720-18576-24-01 CH RR Waterlines_Construction Drawings.pdf
PDF 11 MB Posted
- Solicitation number
- 62279
- Issued by
- Roanoke County, Charlotte Court House Town, Virginia
About this file
This document appears to be the Construction Drawings for IFB 24-004, a state and local contract opportunity issued by the Commonwealth of Virginia for the Repair/Replace Waterlines and Water Treatment Plant at the Catawba Hospital in Roanoke County and Charlotte Court House Town.
The project generally involves the repair and installation of new water lines to serve the Catawba Hospital, as well as upgrades to the water treatment plant and all related appurtenances. The contract will be awarded by the state of Virginia, with the work to be performed in the local jurisdictions of Roanoke County and Charlotte Court House Town. The response for this Invitation for Bid (IFB) is due on a date not specified in the provided information.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET NO.
PROJECT NO.
LAT.
CHECKED BY:
DRAWN BY:
LONG.
DATE:
M ar
1,
- 6
:1 0a m Z
:\2
3\
\E ng in ee rin g\ C
AD
\2
2_
Ti tle
_N ot es _D et ai ls .d w g
ENGINEERING • SURVEYING • LAND DEVELOPMENT • ENVIRONMENTAL
GEOTECHNICAL • CONSTRUCTION TESTING & INSPECTION • CULTURAL RESOURCES
540.552.5592
1861 PRATT DR, STE 1100 BLACKSBURG, VA. 24060
HANDP.COM
INSPIRED / RESPONSIVE / TRUSTED
REV.
TITLE SHEET
G01
MGG
CBD
12 FEB 24
-80.318494 36.911436 20230442
C
AT
AW
BA
, V A
W
AT
ER
LI
NE
R
EP
AC
EM
EN
T
PR
O
JE
CT
C
AT
AW
BA
H
O
SP
IT
AL
C O
M M
O N
W
EA
LT
H
O F
VI
R
G
IN
IA
COMMONWEALTH OF VIRGINIA, CATAWBA HOSPITAL
WATERLINE REPLACEMENT PROJECT - IFB 24-004 CH WATERLINE REPLACEMENT
ROANOKE COUNTY , VA.
STATE PROJECT CODE: 720-18576-002
DBHDS PROJECT CODE PC - 720-18576-24-01
ARLINGTON
WASHINGTON, D.C.
ESSEX
WESTMORELAND
LOUDOUNFREDERICK
CLARKE
PRINCE
WILLIAM
FAUQUIER
STAFFORDCULPEPER
SPOTSYLVANIA
W
AR
REN
PA
GE
SHENANDOAH
MADISON
GREENE
RAPPHAHANNOCK
ORANGE
FAIRFAX
KING
GEORGE
AC
CO
M
AC
K
N O
R
TH
AM
PT
O N
MIDDLESEX
RICHMOND
KING AND QUEEN
YORK
GLOUCESTERCITY
CHARLES
NEW KENT
SURRY
JAMES
CITY
NORTHUMBERLANDLANCASTER
MATEWS
VIRGINIA
BEACH
ISLE
WIGHT
OF
SUFFOLK
CHESAPEAKE
LOUISA
GOOCHLAND
HANOVER
AMELIA
POWHATAN
CHESTERFIELD
HENRICO
FLUVANNANELSON
ALBEMARLE
PRINCE
EDWARD
APPOMATTOX
BUCKINGHAM
CU
M
BE
RL
AN
D
NOTTOWAY
BRUNSWICK
GREENSVILLE
MECKLENBURG
HALIFAX
CHARLOTTE
LUNENBURG
DINWIDDIE
PRINCE
GEORGE
CAROLINE
KING WILLIAM
SUSSEX
SOUTHAMPTON
AUGUSTA
HIGHLAND
AMHERST
ROCKB
RID
GE
BEDFORD
ALLEGHANY
CRAIG
ROANOKE
BOTETOURT
PITTSYLVANIA
FLOYD
PATRICK HENRY
FRANKLIN
MONTGOMERYBLAND
BUCHANAN
WYTHE
TAZEWELL
SMYTH
GRAYSON
WASHINGTON
RUSSELL
DICKENSON
CARROLL
GILES
PULASKI
LEE
SCOTT
WISE
BATH
ROCKINGHAM
CAMPBELL
N
DESIGNED BY
BLACKSBURG, VIRGINIA
INSPIRED│RESPONSIVE │TRUSTED
HURT & PROFFITT, INC
Sheet List Table Sheet Number Sheet Title
G01 TITLE SHEET
G02 GENERAL NOTES
G03 E&SC NOTES
G04 E&SC DETAILS
G05 STANDARD DETAILS
G06 STANDARD DETAILS
G07 STANDARD DETAILS
G08 STANDARD DETAILS
G09 INGRESS EGRESS PLAN
C01 SHEET LAYOUT SURVEY DATA
C02 PLAN SHEET
C03 PLAN SHEET
C04 PLAN SHEET
C05 PLAN SHEET
C06 SITE RESTORATION
C07 PROFILES
C08 PROFILES
C09 PROFILES
C10 PROFILES
C11 PROFILES
CONTACTS:
Jennifer Hamby, CCM, LEAN CM, LEED AP Department of Behavioral Health and Developmental Services Project Manager Office of Environment of Care Facilities Service Division 804-205-2212
Cindy McDaniel Department of Behavioral Health and Developmental Services Chief Operating Officer Catawba Hospital 540-375-4210
Mark York Department of Behavioral Health and Developmental Services Buildings & Grounds Director Catawba Hospital 540-312-5969
SEQUENCE OF CONSTRUCTION
· FOLLOWING IS A SAMPLE WORKFLOW PLAN. CONTRACTOR SHALL SUBMIT AN OFFICIAL
PHASING PLAN, INCLUDING MEASURES TO CONTROL AND MAINTAIN SAFE VEHICULAR AND
PEDESTRIAN TRAFFIC USING SAFETY FENCING, ECT., TO THE ENGINEER AND OWNER FOR
APPROVAL PRIOR TO BEGINNING WORK.
· INSTALL TEMPORARY SIGNAGE AND MAINTENANCE OF VEHICULAR AND PEDESTRIAN
TRAFFIC DEVICES.
· POTHOLE EXISTING UTILITIES. POTHOLE EXISTING BUILDING CONNECTIONS. ALERT ENGINEER
AND OWNER OF ANY DESCREPANCIES FROM THE PLANS.
· INSTALL 8” MAIN WATERLINE, VALVES, METERS, AND RELATED APPURTENANCES BEGINNING
NEAR STATION 10+00 AND ENDING NEAR STATION 31+65.
· TIE PROPOSED 8” MAIN WATERLINE TO THE EXISTING 12” MAIN WATERLINE AT STATION
10+00.
· FLUSH THE NEWLY INSTALLED 8” MAIN WATERLINE AND PERFORM PRESSURE AND
BACKTERIOLOGICAL TESTING ON THE NEWLY INSTALLED 8” MAIN WATERLINE.
· AFTER SUCCESSFUL COMPLETION OF PRESSURE AND BACKTERIOLOGICAL TESTING
CONTRACTOR SHALL BEGIN INSTALLING AND CONNECTING SERVICE LINES FROM THE NEW
8” MAIN WATERLINE TO THE INDIVIDUAL BUILDINGS, FIRE HYDRANTS, ETC.
· AFTER ALL CONNECTIONS ARE MADE TO THE NEW 8” MAIN WATERLINE THE OLD
WATERLINES SHALL BE CUT, CAPPED, AND ABANDONED AS SHOWN ON THE PLANS.
· RESTORATION SHALL BE COMPLETED AS SHOWN ON THE PLANS.
· CONFIRM SIZING AND MEASUREMENTS OF WATER TREATMENT PLANT WORK.
· FABRICATE NEW MAIN LINE WITH HANDWHEEL OPERATED GATE VALVE.
· COORDINATE WATER TREATMENT SHUTDOWN WITH CATAWBA STAFF.
· REMOVE EXISTING SECTION OF PIPING AND INSERT NEW PIPING AND VALVE.
GENERAL NOTES
· CONTRACTOR SHALL POTHOLE ALL EXISTING UTILITY CROSSINGS PRIOR TO INSTALLATION OF
WATERLINES. CONTRACTOR SHALL ALERT ENGINEER AND OWNER OF CONFLICTS, IF ANY ARE
FOUND.
· CONTRACTOR SHALL CONFIRM ALL PIPE SIZES PRIOR TO BEGINNING INTERCONNECTION
WORK.
APPLICABLE CODES AND STANDARDS
· CONSTRUCTION OF PROFESSIONAL SERVICES MANUAL (CPSM) 2023, REVISION 0.
· VIRGINIA UNIFORM STATEWIDE BUILDING CODE (VUSBC) 2018.
· VIRGINIA CONSTRUCTION CODE (VCC) - 2018 (VUSBC PART 1).
· VIRGINIA EXISTING BUILDING CODE (VEBC) - 2018 (VUSBC PART II).
· VIRGINIA MECHANICAL CODE (VMC) - 2018
· VIRGINIA STATEWIDE FIRE PREVENTION CODE (VSFPC) 2018
· INTERNATIONAL FIRE CODE (IFC) 2018 - (WHERE REFERENCED IN THE VUSBC AND VEBC)
· STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION
OPERATIONS - NFPA 241-2013 (WHERE REFERENCED IN THE IFC & VSFPC)
· HANDICAPPED ACCESSIBILITY: 2010 ADA STANDARDS FOR ACCESSIBLE DESIGN - 9/15/2010
(2010 ASAD)
· STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND
APPURTENANCES - NFPA 24-2016.
THE CONTRACTOR SHALL HAVE A VALID MISS UTILITY TICKET PRIOR TO
EXCAVATION. CONTRACTOR TO CONTACT MISS UTILITY AT 811, 72 HOURS
PRIOR TO BEGINNING EXCAVATION AND DO NOT DISTURB SOIL UNTIL DIG
TICKET HAS BEEN PROCESSED AS REQUIRED BY CPSM 5.8.6.2.
DIG NOTICE:
ASBESTOS DISCLOSURE STATEMENT
AN ASBESTOS INSPECTION WAS NOT PERFORMED BECAUSE ALL WORK WILL
TAKE PLACE OUTSIDE OF THE EXISTING BUILDINGS. THE EXISTING WATERLINES
BEING REPLACED ARE COMPRISED OF DUCTILE IRON PIPING.
LEAD MATERIALS DISCLOSURE STATEMENT
AN INSPECTION TO IDENTIFY LEAD CONTAINING COMPONENTS HAS NOT BEEN
CONDUCTED BECAUSE ALL WORK WILL TAKE PLACE OUTSIDE OF THE EXISTING
BUILDINGS. THE EXISTING WATERLINES BEING REPLACED ARE COMPRISED OF
DUCTILE IRON PIPING. THE OWNER HAS NO KNOWLEDGE OF LEAD CONTAINING
WATERLINE COMPONENTS.
STATE PROJECT CODE:
720-18576-002
AutoCAD SHX Text
LOCATION MAP
AutoCAD SHX Text
NTS
AutoCAD SHX Text p
AutoCAD SHX Text
AutoCAD SHX Text p
AutoCAD SHX Text
AutoCAD SHX Text p
AutoCAD SHX Text
AutoCAD SHX Text p
AutoCAD SHX Text
AutoCAD SHX Text p
AutoCAD SHX Text
AutoCAD SHX Text p
AutoCAD SHX Text
AutoCAD SHX Text p
AutoCAD SHX Text
AutoCAD SHX Text p
AutoCAD SHX Text
AutoCAD SHX Text p
AutoCAD SHX Text
AutoCAD SHX Text o
AutoCAD SHX Text
AutoCAD SHX Text p
AutoCAD SHX Text
AutoCAD SHX Text o
AutoCAD SHX Text
AutoCAD SHX Text p
AutoCAD SHX Text
AutoCAD SHX Text p
AutoCAD SHX Text
AutoCAD SHX Text
VICINITY MAP
AutoCAD SHX Text
NTS
LAT.
CHECKED BY:
DRAWN BY:
LONG.
DATE:
F eb
9,
- 1
2:
pm Z
:\2
3\
\E ng in ee rin g\ C
A D
\2
2_ Ti tle _N ot es
_D et ai ls
.d w g
ENGINEERING • SURVEYING • LAND DEVELOPMENT • ENVIRONMENTAL
GEOTECHNICAL • CONSTRUCTION TESTING & INSPECTION • CULTURAL RESOURCES
540.552.5592
1861 PRATT DR, STE 1100 BLACKSBURG, VA. 24060
HANDP.COM
INSPIRED / RESPONSIVE / TRUSTED
REV.
GENERAL NOTES
G02
MGG
CBD
12 FEB 24
-80.318494 36.911436 20230442
C A
TA
W
B A
, V A
W
AT
ER
LI
NE
R
EP
AC
EM
EN
T
PR
O
JE
CT
C
AT
AW
BA
H
O
SP
IT
AL
C O
M M
O N
W E
A
LT
H O
F V
IR
G
IN
IA
STATE PROJECT CODE:
720-18576-002
LAT.
CHECKED BY:
DRAWN BY:
LONG.
DATE:
F eb
9,
- 1
2:
pm Z
:\2
3\
\E ng in ee rin g\ C
A D
\2
2_ Ti tle _N ot es
_D et ai ls
.d w g
ENGINEERING • SURVEYING • LAND DEVELOPMENT • ENVIRONMENTAL
GEOTECHNICAL • CONSTRUCTION TESTING & INSPECTION • CULTURAL RESOURCES
540.552.5592
1861 PRATT DR, STE 1100 BLACKSBURG, VA. 24060
HANDP.COM
INSPIRED / RESPONSIVE / TRUSTED
REV.
E&SC NOTES
G03
MGG
CBD
12 FEB 24
-80.318494 36.911436 20230442
C A
TA
W
B A
, V A
W
AT
ER
LI
NE
R
EP
AC
EM
EN
T
PR
O
JE
CT
C
AT
AW
BA
H
O
SP
IT
AL
C O
M M
O N
W E
A
LT
H O
F V
IR
G
IN
IA
STATE PROJECT CODE:
720-18576-002
AutoCAD SHX Text
CRITERIA, TECHNIQUE OR METHOD
AutoCAD SHX Text
PRACTICES PROVIDED
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text No.
AutoCAD SHX Text
AutoCAD SHX Text %%uMINIMUM STANDARDS
AutoCAD SHX Text
FOR ALL DENUDED AREAS
AutoCAD SHX Text
FOR ALL DENUDED AREAS
AutoCAD SHX Text SHOULD SEEPS OCCUR IN ANY EXISTING OR NEW CUT OR FILL SLOPE, THE CONTRACTOR SHALL FIRST INSURE THAT THERE ARE NOT AREAS OF PONDED WATER AT THE TOPS OF THE SLOPES, AND THEN SHALL CONTACT BOTH THE DESIGN ENGINEER AND THE PROJECT GEOTECHNICAL ENGINEER FOR ON-SITE EVALUATION OF THE AREAS OF SEEPAGE.
AutoCAD SHX Text
SELF-EXPLANATORY
AutoCAD SHX Text THE FOLLOWING STANDARDS ARE TO BE PROVIDED OR ADDRESSED ON EVERY DEVELOPMENT PROJECT EXCEEDING 10,000 S.F. IN AREA OF DISTURBANCE. THESE STANDARDS ARE CONSIDERED A MINIMUM AND MAY REQUIRE ADDITIONAL MEASURES AS DEEMED NECESSARY BY THE LOCAL APPROVING AUTHORITY OR THE CONSULTING ENGINEER.
AutoCAD SHX Text PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAYNOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 14 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR.
AutoCAD SHX Text DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE OWNER IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE.
AutoCAD SHX Text A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT, IN THE OPINION OF THE LOCAL PROGRAM ADMINISTRATOR OR DESIGNATED AGENT, IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION.
AutoCAD SHX Text SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND-DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE.
AutoCAD SHX Text STABILIZATION METHODS SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION.
AutoCAD SHX Text SEDIMENT TRAPS AND BASINS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN.
AutoCAD SHX Text CUT AND FILL SLOPES SHALL BE CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE (1) YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZATION MEASURES UNTIL THE PROBLEM IS CORRECTED.
AutoCAD SHX Text CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE.
AutoCAD SHX Text WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED.
AutoCAD SHX Text ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT-LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT.
AutoCAD SHX Text BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL.
AutoCAD SHX Text WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY NONERODIBLE COVER MATERIALS.
AutoCAD SHX Text WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY SIX (6) MONTH PERIOD, A TEMPORARY STREAM CROSSING CONSTRUCTED OF NONERODIBLE MATERIAL, SHALL BE PROVIDED.
AutoCAD SHX Text ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS PERTAINING TO WORKING IN OR CROSSING LIVE WATERCOURSES SHALL BE MET.
AutoCAD SHX Text THE BEDS AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE WATERCOURSE IS COMPLETED.
AutoCAD SHX Text UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: 1) NO MORE THAN 500 LINEAR FEET OF ANY TRENCH MAY BE OPENED AT ONE TIME. 2) EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. 3)EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF-SITE PROPERTY. 4)MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION. 5)RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THESE REGULATIONS. 6)APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH.
AutoCAD SHX Text WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER.
AutoCAD SHX Text ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN THIRTY (30) DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM ADMINISTRATOR. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION.
AutoCAD SHX Text GENERAL EROSION AND SEDIMENT CONTROL NOTES: ES-l: UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS 9VAC25-840 EROSION AND SEDIMENT CONTROL REGULATIONS. ES-2: THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE-CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE-CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. ES-3: ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. ES-4: A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. ES-5: PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF-SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. ES-6: THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. ES-7: ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. ES-8: DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. ES-9: THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF-PRODUCING RAINFALL EVENT. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF-PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. INSPECTION: THE GENERAL CONTRACTOR SHALL INSPECT DISTURBED AREAS OF THE SITE THAT HAVE NOT BEEN FULLY STABILIZED, AREAS USED FOR MATERIALS STORAGE AND STOCKPILE AREAS WHICH ARE EXPOSED TO PRECIPITATION, STRUCTURAL CONTROL MEASURES, AND CONSTRUCTION VEHICLES ACCESS AREAS AT LEAST EVERY (14) CALENDAR DAYS, AND WITHIN FORTY-EIGHT (48) HOURS OF THE END OF A STORM EVENT PRODUCING ONE-HALF ( ) 12) INCH OR GREATER OF PRECIPITATION. WHERE AREAS HAVE BEEN PERMANENTLY OR TEMPORARILY STABILIZED, OR RUNOFF IS UNLIKELY DUE TO WINTER CONDITIONS, SUCH INSPECTIONS SHALL BE CONDUCTED AT LEAST ONCE EVERY MONTH. INSPECT DISTURBED AREAS, MATERIALS STORAGE AREAS AND STOCKPILE AREAS WHICH ARE EXPOSED TO PRECIPITATION FOR EVIDENCE OF, OR THE POTENTIAL FOR SEDIMENT ENTERING THE STORM DRAIN SYSTEM. INSPECT EROSION AND SEDIMENT CONTROL MEASURES IN ACCORDANCE WITH REQUIREMENTS STATED IN THE CONTRACT DOCUMENTS, AND INSPECT STORM DRAINS DISCHARGE POINTS FOR EXCESSIVE SEDIMENTATION. CORRECT SITE CONTROLS AS REQUIRED TO REDUCE SEDIMENTATION OF STORM DRAINS, CULVERTS, AND RECEIVING CHANNELS. IF CONTROLS OR SEDIMENT PREVENTION AREAS ARE FOUND TO NEED REPAIR OR MODIFICATION, THE GENERAL CONTRACTOR SHALL PROVIDE ADDITIONAL MEASURES OR MODIFICATIONS AS REQUIRED. ANY ADDITIONAL MEASURES OR MODIFICATIONS TO EXISTING CONTROLS SHALL BE RECORDED AS FIELD REVISIONS TO THESE PLANS. IN THE EVENT THAT ADDITIONAL CONTROLS ARE FOUND TO BE REQUIRED, THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR IMPLEMENTING AND INSTALLING THESE CONTROLS BEFORE THE NEXT ANTICIPATED STORM EVENT. A REPORT SUMMARIZING THE SCOPE OF THE INSPECTIONS, NAME OF INSPECTOR, INSPECTOR'S CERTIFICATION, DATES OF INSPECTIONS, MAJOR OBSERVATIONS PERTAINING TO THE IMPLEMENTATION OF THESE EROSION CONTROL PLANS, AND ACTIONS TAKEN SHALL BE DOCUMENTED AND RETAINED AS A PART OF THESE PLANS. MAJOR OBSERVATIONS SHALL INCLUDE: THE LOCATIONS OF EXCESSIVE SEDIMENTATION FROM THE SITE, LOCATIONS OF CONTROLS REQUIRING REPAIR, LOCATIONS OF FAILED OR INADEQUATE CONTROLS, AND LOCATIONS WHERE ADDITIONAL CONTROLS ARE NECESSARY.
AutoCAD SHX Text
MU
AutoCAD SHX Text PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE WITH THE FOLLOWING STANDARDS AND CRITERIA. STREAM RESTORATION AND RELOCATION PROJECTS THAT INCORPORATE NATURAL CHANNEL DESIGN CONCEPTS ARE NOT MAN-MADE CHANNELS AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS: A. CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE SHALL BE DISCHARGED DIRECTLY INTO AN ADEQUATE CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE SHALL BE DISCHARGED DIRECTLY INTO AN ADEQUATE NATURAL OR MAN-MADE RECEIVING CHANNEL, PIPE OR STORM SEWER SYSTEM. FOR THOSE SITES WHERE RUNOFF IS DISCHARGED INTO A PIPE OR PIPE SYSTEM, DOWNSTREAM STABILITY ANALYSES AT THE OUTFALL OF THE PIPE OR PIPE SYSTEM SHALL BE PERFORMED. B. ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED IN THE FOLLOWING MANNER: ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED IN THE FOLLOWING MANNER: 1) THE APPLICANT SHALL DEMONSTRATE THAT THE TOTAL DRAINAGE AREA TO THE POINT OF ANALYSIS WITHIN THE CHANNEL IS THE APPLICANT SHALL DEMONSTRATE THAT THE TOTAL DRAINAGE AREA TO THE POINT OF ANALYSIS WITHIN THE CHANNEL IS ONE HUNDRED TIMES GREATER THAN THE CONTRIBUTING DRAINAGE AREA OF THE PROJECT IN QUESTION; OR 2) (A) NATURAL CHANNELS SHALL BE ANALYZED BY THE USE OF A TWO-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT (A) NATURAL CHANNELS SHALL BE ANALYZED BY THE USE OF A TWO-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP CHANNEL BANKS NOR CAUSE EROSION OF CHANNEL BED OR BANKS. (B) ALL PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS SHALL BE ANALYZED BY THE USE OF A TEN-YEAR STORM TO VERIFY ALL PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS SHALL BE ANALYZED BY THE USE OF A TEN-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP ITS BANKS AND BY THE USE OF A TWO-YEAR STORM TO DEMONSTRATE THAT STORMWATER WILL NOT CAUSE EROSION OF CHANNEL BED OR BANKS; AND (C) PIPES AND STORM SEWER SYSTEMS SHALL BE ANALYZED BY THE USE OF A TEN-YEAR STORM TO VERIFY THAT STORMWATER WILL PIPES AND STORM SEWER SYSTEMS SHALL BE ANALYZED BY THE USE OF A TEN-YEAR STORM TO VERIFY THAT STORMWATER WILL BE CONTAINED WITHIN THE PIPE OR SYSTEM. C. IF EXISTING NATURAL RECEIVING CHANNELS OR PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS OR PIPES ARE NOT ADEQUATE, IF EXISTING NATURAL RECEIVING CHANNELS OR PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS OR PIPES ARE NOT ADEQUATE, THE APPLICANT SHALL: 1) IMPROVE THE CHANNELS TO A CONDITION WHERE A TEN-YEAR STORM WILL NOT OVERTOP THE BANKS AND A TWO-YEAR IMPROVE THE CHANNELS TO A CONDITION WHERE A TEN-YEAR STORM WILL NOT OVERTOP THE BANKS AND A TWO-YEAR STORM WILL NOT CAUSE EROSION TO CHANNEL THE BED OR BANKS; OR 2) IMPROVE THE PIPE OR PIPE SYSTEM TO A CONDITION WHERE THE TEN-YEAR STORM IS CONTAINED WITHIN THE IMPROVE THE PIPE OR PIPE SYSTEM TO A CONDITION WHERE THE TEN-YEAR STORM IS CONTAINED WITHIN THE APPURTENANCES; 3) DEVELOP A SITE DESIGN THAT WILL NOT CAUSE THE PRE-DEVELOPMENT PEAK RUNOFF RATE FROM A TOWER STORM TO DEVELOP A SITE DESIGN THAT WILL NOT CAUSE THE PRE-DEVELOPMENT PEAK RUNOFF RATE FROM A TOWER STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A NATURAL CHANNEL OR WILL NOT CAUSE THE PREDEVELOPMENT PEAK RUNOFF RATE FROM A TEN-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A MANMADE CHANNEL; OR 4) PROVIDE A COMBINATION OF CHANNEL IMPROVEMENT, STORMWATER DETENTION OR OTHER MEASURES WHICH IS PROVIDE A COMBINATION OF CHANNEL IMPROVEMENT, STORMWATER DETENTION OR OTHER MEASURES WHICH IS SATISFACTORY TO THE VESCP AUTHORITY TO PREVENT DOWNSTREAM EROSION. D. THE APPLICANT SHALL PROVIDE EVIDENCE OF PERMISSION TO MAKE THE IMPROVEMENTS. THE APPLICANT SHALL PROVIDE EVIDENCE OF PERMISSION TO MAKE THE IMPROVEMENTS. E. ALL HYDROLOGIC ANALYSES SHALL BE BASED ON THE EXISTING WATERSHED CHARACTERISTICS AND THE ULTIMATE DEVELOPMENT ALL HYDROLOGIC ANALYSES SHALL BE BASED ON THE EXISTING WATERSHED CHARACTERISTICS AND THE ULTIMATE DEVELOPMENT CONDITION OF THE SUBJECT PROJECT. F. IF THE APPLICANT CHOOSES AN OPTION THAT INCLUDES STORMWATER DETENTION, HE SHALL OBTAIN APPROVAL FROM THE VESCP IF THE APPLICANT CHOOSES AN OPTION THAT INCLUDES STORMWATER DETENTION, HE SHALL OBTAIN APPROVAL FROM THE VESCP OF A PLAN FOR MAINTENANCE OF THE DETENTION FACILITIES. THE PLAN SHALL SET FORTH THE MAINTENANCE REQUIREMENTS OF THE FACILITY AND THE PERSON RESPONSIBLE FOR PERFORMING THE MAINTENANCE. G. OUTFALL FROM A DETENTION FACILITY SHALL BE DISCHARGED TO A RECEIVING CHANNEL, AND ENERGY DISSIPATORS SHALL BE OUTFALL FROM A DETENTION FACILITY SHALL BE DISCHARGED TO A RECEIVING CHANNEL, AND ENERGY DISSIPATORS SHALL BE PLACED AT THE OUTFALL OF ALL DETENTION FACILITIES AS NECESSARY TO PROVIDE A STABILIZED TRANSITION FROM THE FACILITY TO THE RECEIVING CHANNEL. H. ALL ON-SITE CHANNELS MUST BE VERIFIED TO BE ADEQUATE. ALL ON-SITE CHANNELS MUST BE VERIFIED TO BE ADEQUATE. I. INCREASED VOLUMES OF SHEET FLOWS THAT MAY CAUSE EROSION OR SEDIMENTATION ON ADJACENT PROPERTY SHALL BE INCREASED VOLUMES OF SHEET FLOWS THAT MAY CAUSE EROSION OR SEDIMENTATION ON ADJACENT PROPERTY SHALL BE DIVERTED TO A STABLE OUTLET, ADEQUATE CHANNEL, PIPE OR PIPE SYSTEM, OR TO A DETENTION FACILITY. J. IN APPLYING THESE STORMWATER MANAGEMENT CRITERIA, INDIVIDUAL LOTS OR PARCELS IN A RESIDENTIAL, COMMERCIAL OR IN APPLYING THESE STORMWATER MANAGEMENT CRITERIA, INDIVIDUAL LOTS OR PARCELS IN A RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT SHALL NOT BE CONSIDERED TO BE SEPARATE DEVELOPMENT PROJECTS. INSTEAD, THE DEVELOPMENT, AS A WHOLE, SHALL BE CONSIDERED TO BE A SINGLE DEVELOPMENT PROJECT. HYDROLOGIC PARAMETERS THAT REFLECT THE ULTIMATE DEVELOPMENT CONDITION SHALL BE USED IN ALL ENGINEERING CALCULATIONS. K. ALL MEASURES USED TO PROTECT PROPERTIES AND WATERWAYS SHALL BE EMPLOYED IN A MANNER WHICH MINIMIZES ALL MEASURES USED TO PROTECT PROPERTIES AND WATERWAYS SHALL BE EMPLOYED IN A MANNER WHICH MINIMIZES IMPACTS ON THE PHYSICAL, CHEMICAL AND BIOLOGICAL INTEGRITY OF RIVERS, STREAMS AND OTHER WATERS OF THE STATE. L. ANY PLAN APPROVED PRIOR TO JULY 1, 2014, THAT PROVIDES FOR STORMWATER MANAGEMENT THAT ADDRESSES ANY FLOW ANY PLAN APPROVED PRIOR TO JULY 1, 2014, THAT PROVIDES FOR STORMWATER MANAGEMENT THAT ADDRESSES ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS SHALL SATISFY THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS IF THE PRACTICES ARE DESIGNED TO I. DETAIN THE WATER QUALITY VOLUME AND TO RELEASE IT OVER 48 HOURS; DETAIN THE WATER QUALITY VOLUME AND TO RELEASE IT OVER 48 HOURS; II. DETAIN AND RELEASE OVER A 24-HOUR PERIOD THE EXPECTED RAINFALL RESULTING FROM THE ONE YEAR, 24- HOUR DETAIN AND RELEASE OVER A 24-HOUR PERIOD THE EXPECTED RAINFALL RESULTING FROM THE ONE YEAR, 24- HOUR STORM; AND III. REDUCE THE ALLOWABLE PEAK FLOW RATE RESULTING FROM THE 1.5, 2, AND 10-YEAR, 24-HOUR STORMS TO A LEVEL THAT REDUCE THE ALLOWABLE PEAK FLOW RATE RESULTING FROM THE 1.5, 2, AND 10-YEAR, 24-HOUR STORMS TO A LEVEL THAT IS LESS THAN OR EQUAL TO THE PEAK FLOW RATE FROM THE SITE ASSUMING IT WAS IN A GOOD FORESTED CONDITION, ACHIEVED THROUGH MULTIPLICATION OF THE FORESTED PEAK FLOW RATE BY A REDUCTION FACTOR THAT IS EQUAL TO THE RUNOFF VOLUME FROM THE SITE WHEN IT WAS IN A GOOD FORESTED CONDITION DIVIDED BY THE RUNOFF VOLUME FROM THE SITE IN ITS PROPOSED CONDITION, AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS AS DEFINED IN ANY REGULATIONS PROMULGATED PURSUANT TO § 10.1-562 OR 10.1-570 OF THE ACT. M. FOR PLANS APPROVED ON AND AFTER JULY 1, 2014, THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS OF § 10.1-561 A FOR PLANS APPROVED ON AND AFTER JULY 1, 2014, THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS OF § 10.1-561 A OF THE ACT AND THIS SUBSECTION SHALL BE SATISFIED BY COMPLIANCE WITH WATER QUANTITY REQUIREMENTS IN THE STORMWATER MANAGEMENT ACT (§ 10.1-603.2 ET SEQ. OF THE CODE OF VIRGINIA) AND ATTENDANT REGULATIONS, UNLESS SUCH LAND DISTURBING ACTIVITIES ARE IN ACCORDANCE WITH 4VAC50-60-48 OF THE VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) PERMIT REGULATIONS. N. COMPLIANCE WITH THE WATER QUANTITY MINIMUM STANDARDS SET OUT IN 4VAC50-60-66 OF THE VIRGINIA STORMWATER COMPLIANCE WITH THE WATER QUANTITY MINIMUM STANDARDS SET OUT IN 4VAC50-60-66 OF THE VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) PERMIT REGULATIONS SHALL BE DEEMED TO SATISFY THE REQUIREMENTS OF MINIMUM STANDARD 19.
AutoCAD SHX Text
AutoCAD SHX Text
NOT APPLICABLE
AutoCAD SHX Text
CRITERIA, TECHNIQUE OR METHOD
AutoCAD SHX Text
PRACTICES PROVIDED
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text STORM WATER NOTES: 1. THIS PROJECT DISTURBS LESS THAN 1 ACRE OF LAND (LIMITS OF DISTURBANCE: PROPOSED ALIGNMENT @ 0.78 AC. THIS PROJECT DISTURBS LESS THAN 1 ACRE OF LAND (LIMITS OF DISTURBANCE: PROPOSED ALIGNMENT @ 0.78 AC. HOWEVER, THIS PLAN HAS BEEN DEVELOPED WITH THE INTENT THAT THIS PROJECT DOES NOT SIGNIFICANTLY ALTER THE PREDEVELOPMENT RUNOFF CHARACTERISTICS OF THE LAND SURFACE AFTER THE COMPLETION OF CONSTRUCTION AND FINAL STABILIZATION. 2. CONTRACTOR SHALL MANAGE THIS SITE SO THAT LESS THAN ONE (1) ACRE OF LAND DISTURBANCE OCCURS ON A CONTRACTOR SHALL MANAGE THIS SITE SO THAT LESS THAN ONE (1) ACRE OF LAND DISTURBANCE OCCURS ON A DAILY BASIS. 3. CONTRACTOR SHALL ADEQUATELY STABILIZE THE SITE ON A DAILY BASIS. CONTRACTOR SHALL ADEQUATELY STABILIZE THE SITE ON A DAILY BASIS. 4. CONTRACTOR SHALL AT ALL TIMES PROTECT THE ENVIRONMENT FROM EROSION AND SEDIMENTATION DAMAGE CONTRACTOR SHALL AT ALL TIMES PROTECT THE ENVIRONMENT FROM EROSION AND SEDIMENTATION DAMAGE ASSOCIATED WITH LAND-DISTURBING ACTIVITY. 5. CONTRACTOR SHALL MINIMIZE THE DISCHARGE OF POLLUTANTS FROM EQUIPMENT AND VEHICLE WASHING, WHEEL CONTRACTOR SHALL MINIMIZE THE DISCHARGE OF POLLUTANTS FROM EQUIPMENT AND VEHICLE WASHING, WHEEL WASH WATER, AND OTHER WASH WATERS. 6. CONTRACTOR SHALL MINIMIZE THE EXPOSURE OF BUILDING MATERIALS, BUILDING PRODUCTS, CONSTRUCTION WASTES, CONTRACTOR SHALL MINIMIZE THE EXPOSURE OF BUILDING MATERIALS, BUILDING PRODUCTS, CONSTRUCTION WASTES, TRASH, LANDSCAPE MATERIALS, FERTILIZERS, PESTICIDES, HERBICIDES, DETERGENTS, SANITARY WASTE, AND OTHER MATERIALS PRESENT ON-SITE TO PRECIPITATION AND STORM WATER. 7. CONTRACTOR SHALL MINIMIZE THE DISCHARGE OF POLLUTANTS FROM SPILLS AND LEAKS AND IMPLEMENT CHEMICAL CONTRACTOR SHALL MINIMIZE THE DISCHARGE OF POLLUTANTS FROM SPILLS AND LEAKS AND IMPLEMENT CHEMICAL SPILL AND LEAK PREVENTION AND RESPONSE PROCEDURES. 8. THE DISCHARGE OF WASTEWATER FROM THE WASHOUT FROM CONCRETE IS PROHIBITED. THE DISCHARGE OF WASTEWATER FROM THE WASHOUT FROM CONCRETE IS PROHIBITED. 9. THE DISCHARGE OF WASTEWATER FROM THE WASHOUT AND CLEANOUT OF STUCCO, PAINT, FORM RELEASE OILS, THE DISCHARGE OF WASTEWATER FROM THE WASHOUT AND CLEANOUT OF STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS, AND OTHER CONSTRUCTION MATERIALS IS PROHIBITED. 10.THE DISCHARGE OF FUELS, OILS, OR OTHER POLLUTANTS USED IN VEHICLE AND EQUIPMENT OPERATION AND MAINTENANCE IS PROHIBITED.
AutoCAD SHX Text THE CONTRACTOR IS RESPONSIBLE FOR THE MAINTENANCE OF ALL EROSION CONTROL MEASURES ON SITE. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED DAILY AND AFTER EACH RUN-OFF PRODUCING RAINFALL. THE FOLLOWING ITEMS SHALL BE CHECKED IN PARTICULAR: 1. SILT FENCE, AFTER EVERY STORM EVENT TO ENSURE EFFECTIVE OPERATION AND REMOVE SEDIMENT WHEN THE SILT FENCE, AFTER EVERY STORM EVENT TO ENSURE EFFECTIVE OPERATION AND REMOVE SEDIMENT WHEN THE LEVEL OF SEDIMENT DEPOSITION REACHES HALF WAY TO THE TOP OF THE BARRIER. 2. PROVIDE PERIODIC TOP DRESSING OF CONSTRUCTION ENTRANCES WITH ADDITIONAL STONE AND REPAIR OR CLEAN PROVIDE PERIODIC TOP DRESSING OF CONSTRUCTION ENTRANCES WITH ADDITIONAL STONE AND REPAIR OR CLEAN OUT ANY OF THE STRUCTURES USED TO TRAP SEDIMENT. 3. CHECK GRAVEL INLET PROTECTION FOR SEDIMENT BUILDUP WHICH WILL PREVENT DRAINAGE. IF THE GRAVEL IS CHECK GRAVEL INLET PROTECTION FOR SEDIMENT BUILDUP WHICH WILL PREVENT DRAINAGE. IF THE GRAVEL IS CLOGGED BY SEDIMENT, REMOVE AND CLEAN, OR REPLACE. 4. CHECK THE SEEDED AREAS TO ENSURE THAT A STAND OF GRASS IS MAINTAINED. FERTILIZE AND RESEED AS CHECK THE SEEDED AREAS TO ENSURE THAT A STAND OF GRASS IS MAINTAINED. FERTILIZE AND RESEED AS NEEDED.
AutoCAD SHX Text
PS
AutoCAD SHX Text
TO
AutoCAD SHX Text
NOT APPLICABLE
AutoCAD SHX Text
PS
AutoCAD SHX Text
MU
AutoCAD SHX Text
ALL ERODING SLOPES
AutoCAD SHX Text
NOT APPLICABLE
AutoCAD SHX Text
NOT APPLICABLE
AutoCAD SHX Text
SEE PLANS
AutoCAD SHX Text
SF
AutoCAD SHX Text
NOT APPLICABLE
AutoCAD SHX Text
MU
AutoCAD SHX Text
PS
AutoCAD SHX Text
PS
AutoCAD SHX Text
MU
AutoCAD SHX Text
TO
AutoCAD SHX Text
MU
AutoCAD SHX Text
PS
AutoCAD SHX Text B/M
AutoCAD SHX Text EROSION AND SEDIMENT CONTROL NOTES: 1. UPON AWARD OF THE CONTRACT AND PRIOR TO ANY LAND DISTURBANCE, DESIGNATE A PERSON UPON AWARD OF THE CONTRACT AND PRIOR TO ANY LAND DISTURBANCE, DESIGNATE A PERSON WHO IS CERTIFIED BY THE VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) AS A RESPONSIBLE LAND DISTURBER (RLD) FOR THIS PROJECT. NOTIFY THE OWNER, (DEQ), AND HURT & PROFFITT, INC. IN WRITING OF THIS DESIGNATION. NAME OF RLD AND CERTIFICATE NUMBER SHALL BE HANDWRITTEN ON THE APPROVED PLANS AT THE PRE-CONSTRUCTION MEETING. 2. THE RESPONSIBLE LAND DISTURBER SHALL INSPECT EROSION AND SEDIMENT CONTROL DEVICES THE RESPONSIBLE LAND DISTURBER SHALL INSPECT EROSION AND SEDIMENT CONTROL DEVICES AND MEASURES FOR PROPER INSTALLATION AND DEFICIENCIES IMMEDIATELY AFTER EACH RAINFALL, AT LEAST DAILY DURING PROLONGED RAINFALL, AND WEEKLY WHEN NO RAINFALL EVENT OCCURS. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION AND SEDIMENT CONTROL DEVICES SHALL BE MADE IMMEDIATELY. THE RLD SHALL SUBMIT EVIDENTIARIES OF INSPECTIONS WITH MONTHLY REPORTS TO THE OWNER. 3. PLACE ALL EROSION AND SEDIMENT CONTROL MEASURES PRIOR TO OR AS THE FIRST STEP IN SITE PLACE ALL EROSION AND SEDIMENT CONTROL MEASURES PRIOR TO OR AS THE FIRST STEP IN SITE OPERATIONS. 4. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS (IN ADDITION TO OTHER APPLICABLE CRITERIA): -NO MORE THAN 500' OF TRENCH MAY BE OPEN AT ONE TIME. -EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCH. -MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION. -RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THE LATEST EDITION OF VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK (VESCH). -ALL APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH. -EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF-SITE PROPERTY. -DURING DEWATERING OPERATIONS, PUMP WATER INTO AN APPROVED FILTERING DEVICE. 5. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, LATEST EDITION (VESCH), AND VIRGINIA REGULATIONS 9VAC25-840 EROSION AND SEDIMENT CONTROL REGULATIONS. 6. NOTIFY THE PLAN APPROVING AUTHORITY ONE WEEK PRIOR TO THE PRECONSTRUCTION NOTIFY THE PLAN APPROVING AUTHORITY ONE WEEK PRIOR TO THE PRECONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. 7. THE NARRATIVE PREPARED FOR THIS PLAN IS PART OF THE PLANS AND SHALL BE USED IN THE NARRATIVE PREPARED FOR THIS PLAN IS PART OF THE PLANS AND SHALL BE USED IN CONJUNCTION WITH THE PLANS. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN NARRATIVE AND THE VESCH, SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 8. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, LAYDOWN AREAS AND OFF-SITE BORROW OR WASTE AREAS), SUBMIT A SUPPLEMENTARY EROSION AND SEDIMENT CONTROL PLAN FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. DISPOSE OF EXCESS MATERIALS IN A LEGAL, APPROVED SITE. 9. INSTALL ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES AS REQUIRED TO PREVENT INSTALL ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES AS REQUIRED TO PREVENT SEDIMENT LADEN RUNOFF FROM LEAVING THE SITE, AND AS DICTATED BY THE PLAN APPROVING AUTHORITY OR ENGINEER. 10. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT TRAPPING MEASURES AT ALL TIMES ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT TRAPPING MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. 11. AS THE EROSION CONTROL PLAN APPROVING AUTHORITY, THE (DEQ) MAY CHANGE THE APPROVED AS THE EROSION CONTROL PLAN APPROVING AUTHORITY, THE (DEQ) MAY CHANGE THE APPROVED PLAN IF INSPECTION REVEALS THAT THE APPROVED PLAN IS INADEQUATE TO SATISFY APPLICABLE REGULATIONS. 12. STORE EXCAVATED TOPSOIL IN TOPSOIL STOCKPILES WITHIN THE LIMITS OF CONSTRUCTION, IN STORE EXCAVATED TOPSOIL IN TOPSOIL STOCKPILES WITHIN THE LIMITS OF CONSTRUCTION, IN COORDINATION WITH THE OWNER. PROTECT STOCKPILE WITH SILT FENCE IN ACCORDANCE WITH VESCH STANDARDS. 13. FOR ALL DISTURBED AREAS THAT ARE NOT PAVED, SEED IN ACCORDANCE WITH THE FOR ALL DISTURBED AREAS THAT ARE NOT PAVED, SEED IN ACCORDANCE WITH THE SPECIFICATIONS, & THE VESCH, LATEST EDITION. 14. SEED AND STRAW MULCH ALL SOIL STOCKPILES LEFT UNDISTURBED MORE THAN 14 DAYS. SEED AND STRAW MULCH ALL SOIL STOCKPILES LEFT UNDISTURBED MORE THAN 14 DAYS. 15. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 14 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. 16. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION. ANY AREAS THAT DO NOT ESTABLISH WILL REQUIRE ADDITIONAL STABILIZATION. 17. STABILIZE EARTHEN STRUCTURES SUCH AS DIVERSIONS, BASIN EMBANKMENTS, ETC. IMMEDIATELY STABILIZE EARTHEN STRUCTURES SUCH AS DIVERSIONS, BASIN EMBANKMENTS, ETC. IMMEDIATELY AFTER INSTALLATION. 18. CUT AND FILL SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF CUT AND FILL SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION MUST BE PROVIDED WITH ADDITIONAL STABILIZATION MEASURES UNTIL THE PROBLEM IS CORRECTED. 19. WHERE CONSTRUCTION VEHICLES ACCESS PAVED OR PUBLIC ROADS, PROVISIONS MUST BE MADE WHERE CONSTRUCTION VEHICLES ACCESS PAVED OR PUBLIC ROADS, PROVISIONS MUST BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT. ANY SEDIMENT WHICH IS TRACKED ONTO PUBLIC ROADS MUST BE REMOVED FROM THE ROADS AT THE END OF EACH DAY, BY EITHER SHOVELING OR SWEEPING, AND TRANSPORTED TO AN APPROVED DISPOSAL AREA. 20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES MUST BE REMOVED WITHIN 30 DAYS ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES MUST BE REMOVED WITHIN 30 DAYS AFTER FINAL STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED. ANY AREAS THAT ARE DISTURBED AS THE RESULT OF REMOVAL OF TEMPORARY PRACTICES MUST BE RESTABILIZED ACCORDING TO VESCH STANDARD AND SPECIFICATION 3.32. TRAPPED SEDIMENT MUST BE EITHER REDISTRIBUTED OR TRANSFERRED TO AN APPROVED DISPOSAL SITE. 21. THE PROJECT LIMITS OF DISTURBANCE SHALL BE MARKED AS AN EARLY STEP IN THE SEQUENCE THE PROJECT LIMITS OF DISTURBANCE SHALL BE MARKED AS AN EARLY STEP IN THE SEQUENCE OF CONSTRUCTION. 22. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING SURFACE AND AIR MOVEMENT OF THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING SURFACE AND AIR MOVEMENT OF DUST FROM EXPOSED SOILS.
AutoCAD SHX Text SAFETY FENCE-VESCH STD. & SPEC. 3.01: A PROTECTIVE BARRIER INSTALLED TO PREVENT ACCESS TO AN -VESCH STD. & SPEC. 3.01: A PROTECTIVE BARRIER INSTALLED TO PREVENT ACCESS TO AN EROSION CONTROL MEASURE. STORM DRAIN INLET PROTECTION-VESCH STD. & SPEC. 3.07: METHOD OF PREVENTING SEDIMENT FROM ENTERING, -VESCH STD. & SPEC. 3.07: METHOD OF PREVENTING SEDIMENT FROM ENTERING, ACCUMULATING IN AND BEING TRANSFERRED BY A CULVERT PRIOR TO PERMANENT STABILIZATION. TOPSOILING-VESCH STD. & SPEC. 3.30: METHODS OF PRESERVING AND USING THE SURFACE LAYER OF -VESCH STD. & SPEC. 3.30: METHODS OF PRESERVING AND USING THE SURFACE LAYER OF UNDISTURBED SOIL, OFTEN ENRICHED IN ORGANIC MATTER, IN ORDER TO OBTAIN A MORE DESIRABLE PLANTING AND GROWTH MEDIUM. PERMANENT SEEDING-VESCH STD. & SPEC. 3.32: ESTABLISHMENT OF PERENNIAL VEGETATIVE COVER BY PLANTING -VESCH STD. & SPEC. 3.32: ESTABLISHMENT OF PERENNIAL VEGETATIVE COVER BY PLANTING SEED IN AREAS WHERE PERMANENT, LONG-LIVED VEGETATIVE COVER IS NEEDED TO STABILIZE THE SOIL AND IN ROUGH GRADED AREAS WHICH WILL NOT BE BROUGHT TO FINAL GRADE FOR A YEAR OR MORE. MULCHING-VESCH STD. & SPEC. 3.35: PLANT RESIDUAL OR OTHER SUITABLE MATERIALS APPLIED TO SOIL -VESCH STD. & SPEC. 3.35: PLANT RESIDUAL OR OTHER SUITABLE MATERIALS APPLIED TO SOIL SURFACE TO PREVENT EROSION FROM RAINDROP IMPACT, REDUCE VELOCITY OF OVERLAND FLOW, FOSTER VEGETATION GROWTH BY INCREASING AVAILABLE MOISTURE, & PROVIDE INSULATION AGAINST EXTREME HEAT AND COLD. SOIL STABILIZATION BLANKETS & MATTING-VESCH STD. & SPEC. 3.36: THE INSTALLATION OF A PROTECTIVE -VESCH STD. & SPEC. 3.36: THE INSTALLATION OF A PROTECTIVE COVERING (BLANKET) OR SOIL STABILIZATION MAT ON A PREPARED PLANTING AREA OF A STEEP SLOPE, CHANNEL OR SHORELINE.
AutoCAD SHX Text
EROSION AND SEDIMENT CONTROL MEASURES::
AutoCAD SHX Text
PS
AutoCAD SHX Text
MU
AutoCAD SHX Text B/M
AutoCAD SHX Text
TO
AutoCAD SHX Text
IP
AutoCAD SHX Text
IP
AutoCAD SHX Text
SAF
AutoCAD SHX Text
NOT APPLICABLE
AutoCAD SHX Text
NOT APPLICABLE
AutoCAD SHX Text
NOT APPLICABLE
AutoCAD SHX Text
NOT APPLICABLE
AutoCAD SHX Text SOILS THE FOLLOWING INFORMATION IS BASED ON THE SOILS MAP FOUND IN THE SOIL SURVEY OF ROANOKE COUNTY, VIRGINIA. THE FOLLOWING SOILS ARE A REPRESENTATIVE SAMPLE OF THE MOST COMMON SOILS FOUND THROUGHOUT THE PROJECT. MAP UNIT SYMBOL DESCRIPTION DESCRIPTION 51C - TUMBLING-URBAN LAND COMPLEX, - 2 TO 15 PERCENT SLOPES - TUMBLING-URBAN LAND COMPLEX, - 2 TO 15 PERCENT SLOPES TUMBLING-URBAN LAND COMPLEX, - 2 TO 15 PERCENT SLOPES
AutoCAD SHX Text
NOT APPLICABLE
AutoCAD SHX Text
NOT APPLICABLE
NOT APPLICABLE
LAT.
CHECKED BY:
DRAWN BY:
LONG.
DATE:
F eb
9,
- 1
2:
pm Z
:\2
3\
\E ng in ee rin g\ C
A D
\2
2_ Ti tle _N ot es
_D et ai ls
.d w g
ENGINEERING • SURVEYING • LAND DEVELOPMENT • ENVIRONMENTAL
GEOTECHNICAL • CONSTRUCTION TESTING & INSPECTION • CULTURAL RESOURCES
540.552.5592
1861 PRATT DR, STE 1100 BLACKSBURG, VA. 24060
HANDP.COM
INSPIRED / RESPONSIVE / TRUSTED
REV.
E&SC DETAILS
G04
MGG
CBD
12 FEB 24
-80.318494 36.911436 20230442
C A
TA
W
B A
, V A
W
AT
ER
LI
NE
R
EP
AC
EM
EN
T
PR
O
JE
CT
C
AT
AW
BA
H
O
SP
IT
AL
C O
M M
O N
W E
A
LT
H O
F V
IR
G
IN
IA
LAT.
CHECKED BY:
DRAWN BY:
LONG.
DATE:
F eb
9,
- 1
2:
pm Z
:\2
3\
\E ng in ee rin g\ C
A D
\2
2_ Ti tle _N ot es
_D et ai ls
.d w g
ENGINEERING • SURVEYING • LAND DEVELOPMENT • ENVIRONMENTAL
GEOTECHNICAL • CONSTRUCTION TESTING & INSPECTION • CULTURAL RESOURCES
540.552.5592
1861 PRATT DR, STE 1100 BLACKSBURG, VA. 24060
HANDP.COM
INSPIRED / RESPONSIVE / TRUSTED
REV.
STANDARD
DETAILS
G05
MGG
CBD
12 FEB 24
-80.318494 36.911436 20230442
C A
TA
W
B A
, V A
W
AT
ER
LI
NE
R
EP
AC
EM
EN
T
PR
O
JE
CT
C
AT
AW
BA
H
O
SP
IT
AL
C O
M M
O N
W E
A
LT
H O
F V
IR
G
IN
IA
SIDEWALK SECTION
1/2"
CONTROL JOINT
TYPICAL SIDEWALK DETAILS
NOT TO SCALE
1"
1/8"
EXPANSION JOINT
1/4"
STANDARD CONCRETE SIDEWALK REPLACEMENT DETAIL
NOT TO SCALE
100' MAX. SPACING BETWEEN EXPANSION JOINTS
4" CONCRETE
4"
4" 4"
4" CONCRETE 4" CONCRETE
STANDARD
MANHOLE STEPS
MS-1
STANDARD PRECAST
CONCRETE MANHOLE
MH SERIES.
SENSUS OMNI C2 METER
WITH RADIO READ
DRAIN SIMILAR TO
NENAH R-4380-4
W/FRAME
6"
4" PVC OR ABS PIPE TO
ATMOSPHERE OR PIPE
DISCHARGE TO 2'x2'x2'
DRYWELL ASTM D-448
NO. 68 AGGREGATE
6" ZONE METER INSTALLATION
CONNECT PIPE TO
STRUCTURE WITH
APPROVED WATERTIGHT
SLEEVE OR GASKET
GATE VALVE
& BOX
48" DIA.
5"
(TYP.)
8" MIN. THICK BED
OF CRUSHED STONE
ASTM D448 NO. 68 STONE
SEAL UNDER CASTING
AND ALL JOINTS WITH
BUTYL RUBBER ROPE
SEALER, AASHTO M-198
2 RINGS OF
3/8"
1/4" 3/8"
3/4"
1-1/2" 3/4" 3/4"
3/4"
1/4"3/8"
3/4"
3/8" 1 1/4"
2"
1" 3/4"
3/4"
1/4"
2 SLOTS
3/4" x 1-1/2"
WATER PROJECT
STANDARD MANHOLE
FRAME & COVER
SECTION B-B
BOTTOM OF COVER
PLAN
SECTION A-A
TOP OF COVER
USE SOLID COVER AND
CONCEALED LIFTING HOLE
WHEN TOP IS BURIED
BELOW GRADE
NOTE: THE LETTERS "WATER" SHALL
TOP OF COVER 1" WIDE AND RAISED
BE CAST IN THE DEPRESSION IN
3/8" HIGH AS SHOWN
MANHOLE FRAME AND COVER
STANDARD 103.09. VDOT
SHALL BE SIMILAR TO VDOT
APPROVED DUCTILE IRON FRAME
APPROXIMATE WEIGHT
CAST IRON
FRAME: 239±12 LBS.
COVER: 137±7 LBS.
AND COVER MAY BE SUBSTITUTED
WATER
F eb
9, :0 1p m
_T itl e_ N ot es
_D et ai ls
.d w g
PROFFITTHURT&
ENGINEERING • SURVEYING • LAND DEVELOPMENT • ENVIRONMENTAL
GEOTECHNICAL • CONSTRUCTION TESTING & INSPECTION • CULTURAL RESOURCES FC-3
26"
1'-7 5/8"
1'-9 3/4"
23-3/4"
F eb
9, :0 1p m
_T itl e_ N ot es
_D et ai ls
.d w g
PROFFITTHURT&
ENGINEERING • SURVEYING • LAND DEVELOPMENT • ENVIRONMENTAL
GEOTECHNICAL • CONSTRUCTION TESTING & INSPECTION • CULTURAL RESOURCES
ø1/4" NEOPRENE GASKET
26 1/4"
28 7/16" 34"
24"
7"
POROUS MASS
NO. 3 DEFORMED
STEEL RODS
POLYPROPYLENE
PLASTIC:
SOLID OUTER
SHELL
POLYPROPYLENE PLASTIC - GRADE
10-1014 "AVISUN CORP."
STEEL REINFORCING BAR - CONFORMS
TO A.S.T.M. STD A-615
STEPS SHALL BE POURED INTEGRALLY
WITH THE MANHOLE SECTION AND
NOT MORTARED OR GROUTED LATER
INSTALLATION
MATERIALS:
1"
1 1/4" 1 5/8"
1/4"
1/4" 1/8"
1/2"
12"
1"
8 3/4"1"
11/16" 1"
5/8"
1 1/4"
10"
1/4"3/4"
1 3/8"
1'
5/8"
SIDE ELEVATION
SECTION A-A
PLAN
FRONT ELEVATION
4"
STANDARD MANHOLE
STEP
F eb
9, :0 1p m
_T itl e_ N ot es
_D et ai ls
.d w g
PROFFITTHURT&
ENGINEERING • SURVEYING • LAND DEVELOPMENT • ENVIRONMENTAL
GEOTECHNICAL • CONSTRUCTION TESTING & INSPECTION • CULTURAL RESOURCES MS-1 F
eb
9, :0 1p m
_T itl e_ N ot es
_D et ai ls
.d w g
PROFFITTHURT&
ENGINEERING • SURVEYING • LAND DEVELOPMENT • ENVIRONMENTAL
GEOTECHNICAL • CONSTRUCTION TESTING & INSPECTION • CULTURAL RESOURCES
BRICK OR CONCRETE
PIPE SUPPORTS
SLOPE FLOOR
TO DRAIN
PROFFITT
HURT&
ENGINEERING • SURVEYING • LAND DEVELOPMENT • ENVIRONMENTAL
GEOTECHNICAL • CONSTRUCTION TESTING & INSPECTION • CULTURAL RESOURCES
6"
MANHOLE FRAME
AND COVER FC-3 AS
SPECIFIED
NOTE: MATERIALS AND FABRICATION IN ACCORDANCE
WITH ASTM C478 EXCEPT AS OTHERWISE SHOWN .
CONNECT PIPE TO SECTION WITH APPROVED FLEXIBLE
WATER-TIGHT SLEEVE OR GASKET (INTERPACE OR EQUAL).
THE FLEXIBLE WATER-TIGHT SLEEVE OR GASKET SHALL BE
INSTALLED PER THE MANUFACTURER'S RECOMMENDATIONS.
CONE SHALL BE OF THE ECCENTRIC TYPE.
33"
15"
REINFORCED STEEL
PER SPEC.
SC-2
PROP. CURB
& GUTTER
2.50' 5.00'
PROP. 4" CONC.
SIDEWALK
VARIES
VARIES
RESIDENTIAL WALKWAY
F eb
9, :0 1p m
_T itl e_ N ot es
_D et ai ls
.d w g F eb
9, :0
1p m
_T itl e_
N ot es _D et ai ls .d w g
RECONNECTION
(N.T.S.)
EXPANSION
JOINT
VDOT STD.
HR-1 (BLACK)
VDOT STD.
S-2
VARIES
TIE TO
EXIST.
WALK
EXPANSION
JOINT
EXIST.
WALK
PROP. 4"
CONC. WALK
4" AGGREGATE BASE MATERIAL
TYPE 21-B COMPACTED TO
95% PROCTOR.
PROP. 4"
CONC. WALK
VARIES
EXPANSION
JOINT
VARIES
PROP. 4" CONC.
SIDEWALK
5.00'2.50'
PROP. CURB
& GUTTER
EXIST.
WALK
TIE TO
EXIST.
WALK
PLAN
ELEVATION
3.00'4.00'
4":1'
NOTE: STAIRS AND HANDRAILS SHALL DESCEND
(SHOWN) OR ASCEND (NOT SHOWN) AS
TERRAIN REQUIRES.
2% SLOPE
MAX
ST-1
12 GAUGE SOLID COPPER LOCATOR WIRE FROM
WATER MAIN IN CONTACT WITH WATER LATERAL
WITH 12-INCH LOOP AT TOP OF METER BOX.
GATE VALVE
& BOX
STATE PROJECT CODE:
720-18576-002
AutoCAD SHX Text R=1/4"
AutoCAD SHX Text
BACK OF CURB
AutoCAD SHX Text
CONTROL JOINTS (TYP.) SEE NOTE 2 FOR SPACING
AutoCAD SHX Text
EXPANSION JOINT
AutoCAD SHX Text
COMPACTED SUBGRADE
AutoCAD SHX Text
COMPACTED SUBGRADE
AutoCAD SHX Text R=1/4"
AutoCAD SHX Text
MATERIAL
AutoCAD SHX Text
EXPANSION JOINTS (TYP.)
AutoCAD SHX Text NOTES: 1. ALL SIDEWALKS SHALL BE 4" THICK UNLESS OTHERWISE NOTED. 2. CONTRACTION JOINTS SHALL BE SPACED AT 5' INTERVALS FOR 5' WIDE SIDEWALKS. 3. SIDEWALKS SHALL BE CONSTRUCTED IN ACCORDANCE WITH STANDARD VDOT SPECIFICATIONS 504.01, 504.02, AND 504.03. 4. CONTRACTOR SHALL BACKFILL BEHIND SIDEWALK TO PROVIDE POSITIVE DRAINAGE.
AutoCAD SHX Text
COMPACTED SUBGRADE
AutoCAD SHX Text
VDOT 21-B STONE
AutoCAD SHX Text
VDOT 21-B STONE
AutoCAD SHX Text
VDOT 21-B STONE
AutoCAD SHX Text
PLAN VIEW
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
SECTION A-A
LAT.
CHECKED BY:
DRAWN BY:
LONG.
DATE:
F eb
9,
- 1
2:
pm Z
:\2
3\
\E ng in ee rin g\ C
A D
\2
2_ Ti tle _N ot es
_D et ai ls
.d w g
ENGINEERING • SURVEYING • LAND DEVELOPMENT • ENVIRONMENTAL
GEOTECHNICAL • CONSTRUCTION TESTING & INSPECTION • CULTURAL RESOURCES
540.552.5592
1861 PRATT DR, STE 1100 BLACKSBURG, VA. 24060
HANDP.COM
INSPIRED / RESPONSIVE / TRUSTED
REV.
STANDARD
DETAILS
G06
MGG
CBD
12 FEB 24
-80.318494 36.911436 20230442
C A
TA
W
B A
, V A
W
AT
ER
LI
NE
R
EP
AC
EM
EN
T
PR
O
JE
CT
C
AT
AW
BA
H
O
SP
IT
AL
C O
M M
O N
W E
A
LT
H O
F V
IR
G
IN
IA
TEE
CONCRETE
ANCHOR
USE TIE RODS (3/4")
FOR ANCHORAGE
PROOF TREATED)
GATE VALVE
WATER MAIN
IF HYDRANT IS
OVER 10' FROM
THE TEE, AN
ADDITIONAL CONCRETE
ANCHOR SHALL BE
PLACED BEHIND THE
ELEVATION
(GALVANIZED OR RUST-
VALVE
BOX
HYDRANT AT THE BASE.
DRAIN HOLES SHALL BE
CLEAR OF CONCRETE.
NOTES:
PLAN
FIRE HYDRANT
RECONNECTION
F eb
9, :0 1p m
_T itl e_ N ot es
_D et ai ls
.d w g
PROFFITTHURT&
ENGINEERING • SURVEYING • LAND DEVELOPMENT • ENVIRONMENTAL
GEOTECHNICAL • CONSTRUCTION TESTING & INSPECTION • CULTURAL RESOURCES FH-1 F
eb
9, :0 1p m
_T itl e_ N ot es
_D et ai ls
.d w g
PROFFITTHURT&
ENGINEERING • SURVEYING • LAND DEVELOPMENT • ENVIRONMENTAL
GEOTECHNICAL • CONSTRUCTION TESTING & INSPECTION • CULTURAL RESOURCES
S A
N
IT
A R
Y
LATERAL OR
MAIN SEWER
(VERIFY MATERIAL)
FERNCO
COUPLING
NEW SECTION
DUCTILE IRON CLASS 350
LENGTH AS SPECIFIED ON
PLANS. EXCAVATE AS REQ'D.
AND PROVIDE SUPPORT TO
PREVENT DEFLECTION
PLAN
SECTION
6" BEDDING
ASTM D448
#68 STONE
WATERLINE
AS SPECIFIED
OR PVC SDR 18
S E
W E
R
JOINTS
EQUIDISTANT
FROM SEWER
10' MIN.
OR AS NOTED
FERNCO SERIES 1000
FLEXIBLE COUPLING
WITH NO. 305
STAINLESS STEEL
CLAMPS EACH END
SAME TREATMENT OF
SEWER REQ'D WHEN
WATERLINE IS LESS
THAN 18" ABOVE
SEWER LINE
WATERLINE - SANITARY SEWER
CROSSING
18" MIN.
18" MIN.
F eb
9, :0 1p m
_T itl e_ N ot es
_D et ai ls
.d w g
PROFFITTHURT&
ENGINEERING • SURVEYING • LAND DEVELOPMENT • ENVIRONMENTAL
GEOTECHNICAL • CONSTRUCTION TESTING & INSPECTION • CULTURAL RESOURCES HC-1
COMPACTED BACKFILL
NOT LESS THAN 6"
NOR MORE THAN 12"
COMPACTED ASTM D448
#68 AGGREGATE
BEDDING
PLACE BEDDING
STONE TO PIPE SPRINGLINE
THIS DETAIL APPLICABLE
FOR DEPTHS LESS THAN 14 FEET.
SEE PLANS FOR MODIFICATIONS
IN DEEPER TRENCHES.
4" MIN.
6" MIN.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .