SOLICITATION ATTACHMENT- Work Item 634-21-001 Nonskid and Deck Preservation.docx
DOCX document 42 KB Posted
- Attached to
- NONSKID AND DECK PRESERVATION
- Solicitation number
- 70ZU0327Q60520Y00
- Issued by
- Not on record
About this file
This is a Solicitation Attachment outlining the scope of work for a nonskid and deck preservation project on a 108-foot Yard Patrol Craft operated by the U.S. Coast Guard. The work (Work Item 634-21-001) involves the removal of existing nonskid coatings and application of new deck preservation treatments on all exterior deck surfaces from stem to stern on the main deck. The contractor must follow the paint schedule specified in NAVSEA Standard Item 009-26 and document 631-8629935 Rev F, which prescribes detailed surface preparation and coating requirements.
Key work requirements include clearing and sealing deck drains during nonskid removal to prevent clogging, performing joint visual, probe, and hammer testing of plywood for structural integrity following existing coating removal, and filing damaged plywood areas with thickened epoxy before sanding flush. Wood surfaces must dry to a moisture content of no greater than 15 percent prior to coating application, with measurements verified using an electronic moisture meter such as a Sovereign Moisture Master or equivalent. The contractor must submit inspection results within three days of completion and avoid applying main deck membrane coating to bitts, chocks, brackets, or superstructure elements. No government-furnished materials are provided, and the work must be performed in accordance with the referenced naval specifications and paint schedule standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOLICITATION ATTACHMENT- FAR CLAUSES.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
CUI
1. SCOPE:
1.1 Title: Nonskid and Deck Preservation; accomplish (634-21-001)
1.2 Location of Work:
1.2.1 Exterior Deck Surfaces, Main Deck, Stem to Stern
2. REFERENCES:
2.1 NAVSEA Standard Item 009-26
2.2 631-8629935 Rev F, 108' Yard Patrol Craft, Paint Schedule
3. REQUIREMENTS:
3.1 Ensure that all deck drains are cleared before and after completion of non-skid coating removal. Deck drains shall be sealed during non-skid coating removal to prevent clogging. When non-skid removal is not occurring deck drains shall be unsealed to permit deck drainage; debris shall be prevented from entering unsealed drains.
3.2 Accomplish the requirements of 2.2 for all surface preparations and coatings of exterior deck listed in 1.2.1; all existing non-skid on 1.2.1 shall be removed.
3.2.1 Upon removal of existing coatings of exterior deck listed in 1.2.1, accomplish a joint visual, probe and hammer test inspection with the SUPERVISOR of top layer of plywood, for structural integrity, damage, cracks, splitting and deterioration.
Report: Inspection Results Date: + 3
3.2.2 Submit one legible copy, in hard copy or approved transferrable media, of a report listing the results of the requirements of 3.2.1 to the SUPERVISOR.
3.2.3 Damaged areas of plywood shall be filled with thickened West System epoxy then sanded flush. Main Deck membrane coating shall not be applied to bitts, chocks, brackets or superstructure/main deck covering board.
"MOISTURE CONTENT"
3.3 Allow the wood surfaces to dry to a moisture content of no greater than 15 percent prior to coating. Readings shall be taken with an electronic moisture meter, Sovereign Moisture Master, or equal.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 None.
CUI
File details come from the government source that posted it. Updated .