This is a Specification Package (Revision 0, dated November 19, 2026) for drydock repairs to the USCG 45646 (RB-M 45) vessel during Fiscal Year 2027. The specification encompasses 37 work items detailing comprehensive repair, maintenance, and preservation requirements for a 45-foot Response Boat-Medium, including hull inspection and preservation, machinery renewal, system upgrades, and associated support services. The vessel is 44 feet 10.5 inches in length with a full load displacement of 36,500 pounds, powered by two MTU Series 60 diesel engines (825 hp each) and two Rolls-Royce water-jet propulsors. The contract period of performance runs from February 2, 2027, through June 1, 2027, representing approximately four months for completion.

Key work items include general welding and fabrication repairs (Work Item 1); ultrasonic thickness testing of 100 hull shots (Work Item 2); underwater hull body inspection and preservation (Work Items 3, 27, 28, 35); fendering system inspection and repair (Work Items 4, 5); accessible space inspections (Work Item 6); diesel fuel tank cleaning and inspection (Work Item 7); watertight door and hatch inspection and adjustment (Work Item 8); mast removal and inspection (Work Item 9); renewal of main diesel engines, reduction gears, and cardan shafts (Work Item 10); engine-to-generator and engine-to-jet-drive alignment (Work Item 11); and various system renewals including jet drive components, hydraulic coolers, sea valves, hoses, electrical systems, and HVAC upgrades. Government-furnished property includes two new main diesel engines (estimated cost $100,042.64 and $100,027.23), two marine gears ($14,084.96 each), cardan shafts, two MEPS generators ($3,134.71 each), and numerous smaller components and repair kits totaling significant value. The contractor must comply with Surface Forces Logistics Center (SFLC) Standard Specifications for general requirements, welding and allied processes, preservation of ship structures, and drydocking; perform all work in accordance with Coast Guard drawings and technical publications; manage environmental protection requirements; conduct operational tests before and after repairs; and submit Critical Inspection Reports (CIRs) for designated critical inspection items within the first 25 percent of the contract period. Quality assurance requirements include documentation of surface preparation, coating applications, thickness measurements, and soluble salt conductivity testing for all preservation work on critical-coated surfaces.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCG 45646 (RB-M 45)

SPECIFICATION FOR DRYDOCK REPAIRS

FY2027

Developed By: Timothy Tolliver

(Rev-0, 19 November 2026)

USCG 45646 (RB-M-45) DRYDOCK AVAILABILITY FY2027

ii (Rev-0)

TABLE OF CONTENTS

Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property .............................................................................. viii Consolidated List of Critical Inspection Items .......................................................................................... xiii Principal Characteristics ............................................................................................................................. xiv General Requirements WORK ITEM 1: General Welding, Provide WORK ITEM 2: Ultrasonic Testing (UT) (100) Shots, Perform WORK ITEM 3: Hull Plating (U/W Body), Inspect WORK ITEM 4: Fendering System, Inspect WORK ITEM 5: Fendering System, Repair WORK ITEM 6: Accessible Spaces, Inspect WORK ITEM 7: Diesel Fuel Tank, Clean and Inspect WORK ITEM 8: Watertight Door and Hatches, Inspect and Adjust WORK ITEM 9: Mast, Inspect WORK ITEM 10: Main Diesel Engines, Reduction Gears, and Cardan Shafts, Renew WORK ITEM 11: Main Diesel Engine(s) To MEPS Generator(s) And 1. SCOPE WORK ITEM 12: Jet Drive Shaft Bearing Housing, Renew WORK ITEM 13: Hydraulic Oil Cooler, Water Jet, Renew WORK ITEM 14: Water Jet-Inspect, Perform Service WORK ITEM 15: Jet Drive Anodes, Renew WORK ITEM 16: Sea Strainer, Renew WORK ITEM 17: Engine Exhaust Piping, Inspect WORK ITEM 18: Electrical / Electronics, Renew WORK ITEM 19: MEPS Generator, Renew WORK ITEM 20: Electrical Isolation, Perform, MEPS WORK ITEM 21: Standard Hoses, Renew WORK ITEM 22: MDE SW Valves, Overhaul WORK ITEM 23: Sea Valves, Renew WORK ITEM 24: Diesel Tanks, Refuel WORK ITEM 25: Tow Reel, Remove and Install WORK ITEM 26: Fender Faying Surfaces, Preserve, 100 percent WORK ITEM 27: Water Jet Drive, Preserve WORK ITEM 28: U/W Body, Preserve (100%) WORK ITEM 29: Exterior and Interior Non-Skid Pads, Renew WORK ITEM 30: Interior Hull Insulation, Renew WORK ITEM 31: Marine Chemist Services, Provide WORK ITEM 32: Drydock WORK ITEM 33: Temporary Services, Provide WORK ITEM 34: Sea Trial Performance, Support, Provide WORK ITEM 35: Lazarette Bilge, Preserve WORK ITEM 36: Fuel Level Sending Unit, Modify WORK ITEM 37: HVAC Upgrade iii (Rev-0)

REVISIONS RECORD

This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK

ITEM#

CHANGES MADE

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

iv (Rev-0)

CONSOLIDATED LIST OF REFERENCES

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.

All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.

COAST GUARD DRAWINGS

Coast Guard Drawing 45 RB-M 084-002, Rev -, Docking Plan Coast Guard Drawing 45 RB-M 084-002, Rev –, Docking Plan Coast Guard Drawing 45 RB-M 084-005, Rev -, Main Diesel Engine Mounting for 45FT RB-M Coast Guard Drawing 45 RB-M 110-001, Rev -, Hull Structure Coast Guard Drawing 45 RB-M 110-002, Rev -, Hull Structure Module A Coast Guard Drawing 45 RB-M 110-002, Rev -, Hull Structures Modular A Coast Guard Drawing 45 RB-M 110-003, Rev -, Hull Structure Module B Coast Guard Drawing 45 RB-M 110-083, Rev -, Hull Structure Module B - Deck Coast Guard Drawing 45 RB-M 111-001, Rev -, Shell Plating, Module A Coast Guard Drawing 45 RB-M 114-001, Rev -, Fendering Arrangement Coast Guard Drawing 45 RB-M 167-003, Rev -, Doors and Hatches Coast Guard Drawing 45 RB-M 170-002, Rev B, Folding Mast Coast Guard Drawing 45 RB-M 182-001, Rev -, Propulsion System Foundations Coast Guard Drawing 45 RB-M 182-001, Rev -, Propulsion System Foundations Coast Guard Drawing 45 RB-M 185-001, Rev A, Auxiliary System Foundations Coast Guard Drawing 45 RB-M 185-001, Rev A, Auxiliary System Foundations Coast Guard Drawing 45 RB-M 186-001, Rev -, Outfit and Furnishing Foundations Coast Guard Drawing 45 RBM 201-001, Rev B, Main Engine Arrangement Coast Guard Drawing 45 RB-M 201-001, Rev B, Main Engine Arrangement Coast Guard Drawing 45 RBM 247-002, Rev -, Water Jet Propulsor Arrangement Coast Guard Drawing 45 RB-M 247-002, Rev -, Water Jet Propulsor Arrangement Coast Guard Drawing 45 RB-M 252-002, Rev A, Propulsion Control System Coast Guard Drawing 45 RB-M 256-002, Rev -, Cooling System Propulsion Coast Guard Drawing 45 RB-M 256-101, Rev -, Cooling System HVAC Coast Guard Drawing 45 RB-M 256-102, Rev -, Strainer Installation and Rip Out Coast Guard Drawing 45 RB-M 259-002, Rev -, Exhaust System Coast Guard Drawing 45 RB-M 261-001, Rev -, Fuel Supply System Schematic Coast Guard Drawing 45 RB-M 261-002, Rev -, Fuel Supply System Coast Guard Drawing 45 RB-M 261-002, Rev -, Fuel Supply System v (Rev-0)

Coast Guard Drawing 45 RB-M 261-004, Rev -, Fuel Supply System Tubes Coast Guard Drawing 45 RB-M 261-005, Rev -, Fuel Supply System - Pipe Assemblies Coast Guard Drawing 45 RB-M 261-100, Rev -, Fuel Fill and Vent Schematic Coast Guard Drawing 45 RB-M 261-101, Rev -, Fuel Fill and Vent Arrangement Coast Guard Drawing 45 RB-M 262-002, Rev -, Lube Oil FLOCS System Coast Guard Drawing 45 RB-M 311-001, Rev -, APU System Block Schematic Coast Guard Drawing 45 RB-M 311-004, Rev A, APU Generator Drive System Coast Guard Drawing 45 RBM 311-004, Rev A, APU Generator Drive System Coast Guard Drawing 45 RB-M 320-001, Rev E, DC Power Distribution System Schematic Coast Guard Drawing 45 RB-M 321-100, Rev A, 60Hz Power Distribution System Schematic Coast Guard Drawing 45 RB-M 321-200, Rev A, Wire Harness Arrangement Coast Guard Drawing 45 RB-M 321-201, Rev -, Wire Way Arrangement Coast Guard Drawing 45 RB-M 330-002, Rev B, Lighting System Schematic Coast Guard Drawing 45 RB-M 406-001, Rev A, Grounding and Bonding Schematic Coast Guard Drawing 45 RB-M 423-001, Rev B, Electronic Navigation System Schematic Coast Guard Drawing 45 RB-M 437-001, Rev -, Tank Level Indicating System Schematic Coast Guard Drawing 45 RB-M 437-002, Rev A, Tank Level Indicating System Coast Guard Drawing 45 RB-M 439-002, Rev -, C.C.T.V. System Coast Guard Drawing 45 RB-M 441-001, Rev G, Radio System Schematic Coast Guard Drawing 45 RB-M 505-001, Rev A, Hose and Hose Assemblies Coast Guard Drawing 45 RB-M 511-002, Rev -, Compartment Heating Arrangement Coast Guard Drawing 45 RB-M 514-001, Rev -, HVAC System Schematic Coast Guard Drawing 45 RB-M 514-003, Rev -, Air Conditioning Units, Self-Contained Coast Guard Drawing 45 RB-M 555-100, Rev -, Fire Extinguishing System, Dry Chemical Coast Guard Drawing 45 RB-M 556-003, Rev -, Hydraulic Control System Coast Guard Drawing 45 RB-M 582-002, Rev -, Mooring and Towing Systems Coast Guard Drawing 45 RB-M 601-001, Rev D, General Arrangement Coast Guard Drawing 45 RB-M 622-002, Rev -, Machinery Space Removable Deck Plate Coast Guard Drawing 45 RB-M 631-001, Rev A, Painting Layout Coast Guard Drawing 45 RB-M 633-002, Rev -, Cathodic Protection Sacrificial Anode Coast Guard Drawing 45 RB-M 634-002, Rev -, Deck Covering Coast Guard Drawing 45 RB-M 635-002, Rev C, Insulation Details Coast Guard Drawing FL-85-002, Rev A, GFE Boat Hot Work Diagrams Coast Guard Drawing FL-85-002, Rev E, GFE Boat Hot Work Diagrams Coast Guard Drawing FL-85-2, Rev E, GFE Boat Hot Work Diagrams

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors

Manual Coast Guard Technical Publication (TP) 4698, SWBS 241, Dec 2013, Marine Transmission Manual Coast Guard Technical Publication (TP) 4993, SWBS 634, Oct 2011, Nonskid Pads, Peel and Stick

Catalog vi (Rev-0)

Coast Guard Technical Publication (TP) 5716, SWBS 163, Apr 2014, Seawater Cooling System Duplex Strainer - Model RBM-203976

Coast Guard Technical Publication (TP) 5729, SWBS 233, May 2014, Main Diesel Engine - Series 60 – Operator’s Guide

Coast Guard Technical Publication (TP) 5737, SWBS 247, Jun 2014, Water Jet – Model FF375S Coast Guard Time Compliance Technical Order (TCTO) TJ3020.1, Aug 2013, HVAC Upgrade Fire Prevention and Response Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General

Requirements Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Latest Version, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and

Allied Processes Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Latest Version, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 0740, (SFLC Std Spec 0740), 2022, Welding and

Allied Processes Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2022, Shipboard

Electrical Cable Test Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2022, Shipboard

Electrical Cable Removal, Relocation, Splice, Repair, and Installation Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary

Machine Systems Surface Forces Logistics Center Standard Specification 5000, (SFLC Std Spec 5000), 2022, Auxiliary

Machine Systems Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), Latest Version, Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), Latest Version, Requirements for Preservation of Ship Structures Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2022, Drydocking Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2022, Temporary

Services

OTHER REFERENCES

1), 2015, Solvent Cleaning 2), 2004, Mechanical Tool Cleaning 45 RB-M Water Jet Disassembly / Assembly Procedures American Boat and Yacht Council (ABYC), E-11, AC and DC Electrical Systems on Boats, 2023 American Society of Mechanical Engineers (ASME) B16.34, 2025, Valves-Flanged, Threaded, and

Welding End ASTM International (ASTM) D4138, Rev A, 2007 (R 2017), Standard Practices for Measurement of Dry

Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means ASTM International (ASTM) F992, 2017, Standard Specification for Valve Label Plates vii (Rev-0)

Code of Federal Regulations (CFR) Title 29, Part 1915, Jul 2022, Occupational Safety and Health Standards for Shipyard Employment

Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for Shipyard Employment

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2019 Edition, Pressure Testing of Valves

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2022 Edition, Butterfly Valves

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72A, 2010 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service

Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2019 Edition, Bronze Gate, Globe, Angle and Check Valves

NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for Fabrication, Welding, and Inspection of Submarine Structure

Rolls-Royce Kamewa Water Jet Assembly Drawing 376 000 49 Standard Practice for Commercial Packaging, ASTM D-3951, Rev-18, Mar 2018.

The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2015, Solvent Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 2 (SSPC-SP The Society for Protective Coatings (SSPC), 2015 (E 2017), Paint Application Specification No. 2 (PA-

2), Procedure for Determining Conformance to Dry Coating Thickness Requirements The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation

Standard SSPC-SP WJ-2/NACE WJ-2, 2012, Waterjet Cleaning of Metals – Very Thorough Cleaning

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-WJ-2/NACE WJ-2, 2012 Water Jet Cleaning of Metals-Very Thorough Cleaning viii (Rev-0)

CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK

ITEM

MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED

COST

($/UNIT)

5 N Repair Kit, Fender NSN: 2090-01-589-9430 or

PN: RBM-SRK

2 ea. 411.82

7 N Gasket (Manhole Cover) NSN: 5330-01-134-1986 PN:

3560BN

4 ea. 16.98

10 Y *Engine, RB-M, Starboard NSN: 2895-01-590-7303 PN:

6062-HK30

1 ea. 100,042.64

10 Y *Engine, RB-M, Port NSN: 2895-01-590-7317 PN:

6062-HK31

1 ea. 100,027.23

10 Y *Marine Gear NSN: 3010-01-590-4163 PN:

MG5114SC

2 ea. 14,084.96

10 Y *Shaft, Straight (Cardan) NSN:3040-01-604-1460 PN:

107255-00

2 ea. 3,651.43

10 N Mount, Resilient, General Purpose (Vibration

Isolator)

NSN: 5340-01-645-0607 PN:

RB1-200

4 ea. 20.76

10 N Washer, Flat (Mount, Vibration Snubbing

Washer)

NSN: 5310-01-626-2423 PN:

148099-1

4 ea. 1.90

10 N Filter, Lube Oil NSN: 4330-01-588-9744 PN:

X54418300057

2 ea. 29.52

10 N Filter Element, Fluid (Fuel, Primary)

NSN: 4330-01-540-3412 PN:

01030

4 ea. 30.94

10 N Filter Element, Fluid (Fuel, Secondary)

NSN: 2910-01-022-8183

P/N: 23530707

2 ea. 8.80

10 N Isolator, Engine Mount NSN: 2990016309011 or PN:

23525490

8 ea. 342.09

12 Y *Housing, Bearing Unit NSN: 3130-01-590-4525 PN:

450 087 19

2 ea. 11,442.33

12 N Nut, Self Locking, Hexagon (Flange Nut)

NSN: 5310-01-616-2982 PN:

102 029 08

2 ea. 26.33

12 N Washer, Locking NSN: 5310-01-623-2756 PN:

102 030 08

2 ea. 2.37

13 N Hydraulic Cooler, Port (Cooler, Fluid, Industrial)

NSN: 4420-01-632-6777 PN:

RRM000208650

1 ea. 1,180.38

13 N Hydraulic Cooler, Starboard (Cooler, Fluid, Waterjet)

NSN: 4420-01-630-5070 PN:

101 121 03

1 ea. 1,329.90

14 N Stainless Steel Ball Joint NSN: 3040016152117 or PN:

59915K483

10 ea. 12.26

14 N Stainless Steel Threaded Rod

NSN: 5306016152224 or PN:

93250A140

1 ea. 10.67

14 N Bearing Bushing NSN: 3120014555212 or PN: 4 ea. 9.80 ix (Rev-0)

10106911 14 N Bearing Bushing NSN: 3120580006242 or PN:

36M05101 4 ea. 49.00

14 N **Socket Head Screw NSN: 5305016171580 or PN:

91210050

16 ea. 2.71

14 N **Bolt Kit NSN: 2815016171688 or PN:

93112085A

2 ea. 15.64

14 N **Key NSN: 5315016166360 or PN:

10100824

3 ea. 28.14

14 N Seal NSN: 5330580006238 or PN:

10118902

2 ea. 4.35

14 N Bushing NSN: 3120580006239 or PN:

10105511

2 ea. 48.19

14 N Bearing Bushing NSN: 3120014555272 or PN:

10105111

4 ea. 35.33

14 N **Bolt Kit NSN: 2815016171974 or PN:

93112080F

2 ea. 6.13

14 N **Bolt Kit NSN: 5340016167191 or PN:

93112065K

12 ea. 13.07

14 N Bearing Unit NSN: 3110016166342 or PN:

37506201

2 ea. 614.35

14 N Bushing NSN: 3120580006240 or PN:

10106011

4 ea. 47.21

14 N **Set Screw NSN: 5305016020672 or PN:

91608012

6 ea. 0.58

14 N **Bolt Kit NSN: 5305016173161 or PN:

93112090K

10 ea. 12.56

14 N O-ring NSN: 5331580006241 or PN:

10202606

6 ea. 14.56

14 N **Mechanical Sealing NSN: 4320580006403 or PN:

10203870

2 ea. 1052.97

14 N Bolt Kit NSN: 5306016164058 or PN:

93310030E

6 ea. 1.92

14 N O-ring NSN: 5331016020679 or PN:

10202631

2 ea. 4.39

14 N O-ring NSN: 5331016020680 or PN:

10202625

4 ea. 15.15

14 N Sealing NSN: 5365016233174 or PN:

41018801

2 ea. 8.87

14 N O-ring NSN: 5331016200368 or PN:

10202611

2 ea. 5.21

14 N Seal Lip NSN: 4730016204613 or PN:

10202590

4 ea. 39.47

14 N Sealing NSN: 5330016163186 or PN:

45002010

2 ea. 535.93

14 N **Lock Nut NSN: 5310016162982 or PN:

10202908

2 ea. 16.63

14 N Lock Washer NSN: 5310016232756 or PN:

10203008

2 ea. 2.34 x (Rev-0)

14 N **Ring Nut NSN: 5310016164016 or PN:

10202912

2 ea. 32.60

14 N Seal NSN: 5330016243735 or PN:

10202540R

6 ea. 19.68

14 N **Screw NSN: 5305016162955 or PN:

93305025

8 ea. 0.28

14 N **Washer NSN: 5310016162966 or PN:

912505

8 ea. 0.06

14 N Gasket NSN: 5330016232867 or PN:

37527805

2 ea. 63.43

14 N Bushing NSN: 5365016202680 or PN:

10108416

8 ea. 15.91

14 N **Bolt Kit NSN: 5305016242899 or PN:

93110060A

4 ea. 12.91

14 N **Bolt Kit NSN: 5305016242922 or PN:

99110040G

14 ea. 6.60

14 N Bushing NSN: 3120014555268 or PN:

10106902

8 ea. 7.90

14 N Gasket NSN: 5330016163014 or PN:

10108901

2 ea. 5.65

14 N **Bolt Kit NSN: 5305016231019 or PN:

93110090A

4 ea. 5.05

14 N Lock Washer NSN: 5310016232699 or PN:

10203012

2 ea. 5.62

14 N O-ring NSN: 5331016242120 or PN:

10202603

2 ea. 3.89

14 N **Screw, Countersunk NSN: 5305016309734 or PN:

99106016

8 ea. 5.65

14 N Seal/Gasket NSN: 1040016337691 or PN:

45011611

2 ea. 57.64

14 N Woodruff Key NSN: 5315016172999 or PN:

10100823

2 ea. 19.09

14 N Washer, Sealing NSN: 5310016452084 or PN:

8755000050

24 ea. 0.06

14 N Screw, Connection NSN: 5305016476396 or PN:

91212045L

8 ea. 6.45

14 N Cylinder, Hydraulic NSN: 2010015904296 or PN:

10121038

2 ea. 2126.60

14 N Shaft, Steering Port NSN: 3010016147047 or PN:

37505816

1 ea. 817.88

14 N Shaft, Steering NSN: 3010015904327 or PN:

37505817

1 ea. 813.34

14 N Cylinder, Hydraulic NSN: 2010015904260 or PN:

10121080

2 ea. 4872.34

14 Y Guide Vane Chamber NSN: 2990015904492 or 37618602-11_528097

2 ea. 7688.04

14 Y Housing, Bearing NSN: 3130015904525 or 45008719_5381232

2 ea. 12001.59

14 Y Nozzle, Steering NSN: 2010015904266 or 2 ea. 1852.66 xi (Rev-0)

37501113_5380858 15 N Anode, Inspection Hatch

(Port & Stbd) (Anode, Corrosion Preventive)

NSN: 5342-58-000-3759 or

PN: 10108231

2 ea. 71.89

15 N Transom Anode (Anode, Corrosion Preventive)

NSN: 5342-01-602-0658 or

PN: 10108230

4 ea. 234.75

15 N Tunnel Anode (Anode, Corrosion Preventive)

NSN: 5342-01-602-0668 or

PN: 10108220

4 ea. 40.25

15 N Impeller Housing/Bucket/Interceptor Anode (Anode, Corrosion

Preventive)

NSN: 5342-25-146-5438 or

PN: 10107701

10 ea. 16.22

15 N Guide Vane Chamber Anode (Anode, Corrosion

Preventive)

NSN: 5342-01-602-0669 or

PN: 37517411

2 ea. 207.27

15 N Anode, Anode Hatch (Anode, Corrosion

Preventive)

NSN: 5342-25-146-5439 or

PN: 10108210

2 ea. 60.15

15 N Screw Connection (Screw, Cap, Socket Head)

NSN: 5305-01-602-2100 or

PN: 93310025H

4 ea. 4.53

15 N Screw Connection NSN: 5305-01-627-5854 or

PN: 93308025H

14 ea. 1.00

15 N Screw Connection (Screw, Cap, Socket Head)

NSN:5305-01-602-2105 or

PN: 91206020E

8 ea. 1.47

15 N Screw Connection (Bolt Assembly, Clamp)

NSN: 5340-01-624-3271 or

PN: 93308025E

8 ea. .73

15 N O-ring NSN: 5331-01-602-0670 or

PN: 10202639

2 ea. 15.46

15 N Screw Connection NSN: 5305-01-624-0905 or

PN: 93310016E

8 ea. 1.17

15 N Screw Connection (Bolt Blank)

NSN: 5306-01-630-9800 or

PN: 93312030E

2 ea. 2.09

15 N Screw Connection NSN: 5305-01-620-4602 or

PN: 91212025E

8 ea. 1.41

15 N O-ring NSN: 5331-22-607-8691 or

PN: 10202626

2 ea. 9.26

15 N Tube Extension NSN: 4730-01-621-0708 or

PN: 37610802

2 ea. 120.22

15 N Tube Clamp (Clamp, Hose) NSN: 4730-01-620-0951 or

PN: 10217881

2 ea. 16.13

15 N Screw Connection (Screw, Cap, Socket Head)

NSN: 5305-01-602-2101 or

PN: 93310030H

2 ea. 3.40

15 N Connecting Cable NSN: 6145-01-620-3663 or

PN: 10234301

4 ea. 19.00

15 N Screw Connection NSN: 5305-01-617-6732 or

PN: 93306016E

8 ea. 0.35

15 N Anode, Corrosion Preventive

NSN: 5340-01-589-9440 or

PN: 51125

2 ea. 82.13

15 N Anode, Corrosion NSN: 5340-01-589-9425 or 2 ea. 26.86 xii (Rev-0)

Preventive PN: 89287 17 N Gasket (Exhaust Flange

Outlet) NSN: 5330-01-303-5437 or

PN: 23501147

2 ea. 17.24

18 N Solenoid, Electrical NSN: 5945-01-524-7896 or

PN: 24063-08

1 ea. 31.85

18 N Switch, Push NSN: 01HS27610 or PN:

ZB5AA4

1 ea. 0.00

18 N Pump Unit, Centrifugal NSN: 4320-01-648-1332 or

PN: B35068J300B03XX

1 ea. 811.72

18 N Tester, Smoke Detector NSN: 6350-01-169-2535 or

PN: HO-25S

1 ea. 12.38

18 N Alarm, Smoke, Automatic NSN: 6350-01-121-2908 or

PN: 71-570000-001

1 ea. 63.04

18 N Fan, Vane Axial NSN: 4140-01-502-0553 or

PN: 500-311242

1 ea. 356.00

18 N Switch, Thermostatic NSN: 5930-01-618-7052 or

PN: 1C1B9-AP

1 ea. 96.14

18 N Switch, Liquid Level NSN: 5930-01-568-0518 or

PN: 164870

1 ea. 1,255.50

19 Y *Generator, Engine Accessory

NSN: 2920-01-644-6491 or

PN: 7102252-00

2 ea. 3134.71

21 N Parts Kit, Hose Assembly NSN: 4720-01-679-1782 or

P/N: 45-RB-M-505-101

1 ea. $16,520.00

23 N Raw Water Sys De-Icing Valve, Ball, 1-inch NPT

316 SS

NSN: 4820-01-600-0385 or

PN: V210FP-16

2 ea. 34.92

23 N AC Supply/Discharge Ball Valve, Ball 3/4-inch NPT

316 SS

NSN: 4820-01-600-0389 or

PN: V210FP-12

3 ea. 26.44

23 N AC Overboard Check Valve High-Flow SS

Check Valve 3/4-inch NPT Female

NSN: 4820-01-599-7249 or

PN: 46635K65

1 ea. 60.83

26 N Marker Set, Identification NSN: 7690-01-665-8162 1 ea. $181.73 29 N 45 FT RBM Whole Kit

Contents of kit include box 1 through box 8. (Round and square hatches not included) (Tread, Nonmetallic, Nonskid)

NSN: 7220-01-615-5012 or

P/N: 2040-00-NIB-0707

1 kt. 6,733.18

29 N Non-Skid 45 FT RBM - Round and Square Hatches

- (Not included in main kit)

(Non-Skid Kit #9)

NSN: 2040-01-633-4911 or

P/N: 2040-00-NIB-0707J

1 kt. 139.47

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xiii (Rev-0)

CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS

The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):

Work Item Title

2 Ultrasonic Testing (UT) (100) Shots, Perform

4 Fendering System, Inspect

6 Accessible Spaces, Inspect

11 Main Diesel Engine(s) To MEPS Generator(s) And 1. SCOPE

14 Water Jet-Inspect, Perform Service

17 Engine Exhaust Piping, Inspect

26 Fender Faying Surfaces, Preserve, 100 percent

27 Water Jet Drive, Preserve

28 U/W Body, Preserve (100%)

35 Lazarette Bilge, Preserve xiv (Rev-0)

PRINCIPAL CHARACTERISTICS

45' RB-M

PHYSICAL

Length overall 44 feet, 10.5 inches Unfixed height 20 feet 9 inches Beam, maximum 14 feet, 7.75 inches Full load draft 3 feet, 4 inches Full load displacement 36,500 pounds Max sustained speed 42.5 knots Range 250 nautical miles at 30 knots Mission limits 8 foot seas / 30 knot winds Survivability limits 12 foot seas / 50 knot winds

HULL

Hull manufacturer Marinette Marine Corp.

5086 (GRADE) Aluminum Hin- 2009

MACHINERY

Type 6, cylinder diesel engine Number of units 2, MTU's 60 series 825 hp Propulsion type 2, Rolls-royce water-jet

TANKS

1 (Rev-0)

00000_0226_FLT

REC_00000_FLT_Boats @ Commercial Facility (0121)

General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting boat repairs performed at a commercial contractor’s facility for Coast Guard vessels.

1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.

2. REFERENCES

COAST GUARD DRAWINGS

None

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Latest Version, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Latest Version, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), Latest Version, Fire Prevention and Response Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), Latest Version, Requirements for Preservation of Ship Structures

OTHER REFERENCES

Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for

Shipyard Employment NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for

Fabrication, Welding, and Inspection of Submarine Structure

2 (Rev-0)

3. REQUIREMENTS

3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements in this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

NOTE

NAVSEA drawings listed will be available FOR INSPECTION ONLY from the Coast Guard Port Engineer post-award. SFLC will not redistribute NAVSEA documents.

Contractors can apply to NAVSEA headquarters directly for copies.

3.2 Contractor-provided fire watch personnel. The Contractor must provide fire watch personnel and equipment.

3.3 Preservation requirements. The Contractor must accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.

3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.3.2 Coating colors and system color schemes. The Contractor must obtain a written KO authorization to deviate from any coatings required in SFLC Std Spec 6310 Appendix C before work.

3.3.3 In-process quality control measures. The Contractor must abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces”).

3.3.3.1 Quality control requirements. The Contractor must abide by the following when performing preservation related inspections. The following measurements must be randomly spaced throughout for the purposes of providing a representation of the entire prepared or coated surface.

3.3.3.1.1 Surface profile measurements. One surface profile measurement must be taken for every 200 square feet for the first 1000 square feet; for each additional 500 square feet or less, one profile measurement must be taken.

Profile measurements must be taken in accordance with SFLC Std Spec 6310, paragraph 3.1.8.3 (Surface profile measurements). A “measurement” for surface profile is defined as follows:

• ASTM D4417, Method B: One profile measurement is the average (mean) of 10 individual readings.

• ASTM D4417, Method C: One profile measurement is the average (mean) of 2 individual readings.

3.3.3.1.2 Soluble salt conductivity measurements. 5 conductivity measurements must be taken every 1000 square feet. For submerged (immersed) applications conductivity measurements must not exceed 30 microsiemens/cm.

For non-submerged (non-immersed) applications conductivity measurements must not exceed 70 microsiemens/cm. If a conductivity check fails, clean the surface in accordance with SFLC Std Spec 6310, paragraph 3.1.8.5 (Soluble salt removal).

3.3.3.1.3 Coating thickness measurements. Three area measurements must be taken for the first 1000 square feet;

for each additional 1000 square feet, perform an additional area measurement. A “measurement” for coating thickness is defined as follows:

• SSPC-PA 2 defines an area measurement as 5 separate spot measurements randomly spaced throughout a 100 square foot area.

• SSPC-PA 2 defines a spot measurement as 3 gage readings and each new gage reading the probe must

3 (Rev-0) be moved to a new location within a 1.5-inch diameter circle defining the spot.

3.4 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.

NOTE

NAVSEA approval is NOT required for welding procedures submitted but the procedures must be reviewed and shown to satisfy the requirements set forth in NAVSEA TP 1688, by a welding regulatory agency. The requirements for welding Strenx 900 are considered the same as those for welding HY-130.

3.5 Environmental protection requirements. The Contractor must adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:

3.5.1 Contractor operated (non USCG) facilities. The Contractor must provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor must plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor must comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item must not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

3.5.2 Test and procedures. The Contractor is required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work must be done by qualified laboratories; and where required by law, the laboratories must be certified.

3.5.3 Regulatory notifications. The Contractor is responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor must submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications must be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.

3.5.4 Environmental manager. The Contractor must appoint in writing an Environmental Manager for the project, who is responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager must ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out;

ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.

4 (Rev-0)

3.5.5 HW disposal. Contractor must comply with SFLC Std Spec 0000 Appendix A, Requirements For Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.

3.6 Local Policy. The Contractor must refer to site (e.g., Base) Regulations and Instructions for details regarding local policies (e.g., crane services, parking, or facility usage).

3.6.1 Coast Guard turn-over preparation. The Contractor must be aware that, upon arrival, after haul out, and prior to departing the Contractor’s facility, the Coast Guard crew must be allowed to accomplish various tasks in preparation for the turn-over of the boat to the Contractor. The following conditions apply to this paragraph:

3.6.1.1 The Coast Guard requires a maximum of three days at the beginning of the contract, and three days at the end to accomplish various tasks.

3.6.1.2 The Contractor may commence/continue work during these time frames.

3.6.1.3 Coast Guard personnel will disconnect the Detroit Diesel Electronic Control (DDEC) System and any other electronic equipment, as required to avoid damage to systems arising from hotwork on the vessel during the availability.

3.6.1.4 Coast Guard personnel will remove the transducers after initial haul-out and reinstall prior to re-floating the vessel.

3.6.1.5 The Unit will contact the servicing ESD or ESU to setup removal/installation of the transducer if Unit personnel are unable to accomplish this task.

3.7 SFLC Standard Specification approved changes. Approved updates to the 2022 SFLC Standard Specifications will appear here.

3.7.1 SFLC Standard Specification 5550: Replace paragraph 3.11.3 to state, “Material supporting imminent work shall be brought on the cutter and stored where the work is being performed. Material that appreciably contributes to fire load shall be removed at the end of each work shift when personnel are not present. Trash, debris, and packaging materials shall be promptly removed from the vessel at the end of each work shift and not allowed to accumulate.” Advance the paragraph numbering of the Fire Prevention and Safety Inspection form to 3.11.4.

4. NOTES

4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

5 (Rev-0)

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

VESSEL NAME HULL # WORK ITEM

WORK ITEM TITLE

LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).

Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

NAME OF QP-1/AMPP INSPECTOR SIGNATURE CERT. # DATE / TIME

NAME OF CG REPRESENTATIVE SIGNATURE UNIT DATE/TIME

6 (Rev-0)

QA-2 - QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

VESSEL NAME HULL # WORK ITEM

# WORK ITEM TITLE

Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.

DATE

TIME

ACTIVITY (SURFACE

PREPARATION, PRIMER COAT,

BARRIER COAT, TOP COAT,

ETC…)

LOCATION (FRAME &

DECK, RELATION TO

EQUIPMENT, ETC.)

TEMPERATURE % REL.

HUMID-

ITY

DEW

PT.

SURFACE AMBIENT ΔT

| DP -

SURFACE |

7 (Rev-0)

QA-3a - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)

VESSEL NAME HULL # WORK ITEM

LOCATION OF WORK (FRAME REFERENCES) AREA (SQFT)

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/AMPP No. 2

SSPC-SP WJ-2/AMPP WJ-2

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS

PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS

DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:

NAME OF QP-1/AMPP INSPECTOR SIGNATURE CERT. # DATE /

TIME

8 (Rev-0)

QA-3b - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)

VESSEL NAME HULL # WORK ITEM

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/AMPP No. 2

SSPC-SP WJ-2/AMPP WJ-2

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA

RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO

SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Mean Mils Reading (IAW ASTM D4417-Method B for above 10 readings (by column):

Mean Reading (mils)

9 (Rev-0)

QA-4 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)

VESSEL NAME HULL # WORK ITEM

SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.

DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)

10 (Rev-0)

QA-5 - QUALITY ASSURANCE DATA FORM

(COATING THICKNESS)

(Use one sheet for each sequence)

VESSEL NAME HULL # WORK ITEM

# WORK ITEM TITLE

COATING MFG PRODUCT NAME BATC

H #

INDUCTI

ON TIME

COATING SYSTEM

SEQUENCE

(PRIMER/TOUCHUP/3RD

COAT, ETC.)

DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.

SPOT 1 2 3 4 5 AVERAGE

VALUE

*BASE METAL READING

(BMR)

*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.

LOCATION (FRAME REFERENCE):

SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS

1 AVG. BMR DEVIATION

3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS

AVG.

LOCATION (FRAME REFERENCE):

SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS

1 AVG. BMR DEVIATION

3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS

AVG.

LOCATION (FRAME REFERENCE):

SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS

1 AVG. BMR DEVIATION

3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS

AVG.

APPLICATION METHOD (AIRLESS,

CONVENTIONAL SPRAY, ROLLED)

AVERAGE DFT

11 (Rev-0)

4.2 Tank and Void Assessment form.

12 (Rev-0)

13 (Rev-0)

07400_AKP_0526_BOAT_FLT

WORK ITEM 1: General Welding, Provide

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to provide general welding as identified in Table 1 (Welding).

TABLE 1 – WELDING

ITEM DESCRIPTION LOCATION APPROXIMATE

SQFT.

PHOTO I.D.

(BELOW IN

NOTES)

Repair Latches/Combing Swimdeck Corrosion Around Combing N/A Photo #1

Perform Crop and Renew Aft Deck Bent Swing Bar Bracket N/A Photo #2

Perform Heat and Straighten Bent Mooring Bitt Caps N/A Photo #3

Perform Clad Welding P/S Strainers in the Bilge 16 Square Feet Photos #4 & #5

Crop and Renew Frame Steering Ram Support Bracket Frame N/A Photo #6

Crop and Renew Bent R/W Hose Bracket N/A Photo #7

Perform Heat and Straighten Bent E/R Frame N/A Photo #8

Perform Clad Welding Various Pilothouse Antenna Mounts 30 Square Inches Photos #9 & #10

Inspect/Report/Repair Pilothouse Bulkhead/Deck Pitting 30 Square Inches Photo #11

Restore/Weld/Braze/Install Pilothouse GFE Provided AC System N/A Photo #12

Repair Cracked Railing Aft Swim Platform Taft Rail 25 Square Inches Photos #1 & #2

Perform Clad Welding Lazarette Bilge (Centerline) 10 Square Feet N/A

Perform Clad Welding Auxiliary Space Bilge Fuel Tank 10 Square Inches Photo #13

Perform Clad Welding Survivor’s Compt. Bilge 10 Square Inches N/A

Inspect/Report/Repair Various Survivor’s Compt. Damage N/A Photos #14 & #15

Inspect/Report/Repair Portside Amidship Dent N/A Phot # 16

1.2 Government-furnished property.

None.

14 (Rev-0)

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing FL-85-002, Rev E, GFE Boat Hot Work Diagrams

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures

OTHER REFERENCES

None

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

None.

3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).

3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).

3.2 Requirement. The Contractor must provide general welding, including but not limited to, fabrication, brazing, inspection, plate renewal, crack repair, overlay, and associated processes on Coast Guard vessels and equipment in accordance with Coast Guard Drawing FL-85-002 and SFLC Std Spec 0740.

3.3 Bidding. The Contractor must ensure for bidding purposes this specification will be broke down by the following:

• One linear foot of welding/brazing.

• Four square inches of clad/overlay welding.

15 (Rev-0)

• One hour of fabrication.

• One square foot of plate renewal.

TABLE 2 – PLATE TYPE

STEEL PLATE ALUMINUM PLATE

THICKNESS WEIGHT

PER SQFT.

TYPE/GRADE THICKNESS WEIGHT

PER SQFT

TYPE/ALLOY

3/16 (.1875) 7.66 lb 1/4 (.250) 10.21 lb 1/4 (.250) 3.53 lb 5/16 (.3125) 12.76 lb 5/16 (.3125) 4.41 lb 3/8 (.375) 15.31 lb 3/8 (.375) 5.29 lb 1/2 (.500) 20.42 lb 1/2 (.500) 7.06 lb

3.4 Touch-up preservation, general. The Contractor must prepare and coat all new and disturbed exterior and interior surfaces, as applicable, to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)

4. NOTES

Photo#1:

16 (Rev-0)

Photo#2:

Photo#3:

Photo#4:

17 (Rev-0)

Photo#5:

Photo#6:

Photo#7:

18 (Rev-0)

Photo#8:

Photo#9:

Photo#10:

19 (Rev-0)

Photo#11:

Photo#12:

20 (Rev-0)

Photo#13:

Photo#14:

Photo#15:

21 (Rev-0)

Photo#16:

22 (Rev-0)

10000_AKP_0925_45RBM

WORK ITEM 2: Ultrasonic Testing (UT) (100) Shots, Perform

1. Scope

1.1 Intent. This work item describes the requirements for the Contractor to take 100 UT shots.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

None

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General.

3.1.1 CIR. The Contractor must submit a CIR for the inspections listed in the following paragraph(s):

• 3.3 Reporting

3.1.2 Tech Rep.

None.

3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).

23 (Rev-0)

3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).

3.2 UT measurement. The Contractor must perform a total of 100 UT measurements in accordance with SFLC Std Spec 0000 and SFLC Std Spec 0740.

3.2.1 Standard measurements. The Contractor must take 70 standard thickness measurements for the designated locations numbered 1 thru 70 between the boot top and keel, (Refer to Figure 1 and Figure 2).

3.2.1.1 The Contractor must record each measured metal thickness in the Standard Underwater (U/W) Body Test Results Report, (Refer to Table 1 and Table 2).

3.2.1.2 The Contractor must calculate each percent loss.

3.2.1.3 The Contractor must record each percent loss in the Standard U/W Body Test Results Report.

3.2.2 Additional measurements. The Contractor must take 30 additional thickness measurements at locations designated by the Coast Guard inspector and numbered 1A through 30A between the boot top and keel, (Refer to Figure 1 and Figure 2).

3.2.2.1 The Contractor must record each measured metal thickness in the Additional U/W Body Test Results Report, (Refer to Table 3).

3.2.2.2 The Contractor must calculate each percent loss.

3.2.2.3 The Contractor must record each percent loss in the Additional U/W Body Test Results Report.

3.2.3 Minimum thickness. The Contractor must record the minimum thickness found for each designated hull section. (A, B, and C) in the Underwater Hull Body Minimum Thickness Test Results Report, (Refer to Table 4).

3.3 Reporting. The Contractor must submit a CIR to include a marked up drawing of Figure 1 and 2 and the completed tables.

4.1 Coast Guard Personnel. The Coast Guard inspector will witness all readings.

24 (Rev-0)

FIGURE 1. BOTTOM SHELL PLATING EXPANDED

25 (Rev-0)

FIGURE 2. STERN SECTION SHELL PLATING

TABLE 1 - STANDARD U/W BODY TEST RESULTS REPORT

DATE: ____________________________

*CALCULATING PERCENT LOSS = 100- (UT READING / DESIGN THICKNESS X 100)

26 (Rev-0)

27 (Rev-0)

TABLE 2 - STANDARD U/W BODY TEST RESULTS REPORT (STERN)

*CALCULATING PERCENT LOSS = 100- (UT READING / DESIGN THICKNESS X 100)

LOCATION

AREA

DESIGN

THICKNESS

MINIMUM

ALLOWABLE THICKNESS

UT

READINGS

*PERCENT LOSS

STERN SECTION “C”

61 .250 .187 62 .250 .187 63 .250 .187