45633-Schedule of Supplies and Services.pdf
PDF 150 KB Posted
- Solicitation number
- 70ZU0327SSBPL0002
- Issued by
- Not on record
About this file
This document is a Schedule of Supplies and Services for a federal solicitation (70ZU0327QSBPL0002) issued by the U.S. Coast Guard for drydock repairs to a vessel at USCG Station Panama City (45633).
The contractor must furnish all necessary labor, materials, services, equipment, supplies, power, accessories, and facilities to perform comprehensive dry-docking repairs and alterations in accordance with the solicitation and attached specifications. The schedule contains 30 contract line items (CLINs), consisting of 27 definite items (marked "D") and 3 optional items (marked "O"). Definite items include general welding, ultrasonic testing, hull inspections, engine removal and installation, fuel tank cleaning, hose and valve renewal, preservation services, and marine chemist services. Optional items include composite labor rate (measured in hours), lay days (measured in days), and a GFP report marked as "Not Separately Priced" (NSP). All items require unit price submissions except the GFP Report, which is marked NSP. Contractors must submit pricing on an Excel spreadsheet with unit prices for each CLIN and totals for the definite value, option value, and overall contract value. All contract line items are firm-fixed price except additional labor performed on a labor hour basis. The solicitation emphasizes that failure to read specifications in their entirety does not relieve quoters from responsibility for properly estimating work difficulty and pricing, with such failure at the quoter's risk.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 45633 SF-1449.pdf | ||
| 45633 SPEC.pdf | ||
| 45633 PPQ.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Supplies and Services: USCG STA PANAMA CITY (45633) DRYDOCK REPAIRS
Solicitation: 70ZU0327QSBPL0002
The Contractor shall furnish all necessary labor, material, services, equipment, supplies, power, accessories, facilities and such other things as are necessary, except as otherwise specified, to perform dry-docking repairs and alterations to the vessel, in accordance with this solicitation and attached specifications.
Failure to read the specifications in their entirety will not relieve the quoter from the responsibility for properly estimating the difficulty or price of successfully performing the work. Failure to do so will be at the quoter’s risk.
Schedule of Supplies and Services:
To be filled out with a cost associated for each Definite CLIN and Option(s) CLIN with an overall total submitted on an Excel spreadsheet.
CLIN DESCRIPTION QUANTITY
UNIT
OF
ISSUE
UNIT PRICE TOTAL
D-001 General Welding, Provide 1 JOB
D-002 Ultrasonic Testing (UT) (100) Shots, Perform 1 JOB
D-003 Hull Plating (U/W Body), Inspect 1 JOB
D-004 Fendering System, Inspect 1 JOB
D-005 Accessible Spaces, Inspect 1 JOB
D-006 Diesel Fuel Tank, Clean and Inspect 1 JOB
D-007 Watertight Door and Hatches, Inspect and Adjust 1 JOB
D-008 Mast, Inspect 1 JOB
D-009 Main Diesel Engine(s) and Reduction Gear(s), Remove and Install 1 JOB
D-010 Main Diesel Engine(s) To MEPS Generator(s) And Jet Drive(s), Align 1 JOB
D-011 Water Jet-Inspect, Perform Service 1 JOB
D-012 Jet Drive Anodes, Renew 1 JOB
D-013 Engine Exhaust Piping, Inspect 1 JOB
D-014 Electrical Isolation, Perform, MEPS 1 JOB
D-015 Standard Hoses, Renew 1 JOB
D-016 Sea Valves, Renew 1 JOB
D-017 Diesel Tanks, Refuel 1 JOB
D-018 Water Jet Drive, Preserve 1 JOB
D-019 U/W Body, Preserve (100%) 1 JOB
D-020 Interior Hull Insulation, Renew 1 JOB
D-021 Marine Chemist Services, Provide 1 JOB
D-022 Drydock 1 JOB
D-023 Temporary Services, Provide 1 JOB
D-024 Sea Trial Performance, Support, Provide 1 JOB
D-025 Lazarette Bilge, Preserve 1 JOB
D-026 Sea Strainer (Copper Alloy), Renew 1 JOB
D-027 Window(s), Renew 1 JOB
O-028 Composite Labor Rate 1 HR
D-029 GFP Report 1 JOB NSP NSP
O-030 Lay Days 1 DAY
(v) Definite Contract Line Items are marked as “D” for Definite. Optional Contract Line Items are marked “O” for Optional.
Insert unit prices in all items listed in the Schedule unless “NSP” is printed in the unit price column for any item. “NSP” in the columns means “Not Separately Priced”. Any additional labor necessary will be performed on a labor hour basis, the quantity. All other Contract Line Items are firm-fixed price.
Total Definite Value $
Total Option Value $
(Firm fixed priced items and optional items) Total Value $
File details come from the government source that posted it. Updated .