This is a Statement of Work (SOW) for wood crate construction, delivery, and marking support services for the U.S. Coast Guard's Surface Forces Logistics Center (SFLC) Inventory Control Point (ICP) located in Baltimore, Maryland.
The contract requires the contractor to provide off-site wood crate construction, assembly, delivery, on-site bracing, and marking support services within 30 calendar days of Task Order receipt. Services include Task One (wood crate construction per ASTM specifications for loads ranging from under 200 pounds to 30,000 pounds with varying dimensional limits); Task Two (delivery services including stenciling, bracing, dunnage application, and labeling at the ICP); Task Three (repackaging services for Hull, Material & Electrical (HM&E) related inventory items using standard fiberboard containers per MIL-STD-2073-1E); and Task Four (repackaging services for Electronics (ELEX) related inventory items using Type I or Type II containers). All construction must comply with ASTM D6880-10, ASTM D7478/D7478M, and MIL-STD-2073-1E standards, with wood treated using copper naphthenate solution. Repackaging services for HM&E and ELEX items must be completed within five business days of Task Order receipt or by the 30th day of the government's "Frustrated date," whichever is sooner. The contractor must provide a qualified Project Manager available Monday through Friday, 0800–1630 EST, with 24-hour response time for technical issues. The period of performance is a one-year base period (September 27, 2027–September 26, 2028) with four one-year option periods. Work is performed at the contractor's facilities and at USCG Yard SFLC ICP, 2401 Hawkins Point Road, Baltimore, Maryland 21226, with hours of operation generally 0800–1600 EST Monday–Friday. The government furnishes workspace, forklift, and forklift operator. Security requirements include Tier 1 Investigation (Low Risk, Non-Sensitive) using SF85 form and DHS Form 11000-6 Non-Disclosure Agreement for personnel with access to sensitive information.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PR# 52000PR270000465
STATEMENT OF WORK
STATEMENT OF WORK (SOW)
FOR
WOOD CRATE CONSTRUCTION, DELIVERY AND MARKING SUPPORT SERVICES
SURFACE FORCES LOGISTICS CENTER (SFLC) INVENTORY CONTROL POINT (ICP)
1.0 GENERAL
1.1 BACKGROUND The U.S. Coast Guard’s Surface Forces Logistics Center (SFLC) is the centralized inventory source of parts, equipment, and materials for Coast Guard assets worldwide. A crucial part of SFLC’s mission is to ensure materials, parts, gear, and equipment (inventory) are adequately packaged in wood crates, when required, prior to acceptance at receiving and prior to shipment to domestic and overseas locations from the ICP. The ICP has no dedicated team to support wood crate construction in accordance with applicable ASTM specifications.
Rejected inventory at receiving and inventory found in ICP stowage occupy valuable ICP space and cannot be accepted or returned to stowage within a general 30-day period requirement. The contractor may expect Task Orders to construct any of the below described wood crates based on the government’s intended use, item sensitivity and overall item weight of inventory.
1.2 SCOPE This requirement augments SFLC ICP organic capability by implementing off-site wood crate construction, assembly, delivery, on-site bracing and/or marking support services delivered to the ICP within 30-calendar days using newly constructed wood crates based upon gov’t provided inventory weight, dimensions, item description and sensitivity.
1.3 OBJECTIVE The desired goal of requirements in this SOW applies toward location of services for inadequately packaged inventory and number of days for planning, execution of efforts within this SOW and the contractor’s receipt of a Task Order.
1.3.1 Wood Crate Construction Services provide within 30 days from Task Order receipt.
1.3.2 Services at ICP Delivery provide within 30 days of Task Order receipt.
1.4 REFERENCE DOCUMENTS
DoD Standard Practice for Military Packaging - MIL-STD-2073-1E
Standard Specification for Wood Boxes ASTM D6880-19
Standard Specification for Heavy Duty Sheathed Wood Crates - ASTM D7478/D7478M-11
Standard Terminology of Packaging and Distribution Environments – ASTM D996-16
MIL-STD-129P Change 4, Sept 2007 Marking for Shipment and Storage
Shipping Boxes & Reusable Containers PPP-B-1672E
2.0 SPECIFIC REQUIREMENTS
2.1 TASK ONE. WOOD CRATE CONSTRUCTION SERVICES
The contractor shall note changes in gov’t requirements for crate maximum exterior dimensions and weight specifications; Type II constructed with plywood panels, Class 2 assembled with screws/bolts, are specifically used for crates up to 10,000-lbs and while Style A or B is indicated for base configuration, most Task Orders are expected to be generated with a with skid-base for loads up to 10,000-lbs.
2.1.1 Provide all labor and materials, using ASTM-prescribed lumber cut to dimensions & treated with copper naphthenate solution, wood preservative(s) and/or water repellent lumber, specified tolerances and using required hardware for crate assembly from Task Order provided inventory description that includes weight, length, width and height for wood crate construction in accordance with ASTM D6880-10 Standard Specification for Wood boxes, Class 2 – Heavy Duty Full Cleated Ends, Butt Joints for loads less than 200-lbs and dimensions less than 48-inch length, 48-inch width and 48-inch height. Construct, assemble, prepare and attach using appropriately sized wood screws and apply a re-closable top panel closure described in ASTM D6880-10 for all constructed crates.
2.1.2 Provide all labor and materials using ASTM-prescribed & treated with copper naphthenate solution, wood preservative(s) and/or water repellent lumber cut to dimensions, specified tolerances, and using required hardware for crate assembly from Task Order provided inventory description that includes weight, length, width, and height for wood crate construction in accordance with ASTM D7478M Standard Specification for Heavy Duty Sheathed Wood
Crates. Complete, construct, assemble, prepare, and attach using appropriately sized and arranged bolts and/or wood screws as specified in ASTM D7478M for crate quantities, loads and weight of inventory on Task Orders prescribed in the following paragraphs.
2.1.2.1 for Type II Class 2, Style A or B, for loads less than 1,000-lbs and dimensions less than 30-ft length, 9-ft width & 10-ft height.
2.1.2.2 for Type II Class 2, Style A or B, for loads less than 2,000-lbs and dimensions less than 30-ft l length, 9-ft width & 10-ft height.
2.1.2.3 for Type II, Class 2, Style A or B, for loads less than 4,000-lbs and dimensions less than 10-ft length, 8-ft width & 8-ft height.
2.1.2.4 for Type II Class 2, Style A or B, for loads less than 6,000-lbs and dimensions less than 30-ft length, 9-ft width & 10-ft height
2.1.2.5 for Type II, Class 2, Style A or B, for loads less than 8,000-lbs and dimensions less than 12-ft length, 8-ft width & 8-ft height.
2.1.2.6 for Type II, Class 2, Style A or B, for loads less than 10,000-lbs and dimensions less than 24-ft length, 8-ft width & 10-ft height.
2.1.2.7 for Type I or II, Class 1 or 2, Style A or B, for loads less than 15,000-lbs and dimensions less than 24-ft length, 8-ft width & 10-ft height.
2.1.2.8 for Type I or II Class 1 or 2, Style A or B, for loads less than 20,000-lbs and dimensions less than 30-ft length, 9-ft width & 10-ft height.
2.1.2.9 for Type I or II Class 1 or 2, Style A or B, for loads less than 25,000-lbs and dimensions less than 30-ft length, 9-ft width & 10-ft height
2.1.2.10 for Type I or II, Class 1 or 2, Style A or B, for loads less than 30,000-lbs and dimensions less than 30-ft length, 9-ft width & 10-ft height.
2.2 TASK TWO. SERVICES AT ICP DELIVERY
2.2.1 When required by Task Order, the Contractor shall apply stencil(s) with black enamel paint directly on the container and be 1/2-inch minimum height black characters on a white painted contrasting background in the upper left-hand side of the two longest sides (two opposite sides if square) of each crate.
2.2.1.1 With all Task Orders scheduled for delivery, arrive at delivery location within 1-hour of pre-arranged delivery time, contact Contracting Officer’s Representative (COR), locate assembly area, verify inventory staged to information on Task Order(s), and provide verbal pre-loading brief to U.S.
Coast Guard (USCG) forklift driver, as needed.
2.2.1.2 Apply bracing, dunnage, cushioning, bolting, strapping and/or other means described on the
Task Order and in accordance with ASTM techniques, methods, and instructions to prevent inventory movement inside crate.
2.2.1.3 Apply crate closure(s) using screws and/or bolts.
2.2.1.4 Apply gov’t furnished labels on vertical exterior sides of crates in accordance with
Task Order instructions, notify COR of any discrepancies.
2.2.1.5 Leave No Trace Behind by removal of all unused packaging supplies, debris, wood chips, tape and particles from work area prior to departure.
2.3 TASK THREE. REPACKAGING SERVICES – FOR HULL, MATERIAL & ELECTRICAL (HM&E)
RELATED INVENTORY ITEM
2.3.1 The Contractor shall supply all labor and materials to complete services described herein and prior to delivery, the contractor shall recommend, for COR approval, suitable standard sized containers found in MIL-STD-2073-1E
Table C-III (pg 84) to ensure the size of the selected container provides a snug fit for a wrapped and cushioned item.
Each inventory item shall be individually packaged, marked and labelled.
2.3.2 Task Orders for repackaging services shall be scheduled for delivery, the contractor shall arrive at delivery location within 1-hour of pre-arranged delivery time, contact COR, locate assembly area, verify inventory staged to information on Task Order(s).
2.3.3 The contractor shall ensure item identification labels, stickers or stenciling are included inside selected containers and item identification methods are provided by gov’t representatives.
2.3.4 Apply fiberboard box closure of selected containers and use multiple strips of clear tape on load bearing bottom(s) and dual strips on container(s)’ top.
2.3.5 Apply suitable cushioning and dunnage, as required, to prevent item movement inside selected containers during shipping and/or securing methods indicated on a particular Task Order.
2.3.6 Apply government approved labels on vertical exterior sides of containers in accordance with Task Order instructions, notify COR of any discrepancies.
2.3.7 For small delicate items, such as gaskets, seals or o-rings, the use of clear plastic sealable ‘zip-loc’ bags of suitable size with fiberboard inserts to prevent bending or disfigurement are required.
2.3.8 Leave No Trace Behind by removal of all unused packaging supplies, debris, tape and particles from work area prior to departure.
2.4 TASK FOUR. REPACKAGING SERVICES – FOR ELECTRONICS (ELEX) RELATED INVENTORY
ITEMS
2.4.1 The Contractor shall supply all labor and materials to complete services described herein and prior to delivery, the contractor shall recommend containers Type I (vertical star) or Type II (folding convoluted) found in MIL-STD-
2073-1E Table C-IV (pg 86), for COR approval, to ensure the size of the selected container provides a snug fit for a wrapped and cushioned item. Each inventory item shall be individually packaged, marked and labelled.
2.4.2 Task Orders for repackaging services shall be scheduled for delivery, the contractor shall arrive at delivery location within 1-hour of pre-arranged delivery time, contact COR, locate assembly area, verify inventory staged to information on Task Order(s).
2.4.3 The contractor shall ensure item identification labels, stickers or stenciling are included inside selected containers, and item identification methods are provided by the COR or government representatives.
2.4.4 Apply government approved labels on vertical exterior sides of containers in accordance with Task Order instructions, notify COR of any discrepancies.
2.4.5 Leave No Trace Behind by removal of all unused packaging supplies, debris, tape and particles from work area prior to departure.
3.0 CONTRACTOR PERSONNEL
3.1 QUALIFIED PERSONNEL
The Contractor must provide qualified personnel to perform all requirements specified in this SOW.
3.2 CONTINUITY OF SUPPORT
The Contractor must ensure that the contractually required level of support for this requirement is maintained at all times. The Contractor must ensure that all contract support personnel are present for all hours of the workday. If for any reason the Contractor staffing levels are not maintained due to vacation, leave, appointments, etc., and replacement personnel will not be provided, the Contractor must provide e-mail notification to the Contracting Officer’s
Representative (COR) prior to employee absence. Otherwise, the Contractor must provide a fully qualified replacement.
3.3 PROJECT MANAGER
The Contractor must provide a Project Manager who must be responsible for all Contractor work performed under this
SOW. The Project Manager must be a single point of contact for the Contracting Officer and the COR. The name of the Project Manager, and the name(s) of any alternate(s) who must act for the Contractor in the absence of the Project
Manager, must be provided to the Government as part of the Contractor’s proposal. During any absence of the Project
Manager, only one alternate must have full authority to act for the Contractor on all matters relating to work performed under this contract. The Project Manager is further designated as Key by the Government.
3.3.1 The Project Manager must be available to the COR via telephone between the hours 0800 and 1630 EST, Monday through Friday, and must respond to a request for discussion or resolution of technical problems within 24 hours of notification.
3.4 EMPLOYEE IDENTIFICATION
Contractor employees visiting Government facilities must wear an identification badge that, at a minimum, displays the
Contractor name, the employee’s photo, name, clearance-level and badge expiration date. Visiting Contractor employees must comply with all Government escort rules and requirements. All Contractor employees must identify themselves as
Contractors when their status is not readily apparent and display all identification and visitor badges in plain view above the waist at all times. All contract personnel shall always identify themselves as contractors whether in-person or via electronic mail, voicemail, and writing.
3.5 EMPLOYEE CONDUCT
Contractor’s employees must comply with all applicable Government regulations, policies, and procedures (e.g., fire, safety, sanitation, environmental protection, security, “off limits” areas, wearing of parts of DHS uniforms, and possession of weapons) when visiting or working at Government facilities. The Project Manager must ensure
Contractor employees understand and abide by Department of Homeland Security established rules, regulations and policies concerning safety and security.
3.6 REMOVING EMPLOYEES FOR MISCONDUCT OR SECURITY REASONS
The Contracting Officer may direct the contractor to remove an employee for reasons that jeopardize performance.
Employee removal by the Contractor does not relieve the Contractor of the responsibility to continue providing the services required under the contract. The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.
3.6.1 PROTECTION OF INFORMATION
No Contractor shall have access to information protected under the Privacy Act under this contract. Contractor employees must safeguard this information against unauthorized disclosure or dissemination in accordance with the law and Government policy and regulation. Contractor personnel must safeguard and handle all sensitive information in accordance with the DHS HSAR Class deviation 15-01 clauses as applicable for proper handling and safeguarding of the security of all such USCG information, as defined in the terms and conditions of this Contract. All Contractor personnel with access to sensitive information (i.e., For Official Use Only, etc.) must execute DHS Form 11000-6, Department of Homeland Security Non-Disclosure Agreement (NDA), as a condition of access to such information.
The Contractor must provide copies of the signed NDA to the Contracting Officer’s Representative (COR) no later than two (2) days after execution of the form.
4.0 OTHER APPLICABLE CONDITIONS
4.1 APPLICABLE CONDITIONS FOR SERVICES PRIOR TO DELIVERY
4.1.1 The Contractor shall establish a date and time with the COR and deliver completed orders on
Mondays through Thursdays 0900 to 1300, excluding federal holidays.
4.1.2 When required by the Task Order, anchoring, blocking, bracing, cushioning, etc. and labelling processes (except for stenciling) shall be conducted at crate delivery.
4.2 APPLICABLE CONDITIONS FOR WOOD CRATE CONSTRUCTION SERVICES
4.2.1 Re-closable top panel closure for ASTM D6880 crates shall be constructed with cleats on the underside that fit snugly inside the box sides and ends and the closure.
4.2.2 The Contractor shall use appropriately sized wood screws for all ASTM D6880-10 constructed crates.
4.2.3 The Contractor shall use construction methods, techniques, materials, lumber, plywood, bolts, and fasteners prescribed in accordance with each listed ASTM standard unless noted within this SOW. Other construction methods or techniques are not acceptable or permitted.
4.2.4 Interior Clearance of not less than 2 inches shall be allowed between the item (inventory) and the closest side, end, or top crate member. Additional clearances may be provided for shock-mounted items.
4.2.5 Plywood 3Ú8 inches thick shall be used in place of 1-inch lumber flooring as shown in ASTM D7478 Fig
7 and 8, but not as load-bearing floorboards.
4.2.6 Plywood sheathing shall be 3Ú8 inches thick for net loads up to 10,000-lbs and 1Ú2 in for net loads over
10,000-lbs and shall be applied so that the face grain is vertical. Plywood sheathing shall be used by the contractor unless documented and/or specifically documents on the Task Order for use of other sheathing material.
4.2.7 Phyto sanitation – The contractor shall apply and/or ensure all wood components used for manufacturing wood crates in accordance with this SOW have a copper naphthenate solution, wood preservative/ water repellent treatment using solutions and application techniques found in ASTM D 6253, Appendix paragraphs
X1.1 or X1.1.1.
4.2.8 The Contractor shall use methods and techniques found in ASTM D7478M - Supplementary
Requirements for securing contents within the crate in order that proper container design and construction will not be nullified during shipment and rough handling.
4.2.9 Due to ASTM allowable tolerances of inside dimensions of newly constructed wood crates and to ease placement of items inside, the Contractor may deliver major elements of wood crate, such as assembled flooring or pallets, assembled side panels, assembled top panels, and attach these elements after the material is placed and/or braced on the flooring or pallets by ICP personnel.
4.2.10 The contractor is expected to provide variable pricing structure(s) based upon lessening crate dimensions within a specification’s maximum weight capacity & actual crate dimensions provided on a Task Order, such as pricing per cubic volume or footage for nominal lumber or square footage of plywood used during construction. For example, estimating the cost of crate construction services may include gaining a crate’s overall dimensions by length, width, and depth, adding 6-inches to each and rounding to the nearest whole number for a consistent method to apply costs for crate construction materials at various weight capacity intervals offered in this
SOW.
4.3 APPLICABLE CONDITIONS FOR SERVICES AT ICP DELIVERY
4.3.1 Newly constructed wood crates shall be delivered fully assembled to SFLC ICP unless otherwise noted in accordance with paragraph 4.2.9 above.
4.3.2 A unit package label is for an inventory item displaying the national stock numbers, parts numbers and other logistics data related to a crate’s contents or inventory item placed in newly constructed wood crates.
4.3.3 Task Orders are generated to prepare inventory for shipment into newly constructed wood crate(s), provide a technical description of inventory, including its overall dimensions, weight, and item sensitivity, a method to prevent inventory movement within its crate, digital photos of inventory, a template for exterior labels, and the number of crates to be constructed. Each Task Order will include a completed unit package label template using one of two methods described below.
Method 1: The Contractor shall print the completed form’s blocked area using black ink at minimum 5-inch by 5-1/2-inch white paper (see example below) and attach using clear tape covering the entire papered surface and a minimum
1-inch overlap. The label shall be attached to the crate’s exterior top and a minimum two (02) opposing exterior vertical side panels.
Method 2: The Contractor shall stencil with black enamel paint applied directly on the container and be 1/2-inch minimum height black characters on a white painted contrasting background in the upper left-hand side of the two longest sides (two opposite sides if square) of each crate. Method 2 has no bar-coding requirements.
4.3.4 The contractor shall bring their own tools during all delivery events and due to ICP size and inaccessible or remotely located electrical outlets, the use of battery-powered tools is required.
4.3.5 When required by a Task Order, the contractor shall perform anchoring, blocking, bracing, cushioning, etc. work processes immediately after inventory is placed into a newly constructed wood crate by gov’t personnel operated forklift and the contractor’s central focus shall be protection from physical damage and mechanical malfunction using cushioning materials, dunnage, blocking, and bracing applied as required to protect the item(s) enclosing media and restrict the movement of the item within the container. Materials selected for all blocking, bracing, and the design and application thereof shall be compatible with the item and its bearing load limitations.
Materials shall be as clean and as dry as practicable.
4.4 APPLICABLE CONDITIONS FOR 2.4 REPACKAGING SERVICES FOR HM&E RELATED
INVENTORY ITEMS
All repackaging services shall be completed within five (5) business days of contractor receiving Task Order or prior to the 30th day of Frustrated date established by the government, whichever comes first.
4.5 APPLICABLE CONDITIONS FOR 2.5 REPACKAGING SERVICES FOR ELEX RELATED
INVENTORY ITEMS
All repackaging services shall be completed within five (5) business days of contractor receiving Task Order or prior to the 30th day of Frustrated date established by the government, whichever comes first.
4.6 SECURITY
Security Risk and Background Investigation Form Requirements, the requirements office anticipates the following:
Tier 1 Investigation Low Risk, Non-Sensitive, Physical/Logical Access (HSPD-12 Credentialing) use SF85.
4.7 PERIOD OF PERFORMANCE
The period of performance for this contract is a one-year base period with four (4) one-year option periods as follows:
Base Period September 27, 2027 through September 26, 2028
Option Period One September 27, 2028 through September 26, 2029
Option Period Two September 27, 2029 through September 26, 2030
Option Period Three September 27, 2030 through September 26, 2031
Option Period Four September 27, 2031 through September 26, 2032
4.8 PLACE OF PERFORMANCE
The primary place of performance will be a combination of the Contractor’s facilities and the United States Coast
Guard at:
(a) USCG YARD SFLC ICP, 2401 Hawkins Point Road, Baltimore, MD 21226
4.9 HOURS OF OPERATION
Contractor employees must generally perform all work between the hours of 0800 and 1600 EST, Monday through
Friday (except Federal holidays). However, there may be occasions when Contractor employees must be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW
4.10 TRAVEL
Contractor travel is not required for this requirement.
4.11 POST AWARD CONFERENCE
The Contractor must attend a Post Award Conference with the Contracting Officer and the COR no later than five (5) business days after the date of award. The purpose of the Post Award Conference, which will be chaired by the
Contracting Officer, is to discuss technical and contracting objectives of this contract and review the Contractor's draft project plan. The Post Award Conference will be held at the Government’s facility, located at CG YARD, Baltimore, MD or via teleconference.
4.12 BUSINESS CONTINUITY –
Contract personnel must follow SFLC-Baltimore Yard Operating Status Hotline instructions regarding inclement weather and other closures.
USCG Yard Inclement Weather Hotline: 206-815-7515
4.12.1 Inclement weather and other closure events may prevent contractor arrival times and appointments for delivery, when an event impedes contractor delivery, the contractor and COR shall establish a new delivery appointment.
4.13 GENERAL REPORT REQUIREMENTS
The Contractor must provide all written reports in electronic format with read/write capability using applications that are compatible with DHS workstations (Microsoft Office Applications).
5.0 GOVERNMENT FURNISHED RESOURCES
The Government will provide the workspace, forklift and driver necessary to perform the on-site portion of Contract personnel services required in the SOW. Requests for additional Government resources must be submitted to the
Contracting Officer, who has sole discretion in deciding if additional resources will be provided.
Contract personnel must use Government-furnished information, data, and documents only for the performance of work under this contract and shall be responsible for returning all items at the end of the performance period.
Government-furnished information, data, and documents must not be released to outside parties without the prior and explicit consent of the Contracting Officer.
5.1 CG-manned forklift operations for placing heavy inventory into wood crates are provided for Services at ICP and
Services at SALC ICP.
ITEM SOW
Place of
Performance
DELIVERABLE / EVENT DUE BY DISTRIBUTION
2.2.1
Wood Crate Construction Services 2.2.1
[crate NTE 4x4x4-ft, <200-lbs]
Thirty (30) calendar days from
Task Order receipt
COR
2.2.2
Wood Crate Construction Services 2.2.2.A
[crate NTE 30x9x10-ft, <1K-lbs]
Thirty (30) calendar days from
Wood Crate Construction Services 2.2.2.B
[crate NTE 30x9x10-ft,<2K-lbs]
Thirty (30) calendar days from
Wood Crate Construction Services 2.2.2.2.C
[crate NTE 30x9x10-ft,<4K-lbs]
Thirty (30) calendar days from
2.2.2.
Wood Crate Construction Services 2.2.2.D
[crate NTE 30x9x10-ft,<6K-lbs]
Thirty (30) calendar days from
Wood Crate Construction Services 2.2.2.E
[crate NTE 30x9x10-ft,<8K-lbs]
Thirty (30) calendar days from
Wood Crate Construction Services 2.2.2.F
[crate NTE 30x9x10-ft, 10K-lbs]
Thirty (30) calendar days from
Wood Crate Construction Services 2.2.2.G
[crate NTE 30x9x10-ft,<15K-lbs]
Thirty (30) calendar days from
Wood Crate Construction Services 2.2.2.H
[crate NTE 30x9x10-ft,<20K-lbs]
Thirty (30) calendar days from
Wood Crate Construction Services 2.2.2.I
[crate NTE 30x9x10-ft,<25K-lbs]
Thirty (30) calendar days from
Wood Crate Construction Services 2.2.2.J
[crate NTE 32x9x10-ft,<30K-lbs]
Thirty (30) calendar days from
2.2.3
Contractor
Facility Wood Crate Construction Services 2.2.3
(painted crate stencils, 2 sides of crate)
Thirty (30) calendar days from
2.3
SFLC ICP Services at ICP Delivery 2.3.2, 2.3.4, 2.3.5 & 2.3.6 Thirty (30) calendar days from
2.4
SFLC ICP
Repackaging Services - HM&E
5 business days from Task Order receipt or prior to the 30th day of
Frustrated
2.5
SFLC ICP
Repackaging Services - ELEX
5 business days from Task Order receipt or prior to the 30th day of
Frustrated
6.0 CONTRACTOR FURNISHED PROPERTY
The Contractor must furnish all facilities, materials, equipment and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified above.
7.0 GOVERNMENT ACCEPTANCE PERIOD
The COR will review deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the COR will send an e-mail to the Contractor notifying it that the deliverable has been accepted.
7.1 The COR will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the
Contractor will be notified in writing by the COR of the specific reasons for rejection. The Contractor may have an opportunity to correct the rejected deliverable and return it per delivery instructions.