72016822R00003.pdf

PDF 4 MB Posted

Attached to
Diaspora Invest 2 Activity in Bosnia-Herzegovina
Solicitation number
72016822R00002
Issued by

About this file

This is a request for proposals from the United States Agency for International Development in Bosnia and Herzegovina for a five-year cost-plus-fixed-fee completion contract to implement the USAID Diaspora Invest 2 Activity in Bosnia and Herzegovina. USAID anticipates awarding one contract under full and open competition procedures pursuant to Part 15 of the FAR, with an anticipated award date of September 2022. Offerors are encouraged to submit proposals in accordance with the instructions in Section L by the specified due dates. USAID will evaluate responsive proposals in accordance with the factors in Section M. The activity aims to catalyze the economic and social potential of Bosnia and Herzegovina's diaspora. USAID encourages participation from U.S. small businesses as prime contractors or subcontractors under Part 19 of the FAR. The authorized geographic code is 935. Electronic submissions are mandatory to the specified email address by the stated deadlines.

View the file

Other files

File Type Posted
J.7a Diaspora Invest Completion Report, February 2022.pdf PDF
72016822R00003 Diaspora Invest 2 Q and As.pdf PDF
J.1 SOO amended.pdf PDF
72016822R00003-01.pdf PDF
J.5 Municipalities.pdf PDF
J.3 Branding and Marking Template.pdf PDF
J.1 SOO.pdf PDF
J.6 SF LLL.pdf PDF
J.8 PPI.docx DOCX document
J.2 ATTACHMENT BUDGET TEMPLATE.xlsx XLSX spreadsheet
J.4b Activity LogFrame.docx DOCX document
J.7 Diaspora Invest Lessons learned.pdf PDF
J.9 USAID_FY_2021_Subcontracting_Plan_Template-Vers_012721.docx DOCX document
J.10 QASP+Template.docx DOCX document
J.4a MELP template.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

April 5, 2022

Reference: 72016822R00003 - USAID Diaspora Invest 2 Activity in Bosnia- Herzegovina

Due date and time: Stage 1: April 25, 2022, 9:00 a.m. CEST (local Sarajevo Time) Stage 2: June 17, 2022, 9:00 a.m. CEST (local Sarajevo Time)

Questions Due date and time: April 11, 2022; 4:00 p.m. CEST (local Sarajevo Time)

Geographic Code: 935; NAICS Code: 541690

Dear Sir/Madam:

The United States Agency for International Development (USAID), through the Mission in Bosnia and Herzegovina (BiH) contemplates award of a five-year Cost-Plus-Fixed Fee Completion contract to implement USAID Diaspora Invest 2 Activity in Bosnia-Herzegovina.

The anticipated award date is September 2022.

USAID anticipates awarding one contract conducted under full and open competition procedures, pursuant to Part 15 of the FAR (48 CFR Chapter 1). USAID encourages offerors to express interest in this solicitation by submitting a proposal in accordance with the instructions set forth in Section L, “Instructions to Offerors.” USAID will evaluate the responsive proposals in accordance with the evaluation factors provided in Section M, “Evaluation Factors for Award” hereunder.

USAID encourages the participation of U.S. small businesses (SB) in this activity as prime or subcontractors in accordance with Part 19 of the FAR. Also, please note that the geographic code is 935, which allows participation in this procurement from any area or country including the recipient country, but excluding any country that is a prohibited source.

Electronic responses to this RFP are mandatory (See Section L). Please submit your proposals to the email address below by date and time specified above. Receipt time is when the proposal is received by AID/Washington internet server. The address for the receipt of proposals is Lkranjec@usaid.gov. Hand delivered proposals (including commercial courier) and facsimile transmission will not be accepted.

This RFP can be viewed and downloaded from the official U.S. government website https://sam.gov. USAID bears no responsibility for data errors resulting from transmission or conversion processes. Further be aware that amendments to solicitations are occasionally issued and will be posted on the same website from which you downloaded the solicitation. USAID advises to regularly check the above website for amendments or to create an account for https://sam.gov to save searches, add your entity to an opportunity's Interested Vendors List, and receive automatic updates when the opportunity changes.

https://sam.gov/ https://sam.gov/

This RFP does not obligate the United States Government to award a contract nor does it commit USAID to pay any cost incurred in preparing and submitting of a proposal. Award of a contract under this RFP is subject to availability of funds and other internal USAID approvals.

Sincerely yours, Patrick E. Robison Supervisory Contracting Officer USAID/Bosnia and Herzegovina

72016822R00003

SOLICITATION, OFFER AND AWARD

4. TYPE OF SOLICITATION2. CONTRACT NUMBER 3. SOLICITATION NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO (If other than Item 7)

ORDER UNDER DPAS (15 CFR 700)

6. REQUISITION/PURCHASE NUMBER

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

NEGOTIATED (RFP)

SEALED BID (IFB)

5. DATE ISSUED

1. THIS CONTRACT IS A RATED RATING PAGE OF PAGES

1 108

C. E-MAIL ADDRESS

EXT.NUMBERAREA CODE

B. TELEPHONE (NO COLLECT CALLS)A. NAME

10. FOR

INFORMATION

CALL:

CAUTION: LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

(Date)(Hour) local timeuntildepository located in copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if hand carried, in the

SOLICITATION

9. Sealed offers in original and

PART IV - REPRESENTATIONS AND INSTRUCTIONS

OTHER STATEMENTS OF OFFERORS

EVALUATION FACTORS FOR AWARD

INSTRS., CONDS., AND NOTICES TO OFFERORS

REPRESENTATIONS, CERTIFICATIONS AND

LIST OF ATTACHMENTS

CONTRACT CLAUSES

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.

I

J

K

L

M SPECIAL CONTRACT REQUIREMENTS

CONTRACT ADMINISTRATION DATA

DELIVERIES OR PERFORMANCE

INSPECTION AND ACCEPTANCE

PACKAGING AND MARKING

DESCRIPTION/SPECS./WORK STATEMENT

SUPPLIES OR SERVICES AND PRICES/COSTS

SOLICITATION/CONTRACT FORM

PART II - CONTRACT CLAUSESPART I - THE SCHEDULE

H

G

F

E

D

C

B

A

SEC. DESCRIPTION PAGE(S) (X) DESCRIPTION SEC. (X)

11. TABLE OF CONTENTS

18. OFFER DATE17. SIGNATURE

SUCH ADDRESS IN SCHEDULE.

IS DIFFERENT FROM ABOVE - ENTER

15C. CHECK IF REMITTANCE ADDRESS

EXT.NUMBERAREA CODE

15B. TELEPHONE NUMBER

(Type or print)AND

ADDRESS

OF

OFFEROR

CODE

FACILITY

16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER15A. NAME

DATEAMENDMENT NO.DATEAMENDMENT NO.

and related documents numbered and dated):

amendments to the SOLICITATION for offerors

(The offeror acknowledges receipt of

14. ACKNOWLEDGEMENT OF AMENDMENTS

CALENDAR DAYS (%)30 CALENDAR DAYS (%)20 CALENDAR DAYS (%)10 CALENDAR DAYS (%)

(See Section I, Clause No. 52.232.8)

13. DISCOUNT FOR PROMPT PAYMENT

designated point(s), within the time specified in the schedule.

by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

OFFER (Must be fully completed by offeror)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

28. AWARD DATE

(Signature of Contracting Officer)

27. UNITED STATES OF AMERICA

25. PAYMENT WILL BE MADE BY

26. NAME OF CONTRACTING OFFICER (Type or print)

CODE 24. ADMINISTERED BY (If other than Item 7)

ITEM

(4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

41 U.S.C. 253 (c) ( 10 U.S.C. 2304 (c) (

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

21. ACCOUNTING AND APPROPRIATION20. AMOUNT19. ACCEPTED AS TO ITEMS NUMBERED

AWARD (To be completed by government)

CODE

REQ-168-22-00000304/05/2022

X

720168

USAID/Bosnia/Herz 7130 Sarajevo Place Washington DC 20521-7130

0300 ET 04/25/2022

Lidija Kranjec lkranjec@usaid.gov

X

X

X

X

X

X

X

X

X

X

X

X

X

PAGE(S)

Patrick E. Robison

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is unusable

STANDARD FORM 33 (Rev. 9-97)

Prescribed by GSA - FAR (48 CFR) 53.214(c)

12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____180_________ calendar days (60 calendar days unless a different period is inserted

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 108

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

72016822R00003

(A) (B) (C) (D) (E) (F)

0001 The purpose of this Activity is to catalyze the economic and social potential of BiH diaspora with the goal of improving socio-economic conditions in BiH.

OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

NSN 7540-01-152-8067

ABBREVIATIONS

PART I—THE SCHEDULE

B - Supplies or Services/Prices C - Description/Specifications D - Packaging and Marking E - Inspection and Acceptance F - Deliveries or Performance G - Contract Administration Data H - Special Contract Requirements I - Contract Clauses J - List of Documents, Exhibits and Other Attachments

PART IV – REPRESENTATIONS AND INSTRUCTIONS

K - Representations, Certifications, and Other Statements of Offerors L - Instructions, Conditions, and Notices to Bidders M - Evaluation Criteria

ABBREVIATIONS

AAPD Acquisition & Assistance Policy Directive ADS Automated Directives System AIDAR Agency for International Development Acquisition Regulation BEO Bureau Environmental Officer BiH Bosnia and Herzegovina BIP Branding Implementation Plan CDCS Country Development Cooperation Strategy CCN Cooperating Country National CAS Cost Accounting Standards CFR Code of Federal Regulation CO Contracting Officer COP Chief of Party COR Contracting Officer’s Representative CPAR Contractor Performance Assessment Reporting CPARs Contractor Performance Assessment Reporting System CPFF Cost-Plus-Fixed-Fee CPI Contractor Performance Information.

CPII Contractor Performance and Integrity Information CPR Contractor Performance Report CSO Civil Society Organization DBA Defense Base Act DDL Development Data Library DEC Development Experience Clearinghouse DO Development Objective DOC Development Outreach Coordinator EDO Economic Development Office EFT Electronic Funds Transfer EU European Union E.O. Executive Order eSRS Electronic Subcontracting Reporting System FAPIIS Federal Awardee Performance and Integrity Information System FAR Federal Acquisition Regulation FOIA Freedom of Information Act FPRA Forward Pricing Rate Agreement FY Fiscal Year GAAS Generally Accepted Auditing Standards GAO Government Accountability Office IEE Initial Environmental Examination IPN Implementing Partner Notices LOE Level of Effort MEL Monitoring, Evaluation and Learning MEDEVAC Medical Evacuation MOU Memorandum of Understanding

MSMEs Micro, Small, and Medium Enterprises NAICS North American Industry Classification System OAA Office of Acquisition and Assistance OFAC Office of Foreign Assets Control ORCA Online Representations and Certifications Application PDF Portable Document Format RCE Request for Categorical Exclusion RFP Request for Proposals SAM System for Award Management SOW Statement of Work TBD To be determined TIN Taxpayer Identification Number TCN Third Country National US United States of America USAID United States Agency for International Development USAID/W USAID Washington USG United States Government

PART I—THE SCHEDULE

B - Supplies or Services/Prices

B.1 Purpose

The purpose of this Activity is to catalyze the economic and social potential of BiH diaspora with the goal of improving socio-economic conditions in BiH.

USAID/BiH envisions that the resultant contract will be divided into four objectives:

Objective 1: Local governments’ abilities strengthened to engage diaspora in local economic development.

Objective 2: Country-wide direct investment to high-potential diaspora and/or diaspora-related MSMEs startups and/or joint ventures expanded.

Objective 3: Business and social change that links diaspora best business practices, investment capital, and knowledge with domestic MSMEs stimulated.

Objective 4: Access to existing and new financial instruments that enable flow of private capital (either debt or equity) to all MSMEs and startups operating in BiH increased.

B.2 Contract Type

A Cost-Plus-Fixed-Fee Completion Contract is being contemplated. For the consideration set forth in the contract, the contractor must provide the deliverables and results described in Section C and Section F in accordance with the performance standards specified in Section E (to be incorporated at contract award). The contractor must also comply with all other contract requirements.

B.3 Estimated Cost, Ceiling Price, Fixed Fee, and Obligated Amount

a) The estimated cost for the performance of the work required hereunder, exclusive of fixed fee, is $TBD. The fixed fee, if any, is $TBD. The estimated cost plus fixed fee, if any, is

$TBD.

b) Within the estimated cost plus fixed fee specified in paragraph (a) above, the amount currently obligated and available for reimbursement of allowable costs incurred by the contractor (and payment of fee, if any) for performance hereunder is $TBD. The contractor cannot exceed the aforesaid obligated amount.

c) Funds obligated hereunder are anticipated to be sufficient through TBD.

B.4 Price Schedule

Item Total Estimate US$

Direct Costs Grants under Contract Total Direct Costs Indirect Costs Fixed Fee

TOTAL ESTIMATED COST PLUS FIXED FEE

[USAID will insert the final total estimates of each cost category provided by the contractor in its budget at award; see SECTION J, ATTACHMENT J.2 - BUDGET TEMPLATE that informs the development of the budget].

These amounts may not be adjusted without a written modification signed by the Contracting Officer. The contractor will not bill any amounts against this contract in excess of the amounts specified for each line item as illustrated above.

B.5 Indirect Costs

(a) Pending establishment of revised provisional or final indirect cost rates, USAID will reimburse allowable indirect costs on the basis of the following negotiated provisional or predetermined rates and the appropriate bases pursuant to the contractor’s current executed Forward Pricing Rate Agreement (FPRA):

Description Rate Base Type Period % 1/ 1/ 1/

1/Base of Application:

Type of Rate:

Period:

(b) The contractor will make no change in its established method of classifying or allocating indirect costs without the prior written approval of the contracting officer.

B.6 Ceiling on Indirect Cost Rates

(a) Reimbursement for indirect costs will be at the lower of the negotiated final (or predetermined) rates or the following ceiling rates:

Description Rate Base Type Period % 1/ 1/ 1/

1/Base of Application:

Type of Rate:

Period:

(b) The Government will not be obligated to pay any additional amount should the final indirect cost rates exceed the negotiated ceiling rates. If the final indirect cost rates are less than the negotiated ceiling rates, the negotiated rates will be reduced to conform to the lower rates.

(c) This understanding will not change any monetary ceiling, obligation, or specific cost allowance or disallowance. Any changes in classifying or allocating indirect costs require the prior written approval of the Contracting Officer.

B.7 Cost Reimbursable

(a) The U.S. dollar costs allowable will be limited to reasonable, allocable, and necessary costs determined in accordance with FAR § 52.216-7, “Allowable Cost and Payment,” FAR § 52.216- 8, “Fixed Fee,” and FAR § 52-232-22, “Limitation of Funds,” if applicable, and AIDAR 752.7003, “Documentation for Payment.”

B.8 Payment of Fixed Fee

Pursuant to FAR 52.216-8 and upon receipt of a proper invoice, USAID will pay a portion of the fixed fee in accordance with the following delivery schedule (To be included at the time of award):

Identifier Performance Objective/Deliverable /Output ** Contractor to propose meaningful deliverables

Reference Section

Submission Date Means of Verification

$ Amount

A B C And others as proposed.

Pursuant to FAR 52.216-8 payment of the fixed fee shall be made as specified in the Schedule above; provided that the Contracting Officer withholds a reserve not to exceed 15 percent of the total fixed fee or $100,000, whichever is less, to protect the Government's interest. The Contracting Officer shall release 75 percent of all fee withholds under this contract after receipt of an adequate certified final indirect cost rate proposal covering the year of physical completion of this contract, provided the Contractor has satisfied all other contract terms and conditions, including the submission of the final patent and royalty reports, and is not delinquent in submitting final vouchers on prior years' settlements. The Contracting Officer may release up to https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=f90711f21c4e91b9452956c6ec1909ce&term_occur=1&term_src=Title:48:Chapter:1:Subchapter:H:Part:52:Subpart:52.2:52.216-8 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=9a2fda2c3c1f1184825c68987b872e00&term_occur=1&term_src=Title:48:Chapter:1:Subchapter:H:Part:52:Subpart:52.2:52.216-8 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=80fb588108eda34822560ae27fdc9a0d&term_occur=1&term_src=Title:48:Chapter:1:Subchapter:H:Part:52:Subpart:52.2:52.216-8 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=a78bd960c6114cc1bd364926762fde33&term_occur=1&term_src=Title:48:Chapter:1:Subchapter:H:Part:52:Subpart:52.2:52.216-8 https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=80fb588108eda34822560ae27fdc9a0d&term_occur=2&term_src=Title:48:Chapter:1:Subchapter:H:Part:52:Subpart:52.2:52.216-8

90 percent of the fee withholds under this contract based on the Contractor's past performance related to the submission and settlement of final indirect cost rate proposals.

Nothing in the preceding paragraph precludes the possibility of both parties agreeing to quick-closeout procedure in accordance with FAR 42.708.

[END OF SECTION B]

C - Description/Specifications

[USAID will insert the contractor’s Performance Work Statement (PWS) at award; see SECTION J, ATTACHMENT J.1 - STATEMENT OF OBJECTIVES (SOO) that informs the development of Section C.]

D - Packaging and Marking

D.1 752.7009 Marking. (JAN 1993)

(a) It is USAID policy that USAID-financed commodities and shipping containers, and project construction sites and other project locations be suitably marked with the USAID emblem. Shipping containers are also to be marked with the last five digits of the USAID financing document number. As a general rule, marking is not required for raw materials shipped in bulk (such as coal, grain, etc.), or for semifinished products which are not packaged.

(b) Specific guidance on marking requirements should be obtained prior to procurement of commodities to be shipped, and as early as possible for project construction sites and other project locations. This guidance will be provided through the cognizant technical office indicated on the cover page of this contract, or by the Mission Director in the Cooperating Country to which commodities are being shipped, or in which the project site is located.

(c) Authority to waive marking requirements is vested with the Regional Assistant Administrators, and with Mission Directors.

(d) A copy of any specific marking instructions or waivers from marking requirements is to be sent to the contracting officer; the original should be retained by the Contractor.

D.2 Branding

The Offeror shall comply with the requirements of the USAID branding policies available at www.usaid.gov/branding and appropriately mark all deliverables and public communications with the USAID brand.

USAID receives “exclusive branding and marking” for the work conducted under all acquisition awards. This means that the foreign assistance delivered is clearly credited to the American people. It also means that competing logos or identities, such as the contractor’s, are excluded. News releases/media alerts must be coordinated with the Contracting Officer’s Representative (COR). All media releases, press conferences and public events should incorporate the USAID identity. Approval by the USAID BiH Development outreach Coordinator (DOC) should be received before using any printed materials which incorporate the USAID identity.

D.3 Branding Strategy

Program Name: USAID Diaspora Invest 2 Activity

Branding: The branding shall incorporate the message that “This assistance is from the American People” sponsored by USAID.

Positioning on materials and communications: USAID policy requires exclusive branding and marking in USAID direct acquisitions. Contractor is required to use USAID identity on any program-related deliverables, commodities or communication to be produced and delivered http://www.usaid.gov/branding under this contract. Contractor and subcontractor’s corporate identities are prohibited on all program materials. Marking is not required on contractor vehicles, offices, and office supplies or other commodities used solely for administration of this contract.

Desired Level of Visibility: USAID identity must be prominently displayed on commodities or equipment; printed, audio, visual or electronic public communications; studies, reports, publications, web sites, and promotional and informational products; events and grants under contracts financed by USAID.

Exceptions: Exceptions and waivers to USAID marking requirements may be granted in accordance with ADS 320.3.2.5, Exceptions to Contract Marking Requirements and ADS

320.3.2.6 waivers to Contract Marking Requirements.

Other organizations to be acknowledged: Where appropriate and applicable, the branding may acknowledge the cooperation and participation of other organizations deemed as partners of an event or deliverable.

All branding must comply with the standardized USAID regulations on branding. All branding for USAID, its partners, and other Unites States Government (USG) and non-USG entities engaged in a specific activity implemented under this Contract, must have equal representation on all public or internal documentation, publications, advertising, presentations, brochures, etc.

The Marking Plan (MP) shall enumerate all of the public communications, commodities, program materials, events, deliverables, and other items that shall be marked with the USAID identity or brand.

The Contractor will adhere to all USAID policy directives and required procedures on branding and marking of USAID-funded programs, projects, activities, public communications, and commodities with the USAID “Standard Graphic Identity” (or “USAID Identity”) as specified in ADS 320 and the Graphic Standards Manual (GSM).

(a) In accordance with ADS 320.3.2.1, the Branding Strategy (BS) is a part of the contract requirements. Offerors are instructed to prepare a Branding Implementation Plan (BIP) and Marking Plan (MP) to implement the Branding Strategy for this program (unless directed otherwise). Offeror shall submit Branding Implementation Plan with proposal and will be incorporated into the contract in Section D. The standard forms for the BRANDING AND MARKING TEMPLATES are located at: http://www.usaid.gov/branding/.

(b) Contractors and subcontractors' corporate identities or logos must not be used on USAID-funded program materials. Marking is not permitted on any communications that are strictly administrative, rather than programmatic, in nature. USAID identity is also prohibited on Contractor and recipient communications related to award administration, such as hiring/firing of staff or renting office space and/or equipment.

(c) Each proposal under this RFP shall have a program specific BIP and MP. The contractor shall develop a detailed Branding Implementation Plan and Marking Plan. The Marking Plan may include requests for exceptions to marking requirements or programmatic reasons, to be http://www.usaid.gov/branding/ approved by the Contracting Officer. Waivers, as defined by ADS 320, may be necessary for compelling political, safety or security concerns or if the marking shall have an adverse effect in the host country. Marking and attribution for physical structures may need to be visible as soon as work commences. If grants are authorized in the Contract, the Contractor shall clearly and conspicuously state in the small grants documentation and all delivered procurement that resources for the grant have been donated by USAID and make clear that the Contractor is acting as USAID's agent.

The Contracting Officer will consider the Marking Plan's adequacy and reasonableness and will approve or disapprove any exemption requests. The Marking Plan will be reviewed to ensure the above information is adequately included and consistent with the stated objectives of the award, the offeror’s cost data submissions, and the performance plan.

g. If the Offeror receives an award, the Marking Plan, including any approved exemptions, will be included in and made part of the Contract, and will apply for the term of the award unless provided otherwise.

[END OF SECTION D]

E - Inspection and Acceptance

E.1 Notice Listing Contract Clauses Incorporated by Reference

The following contract clauses pertinent to this section are hereby incorporated by reference (by Citation Number, Title, and Date) in accordance with the clause at FAR “52.252.-2 CLAUSES INCORPORATED BY REFERENCE” in Section I of this contract. See http://acquisition.gov/far/index.html for electronic access to the full text of a FAR clause.

FEDERAL ACQUISITION REGULATION (48 CFR Chapter 1)

Clause Number Clause Title and Date 52.246-5 Inspection of Services - Cost-Reimbursement. (APR 1984)

E.2. Inspection and Acceptance

(a) USAID inspection and acceptance of services, reports, and other required deliverables or outputs will take place at the below location:

Economic Development Office USAID/Bosnia and Herzegovina Robert Frasure Street #1 71000 Sarajevo Bosnia and Herzegovina

(b) USAID reserves the right to inspect and accept any services, reports, and other required deliverables or outputs where the services are performed and where reports and deliverables or outputs are produced or submitted. The contracting officer has delegated authority to inspect and accept all services, reports, and required deliverables or outputs to the Contracting Officer’s Representative (COR) listed in Section G below.

E3. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

The progress, success, and impact of the contractor’s performance under this contract will be monitored and evaluated as a part of the overall activity results. The QASP is a management process with the intent of encouraging maximum performance, efficiency, and cost effectiveness by the contractor and can be modified at any time by the Government.

The QASP will be used as a Government monitoring process to enforce the inspection and acceptance clauses of the contract. The QASP may require modification and/or updates after selection for award to reflect the contractor’s known strengths and weaknesses. The QASP is a “living” monitoring process that should be discussed, reviewed, and updated regularly but no less than on an annual basis. It is based on the premise that the contractor, not the Government, is responsible for managing and ensuring that quality controls meet the terms of the contract.

The Government reserves the right to modify performance standards and/or metrics during the life of this contract, in order to ensure that the right outcomes are being assessed and that the http://acquisition.gov/far/index.html performance standards are appropriate. It is the Contractor’s responsibility to follow up with the COR to ensure the QASP monitoring process is implemented and updated.

[END OF SECTION E]

F - Deliveries or Performance

F.1 Notice Listing Contract Clauses Incorporated by Reference

The following contract clauses pertinent to this section are hereby incorporated by reference (by Citation Number, Title, and Date) in accordance with the clause at FAR “52.252.-2 CLAUSES INCORPORATED BY REFERENCE” in Section I of this contract. See http://acquisition.gov/far/index.html for electronic access to the full text of a FAR clause. The full text of AIDAR clauses may be accessed electronically at http://www.usaid.gov/ads/policy/300/aidar (AIDAR)

FEDERAL ACQUISITION REGULATION (48 CFR Chapter 1)

Clause Number Clause Title 52.242-15 Stop-Work Order. (AUG 1989) - Alternate I (APR 1984)

AGENCY FOR INTERNATIONAL DEVELOPMENT ACQUISITION REGULATION

(48 CFR Chapter 7)

Clause Number Clause Title 752.242-70 Periodic progress reports. (OCT 2007)

F.2 Period of Performance

The period of performance for this contract is five years from the effective date of the contracting officer’s signature on the cover page until [TBD].

F.3 Place of Performance

The place of performance under this contract is Bosnia and Herzegovina.

F.4 Performance Standards

USAID will evaluate the contractor’s performance in accordance with FAR § 42.15, corresponding USAID procedures, and the contractor’s adherence to the annual work plan, reporting against its Monitoring, Evaluation, and Learning Plan (MEL) (Attachment J.4a), quality of reports described in Section F below, as well as the Contractor’s QASP. USAID will evaluate the contractor’s performance during the initial, intermediate, and final periods of the contract in accordance with the Contractor Performance Assessment Reporting System (CPARS). The Contracting Officer and the COR will jointly conduct the evaluation of the contractor’s overall performance. This evaluation will form the basis of the contractor’s permanent performance record under this contract.

http://acquisition.gov/far/index.html http://www.usaid.gov/ads/policy/300/aidar

F.5 Key Personnel

(a) The key personnel who the contractor must furnish for the performance of this contract are as follows:

No. Key Personnel Position

TBD TBD

TBD TBD

(b) The key personnel identified above are considered essential to the work being performed under this contract. The contractor must remain responsible for providing such key personnel for full-time performance for the term of this contract unless otherwise agreed to by the contracting officer.

(c) The failure to provide the key personnel designated above may be considered nonperformance unless such failure is beyond the control, and through no fault or negligence, of the contractor.

(d) The contractor must immediately notify the contracting officer and the COR of any key personnel’s departure and the reasons thereof.

(e) The contractor must take steps to immediately rectify this situation and will propose a substitute candidate for each vacated position along with a budget impact statement in sufficient detail to permit evaluation of the impact on the program.

The contractor must not replace any of the key personnel without the written consent of the contracting officer whether provided in advance or by ratification.

F.6 Authorized Workday/Week

(a) Overseas Employees - The work week for the Contractor's overseas employees must not be less than 40 hours and must be scheduled to coincide with the work week for those employees of the USAID Mission and the Cooperating Country associated with the work of this contract.

(b) A six-day work week may be authorized for short term personnel while in Bosnia with no premium pay if approved by the COR.

F.7 Reports and Deliverables

In addition to providing the services described in Section C, and requirements as set forth in AIDAR 752.242-70, Periodic Progress Reports, the Contractor must submit the following reports to the COR specified in Section G.

All written documentation (correspondence, reports, information sheets, updates) submitted to USAID must be written in professional-level English. Reports must be submitted electronically unless otherwise agreed or directed by USAID. In addition to the reports outlined below and elsewhere in this contract, the fluid nature of the planned activity may require the contractor to respond quickly to information requests, often with little preparation time.

F.8.1 Reports Submission Schedule

(a) The contractor must comply with the below schedule for the submission of each report listed below.

No. Reporting Requirement Submission Date

1 Annual Work Plan Within 60 calendar days after the start date of the contract, and subsequent annual work plans are due no later than 30 days before the beginning of succeeding contract years.

2 Final Monitoring, Evaluation, and Learning (MEL) Plan

Within 60 calendar days after the start date of the contract.

3 Quarterly Accrual Reports (based on USG FY quarters)

10 calendar days before the end of the quarter.

4 Quarterly Performance Reports Within 15 calendar days after the end of the quarter.

5 Quarterly Financial Reports Within 15 calendar days after the end of the quarter.

6 Annual Summary Reports Within 30 calendar days after the end of the fiscal year.

7 Demobilization Plan Four months prior to the completion date of the contract

8 Completion Report 60 calendar days prior to the end date of the contract.

9 Special Reporting On a monthly basis.

10 Government Property Reporting Within 30 days after the end of each contract year.

11 Grants Manual Within 60 calendar days from the date of contract award.

(b) The contractor must comply with the schedule for the submission of each Section C deliverable provided in the table below (TBD).

No. Deliverable Submission Date

1 Activity level gender analysis Within six months after the start date of the contract

2 Disability Inclusion Plan Within six months after the start date of the contract

To be expanded as appropriate.

F.8.2 Annual Work Plans

Within 60 calendar days from the start date of the contract, the Contractor must provide to USAID for review and approval a draft work plan for the first year’s activities, schedules and targets. USAID will provide approval to the Contractor of the work plan for the first year’s activities, schedules and targets. This work plan must include a description of the principal tasks and assistance activities to be undertaken by the Contractor over the first year of the contract, a proposed schedule of such activities, a listing of principal counterpart for each proposed activity, and a description and estimate of amounts of short-term expertise, training and other support resources that would be required to provide the assistance proposed.

The work plan must also include a description of what each assistance activity or combination of activities is expected to accomplish and its baseline data and will indicate how and to what extent those accomplishments will contribute to the achievement of overall targets and benchmarks for the project.

It must further include a detailed MEL Plan indicating results indicators. Subsequent annual work plans will be updated annually, due no later than 30 days before the beginning of succeeding year. Unexpected and unforeseen windows of opportunity must be incorporated on a periodic basis. The final work plan is due 10 days after receiving comments.

F.8.3 Monitoring, Evaluation, and Learning (MEL) Plan

As a part of the initial work plan, the Contractor must provide to USAID for review and approval a draft Monitoring, Learning, and Evaluation Plan (MEL Plan) (Attachment J.4a) that allows for measuring implementation progress against performance indicators and related targets and benchmarks. The MEL Plan must clearly correspond to the award and work plan, and must include indicators for the overall performance period as well as for each year. Appropriate consideration/indicators for youth, gender and environment are required. The Contractor must develop performance indicators; collect necessary baseline and annual follow-up data, and numerical targets to measure the results for each activity component and to assess the impact of proposed interventions. The Contractor must produce a Performance Indicator Sheet (PIRS) for each indicator, which will identify the data sources and collection methods.

The Contractor must report on results achieved and corresponding indicators using Activity Indicator Performance Tracking Table (Annex IV in Attachment J.4a MEL Plan Template) in quarterly/annual reports.

F.8.4 Quarterly Accrual Reports

Quarterly accrual reports will be submitted to USAID that will provide contractual information pertaining to the following information:

• Total Estimated Cost remaining in the contract;

• Unliquidated balance in the contract;

• Accrual amount;

• Estimated Pipeline amount

F.8.5 Quarterly Performance Reports

Quarterly performance reports must present progress on all activities and must include the following information at a minimum:

– Outline of activity purpose and approach;

– Description of significant events during the reporting period;

– Status of each of activities and tasks as defined in the Work Plan;

– Status of overall activity progress per impact indicators as defined in the Work Plan and the M&E plan;

– Achieved outputs compared to planned outputs;

– Achieved outcome objective(s) compared to planned outcome objective(s), or progress towards achieving the outcome objective(s), and an assessment of the likelihood of achieving the planned outcome objectives;

– An assessment of risk factors that may affect achievement of planned objectives;

– An assessment of possible adjustments in activity implementation, including risk management;

– List of reports/deliverables completed in the reporting period;

– Performance problems during the reporting period;

– Status of budget expenditures;

– List of major activities planned for next quarter including indicators and associated targets;

– Any relevant information that has affected or will affect activity progress.

F.8.6 Quarterly Financial Report

Quarterly financial reports will be submitted to USAID. They should be disaggregated by element level and contain, at a minimum:

• Total funds awarded to date by USAID into the contract;

• Total funds previously reported as expended by contractor by main line items;

• Total funds expended in the current quarter by the contractor by main line items;

• Total un-liquidated obligations by main line items;

• List of the significant expenses incurred during the period;

• Projected expenditures for next quarter;

• Estimate to Complete Contract;

• Estimate at Completion of Contract.

The contractor is solely responsible for not exceeding obligated amounts and is reminded of the required notification to the CO as to the percentage of funds expended against the total obligated and available amount as set forth in FAR § 52.232-22 “Limitation of Funds.”

F.8.7 Annual Summary Report

The contractor will prepare and submit to the USAID COR an annual report after the end of the first full activity year and annually thereafter (unless a different annual schedule is provided by USAID), for each authorized year of performance. Annual reports will summarize activities and results during the year in relation to the approved Work Plan and will be based on the USAID fiscal year, which runs from October 1-September 30.

F.8.8 Web-based Geographic Information System (GIS)

The Contractor must submit the MEL Plan and Quarterly/Annual Reports with accompanying data on performance indicators to the COR through USAID/BiH’s web-based performance management/geographic information system.

On a quarterly basis the Contractor must also submit to the COR, through the web-based performance management/geographic information system, data identifying the approximate distribution of Activity spending by main work types and key issues. Activity spending must be based on the last three vouchers approved. The main work types are Small Grants; Property, Plants, Equipment, and Technical Assistance.

Reported data on both performance indicators and Activity spending must be geographically distributed whenever possible. During the MEL plan preparation phase, it will be decided on which geographical level(s) each performance indicator will be reported. Reported data on Activity spending per main work type must be geographically distributed by location point for Small Grants, Property, Plants, and Equipment and by geographic level (State, Entity, Canton, and municipality/city) for Technical Assistance.

All data and deliverables submitted through the web-based performance management/geographic information system will be confirmed by Activity CORs.

The Contractor is responsible for delivery of draft reports, schedules, plans, and other documents described below.

F.8.9 Regular Meetings

Regular meetings between the Contractor’s key personnel and the USAID COR must occur at least once every two weeks.

F.8.10 Demobilization Plan

Four months prior to the completion date of the contract, the Contractor must submit a Demobilization Plan to the COR. The Demobilization Plan must include at a minimum, an illustrative Property Disposition Plan; a plan for the phase out of in-country operations; a delivery schedule for all reports and other deliverables required under the contract; and a timeline for completing all required actions in the Demobilization Plan to the cognizant Contracting Officer. Both the illustrative and final Property Disposition Plans must address all requirements under U.S. and Bosnia and Herzegovina’s law for the transfer of property and must include the inventory schedule required by FAR 52.245-1, a plan for the disposition of property to eligible parties and a timeline for disposition of such property. The Demobilization Plan must be approved in writing by the Contracting Officer.

F.8.11 Completion Report

Sixty (60) calendar days before the end date of the contract, the Contractor must prepare a completion report which highlights accomplishments against the work plan, gives the final status of benchmarks and tangible results, addresses lessons learned during the implementation and suggests ways to resolve constraints identified. A final M&E will be part of the final report.

F.8.12 Special Reporting

During the performance of this activity, some special reporting may be required from the Contractor such as a brief paragraph on note-worthy activities and events, successes stories etc.

F.8.13 Grants Manual

The Contractor must follow ADS 302 and ADS 303 in all respect and all relevant rules and regulation and is required to submit a Grants Management Manual for the COR’s review and CO review and approval. Contractor may proceed with the award of grants upon receipt of notice to proceed from the USAID CO.

F.8.14 Gender Equality and Female Empowerment

The Contractor must have a gender-conscious approach that will maximize gender and social inclusion. Per ADS 205, all USAID activities are required to take into account not only the different roles of men and women, but also the relationship between and among men and women, as well as the broader institutional and social structures that support them. The approach should be informed by a gender and inclusion analysis that will describe how interventions are likely to impact individuals differently based on their gender roles and cultural norms. While this activity is not conceived as one specifically devoted to gender issues, the Contractor will take into account the role of women in the economic and social advancement of a nation as a key component of development. The Contractor must consult the 2019 USAID country-level gender analysis and the Diaspora Invest lessons learned document, provided as attachment J.7 to this RFP, to produce an activity-level gender analysis and implementation plan to fully incorporate the analysis into the activity within the first six months of implementation.

F.8.15 Disability Considerations

USAID has a priority to help underserved groups, including people with disabilities. According to the United Nations Convention on the Rights of People with Disabilities, a person with a disability is defined as someone who has long term physical, mental, and intellectual or sensory https://measurebih.com/uimages/Gender20Analysis20201920Follow-Up20Final20Report.pdf https://measurebih.com/uimages/Gender20Analysis20201920Follow-Up20Final20Report.pdf impairments which, in interaction with various barriers, may hinder their full and effective participation in society on an equal basis with others.

Under this award, every effort will be made to accommodate the needs of people with disabilities. Furthermore, within the first six months of implementation, the Contractor shall submit a disability inclusion plan specifically delineating how the project will address barriers for people with disabilities relevant to the project and ensure equal access and disability inclusive development practices.

F.8.16 Government Property—USAID Reporting Requirements

The contractor must comply with AIDAR 752.245-70 “Government Property—USAID Reporting Requirements (October 2017). Full text of the clause is available at the link in Section F.1 above.

F.9 Evaluation

Consistent with the USAID Evaluation Policy, USAID/BiH may conduct independent impact and/or performance evaluations of this activity due to its innovative nature and the need for assessing progress and evidence to inform future private sector development interventions. Any evaluation design would be completed in consultation with the Contractor to ensure alignment with the activity work plan and locations. The Contractor must coordinate with the evaluation team to facilitate a performance evaluation.

F.10 Audit

The Contractor will be subject to audit standards and procedures based on USAID regulations and GAAP.

F.11 Submission of reports

The contractor must electronically submit all written deliverables to the COR. Additionally, the COR may request printed or bound deliverables.

[END OF SECTION F]

http://www.usaid.gov/evaluation/policy

G - Contract Administration Data

G.1 Administrative Contracting Office

(a) The Contracting Officer(s) in the Office of Acquisition and Assistance (OAA) at USAID/Bosnia and Herzegovina, physically located at the address found on the cover page of this contract, have the authority to administer this contract.

(b) The contractor will submit any questions concerning the administration of this contract to the Acquisition and Assistance Office at USAID/Bosnia and Herzegovina. Technical questions will be submitted to the COR.

(c) It is the contractor’s sole responsibility to inform the Contracting Officer of any requests that will affect any and all sections of the contract.

G.2 Contracting Officer’s Authority

(a) The Contracting Officer is the only person authorized to make or approve any changes in the requirements of this contract and notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely in the Contracting Officer. In the event the contractor makes any changes at the direction of any person other than the Contracting Officer, the change must be considered to have been made without authority and no adjustment must be made in the contract terms and conditions, including price.

G.3 Contracting Officer’s Representative

(a) The Contracting Officer’s designated representative (COR) for this contract is TBD.

(b) The COR will be appointed by separate letter. The Contracting Officer will provide a copy of the COR designation letter to the contractor after award.

G.4 Technical Direction/Limitations of Contracting Officer’s Representative

(a) Technical Direction is defined to include:

(1) Written directions to the Contractor which fill in details, suggest possible lines of inquiry, or otherwise facilitate completion of work;

(2) Provision of written information to the Contractor which assists in the interpretation of drawings, specifications, or technical portions of the work statement;

(3) Review and, where required, provide written approval of technical reports, drawings, specifications, or technical information to be delivered. Technical directions must be in writing, and must be within the scope of the work as detailed in Section C.

(b) The Contracting Officer, by separate designation letter, authorizes the COR to take any or all action with respect to the following which could lawfully be taken by the Contracting Officer, except any action specifically prohibited by the terms of this Contract:

(1) Assure that the Contractor performs the technical requirements of the contract in accordance with the contract terms, conditions, and specifications.

(2) Perform or cause to be performed, inspections necessary in connection with a) above and require the Contractor to correct all deficiencies; perform acceptance for the Government.

(3) Maintain all liaison and direct communications with the Contractor. Written communications with the Contractor and documents must be signed as “Contracting Officer’s Representative” with a copy furnished to the Contracting Officer.

(4) Issue written interpretations of technical requirements of Government drawings, designs, and specifications.

(5) Monitor the Contractor’s production or performance progress and notify the Contractor in writing of deficiencies observed during surveillance, and direct appropriate action to effect correction. Record and report to the Contracting Officer incidents of faulty or nonconforming work, delays or problems.

(6) Complete Contractor Performance Reports (CPR’s) every six to 12 months for task orders.

(7) Obtain necessary security clearance and appropriate identification if access to Government facilities is required.

(8) If to be provided, ensure that Government furnished property is available when required.

(9) Review and approve statements of work for individuals proposed to provide short-term technical assistance.

(10) Review and approve statements of work for subcontracts of technical nature.

LIMITATIONS: The COR is not empowered to award, agree to, or sign any contract (including delivery or purchase orders) or modifications thereto, or in any way to obligate the payment of money by the Government. The COR may not take any action which may impact on the contract schedule, funds, scope or rate of utilization of LOE. All contractual agreements, commitments, or modifications which involve prices, quantities, quality, and schedules must be made only by the Contracting Officer.

In the separately-issued COR designation letter, the CO designates an alternate COR to act in the absence of the designated COR, in accordance with the terms of the letter.

(c) Contractual Problems: Contractual problems of any nature that may arise during the life of the contract must be handled in conformance with specific public laws and regulations (i.e.

Federal Acquisition Regulation and Agency for International Development Acquisition Regulation). The Contractor and the COR must bring all contracting problems to the immediate attention of the Contracting Officer. Only the Contracting Officer is authorized to formally resolve such problems. The Contracting Officer will be responsible for resolving legal issues, determining contract scope and interpreting contract terms and conditions. The Contracting

Officer is the sole authority authorized to approve changes in any of the requirements under this contract. Notwithstanding any clause contained elsewhere in this contract, the said authority remains solely with the Contracting Officer. These changes include but will not be limited to the following areas: scope of work, price, quantity, technical specifications, delivery schedules, and contract terms and conditions.