SPECIFICATION PKG. REV-0, 19 NOVEMBER 2026 45646 (RB-M 45).pdf
PDF 5 MB Posted
- Attached to
- USCG STA SAN JUAN (45646) FY27 DRYDOCK REPAIRS
- Solicitation number
- 70ZU0327QSBPL0004
- Issued by
- Not on record
About this file
This is a Specification Package (Revision 0, dated November 19, 2026) for drydock repairs to the USCG 45646 (RB-M 45) vessel during Fiscal Year 2027. The specification encompasses 37 work items detailing comprehensive repair, maintenance, and preservation requirements for a 45-foot Response Boat-Medium, including hull inspection and preservation, machinery renewal, system upgrades, and associated support services. The vessel is 44 feet 10.5 inches in length with a full load displacement of 36,500 pounds, powered by two MTU Series 60 diesel engines (825 hp each) and two Rolls-Royce water-jet propulsors. The contract period of performance runs from February 2, 2027, through June 1, 2027, representing approximately four months for completion.
Key work items include general welding and fabrication repairs (Work Item 1); ultrasonic thickness testing of 100 hull shots (Work Item 2); underwater hull body inspection and preservation (Work Items 3, 27, 28, 35); fendering system inspection and repair (Work Items 4, 5); accessible space inspections (Work Item 6); diesel fuel tank cleaning and inspection (Work Item 7); watertight door and hatch inspection and adjustment (Work Item 8); mast removal and inspection (Work Item 9); renewal of main diesel engines, reduction gears, and cardan shafts (Work Item 10); engine-to-generator and engine-to-jet-drive alignment (Work Item 11); and various system renewals including jet drive components, hydraulic coolers, sea valves, hoses, electrical systems, and HVAC upgrades. Government-furnished property includes two new main diesel engines (estimated cost $100,042.64 and $100,027.23), two marine gears ($14,084.96 each), cardan shafts, two MEPS generators ($3,134.71 each), and numerous smaller components and repair kits totaling significant value. The contractor must comply with Surface Forces Logistics Center (SFLC) Standard Specifications for general requirements, welding and allied processes, preservation of ship structures, and drydocking; perform all work in accordance with Coast Guard drawings and technical publications; manage environmental protection requirements; conduct operational tests before and after repairs; and submit Critical Inspection Reports (CIRs) for designated critical inspection items within the first 25 percent of the contract period. Quality assurance requirements include documentation of surface preparation, coating applications, thickness measurements, and soluble salt conductivity testing for all preservation work on critical-coated surfaces.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCG 45646 (RB-M 45)
SPECIFICATION FOR DRYDOCK REPAIRS
FY2027
Developed By: Timothy Tolliver
(Rev-0, 19 November 2026)
USCG 45646 (RB-M-45) DRYDOCK AVAILABILITY FY2027
ii (Rev-0)
TABLE OF CONTENTS
Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property .............................................................................. viii Consolidated List of Critical Inspection Items .......................................................................................... xiii Principal Characteristics ............................................................................................................................. xiv General Requirements WORK ITEM 1: General Welding, Provide WORK ITEM 2: Ultrasonic Testing (UT) (100) Shots, Perform WORK ITEM 3: Hull Plating (U/W Body), Inspect WORK ITEM 4: Fendering System, Inspect WORK ITEM 5: Fendering System, Repair WORK ITEM 6: Accessible Spaces, Inspect WORK ITEM 7: Diesel Fuel Tank, Clean and Inspect WORK ITEM 8: Watertight Door and Hatches, Inspect and Adjust WORK ITEM 9: Mast, Inspect WORK ITEM 10: Main Diesel Engines, Reduction Gears, and Cardan Shafts, Renew WORK ITEM 11: Main Diesel Engine(s) To MEPS Generator(s) And 1. SCOPE WORK ITEM 12: Jet Drive Shaft Bearing Housing, Renew WORK ITEM 13: Hydraulic Oil Cooler, Water Jet, Renew WORK ITEM 14: Water Jet-Inspect, Perform Service WORK ITEM 15: Jet Drive Anodes, Renew WORK ITEM 16: Sea Strainer, Renew WORK ITEM 17: Engine Exhaust Piping, Inspect WORK ITEM 18: Electrical / Electronics, Renew WORK ITEM 19: MEPS Generator, Renew WORK ITEM 20: Electrical Isolation, Perform, MEPS WORK ITEM 21: Standard Hoses, Renew WORK ITEM 22: MDE SW Valves, Overhaul WORK ITEM 23: Sea Valves, Renew WORK ITEM 24: Diesel Tanks, Refuel WORK ITEM 25: Tow Reel, Remove and Install WORK ITEM 26: Fender Faying Surfaces, Preserve, 100 percent WORK ITEM 27: Water Jet Drive, Preserve WORK ITEM 28: U/W Body, Preserve (100%) WORK ITEM 29: Exterior and Interior Non-Skid Pads, Renew WORK ITEM 30: Interior Hull Insulation, Renew WORK ITEM 31: Marine Chemist Services, Provide WORK ITEM 32: Drydock WORK ITEM 33: Temporary Services, Provide WORK ITEM 34: Sea Trial Performance, Support, Provide WORK ITEM 35: Lazarette Bilge, Preserve WORK ITEM 36: Fuel Level Sending Unit, Modify WORK ITEM 37: HVAC Upgrade iii (Rev-0)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iv (Rev-0)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Drawing 45 RB-M 084-002, Rev -, Docking Plan Coast Guard Drawing 45 RB-M 084-002, Rev –, Docking Plan Coast Guard Drawing 45 RB-M 084-005, Rev -, Main Diesel Engine Mounting for 45FT RB-M Coast Guard Drawing 45 RB-M 110-001, Rev -, Hull Structure Coast Guard Drawing 45 RB-M 110-002, Rev -, Hull Structure Module A Coast Guard Drawing 45 RB-M 110-002, Rev -, Hull Structures Modular A Coast Guard Drawing 45 RB-M 110-003, Rev -, Hull Structure Module B Coast Guard Drawing 45 RB-M 110-083, Rev -, Hull Structure Module B - Deck Coast Guard Drawing 45 RB-M 111-001, Rev -, Shell Plating, Module A Coast Guard Drawing 45 RB-M 114-001, Rev -, Fendering Arrangement Coast Guard Drawing 45 RB-M 167-003, Rev -, Doors and Hatches Coast Guard Drawing 45 RB-M 170-002, Rev B, Folding Mast Coast Guard Drawing 45 RB-M 182-001, Rev -, Propulsion System Foundations Coast Guard Drawing 45 RB-M 182-001, Rev -, Propulsion System Foundations Coast Guard Drawing 45 RB-M 185-001, Rev A, Auxiliary System Foundations Coast Guard Drawing 45 RB-M 185-001, Rev A, Auxiliary System Foundations Coast Guard Drawing 45 RB-M 186-001, Rev -, Outfit and Furnishing Foundations Coast Guard Drawing 45 RBM 201-001, Rev B, Main Engine Arrangement Coast Guard Drawing 45 RB-M 201-001, Rev B, Main Engine Arrangement Coast Guard Drawing 45 RBM 247-002, Rev -, Water Jet Propulsor Arrangement Coast Guard Drawing 45 RB-M 247-002, Rev -, Water Jet Propulsor Arrangement Coast Guard Drawing 45 RB-M 252-002, Rev A, Propulsion Control System Coast Guard Drawing 45 RB-M 256-002, Rev -, Cooling System Propulsion Coast Guard Drawing 45 RB-M 256-101, Rev -, Cooling System HVAC Coast Guard Drawing 45 RB-M 256-102, Rev -, Strainer Installation and Rip Out Coast Guard Drawing 45 RB-M 259-002, Rev -, Exhaust System Coast Guard Drawing 45 RB-M 261-001, Rev -, Fuel Supply System Schematic Coast Guard Drawing 45 RB-M 261-002, Rev -, Fuel Supply System Coast Guard Drawing 45 RB-M 261-002, Rev -, Fuel Supply System v (Rev-0)
Coast Guard Drawing 45 RB-M 261-004, Rev -, Fuel Supply System Tubes Coast Guard Drawing 45 RB-M 261-005, Rev -, Fuel Supply System - Pipe Assemblies Coast Guard Drawing 45 RB-M 261-100, Rev -, Fuel Fill and Vent Schematic Coast Guard Drawing 45 RB-M 261-101, Rev -, Fuel Fill and Vent Arrangement Coast Guard Drawing 45 RB-M 262-002, Rev -, Lube Oil FLOCS System Coast Guard Drawing 45 RB-M 311-001, Rev -, APU System Block Schematic Coast Guard Drawing 45 RB-M 311-004, Rev A, APU Generator Drive System Coast Guard Drawing 45 RBM 311-004, Rev A, APU Generator Drive System Coast Guard Drawing 45 RB-M 320-001, Rev E, DC Power Distribution System Schematic Coast Guard Drawing 45 RB-M 321-100, Rev A, 60Hz Power Distribution System Schematic Coast Guard Drawing 45 RB-M 321-200, Rev A, Wire Harness Arrangement Coast Guard Drawing 45 RB-M 321-201, Rev -, Wire Way Arrangement Coast Guard Drawing 45 RB-M 330-002, Rev B, Lighting System Schematic Coast Guard Drawing 45 RB-M 406-001, Rev A, Grounding and Bonding Schematic Coast Guard Drawing 45 RB-M 423-001, Rev B, Electronic Navigation System Schematic Coast Guard Drawing 45 RB-M 437-001, Rev -, Tank Level Indicating System Schematic Coast Guard Drawing 45 RB-M 437-002, Rev A, Tank Level Indicating System Coast Guard Drawing 45 RB-M 439-002, Rev -, C.C.T.V. System Coast Guard Drawing 45 RB-M 441-001, Rev G, Radio System Schematic Coast Guard Drawing 45 RB-M 505-001, Rev A, Hose and Hose Assemblies Coast Guard Drawing 45 RB-M 511-002, Rev -, Compartment Heating Arrangement Coast Guard Drawing 45 RB-M 514-001, Rev -, HVAC System Schematic Coast Guard Drawing 45 RB-M 514-003, Rev -, Air Conditioning Units, Self-Contained Coast Guard Drawing 45 RB-M 555-100, Rev -, Fire Extinguishing System, Dry Chemical Coast Guard Drawing 45 RB-M 556-003, Rev -, Hydraulic Control System Coast Guard Drawing 45 RB-M 582-002, Rev -, Mooring and Towing Systems Coast Guard Drawing 45 RB-M 601-001, Rev D, General Arrangement Coast Guard Drawing 45 RB-M 622-002, Rev -, Machinery Space Removable Deck Plate Coast Guard Drawing 45 RB-M 631-001, Rev A, Painting Layout Coast Guard Drawing 45 RB-M 633-002, Rev -, Cathodic Protection Sacrificial Anode Coast Guard Drawing 45 RB-M 634-002, Rev -, Deck Covering Coast Guard Drawing 45 RB-M 635-002, Rev C, Insulation Details Coast Guard Drawing FL-85-002, Rev A, GFE Boat Hot Work Diagrams Coast Guard Drawing FL-85-002, Rev E, GFE Boat Hot Work Diagrams Coast Guard Drawing FL-85-2, Rev E, GFE Boat Hot Work Diagrams
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors
Manual Coast Guard Technical Publication (TP) 4698, SWBS 241, Dec 2013, Marine Transmission Manual Coast Guard Technical Publication (TP) 4993, SWBS 634, Oct 2011, Nonskid Pads, Peel and Stick
Catalog vi (Rev-0)
Coast Guard Technical Publication (TP) 5716, SWBS 163, Apr 2014, Seawater Cooling System Duplex Strainer - Model RBM-203976
Coast Guard Technical Publication (TP) 5729, SWBS 233, May 2014, Main Diesel Engine - Series 60 – Operator’s Guide
Coast Guard Technical Publication (TP) 5737, SWBS 247, Jun 2014, Water Jet – Model FF375S Coast Guard Time Compliance Technical Order (TCTO) TJ3020.1, Aug 2013, HVAC Upgrade Fire Prevention and Response Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General
Requirements Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Latest Version, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and
Allied Processes Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Latest Version, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 0740, (SFLC Std Spec 0740), 2022, Welding and
Allied Processes Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2022, Shipboard
Electrical Cable Test Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2022, Shipboard
Electrical Cable Removal, Relocation, Splice, Repair, and Installation Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary
Machine Systems Surface Forces Logistics Center Standard Specification 5000, (SFLC Std Spec 5000), 2022, Auxiliary
Machine Systems Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), Latest Version, Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), Latest Version, Requirements for Preservation of Ship Structures Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2022, Drydocking Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2022, Temporary
Services
OTHER REFERENCES
1), 2015, Solvent Cleaning 2), 2004, Mechanical Tool Cleaning 45 RB-M Water Jet Disassembly / Assembly Procedures American Boat and Yacht Council (ABYC), E-11, AC and DC Electrical Systems on Boats, 2023 American Society of Mechanical Engineers (ASME) B16.34, 2025, Valves-Flanged, Threaded, and
Welding End ASTM International (ASTM) D4138, Rev A, 2007 (R 2017), Standard Practices for Measurement of Dry
Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means ASTM International (ASTM) F992, 2017, Standard Specification for Valve Label Plates vii (Rev-0)
Code of Federal Regulations (CFR) Title 29, Part 1915, Jul 2022, Occupational Safety and Health Standards for Shipyard Employment
Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for Shipyard Employment
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2019 Edition, Pressure Testing of Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2022 Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72A, 2010 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2019 Edition, Bronze Gate, Globe, Angle and Check Valves
NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for Fabrication, Welding, and Inspection of Submarine Structure
Rolls-Royce Kamewa Water Jet Assembly Drawing 376 000 49 Standard Practice for Commercial Packaging, ASTM D-3951, Rev-18, Mar 2018.
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2015, Solvent Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 2 (SSPC-SP The Society for Protective Coatings (SSPC), 2015 (E 2017), Paint Application Specification No. 2 (PA-
2), Procedure for Determining Conformance to Dry Coating Thickness Requirements The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP WJ-2/NACE WJ-2, 2012, Waterjet Cleaning of Metals – Very Thorough Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-WJ-2/NACE WJ-2, 2012 Water Jet Cleaning of Metals-Very Thorough Cleaning viii (Rev-0)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
5 N Repair Kit, Fender NSN: 2090-01-589-9430 or
PN: RBM-SRK
2 ea. 411.82
7 N Gasket (Manhole Cover) NSN: 5330-01-134-1986 PN:
3560BN
4 ea. 16.98
10 Y *Engine, RB-M, Starboard NSN: 2895-01-590-7303 PN:
6062-HK30
1 ea. 100,042.64
10 Y *Engine, RB-M, Port NSN: 2895-01-590-7317 PN:
6062-HK31
1 ea. 100,027.23
10 Y *Marine Gear NSN: 3010-01-590-4163 PN:
MG5114SC
2 ea. 14,084.96
10 Y *Shaft, Straight (Cardan) NSN:3040-01-604-1460 PN:
107255-00
2 ea. 3,651.43
10 N Mount, Resilient, General Purpose (Vibration
Isolator)
NSN: 5340-01-645-0607 PN:
RB1-200
4 ea. 20.76
10 N Washer, Flat (Mount, Vibration Snubbing
Washer)
NSN: 5310-01-626-2423 PN:
148099-1
4 ea. 1.90
10 N Filter, Lube Oil NSN: 4330-01-588-9744 PN:
X54418300057
2 ea. 29.52
10 N Filter Element, Fluid (Fuel, Primary)
NSN: 4330-01-540-3412 PN:
01030
4 ea. 30.94
10 N Filter Element, Fluid (Fuel, Secondary)
NSN: 2910-01-022-8183
P/N: 23530707
2 ea. 8.80
10 N Isolator, Engine Mount NSN: 2990016309011 or PN:
23525490
8 ea. 342.09
12 Y *Housing, Bearing Unit NSN: 3130-01-590-4525 PN:
450 087 19
2 ea. 11,442.33
12 N Nut, Self Locking, Hexagon (Flange Nut)
NSN: 5310-01-616-2982 PN:
102 029 08
2 ea. 26.33
12 N Washer, Locking NSN: 5310-01-623-2756 PN:
102 030 08
2 ea. 2.37
13 N Hydraulic Cooler, Port (Cooler, Fluid, Industrial)
NSN: 4420-01-632-6777 PN:
RRM000208650
1 ea. 1,180.38
13 N Hydraulic Cooler, Starboard (Cooler, Fluid, Waterjet)
NSN: 4420-01-630-5070 PN:
101 121 03
1 ea. 1,329.90
14 N Stainless Steel Ball Joint NSN: 3040016152117 or PN:
59915K483
10 ea. 12.26
14 N Stainless Steel Threaded Rod
NSN: 5306016152224 or PN:
93250A140
1 ea. 10.67
14 N Bearing Bushing NSN: 3120014555212 or PN: 4 ea. 9.80 ix (Rev-0)
10106911 14 N Bearing Bushing NSN: 3120580006242 or PN:
36M05101 4 ea. 49.00
14 N **Socket Head Screw NSN: 5305016171580 or PN:
91210050
16 ea. 2.71
14 N **Bolt Kit NSN: 2815016171688 or PN:
93112085A
2 ea. 15.64
14 N **Key NSN: 5315016166360 or PN:
10100824
3 ea. 28.14
14 N Seal NSN: 5330580006238 or PN:
10118902
2 ea. 4.35
14 N Bushing NSN: 3120580006239 or PN:
10105511
2 ea. 48.19
14 N Bearing Bushing NSN: 3120014555272 or PN:
10105111
4 ea. 35.33
14 N **Bolt Kit NSN: 2815016171974 or PN:
93112080F
2 ea. 6.13
14 N **Bolt Kit NSN: 5340016167191 or PN:
93112065K
12 ea. 13.07
14 N Bearing Unit NSN: 3110016166342 or PN:
37506201
2 ea. 614.35
14 N Bushing NSN: 3120580006240 or PN:
10106011
4 ea. 47.21
14 N **Set Screw NSN: 5305016020672 or PN:
91608012
6 ea. 0.58
14 N **Bolt Kit NSN: 5305016173161 or PN:
93112090K
10 ea. 12.56
14 N O-ring NSN: 5331580006241 or PN:
10202606
6 ea. 14.56
14 N **Mechanical Sealing NSN: 4320580006403 or PN:
10203870
2 ea. 1052.97
14 N Bolt Kit NSN: 5306016164058 or PN:
93310030E
6 ea. 1.92
14 N O-ring NSN: 5331016020679 or PN:
10202631
2 ea. 4.39
14 N O-ring NSN: 5331016020680 or PN:
10202625
4 ea. 15.15
14 N Sealing NSN: 5365016233174 or PN:
41018801
2 ea. 8.87
14 N O-ring NSN: 5331016200368 or PN:
10202611
2 ea. 5.21
14 N Seal Lip NSN: 4730016204613 or PN:
10202590
4 ea. 39.47
14 N Sealing NSN: 5330016163186 or PN:
45002010
2 ea. 535.93
14 N **Lock Nut NSN: 5310016162982 or PN:
10202908
2 ea. 16.63
14 N Lock Washer NSN: 5310016232756 or PN:
10203008
2 ea. 2.34 x (Rev-0)
14 N **Ring Nut NSN: 5310016164016 or PN:
10202912
2 ea. 32.60
14 N Seal NSN: 5330016243735 or PN:
10202540R
6 ea. 19.68
14 N **Screw NSN: 5305016162955 or PN:
93305025
8 ea. 0.28
14 N **Washer NSN: 5310016162966 or PN:
912505
8 ea. 0.06
14 N Gasket NSN: 5330016232867 or PN:
37527805
2 ea. 63.43
14 N Bushing NSN: 5365016202680 or PN:
10108416
8 ea. 15.91
14 N **Bolt Kit NSN: 5305016242899 or PN:
93110060A
4 ea. 12.91
14 N **Bolt Kit NSN: 5305016242922 or PN:
99110040G
14 ea. 6.60
14 N Bushing NSN: 3120014555268 or PN:
10106902
8 ea. 7.90
14 N Gasket NSN: 5330016163014 or PN:
10108901
2 ea. 5.65
14 N **Bolt Kit NSN: 5305016231019 or PN:
93110090A
4 ea. 5.05
14 N Lock Washer NSN: 5310016232699 or PN:
10203012
2 ea. 5.62
14 N O-ring NSN: 5331016242120 or PN:
10202603
2 ea. 3.89
14 N **Screw, Countersunk NSN: 5305016309734 or PN:
99106016
8 ea. 5.65
14 N Seal/Gasket NSN: 1040016337691 or PN:
45011611
2 ea. 57.64
14 N Woodruff Key NSN: 5315016172999 or PN:
10100823
2 ea. 19.09
14 N Washer, Sealing NSN: 5310016452084 or PN:
8755000050
24 ea. 0.06
14 N Screw, Connection NSN: 5305016476396 or PN:
91212045L
8 ea. 6.45
14 N Cylinder, Hydraulic NSN: 2010015904296 or PN:
10121038
2 ea. 2126.60
14 N Shaft, Steering Port NSN: 3010016147047 or PN:
37505816
1 ea. 817.88
14 N Shaft, Steering NSN: 3010015904327 or PN:
37505817
1 ea. 813.34
14 N Cylinder, Hydraulic NSN: 2010015904260 or PN:
10121080
2 ea. 4872.34
14 Y Guide Vane Chamber NSN: 2990015904492 or 37618602-11_528097
2 ea. 7688.04
14 Y Housing, Bearing NSN: 3130015904525 or 45008719_5381232
2 ea. 12001.59
14 Y Nozzle, Steering NSN: 2010015904266 or 2 ea. 1852.66 xi (Rev-0)
37501113_5380858 15 N Anode, Inspection Hatch
(Port & Stbd) (Anode, Corrosion Preventive)
NSN: 5342-58-000-3759 or
PN: 10108231
2 ea. 71.89
15 N Transom Anode (Anode, Corrosion Preventive)
NSN: 5342-01-602-0658 or
PN: 10108230
4 ea. 234.75
15 N Tunnel Anode (Anode, Corrosion Preventive)
NSN: 5342-01-602-0668 or
PN: 10108220
4 ea. 40.25
15 N Impeller Housing/Bucket/Interceptor Anode (Anode, Corrosion
Preventive)
NSN: 5342-25-146-5438 or
PN: 10107701
10 ea. 16.22
15 N Guide Vane Chamber Anode (Anode, Corrosion
Preventive)
NSN: 5342-01-602-0669 or
PN: 37517411
2 ea. 207.27
15 N Anode, Anode Hatch (Anode, Corrosion
Preventive)
NSN: 5342-25-146-5439 or
PN: 10108210
2 ea. 60.15
15 N Screw Connection (Screw, Cap, Socket Head)
NSN: 5305-01-602-2100 or
PN: 93310025H
4 ea. 4.53
15 N Screw Connection NSN: 5305-01-627-5854 or
PN: 93308025H
14 ea. 1.00
15 N Screw Connection (Screw, Cap, Socket Head)
NSN:5305-01-602-2105 or
PN: 91206020E
8 ea. 1.47
15 N Screw Connection (Bolt Assembly, Clamp)
NSN: 5340-01-624-3271 or
PN: 93308025E
8 ea. .73
15 N O-ring NSN: 5331-01-602-0670 or
PN: 10202639
2 ea. 15.46
15 N Screw Connection NSN: 5305-01-624-0905 or
PN: 93310016E
8 ea. 1.17
15 N Screw Connection (Bolt Blank)
NSN: 5306-01-630-9800 or
PN: 93312030E
2 ea. 2.09
15 N Screw Connection NSN: 5305-01-620-4602 or
PN: 91212025E
8 ea. 1.41
15 N O-ring NSN: 5331-22-607-8691 or
PN: 10202626
2 ea. 9.26
15 N Tube Extension NSN: 4730-01-621-0708 or
PN: 37610802
2 ea. 120.22
15 N Tube Clamp (Clamp, Hose) NSN: 4730-01-620-0951 or
PN: 10217881
2 ea. 16.13
15 N Screw Connection (Screw, Cap, Socket Head)
NSN: 5305-01-602-2101 or
PN: 93310030H
2 ea. 3.40
15 N Connecting Cable NSN: 6145-01-620-3663 or
PN: 10234301
4 ea. 19.00
15 N Screw Connection NSN: 5305-01-617-6732 or
PN: 93306016E
8 ea. 0.35
15 N Anode, Corrosion Preventive
NSN: 5340-01-589-9440 or
PN: 51125
2 ea. 82.13
15 N Anode, Corrosion NSN: 5340-01-589-9425 or 2 ea. 26.86 xii (Rev-0)
Preventive PN: 89287 17 N Gasket (Exhaust Flange
Outlet) NSN: 5330-01-303-5437 or
PN: 23501147
2 ea. 17.24
18 N Solenoid, Electrical NSN: 5945-01-524-7896 or
PN: 24063-08
1 ea. 31.85
18 N Switch, Push NSN: 01HS27610 or PN:
ZB5AA4
1 ea. 0.00
18 N Pump Unit, Centrifugal NSN: 4320-01-648-1332 or
PN: B35068J300B03XX
1 ea. 811.72
18 N Tester, Smoke Detector NSN: 6350-01-169-2535 or
PN: HO-25S
1 ea. 12.38
18 N Alarm, Smoke, Automatic NSN: 6350-01-121-2908 or
PN: 71-570000-001
1 ea. 63.04
18 N Fan, Vane Axial NSN: 4140-01-502-0553 or
PN: 500-311242
1 ea. 356.00
18 N Switch, Thermostatic NSN: 5930-01-618-7052 or
PN: 1C1B9-AP
1 ea. 96.14
18 N Switch, Liquid Level NSN: 5930-01-568-0518 or
PN: 164870
1 ea. 1,255.50
19 Y *Generator, Engine Accessory
NSN: 2920-01-644-6491 or
PN: 7102252-00
2 ea. 3134.71
21 N Parts Kit, Hose Assembly NSN: 4720-01-679-1782 or
P/N: 45-RB-M-505-101
1 ea. $16,520.00
23 N Raw Water Sys De-Icing Valve, Ball, 1-inch NPT
316 SS
NSN: 4820-01-600-0385 or
PN: V210FP-16
2 ea. 34.92
23 N AC Supply/Discharge Ball Valve, Ball 3/4-inch NPT
316 SS
NSN: 4820-01-600-0389 or
PN: V210FP-12
3 ea. 26.44
23 N AC Overboard Check Valve High-Flow SS
Check Valve 3/4-inch NPT Female
NSN: 4820-01-599-7249 or
PN: 46635K65
1 ea. 60.83
26 N Marker Set, Identification NSN: 7690-01-665-8162 1 ea. $181.73 29 N 45 FT RBM Whole Kit
Contents of kit include box 1 through box 8. (Round and square hatches not included) (Tread, Nonmetallic, Nonskid)
NSN: 7220-01-615-5012 or
P/N: 2040-00-NIB-0707
1 kt. 6,733.18
29 N Non-Skid 45 FT RBM - Round and Square Hatches
- (Not included in main kit)
(Non-Skid Kit #9)
NSN: 2040-01-633-4911 or
P/N: 2040-00-NIB-0707J
1 kt. 139.47
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xiii (Rev-0)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):
Work Item Title
2 Ultrasonic Testing (UT) (100) Shots, Perform
4 Fendering System, Inspect
6 Accessible Spaces, Inspect
11 Main Diesel Engine(s) To MEPS Generator(s) And 1. SCOPE
14 Water Jet-Inspect, Perform Service
17 Engine Exhaust Piping, Inspect
26 Fender Faying Surfaces, Preserve, 100 percent
27 Water Jet Drive, Preserve
28 U/W Body, Preserve (100%)
35 Lazarette Bilge, Preserve xiv (Rev-0)
PRINCIPAL CHARACTERISTICS
45' RB-M
PHYSICAL
Length overall 44 feet, 10.5 inches Unfixed height 20 feet 9 inches Beam, maximum 14 feet, 7.75 inches Full load draft 3 feet, 4 inches Full load displacement 36,500 pounds Max sustained speed 42.5 knots Range 250 nautical miles at 30 knots Mission limits 8 foot seas / 30 knot winds Survivability limits 12 foot seas / 50 knot winds
HULL
Hull manufacturer Marinette Marine Corp.
5086 (GRADE) Aluminum Hin- 2009
MACHINERY
Type 6, cylinder diesel engine Number of units 2, MTU's 60 series 825 hp Propulsion type 2, Rolls-royce water-jet
TANKS
1 (Rev-0)
00000_0226_FLT
REC_00000_FLT_Boats @ Commercial Facility (0121)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting boat repairs performed at a commercial contractor’s facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Latest Version, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Latest Version, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), Latest Version, Fire Prevention and Response Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), Latest Version, Requirements for Preservation of Ship Structures
OTHER REFERENCES
Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for
Shipyard Employment NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for
Fabrication, Welding, and Inspection of Submarine Structure
2 (Rev-0)
3. REQUIREMENTS
3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements in this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
NOTE
NAVSEA drawings listed will be available FOR INSPECTION ONLY from the Coast Guard Port Engineer post-award. SFLC will not redistribute NAVSEA documents.
Contractors can apply to NAVSEA headquarters directly for copies.
3.2 Contractor-provided fire watch personnel. The Contractor must provide fire watch personnel and equipment.
3.3 Preservation requirements. The Contractor must accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. The Contractor must obtain a written KO authorization to deviate from any coatings required in SFLC Std Spec 6310 Appendix C before work.
3.3.3 In-process quality control measures. The Contractor must abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces”).
3.3.3.1 Quality control requirements. The Contractor must abide by the following when performing preservation related inspections. The following measurements must be randomly spaced throughout for the purposes of providing a representation of the entire prepared or coated surface.
3.3.3.1.1 Surface profile measurements. One surface profile measurement must be taken for every 200 square feet for the first 1000 square feet; for each additional 500 square feet or less, one profile measurement must be taken.
Profile measurements must be taken in accordance with SFLC Std Spec 6310, paragraph 3.1.8.3 (Surface profile measurements). A “measurement” for surface profile is defined as follows:
• ASTM D4417, Method B: One profile measurement is the average (mean) of 10 individual readings.
• ASTM D4417, Method C: One profile measurement is the average (mean) of 2 individual readings.
3.3.3.1.2 Soluble salt conductivity measurements. 5 conductivity measurements must be taken every 1000 square feet. For submerged (immersed) applications conductivity measurements must not exceed 30 microsiemens/cm.
For non-submerged (non-immersed) applications conductivity measurements must not exceed 70 microsiemens/cm. If a conductivity check fails, clean the surface in accordance with SFLC Std Spec 6310, paragraph 3.1.8.5 (Soluble salt removal).
3.3.3.1.3 Coating thickness measurements. Three area measurements must be taken for the first 1000 square feet;
for each additional 1000 square feet, perform an additional area measurement. A “measurement” for coating thickness is defined as follows:
• SSPC-PA 2 defines an area measurement as 5 separate spot measurements randomly spaced throughout a 100 square foot area.
• SSPC-PA 2 defines a spot measurement as 3 gage readings and each new gage reading the probe must
3 (Rev-0) be moved to a new location within a 1.5-inch diameter circle defining the spot.
3.4 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
NOTE
NAVSEA approval is NOT required for welding procedures submitted but the procedures must be reviewed and shown to satisfy the requirements set forth in NAVSEA TP 1688, by a welding regulatory agency. The requirements for welding Strenx 900 are considered the same as those for welding HY-130.
3.5 Environmental protection requirements. The Contractor must adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 Contractor operated (non USCG) facilities. The Contractor must provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor must plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor must comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item must not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.2 Test and procedures. The Contractor is required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work must be done by qualified laboratories; and where required by law, the laboratories must be certified.
3.5.3 Regulatory notifications. The Contractor is responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor must submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications must be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor must appoint in writing an Environmental Manager for the project, who is responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager must ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out;
ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.
4 (Rev-0)
3.5.5 HW disposal. Contractor must comply with SFLC Std Spec 0000 Appendix A, Requirements For Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.
3.6 Local Policy. The Contractor must refer to site (e.g., Base) Regulations and Instructions for details regarding local policies (e.g., crane services, parking, or facility usage).
3.6.1 Coast Guard turn-over preparation. The Contractor must be aware that, upon arrival, after haul out, and prior to departing the Contractor’s facility, the Coast Guard crew must be allowed to accomplish various tasks in preparation for the turn-over of the boat to the Contractor. The following conditions apply to this paragraph:
3.6.1.1 The Coast Guard requires a maximum of three days at the beginning of the contract, and three days at the end to accomplish various tasks.
3.6.1.2 The Contractor may commence/continue work during these time frames.
3.6.1.3 Coast Guard personnel will disconnect the Detroit Diesel Electronic Control (DDEC) System and any other electronic equipment, as required to avoid damage to systems arising from hotwork on the vessel during the availability.
3.6.1.4 Coast Guard personnel will remove the transducers after initial haul-out and reinstall prior to re-floating the vessel.
3.6.1.5 The Unit will contact the servicing ESD or ESU to setup removal/installation of the transducer if Unit personnel are unable to accomplish this task.
3.7 SFLC Standard Specification approved changes. Approved updates to the 2022 SFLC Standard Specifications will appear here.
3.7.1 SFLC Standard Specification 5550: Replace paragraph 3.11.3 to state, “Material supporting imminent work shall be brought on the cutter and stored where the work is being performed. Material that appreciably contributes to fire load shall be removed at the end of each work shift when personnel are not present. Trash, debris, and packaging materials shall be promptly removed from the vessel at the end of each work shift and not allowed to accumulate.” Advance the paragraph numbering of the Fire Prevention and Safety Inspection form to 3.11.4.
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
5 (Rev-0)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK ITEM
WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/AMPP INSPECTOR SIGNATURE CERT. # DATE / TIME
NAME OF CG REPRESENTATIVE SIGNATURE UNIT DATE/TIME
6 (Rev-0)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
VESSEL NAME HULL # WORK ITEM
# WORK ITEM TITLE
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER COAT,
BARRIER COAT, TOP COAT,
ETC…)
LOCATION (FRAME &
DECK, RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFACE AMBIENT ΔT
| DP -
SURFACE |
7 (Rev-0)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
VESSEL NAME HULL # WORK ITEM
LOCATION OF WORK (FRAME REFERENCES) AREA (SQFT)
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/AMPP No. 2
SSPC-SP WJ-2/AMPP WJ-2
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS
PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS
DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:
NAME OF QP-1/AMPP INSPECTOR SIGNATURE CERT. # DATE /
TIME
8 (Rev-0)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/AMPP No. 2
SSPC-SP WJ-2/AMPP WJ-2
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA
RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO
SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Mils Reading (IAW ASTM D4417-Method B for above 10 readings (by column):
Mean Reading (mils)
9 (Rev-0)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
VESSEL NAME HULL # WORK ITEM
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.
DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)
10 (Rev-0)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
VESSEL NAME HULL # WORK ITEM
# WORK ITEM TITLE
COATING MFG PRODUCT NAME BATC
H #
INDUCTI
ON TIME
COATING SYSTEM
SEQUENCE
(PRIMER/TOUCHUP/3RD
COAT, ETC.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.
SPOT 1 2 3 4 5 AVERAGE
VALUE
*BASE METAL READING
(BMR)
*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
APPLICATION METHOD (AIRLESS,
CONVENTIONAL SPRAY, ROLLED)
AVERAGE DFT
11 (Rev-0)
4.2 Tank and Void Assessment form.
12 (Rev-0)
13 (Rev-0)
07400_AKP_0526_BOAT_FLT
WORK ITEM 1: General Welding, Provide
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to provide general welding as identified in Table 1 (Welding).
TABLE 1 – WELDING
ITEM DESCRIPTION LOCATION APPROXIMATE
SQFT.
PHOTO I.D.
(BELOW IN
NOTES)
Repair Latches/Combing Swimdeck Corrosion Around Combing N/A Photo #1
Perform Crop and Renew Aft Deck Bent Swing Bar Bracket N/A Photo #2
Perform Heat and Straighten Bent Mooring Bitt Caps N/A Photo #3
Perform Clad Welding P/S Strainers in the Bilge 16 Square Feet Photos #4 & #5
Crop and Renew Frame Steering Ram Support Bracket Frame N/A Photo #6
Crop and Renew Bent R/W Hose Bracket N/A Photo #7
Perform Heat and Straighten Bent E/R Frame N/A Photo #8
Perform Clad Welding Various Pilothouse Antenna Mounts 30 Square Inches Photos #9 & #10
Inspect/Report/Repair Pilothouse Bulkhead/Deck Pitting 30 Square Inches Photo #11
Restore/Weld/Braze/Install Pilothouse GFE Provided AC System N/A Photo #12
Repair Cracked Railing Aft Swim Platform Taft Rail 25 Square Inches Photos #1 & #2
Perform Clad Welding Lazarette Bilge (Centerline) 10 Square Feet N/A
Perform Clad Welding Auxiliary Space Bilge Fuel Tank 10 Square Inches Photo #13
Perform Clad Welding Survivor’s Compt. Bilge 10 Square Inches N/A
Inspect/Report/Repair Various Survivor’s Compt. Damage N/A Photos #14 & #15
Inspect/Report/Repair Portside Amidship Dent N/A Phot # 16
1.2 Government-furnished property.
None.
14 (Rev-0)
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing FL-85-002, Rev E, GFE Boat Hot Work Diagrams
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
None.
3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).
3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Requirement. The Contractor must provide general welding, including but not limited to, fabrication, brazing, inspection, plate renewal, crack repair, overlay, and associated processes on Coast Guard vessels and equipment in accordance with Coast Guard Drawing FL-85-002 and SFLC Std Spec 0740.
3.3 Bidding. The Contractor must ensure for bidding purposes this specification will be broke down by the following:
• One linear foot of welding/brazing.
• Four square inches of clad/overlay welding.
15 (Rev-0)
• One hour of fabrication.
• One square foot of plate renewal.
TABLE 2 – PLATE TYPE
STEEL PLATE ALUMINUM PLATE
THICKNESS WEIGHT
PER SQFT.
TYPE/GRADE THICKNESS WEIGHT
PER SQFT
TYPE/ALLOY
3/16 (.1875) 7.66 lb 1/4 (.250) 10.21 lb 1/4 (.250) 3.53 lb 5/16 (.3125) 12.76 lb 5/16 (.3125) 4.41 lb 3/8 (.375) 15.31 lb 3/8 (.375) 5.29 lb 1/2 (.500) 20.42 lb 1/2 (.500) 7.06 lb
3.4 Touch-up preservation, general. The Contractor must prepare and coat all new and disturbed exterior and interior surfaces, as applicable, to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)
4. NOTES
Photo#1:
16 (Rev-0)
Photo#2:
Photo#3:
Photo#4:
17 (Rev-0)
Photo#5:
Photo#6:
Photo#7:
18 (Rev-0)
Photo#8:
Photo#9:
Photo#10:
19 (Rev-0)
Photo#11:
Photo#12:
20 (Rev-0)
Photo#13:
Photo#14:
Photo#15:
21 (Rev-0)
Photo#16:
22 (Rev-0)
10000_AKP_0925_45RBM
WORK ITEM 2: Ultrasonic Testing (UT) (100) Shots, Perform
1. Scope
1.1 Intent. This work item describes the requirements for the Contractor to take 100 UT shots.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor must submit a CIR for the inspections listed in the following paragraph(s):
• 3.3 Reporting
3.1.2 Tech Rep.
None.
3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).
23 (Rev-0)
3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 UT measurement. The Contractor must perform a total of 100 UT measurements in accordance with SFLC Std Spec 0000 and SFLC Std Spec 0740.
3.2.1 Standard measurements. The Contractor must take 70 standard thickness measurements for the designated locations numbered 1 thru 70 between the boot top and keel, (Refer to Figure 1 and Figure 2).
3.2.1.1 The Contractor must record each measured metal thickness in the Standard Underwater (U/W) Body Test Results Report, (Refer to Table 1 and Table 2).
3.2.1.2 The Contractor must calculate each percent loss.
3.2.1.3 The Contractor must record each percent loss in the Standard U/W Body Test Results Report.
3.2.2 Additional measurements. The Contractor must take 30 additional thickness measurements at locations designated by the Coast Guard inspector and numbered 1A through 30A between the boot top and keel, (Refer to Figure 1 and Figure 2).
3.2.2.1 The Contractor must record each measured metal thickness in the Additional U/W Body Test Results Report, (Refer to Table 3).
3.2.2.2 The Contractor must calculate each percent loss.
3.2.2.3 The Contractor must record each percent loss in the Additional U/W Body Test Results Report.
3.2.3 Minimum thickness. The Contractor must record the minimum thickness found for each designated hull section. (A, B, and C) in the Underwater Hull Body Minimum Thickness Test Results Report, (Refer to Table 4).
3.3 Reporting. The Contractor must submit a CIR to include a marked up drawing of Figure 1 and 2 and the completed tables.
4.1 Coast Guard Personnel. The Coast Guard inspector will witness all readings.
24 (Rev-0)
FIGURE 1. BOTTOM SHELL PLATING EXPANDED
25 (Rev-0)
FIGURE 2. STERN SECTION SHELL PLATING
TABLE 1 - STANDARD U/W BODY TEST RESULTS REPORT
DATE: ____________________________
*CALCULATING PERCENT LOSS = 100- (UT READING / DESIGN THICKNESS X 100)
26 (Rev-0)
27 (Rev-0)
TABLE 2 - STANDARD U/W BODY TEST RESULTS REPORT (STERN)
*CALCULATING PERCENT LOSS = 100- (UT READING / DESIGN THICKNESS X 100)
LOCATION
AREA
DESIGN
THICKNESS
MINIMUM
ALLOWABLE THICKNESS
UT
READINGS
*PERCENT LOSS
STERN SECTION “C”
61 .250 .187 62 .250 .187 63 .250 .187
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .