance with the Contractor’s established policies, procedures, and practices, and the cost principles applicable to this contract.” Specifying that offerors not exceed thresholds in the local compensation plan may result in offerors deviating from AIDAR 752.7007. We respectfully request that USAID removes the requirement that labor costs for TCNs and CCNs shall not exceed the thresholds in the U.S. Embassy’s local employee compensation plan in Manilla, thereby allowing offerors to submit cost proposals in line with their established policies, procedures, and practice.
USAID: USAID will not remove section H.8(b)(3).
15. Section H.32 Value Added Tax (VAT) and Custom Duties, last paragraph. Please delete the number 1 in the effective date for Reporting of Foreign Taxes to reflect (July 2007).
USAID: Deleted. See Part II of this Amendment for the revised RFP.
Page | 4
Section I - Contract Clauses
16. Section I. Upon review, we noticed that some of the contract clauses have not been updated as of the January 2019 edition of the FAR.
USAID: Clauses have been checked and/or updated.
Section J - List of Attachments
17. Attachment J.1, Outcomes 1.2, 1.3 and 2.1, can USAID clarify how 1.3d is different than 2.1a?
USAID: See Part II of this Amendment for the revised RFP with the updated sub-results.
18. Attachment J.1, Outcome 1.2 and 2.1, can USAID clarify how 1.2d is different than 2.1b,
19. Attachment J.1, Outcome 2.1, can USAID clarify how 2.1b is different than 2.1e?
20. Attachment J.1, Outcomes 2.2 and 3.1, can USAID clarify the difference between 2.2e and 3.1b?
21. Sub-Result 3.2d (page 66) is a duplicate of Sub-Result 3.1d (page 66). Would USAID clarify whether another result was intended to be included?
22. Attachment J.1, page 68, can USAID clarify if the Offeror must use the three water condition indicators noted or can the Offeror propose other water indicators?
USAID: The water conditions are illustrative and serve only as examples. The Offeror must propose specific indicators that will appropriately demonstrate change conditions between baseline year and the project’s final year.
23. Attachment J.1, page 68, can USAID clarify whether selected sites should include cities in the CDI list? Can USAID clarify whether Safe Water needs to expand ongoing USAID investments in the cities under CDI?
USAID: Site selection will consider CDI sites. See Part II of this Amendment for the revised RFP with the updated Section on Geographic Focus.
Page | 5
24. Attachment J.1, IV, Page 68. USAID states that “At the sub-national level, Safe Water will work with LGUs, water utilities, and watershed councils in three provinces (outside of Metro Manila, Metro Cebu, and Metro Davao), with their key urban areas serving as focal site.” Please clarify whether USAID intends for Offeror’s to use Metro Manila, Metro Cebu and Metro Davao as the focal sites, or whether Offerors should not work in those sites.
USAID: The selection of sites will not include Metro Manila, Metro Cebu and Metro Davao, and therefore at the subnational level, the Safe Water Project will not work in those sites. See Part II of this Amendment for the revised RFP with the updated Section on Geographic Focus.
25. Attachment J1 IV, Geographic Focus, states, “At the sub-national level, Safe Water will work… in three provinces (outside of Metro Manila, Metro Cebu, and Metro Davao) …” Would USAID please clarify that “outside of” means “not including” in this context?
USAID: Yes, “outside of” in this context means “not including.” See also response to Question No. 24.
26. Given its potential relevance to SAFE WATER, will USAID consider sharing all annexes referenced in the “Assessment of Water-Energy-Food Nexus Tradeoffs for Mindanao,” which was completed under the B-LEADERS project?
USAID: The Assessment of Water-Energy-Food Nexus Tradeoffs for Mindanao and its annexes may be downloaded from the following links:
https://pdf.usaid.gov/pdf_docs/PA00TNG6.pdf https://pdf.usaid.gov/pdf_docs/PA00TNGB.pdf
27. The last sentence of Section J.1.IV, Geographic Focus (page 68), states that sites will be added if deemed necessary and strategic to build on USAID’s investment under the Cities Development Initiative or WASH-FIN. Please clarify if USAID will make additional resources available for these sites if they are added and/or how offerors are to program and budget for this scenario in their cost proposals.
USAID: If need arises or conditions warrant adding new sites or committing additional resources, this will be discussed accordingly with the Contractor. At this stage there is no need to allocate funding for additional sites in the cost proposal.
28. Sections J.3 and J.5, the Disclosure of Lobbying Activities and the Certification Regarding
Trafficking in Persons, respectively, are included in the RFP, but not listed in Section L.6 as part of the requirements for the cost proposal. Would USAID please confirm that these two attachments should be included in the cost proposal for both the contractor and major subcontractors, and if so, how would USAID like these documents presented in the cost proposal?
https://pdf.usaid.gov/pdf_docs/PA00TNG6.pdf https://pdf.usaid.gov/pdf_docs/PA00TNGB.pdf
Page | 6
USAID: Yes, the Disclosure of Lobbying Activities and the Certification Regarding Trafficking in Persons should be included in the cost proposal for both the contractor and major subcontractors.
29. Attachment J.G, Note 2: Fringe Benefits is listed as PhP 18,130 employee per annum, which in our experience seems low. Could USAID clarify what’s included in the listed Fringe Benefits?
USAID: The Php 18,130 benefit in the US Embassy Philippines Local Compensation Plan represents annual Miscellaneous Benefits Allowance.
Section L - Instructions, Conditions and Notices to Offerors
30. Section L.3, Standard Form (SF) 33, pages 117 and 125, kindly advise if USAID will provide an SF 33 for this solicitation.
USAID: Standard Form 33 has been added to the solicitation document.
31. L.5, page 119, USAID lists one of the annexes as a “Gantt chart.” Could USAID clarify what this annex should include and if and how it differs from the Rapid Mobilization Plan?
USAID: A Gantt chart will be included in the annex to illustrate the timeline for the Offeror’s proposed mobilization plan. The timeline may also be presented in Excel format. See Part II of this Amendment for the revised RFP with the updated list of Annexes.
32. Section L.5 (page 119) initially states that the Performance Work Statement (PWS) is a component of the Technical Proposal. The next paragraph defines how the Technical Proposal/PWS is to be organized without indicating a section for the PWS. Can USAID confirm that offerors are not required to include a standalone PWS section in their technical proposals?
USAID: Section L.5 of the RFP document has been revised for clarity.
33. Section L.5 (page 119) lists Contractor Past Performance as a section within the Technical Proposal/PWS. However, the RFP later lists “Contractor Past Performance Information” to be included as an annex (page 120). Can USAID confirm that offerors may include a summary of past performance in the body of the technical proposal with Contractor Past Performance presented in an annex as required under Factor 4?
USAID: “Contractor Past Performance Information” as a section within the Technical Proposal/PWS consists of a summary of the Offeror’s past performance. “Contractor Past Performance Information” as an annex consists of unedited scans of relevant contractor performance reports with working email addresses and other contact information for COs and CORs.
Page | 7
34. Section L.5 (page 120) instructs offerors to include unedited scans of relevant CPARs. Given the page limit for annexes and the length of the CPARs in question, may offerors instead reference projects with CPARs available in CPARS/PPIRS?
USAID: See question 38. The page limit for annexes has been removed. Please provide scans of the documents as instructed.
35. Section L.5 lists a number of annexes, but it is unclear which of these are required for submission.
Please clarify.
USAID: See Part II of this Amendment for the revised RFP with the updated list of Annexes.
36. Section L.5 (page 120) states that annexes can include a Rapid Mobilization Plan. Factor 3:
Management Plan (b) (page 123) requires a mobilization plan as part of the management plan.
Please confirm that the mobilization plan is the same as the Rapid Mobilization Plan and that offerors may include this information in an annex.
USAID: This is correct. See Part II of this Amendment for the revised RFP with the updated list of Annexes.
37. Section L.5 (page 120) lists a Gantt chart and Draft Environmental Mitigation and Monitoring
Plan for inclusion with offerors’ technical proposals. Please provide additional instructions for these annexes (e.g., what period of time are offerors to address in Gantt chart)?
USAID: The Gantt Chart will be included as an annex to illustrate the timeline for the Offeror’s proposed mobilization plan. The timeline may also be presented in Excel format. Either format will cover 45 days of mobilization.
38. Section L.5, Bullet 5, Page 120. USAID states that CVs of key personnel are limited to three pages each. Please clarify whether key personnel CVs are included in the 100-page annex limit.
USAID: The page limitation for annexes has been removed.
39. Section L.5, Bullet 7, Page 120. Will USAID confirm that the annexes listed in this bullet are illustrative? If so, will USAID please provide a list of required annexes and a preferred sequence (such as Annex A, Annex B)?
USAID: See Part II of this Amendment for the revised RFP with the updated list of Annexes.
40. Section L.5, Bullet 7, Page 120. USAID lists a “Gantt chart” in its list of annexes. Will USAID kindly clarify whether this is a reference to a Year 1 Work Plan? Please also confirm whether this is a required annex.
Page | 8
USAID: A Gantt chart will be included in the annex to illustrate the timeline for the Offeror’s proposed mobilization plan. The timeline may also be presented in Excel format. See Part II of this Amendment for the revised RFP with the updated list of Annexes.
41. Section L.5, Bullet 7, Page 120. USAID indicates that “information contained in the annexes to the Technical Proposal/PWS will also be used in evaluating the Offeror’s technical strengths.”
Please clarify under which technical evaluation factor listed on Page 132 the listed annexes apply?
USAID: The annexes required under each subfactor will be evaluated along with the corresponding evaluation factors in Section M.
42. Section L.5, page 120, can USAID confirm that the Rapid Mobilization Plan and Illustrative M&E plan are two separate annexes?
USAID: This is correct. See Part II of this Amendment for the revised RFP with the updated list of Annexes.
43. On page 120, USAID asks offerors to highlight “what it believes as a potentially game-changing intervention for Outcomes 1.2, 1.3, and 2.2.” Should offerors also identify a game-changing intervention for Outcome 1.1, as it will also be discussed under Subfactor 1.1(a): Approach to addressing site-specific water security challenges?
USAID: Subfactor 1.1 under Section L has been updated to clarify the requirement. See Part II of this Amendment for the revised RFP with the updated instruction on subfactor 1.1.
44. On page 120, in the bulleted list, USAID requests “CVs of key personnel.” On page 122, Subfactor 2.1: Key Personnel, in the third paragraph, USAID writes that the offeror should provide resumes for “all Key Personnel and long-term staff.” Could USAID confirm that CVs/resumes are only required for Key Personnel?
USAID: CVs/resumes are required for both Key Personnel and the long-term staff. See Part II of this Amendment for the revised RFP with the updated requirements for CVs and resumes.
45. Please confirm that offerors do not need to provide letters of commitment for proposed non-key, long-term personnel.
USAID: Confirmed; Offerors do not need to provide letters of commitment for proposed non-key long-term personnel.
46. Section L.5, Subfactor 1.1 (page 120), states, “The Statement of Objectives (SOO) requires the Offeror to identify and propose three sites, with only one serving as demonstration site for implementing water resource management (WRM). For the two non-WRM demonstration sites.”
Page | 9
Would USAID please clarify the sentence fragment, “For the two non-WRM demonstration sites?”
USAID: See Part II of this Amendment for the revised RFP with the corrected statement.
47. Sections L.5.Subfactor 1.1, Pages 120-121 and Section M.2.Factor 1, Pages 132-33. Outcome 3.2—Knowledge on water security developed and/or shared is the only Outcome that is not referenced in Sections L and M. Will USAID clarify whether Outcome 3.2 will be considered in USAID’s evaluation; and if so, where Offerors should address this in the technical proposal?
USAID: Offerors will address Outcome 3.2 in Subfactor 1.1: Understanding of Safe Water Requirements, part (a) approach to addressing site-specific water security challenges. See Part II of this Amendment for the revised RFP with updated instructions on subfactor 1.1.
48. Section L.5.Subfactor 1.2a, Page 121. USAID directs Offerors to submit a summary table of all indicators listed in Section III. Is this a reference to Table 1: Performance Indicators on Page 67 of the RFP?
USAID: Yes.
49. On page 121, Section L, Subfactor 1.2.a: Monitoring, Evaluation, and Learning (MEL), USAID asks offerors to provide “a summary table of all indicators listed in Section III with their corresponding targets.” Please clarify whether this summary table is to be provided within the body of the technical proposal or as part of the appendix with the illustrative MEL plan.
USAID: The summary table will be part of the proposal, while a more comprehensive table will be included as an annex. See Part II of this Amendment for the revised RFP with the updated Section L on Monitoring, Evaluation and Learning (MEL).
50. Section L.5, Factor 2, Page 122. USAID notes that “current resumes must be submitted for all Key Personnel and long-term staff.” Considering the potential number of long-term staff proposed, will USAID please confirm that resumes and letters of commitment are only required for Key Personnel? If resumes and letters of commitment are required for all long-term staff, will USAID consider making them non-counting pages?
USAID: Letters of commitment are only required for key personnel, as indicated on page 122.
51. Section L.5, Factor 3, Page 123. Will USAID confirm that the mobilization plan is to be submitted as an annex, as is indicated on page 120, instead of as part of the Management Plan?
USAID: The Mobilization Plan will provide within the body of Technical Proposal/PWS a narrative description of the Offeror’s mobilization activities. As supporting information, the Offeror will attach as an annex a table (in Excel or Gantt Chart format) that will illustrate the
Page | 10 timeline for the Offeror’s mobilization plan described within the proposal. See Part II of this Amendment for the revised RFP with the updated Section L on Mobilization Plan.
52. Section L.5.Factor 4, Page 123. In Factor 4a, USAID directs the Offeror to prepare performance information for each proposed major subcontractor, while in 4a.1, USAID directs the Offeror to submit a maximum of three (past performance references) for each of the subcontractors. Can USAID kindly clarify whether Offerors are to submit a maximum of three past performance references for all subcontractors, or only major subcontractors (those whose proposed cost comprises at least 20-percent of the total cost)?
USAID: This requirement refers only to major subcontractors.
53. Sections L.5.IV.a (page 123) and L.6(A) (page 125) define a proposed major subcontractor as one whose cost comprises at least 20 percent of the total proposed cost. Would USAID please confirm whether the $2 million plug for CLIN 0002 should be included in the base for determining a major subcontractor?
USAID: The $2 million plug figurefor CLIN 0002 should not be included in the base for determining a major subcontractor. The base consists of CLIN 0001 only.
54. Section L.6, pages 125 to 126, states that an offer may be deemed unacceptable without a completed Standard Form (SF) 33; however, no SF 33 was included with the RFP. Would USAID please provide the SF 33 to offerors?
USAID: The Standard Form 33 has been added to the solicitation document.
55. Section L.6(C)3(2) (page 127) states, “Offerors must use the plug figure of $2,000,000 for the IDIQ portion of the contract.” Would USAID please provide further clarification of how they would like this plug figure to be presented in the summary budget (table on the preceding page)?
USAID: Please see the revised budget table for clarification on this point.
56. L.6(C)3(3) Budget Narrative: Could USAID confirm that the compensation plan detailed on page
127 is only for expatriate and TCN positions as the RFP contains a detailed local compensation plan?
USAID: The local Compensation Plan provided is illustrative and shows rates that should not be exceeded, given comparable positions. Offerors should develop their own compensation plans, using the Local Compensation Plan as a guide.
57. Section L.6, page 129, states that the offeror and each proposed subcontractor must complete
Section K. However, Section K does not provide a place to sign or provide other pertinent information for the signer. Would USAID please provide an amended Section K?
Page | 11
USAID: Representations and Certifications under Section K should be completed electronically at https://www.sam.gov.
58. Section L.7, Pages 130-31. Please confirm whether offerors must include a Branding Implementation Plan and Marking Plan as “Annex F” to the technical proposal; and whether the Branding Implementation Plan and Marking Plan counts toward the 100-page limit for annexes.
USAID: The Branding Implementation Plan and Marking Plan will be attached as Annex K. See Part II of this Amendment for the revised RFP with the updated list of Annexes.
59. Section L.6(C)8 (page 130) is titled “Letters of Commitment (Major Subcontractors).” However, the instructions state that each subcontractor must include a letter. Would USAID please confirm letters of commitment are only required for major subcontractors?
USAID: Letters of commitment are required only for major subcontractors.
60. Section L.7 (page 130) instructs offerors to include a Branding Implementation Plan and Marking Plan with the technical proposal as Annex F but then references a 35-page limitation. Please confirm that offerors may include the BIP/MP as an annex to the technical proposal that does not count against the 40-page limit of the technical proposal/PWS.
USAID: The Branding Implementation Plan and Marking Plan will be attached as Annex K and therefore will not count against the 40-page limit of the technical proposal/PWS.
61. On page 132, in Section M, under Factor 1: Technical Approach, USAID writes, “Under sub-factor 1, subfactors 1.1 and 1.2 are more important than 1.3.” There is no subfactor 1.3 listed on the subsequent page, only subfactor 1.1: Understanding Safe Water’s technical requirements and subfactor 1.2: Planning requirements and other important considerations. Please clarify. Does USAID mean that sub-factors 1.1(a) and sub-factors 1.1(b) are more important than sub-factor 1.1(c)?
USAID: The statement has been revised to clarify that subfactor 1.1 is more important than subfactor 1.2. See Part II of this Amendment for the revised RFP with the updated statement on Factor 1: Technical Approach under Section M.2.
62. In Section M.2, Factor 1 (page 132), USAID states that “Under sub-factor 1, sub-factors 1.1 and
1.2 are more important than 1.3.” Please confirm that USAID is referring here sub-factors 1.1(a), 1.1(b), and 1.1(c) referenced on the following page and in Section L.5 (pages 120 and 121).
USAID: The statement has been revised to clarify that subfactor 1.1 is more important than subfactor 1.2. See Part II of this Amendment for the revised RFP with the updated statement on Factor 1: Technical Approach under Section M.2.
Page | 12
63. On page 133, Factor 2: Key Personnel and Staffing, USAID writes that the offeror will be evaluated based on two subfactors and that subfactor 2a is more important than subfactor 2b.
However, there is no subfactor 2a, nor is there a 2b. Could USAID please clarify that it means that subfactor 2.1: Key personnel is more important than subfactor 2.2: Staffing plan?
USAID: This statement has been revised to clarify that subfactor 2.1 is more important than subfactor 2.2. See Part II of this Amendment for the revised RFP with the updated statement on Factor 2: Key Personnel and Staffing under Section M.2.
64. Section M.2, Factor 2 (page 133) states that “subfactor 2a is more important than subfactor 2b.”
Please confirm that USAID is referring here to sub-factor 2.1 and sub-factor 2.2, respectively.
USAID: Confirmed. See Part II of this Amendment for the revised RFP with the updated statement on Factor 2: Key Personnel and Staffing under Section M.2.
65. The RFP is vague on where offerors should address Outcome 3.2 in their technical proposals.
Outcome 3.2 is clearly part of Objective 3, as described on page 66 of the RFP. Page 68, however, in Section IV: Geographic Focus, makes clear that interventions for Outcomes 1.1, 1.2, 1.3, 2.2, and 3.2 will take place in the three proposed sites. This points to a need to discuss Outcome 3.2 under Subfactor 1.1.a: Approach to addressing site-specific water security challenges. Moreover, there is no mention of Outcome 3.2 in the relevant sub-factor for evaluation in Section M (i.e. 1.1.c, on page 133, which reads, “how strategic and compelling the Offeror’s proposed approach and interventions are for achieving Outcome 3.1 results and sub-results.”). Nor is Outcome 3.2 mentioned under Subfactors 1.1.a, 1.1.b, or 1.1.c in Section L on pages 120 or 121. At the same time, an associated indicator is included under Objective in Table 1: Performance Indicators on page 67.
May offerors address Outcome 3.2: Knowledge on water security developed and/or shared as part of Subfactor 1.1.a: Approach to addressing site-specific water security challenges?
USAID: Yes. See Part II of this Amendment for the revised RFP with the updated statement on subfactor 1.1 under Sections L.5 and M.2.
65. Related to the above, could USAID clarify where the approach to Outcome 3.2 will be scored
(i.e., as part of Subfactor 1.1: Understanding of Safe Water Requirements, part (a) approach to addressing site-specific water security challenges)?
USAID: Outcome 3.2 will be scored as part of Subfactor 1.1: Understanding of Safe Water Requirements, part (a) approach to addressing site-specific water security challenges. See Part II of this Amendment for the revised RFP with the updated statement on subfactor 1.1 under Technical Approach of Section M.2.
66. Please confirm that USAID does not require that proposed local personnel and subcontractors sign exclusive letters of commitment.
Page | 13
USAID: Letters of commitment are required for key personnel and major subcontractors.
Exclusivity agreements are neither required nor encouraged.
67. How interested is USAID in innovation under this activity vs. tried and tested approaches?
USAID: Please refer to the relevant sections of the RFP where innovative approaches are required.
68. Is USAID interested in including Marawi as a key site? Given the existing Marawi Response Project, plus the transition to BARMM, it may be difficult to generate clear impact in this region in five years.
USAID: Site selection excludes Marawi City. See Part II of this Amendment for the revised RFP with the updated Section on Geographic Focus.
69. Can USAID explain why Bukidnon was removed as a priority site identified in the RFI?
USAID: Bukidnon was not removed as a priority site. Rather, the geographic scope was expanded, taking into account that many watersheds and municipalities nationwide are experiencing water stress and are potentially in need of assistance to address high demand for water supply and sanitation services, limited freshwater supplies, and vulnerability to multiple stresses that affect water resources and service delivery.
70. Would USAID clarify whether the contractor will conduct water supply and sanitation work in all three sites (including the integrated water resource management site)?
USAID: Yes, water supply and sanitation interventions must be conducted in all three sites.
72049219R00004
SOLICITATION, OFFER AND AWARD
4. TYPE OF SOLICITATION2. CONTRACT NUMBER 3. SOLICITATION NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO (If other than Item 7)
ORDER UNDER DPAS (15 CFR 700)
6. REQUISITION/PURCHASE NUMBER
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
NEGOTIATED (RFP)
SEALED BID (IFB)
5. DATE ISSUED
1. THIS CONTRACT IS A RATED RATING PAGE OF PAGES
1 133
C. E-MAIL ADDRESS
EXT.NUMBERAREA CODE
B. TELEPHONE (NO COLLECT CALLS)A. NAME
10. FOR
INFORMATION
CALL:
CAUTION: LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
(Date)(Hour) local timeuntildepository located in copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if hand carried, in the
SOLICITATION
9. Sealed offers in original and
PART IV - REPRESENTATIONS AND INSTRUCTIONS
OTHER STATEMENTS OF OFFERORS
EVALUATION FACTORS FOR AWARD
INSTRS., CONDS., AND NOTICES TO OFFERORS
REPRESENTATIONS, CERTIFICATIONS AND
LIST OF ATTACHMENTS
CONTRACT CLAUSES
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.
I
J
K
L
M SPECIAL CONTRACT REQUIREMENTS
CONTRACT ADMINISTRATION DATA
DELIVERIES OR PERFORMANCE
INSPECTION AND ACCEPTANCE
PACKAGING AND MARKING
DESCRIPTION/SPECS./WORK STATEMENT
SUPPLIES OR SERVICES AND PRICES/COSTS
SOLICITATION/CONTRACT FORM
PART II - CONTRACT CLAUSESPART I - THE SCHEDULE
H
G
F
E
D
C
B
A
SEC. DESCRIPTION PAGE(S) (X) DESCRIPTION SEC. (X)
11. TABLE OF CONTENTS
18. OFFER DATE17. SIGNATURE
SUCH ADDRESS IN SCHEDULE.
IS DIFFERENT FROM ABOVE - ENTER
15C. CHECK IF REMITTANCE ADDRESS
EXT.NUMBERAREA CODE
15B. TELEPHONE NUMBER
(Type or print)AND
ADDRESS
OF
OFFEROR
CODE FACILITY
16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER15A. NAME
DATEAMENDMENT NO.DATEAMENDMENT NO.
and related documents numbered and dated):
amendments to the SOLICITATION for offerors
(The offeror acknowledges receipt of
14. ACKNOWLEDGEMENT OF AMENDMENTS
CALENDAR DAYS (%)30 CALENDAR DAYS (%)20 CALENDAR DAYS (%)10 CALENDAR DAYS (%)
(See Section I, Clause No. 52.232.8)
13. DISCOUNT FOR PROMPT PAYMENT
designated point(s), within the time specified in the schedule.
by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
OFFER (Must be fully completed by offeror)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
28. AWARD DATE
(Signature of Contracting Officer)
27. UNITED STATES OF AMERICA
25. PAYMENT WILL BE MADE BY
26. NAME OF CONTRACTING OFFICER (Type or print)
CODE 24. ADMINISTERED BY (If other than Item 7)
ITEM
(4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN
41 U.S.C. 253 (c) ( 10 U.S.C. 2304 (c) (
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
21. ACCOUNTING AND APPROPRIATION20. AMOUNT19. ACCEPTED AS TO ITEMS NUMBERED
AWARD (To be completed by government)
CODE
REQ-492-19-000044
1400 U
Nathan Hilgendorf nhilgendorf@usaid.gov
301-4615
X
X
X
X
X
X
X
X
X
X
X
X
X
PAGE(S)
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is unusable
STANDARD FORM 33 (Rev. 9-97)
Prescribed by GSA - FAR (48 CFR) 53.214(c)
2-5 7-8 10-22 23-27 28-48
49-56
56-99
100-113
114-129 130-133
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____0_________ calendar days (60 calendar days unless a different period is inserted
Solicitation No. 72049219R00004 USAID/Philippines Safe Water Activity
Page | 2
SECTION B – SUPPLIES OR SERVICES AND PRICE/COSTS
B.1. PURPOSE
The purpose of this contract is to provide technical assistance services necessary for the successful implementation of the USAID/Philippines Safe Water activity.
B.2. CONTRACT TYPE
This is a FAR 16.102(b) combination award consisting of a Cost-Plus-Fixed-Fee (CPFF) completion type contract (CLIN 0001) and a single-award Indefinite Delivery, Indefinite Quantity (IDIQ) contract (CLIN 0002).
Under the cost reimbursement completion portion of the contract (CLIN 0001), the Contractor shall furnish all personnel, materials, equipment, supplies, facilities, services (except as expressly set forth in this contract as furnished by the Government) and perform all activities necessary for, or incidental to, the performance of work described in Section C and other sections of the contract not specifically identified under CLIN 0002 (Supplemental Technical Assistance IDIQ).
Under the IDIQ portion of the contract (CLIN 0002), the Contractor must furnish additional technical assistance arising out of or related to the completion portion of the contract, as required by Government-issued Task Orders. The services shall be ordered in accordance with Section H.35 entitled, “Ordering Supplemental Technical Assistance (CLIN 0002)” and the IDIQ clauses in Section I. As this CLIN is part of this contract and not a stand-alone award, the Government is not required to state or order any minimum number of person-days as otherwise provided in FAR 16.504(a)(1). The other CLINs contained in this contract provide sufficient consideration to make this a legally binding contract, and the Government has no obligation to fund or order under this
CLIN.
B.3. ESTIMATED COST, FIXED FEE, AND OBLIGATED AMOUNT
The total estimated cost plus fixed fee for CLIN 0001 and CLIN 0002 is [$TBD].
(a) Estimated Cost and Fixed Fee for CLIN 0001
The estimated cost of CLIN 0001, exclusive of fixed fee, if any, is [$TBD]. The fixed fee, if any, is [$TBD]. The total estimated cost plus fixed fee, if any, is [$TBD]. The Contractor shall not be paid any sum in excess of this amount.
(b) Estimated Ceiling Cost and Maximum Fee for CLIN 0002 (Supplemental Technical Assistance)
The total estimated ceiling cost and maximum fee of CLIN 0002 is $2,000,000. The Contractor shall not be paid any sum in excess of this amount.
Page | 3
(c) Within the estimated cost plus fixed fee amounts specified in paragraphs (a)-(c) above, the amount currently obligated and available for reimbursement of allowable costs incurred by the Contractor (and payment of fee, if any) for performance hereunder is as follows.
CLIN 0001 CLIN 0002 TOTAL
[$TBD] [$TBD] [$TBD]
The Contractor shall not exceed the obligated amount unless authorized by the Contracting Officer pursuant to the clause of this contract entitled “Limitation of Funds” (FAR 52.232‐ 22).
(d) Funds obligated are anticipated to be sufficient through [$TBD].
(e) Any costs that exceed the obligated amount of the CLIN or total amount are unallowable.
B.4. CONTRACT LINE ITEM SCHEDULE
CLIN 0001 Base Period Activity Costs TBD Indirect Costs TBD Total Estimated Cost TBD
Fixed Fee TBD Total Estimated Cost Plus Fixed Fee TBD
CLIN 0002 Supplemental Technical Assistance (STA)
Total Estimated Ceiling Cost and Maximum Fee $2,000,000
B.5. PAYMENT OF FIXED FEE FOR CLIN 0001
Pursuant to FAR 16.306(d)(1), payment of the entire fixed fee shall be based on the achievement of the objectives indicated in the Performance Work Statement and on completion of the deliverables described in Section F of this contract.
Upon successful completion of each deliverable, the Contractor must provide evidence of completion to the Contracting Officer’s Representative (COR). Upon acceptance by the COR, the Contractor shall submit an invoice for the amount of fee associated with the deliverable(s).
B.6. OTHER DIRECT COSTS, LEVEL OF EFFORT, AND FIXED FEE UNDER CLIN
(a) The estimated cost of CLIN 0002 includes estimates for materials, equipment, subcontracts, travel, and training required for performance of the total amount of work that can be ordered by the Government under this CLIN during the life of the contract.
(b) In performing Government orders for Technical Assistance under this CLIN, the Contractor will provide up to a maximum of 3,000 professional/technical person-days for the entire life of the project.
Page | 4
(c) The total estimated cost and fixed fee will be established in the individual Government issued Task Orders and shall not exceed the amount set forth in section B.3(b). The contract type and fee for each Task Order shall be negotiated and will be based on the nature of the work and associated risks.
B.7. INDIRECT COSTS
(a) FAR 52.216-7 “Allowable Cost and Payment (Jun 2013)” specifies that the indirect cost rates shall be established for each of the Contractor’s accounting periods which apply to this contract. Pending establishment of revised provisional or final indirect cost rates, allowable indirect costs shall be reimbursed on the basis of the following negotiated provisional or predetermined rates and the appropriate bases:
Description Rate Base Type Period % 1/ 1/ 1/ % 2/ 2/ 2/ % 3/ 3/ 3/
1/Base of Application:
Type of Rate:
Period:
2/Base of Application:
Type of Rate:
Period:
3/Base of Application:
Type of Rate:
Period:
(b) The Contractor will make no change in its established method of classifying or allocating indirect costs without the prior written approval of the Contracting Officer.
B.8. COST REIMBURSABLE
The U.S. dollar costs allowable will be limited to reasonable, allocable, and necessary costs determined in accordance with FAR 52.216-7, “Allowable Cost and Payment,” FAR 52.216-8, “Fixed Fee,” FAR 52.232-20, “Limitation of Cost,” and FAR 52-232-22, “Limitation of Funds,” if applicable, and AIDAR 752.7003, “Documentation for Payment.”
B.9. CANCELLATION PROCEDURES
Per FAR 17.106-1(c) Cancellation Procedures, all program years except the first are subject to cancellation. The cancellation ceiling shall be established below for Years 2 -5 of the contract.
Page | 5
Cancellation Ceiling:
This hybrid contract contains a CPFF completion type portion where the Contractor is authorized to be reimbursed for all costs which are allowable in accordance with FAR 52.216-7, “Allowable Costs and Payment”. Therefore, the Contractor is expected not to incur any costs which would have been amortized over the life of the contract should the contract be cancelled in accordance with FAR 52.217-2. Therefore, the cancellation cost for each cancellation date is [TBD – to be filled in at the time of award].
Cancellation Dates
Total Cost
Fixed Fee
Total CPFF
Cumulative
CPFF
Contract Year 2 Contract Year 3 Contract Year 4 Contract Year 5
[END OF SECTION B]
Page | 6
SECTION C – DESCRIPTION/PERFORMANCE WORK STATEMENT
[Contents of this Section shall be derived from the Contractor’s proposed Performance Work Statement (PWS)].
Refer to Attachment J.1 for the Statement of Objectives (SOO), which includes the purpose, background, scope, objectives, and desired outcomes.
[END OF SECTION C]
Page | 7
SECTION D – PACKAGING AND MARKING
D.1 AIDAR 752.7009 MARKING (JAN 1993)
(a) It is USAID policy that USAID-financed commodities and shipping containers, and project construction sites and other project locations be suitably marked with the USAID emblem.
Shipping containers are also to be marked with the last five digits of the USAID financing document number. As a general rule, marking is not required for raw materials shipped in bulk (such as coal, grain, etc.), or for semi-finished products which are not packaged.
(b) Specific guidance on marking requirements should be obtained prior to procurement of commodities to be shipped, and as early as possible for project construction sites and other project locations. This guidance will be provided through the COR indicated on the cover page of this Contract, or by the Mission Director in the Cooperating Country to which commodities are being shipped, or in which the project site is located.
(c) Authority to waive marking requirements is vested with the Regional Assistant Administrators, and with Mission Directors.
(d) A copy of any specific marking instructions or waivers from marking requirements is to be sent to the Contracting Officer; the original should be retained by the Contractor.
D.2 BRANDING STRATEGY
The Contractor shall comply with the requirements of the policy directives and required procedures outlined in USAID Automated Directive System (ADS) 320.3.2 “Branding and Marking in USAID Direct Contracting” which can be found at https://www.usaid.gov/ads/policy/300/320; and USAID “Graphics Standards Manual” available at http://www.usaid.gov/branding, or any successor branding policy.
The Branding Strategy for this contract is as follows:
Objective: To provide prospective Offerors with areas to be addressed in the development of the Safe Water Branding and Marking Plans so as to deliver the message that the assistance is “from the American People”.
Activity name: The name of the activity is “Safe Water.” In every public event or document and in discussions with the Government of the Philippines and other counterparts from the private sector and civil society, the Contractor shall identify the activity as the “Safe Water Project” on each reference.
Branding: The branding strategy will incorporate the message that the assistance is “From the American People”, and is sponsored by USAID. USAID policy is to require exclusive branding and marking in all its direct contracts.
Positioning: Publicity materials and communications shall clearly reflect the notion that this activity is provided by the American People through USAID with close collaboration and support of the Government of the Philippines. No other organizations will be acknowledged publicly in https://www.usaid.gov/ads/policy/300/320
Page | 8 connection with Safe Water.
Visibility: USAID seeks a very high level of visibility through USAID‐branded public events, high‐level visits, community awareness and training activities, and media coverage. The Contractor may propose activities to be exempted from this requirement, and will be subject to the Contracting Officer’s Representative’s concurrence and Contracting Officer’s approval.
Anticipated Elements of the Branding and Marking Plan: Deliverables to be marked include products, equipment and inputs delivered; places where activities are carried out; external public communications, studies, reports, publications and informative and promotional products; and workshops, conferences, fairs and any such events. Studies, reports, publications, Web sites, and all informational and promotional products not authored, reviewed, or edited by USAID must contain a provision substantially as follows:
“This study/report/Web site (specify) is made possible by the support of the American People through the United States Agency for International Development (USAID.) The contents of this (specify) are the sole responsibility of (name of organization) and do not necessarily reflect the views of USAID or the United States Government.”
Approval Procedures: In carrying out the approved Branding and Marking Plans, the Contractor shall seek approval from the COR for all public and media documents, speeches, and event preparation forms at least three (3) weeks prior to the implementation date of the subject activity.
Specific waivers of branding implementation and marking require Contracting Officer’s prior written approval.
[END OF SECTION D]
Page | 9
SECTION E – INSPECTION AND ACCEPTANCE
E.1 NOTICE LISTING FAR SOLICITATION PROVISION INCORPORATED BY
REFERENCE
The solicitation provision pertinent to this section is hereby incorporated by reference (by Citation Number, Title, and Date) per the provision at FAR “52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE” under Section I of this solicitation. The solicitation provision full text may be accessed electronically at this address:
http://www.