This is a Request for Quotation (RFQ) issued by the United States Coast Guard Yard for commercial vulcanization services. The solicitation number is 70ZU0327P60003Y00, issued November 18, 2026, with quotations due November 22, 2026 at 0700 EST. The Coast Guard intends to award a firm fixed-price purchase order to the responsible quoter offering the lowest evaluated total price who demonstrates technical acceptability. Quotations must be submitted via email to Chelsea L. Colson at Chelsea.L.Colson@uscg.mil with subject line "RFQ 70ZU0327P60003Y00," and quoters must be registered in the System for Award Management (SAM) unless an FAR 4.1102 exception applies. Quotations must remain valid for 30 calendar days after the due date.
The scope of work consists of two contract line items: inspection, preparation, vulcanization, testing, documentation, packaging, and return shipment of one original equipment manufacturer (OEM) inflatable shaft seal (CLIN 0001) and one OEM shaft-seal bellow (CLIN 0002) for USCGC Eagle. Defense Maritime Solutions is identified as the OEM. The contractor must use OEM-approved procedures, proprietary tooling, qualified personnel, and materials to restore items to serviceable condition in accordance with U.S. Coast Guard Technical Publication 4985. Work includes receipt inspection and condition documentation, cleaning and bonding surface preparation, verification of part identity and dimensions, application of OEM-approved elastomeric bonding materials, vulcanization using OEM-approved tooling with controlled temperature, pressure, and cure cycles, post-cure cooling and finishing, and required testing and quality-assurance verification. The contractor must furnish all personnel, supervision, facilities, materials, specialized tooling, and equipment; the Government provides transportation costs for shipping to and from the contractor's facility. The required period of performance begins on or about November 10, 2026. The contractor must provide eight deliverables including receiving-inspection reports, certificates of conformance, vulcanization process records, material traceability records, final inspection reports, test reports, calibration documentation, and completed-joint photographs. The contractor must warrant all vulcanization workmanship, contractor-furnished materials, and vulcanized joint integrity for twelve months after installation, covering bond separation, delamination, premature cracking, blistering, leakage, pressure-retention failure, and material degradation attributable to the vulcanization process. Technical acceptability criteria include demonstrated ability to perform vulcanization services per the Performance Work Statement, demonstrated use of OEM-approved procedures and qualified personnel, ability to meet the required performance schedule, ability to conduct and document all required inspections and testing, ability to provide the required warranty, and submission of all required quotation information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SAP JOTFOC_70ZU0327P60003Y00.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNITED STATES COAST GUARD YARD
2401 Hawkins Point Road
Baltimore, MD 21226
SOLICITATION FOR COMMERCIAL SERVICES
Solicitation Number: 70ZU0327P60003Y00 Issue Date: November 18, 2026 Quotation Due Date and Time: November 22, 2026, 0700, EST Contracting Office: United States Coast Guard Yard Contract Specialist: Chelsea Colson, SKC Email: Chelsea.L.Colson@uscg.mil
1. SOLICITATION TERMS
1. This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with the format in FAR subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.
2. Solicitation No. 70ZU0327P60003Y00 is issued as a Request for Quotation (RFQ). This solicitation and its incorporated provisions and clauses are those in effect through Federal
Acquisition Circular (FAC) 2026-01, with an effective date of March 13, 2026.
3. The United States Coast Guard intends to award a FIRM FIXED PRICE purchase order as a result of this solicitation.
4. All responsible sources may submit a quotation, which, if timely received, will be considered by the Government.
5. Offerors shall be registered in the System for Award Management (SAM) at the time a quotation is submitted, unless an exception under FAR 4.1102 applies.
6. Quotations shall be submitted by email to Chelsea Colson at Chelsea.L.Colson@uscg.mil no later than November 22, 2026, 0700, EST.
7. The email subject line shall state: RFQ 70ZU0327P60003Y00
8. Quotations received after the stated closing date and time will not be considered.
9. Quotations shall remain valid for a minimum of 30 calendar days after the quotation due date.
mailto:Chelsea.L.Colson@uscg.mil
10. Payment will be made in accordance with FAR 52.212-4, Contract Terms and
Conditions—Commercial Products and Commercial Services, and applicable Prompt
Payment Act requirements.
3. QUOTATION SUBMISSION REQUIREMENTS
Each quotation shall include, at a minimum:
1. Solicitation number.
2. Quoter legal business name, physical address, CAGE code, and Unique Entity Identifier
(UEI).
3. Point of contact name, telephone number, and email address.
4. Technical quotation addressing the contractor’s understanding of the requirement and ability to perform the work described in Section 5, Performance Work Statement.
5. Proposed staffing, labor categories, qualifications, certifications, licenses, and experience required by the solicitation.
6. Proposed period of performance and confirmation of the contractor’s ability to meet the required schedule.
7. Price quotation by contract line item number.
8. Any assumptions, exceptions, or conditions.
9. Acknowledgment of all solicitation amendments, if any.
10. A completed copy of any required representations, certifications, or clause fill-ins not available through SAM.
4. SCHEDULE OF SERVICES
CLIN Description Quantity Unit of
Issue
Inspection, preparation, vulcanization, testing, documentation, packaging, and preparation for return shipment of one OEM inflatable shaft seal for USCGC Eagle, in accordance with
Section 5, Performance Work Statement.
1 JOB
CLIN Description Quantity Unit of
Issue
Inspection, preparation, vulcanization, testing, documentation, packaging, and preparation for return shipment of one OEM shaft-seal bellow for USCGC Eagle, in accordance with
Section 5, Performance Work Statement.
1 JOB
4.1 Contract Type Instructions
Firm Fixed Price: The prices quoted for each contract line item shall include all labor, supervision, management, materials, equipment, tools, travel, overhead, general and administrative expenses, and all other costs necessary to perform the required services, unless specifically identified as a separately priced line item.
5. PERFORMANCE WORK STATEMENT
5.1 Background
1. This Performance Work Statement establishes the requirements for contractor inspection, preparation, vulcanization, quality assurance, documentation, packaging, and return shipment of one inflatable shaft seal and one shaft-seal bellow for USCGC Eagle.
2. The contractor shall furnish all personnel, supervision, facilities, consumable materials, specialized tooling, proprietary vulcanizing jigs, equipment, technical data, and quality-control measures necessary to complete the work, except for Government-furnished property and transportation costs specifically identified in this Performance Work
Statement.
3. Defense Maritime Solutions is identified as the Original Equipment Manufacturer for the applicable inflatable shaft seal and shaft-seal bellow. The contractor shall use OEM-approved procedures, proprietary tooling, and qualified personnel necessary to produce a completed vulcanized joint compatible with the original equipment design and intended operating environment.
4. The contractor shall perform all work in a manner that preserves the functional integrity, dimensional fit, pressure-retention capability, and watertight performance of the inflatable seal and shaft-seal bellow.
5. Nothing in this Performance Work Statement authorizes substitution of materials, changes to OEM design, deviations from applicable technical data, or alternate repair methods without prior written authorization from the Contracting Officer and designated
Government technical representative.
5.2 Scope and Objective
1. The contractor shall vulcanize and return to serviceable condition the following
Government-furnished items:
• One OEM inflatable shaft seal; and
• One OEM shaft-seal bellow.
2. At a minimum, the work shall include:
a. Receipt inspection and condition documentation;
b. Cleaning and preparation of bonding surfaces;
c. Verification of part identity, dimensions, orientation, and splice configuration;
d. Application of OEM-approved elastomeric bonding materials and compounds;
e. Vulcanization using OEM-approved tooling, jigs, temperature controls, pressure controls, and cure cycles;
f. Post-cure cooling, finishing, and inspection;
g. Required testing and quality-assurance verification;
h. Preparation of a final inspection and test report; and
i. Preservation, packaging, and preparation for return shipment to the Government.
3. The objective is to provide completed seals and bellows with vulcanized joints that meet the applicable requirements of U.S. Coast Guard Technical Publication 4985, OEM technical procedures, and applicable OEM drawings and specifications.
4. The U.S. Coast Guard Yard will be responsible for transportation costs associated with shipping the Government-furnished items to and from the contractor’s facility. The contractor shall coordinate shipment dates, shipping instructions, and receiving information with the Government point of contact.
5. The required period of performance shall begin on or about 10 November 2026, or as otherwise directed by the Contracting Officer.
6. The contractor shall provide receiving-address, point-of-contact, telephone-number, email-address, and receiving-hours information to the Government before shipment of
Government-furnished property.
5.3 Applicable Documents
1. The contractor shall perform work in accordance with the latest Government-provided revision of the following documents, unless otherwise directed in writing:
a. U.S. Coast Guard Technical Publication 4985;
b. Applicable OEM technical manuals, engineering drawings, repair procedures, and material specifications;
c. Applicable OEM quality-assurance and inspection procedures; and
d. Applicable packaging, preservation, and shipping requirements provided by the
Government.
2. In the event of a conflict among applicable documents, the contractor shall immediately notify the Contracting Officer and Government technical representative. The contractor shall not proceed with the affected work until receiving written direction.
3. The contractor shall not use superseded drawings, obsolete procedures, or unapproved process instructions unless specifically authorized in writing by the Government.
5.4 Performance Requirements
5.4.1 General Workmanship
1. The contractor shall perform all vulcanization work using personnel trained and qualified in OEM-approved elastomeric sealing-system repair procedures.
2. The contractor shall use only OEM-approved or OEM-compatible elastomer compounds, adhesives, primers, release agents, backing materials, and other consumables required for the specific seal and bellow configuration.
3. The contractor shall maintain lot traceability for all materials incorporated into the repair.
4. The contractor shall protect sealing surfaces, inflation passages, mating surfaces, and critical dimensions from contamination, damage, distortion, or degradation throughout the repair process.
5.4.2 Preparation and Alignment
1. Before vulcanization, the contractor shall verify the part number, configuration, orientation, joint location, and dimensions against applicable technical data.
2. The contractor shall prepare the joint and bonding surfaces in accordance with OEM procedures. Preparation shall include removal of deteriorated material, cleaning, surface conditioning, and any required trimming or profiling.
3. The contractor shall use OEM-approved vulcanizing jigs or fixtures to maintain correct alignment, geometry, joint overlap or scarf configuration, and dimensional control throughout the curing process.
4. The contractor shall not proceed with vulcanization if the seal or bellow condition prevents a repair meeting applicable acceptance criteria. The contractor shall notify the
Government and provide a written technical assessment of the condition and recommended disposition.
5.4.3 Vulcanization Process Control
1. The contractor shall control and document all critical vulcanization parameters, including, as applicable:
a. Joint-preparation method;
b. Material batch or lot identification;
c. Fixture or jig identification;
d. Alignment verification;
e. Vulcanization temperature profile;
f. Applied pressure or clamping force;
g. Cure duration;
h. Cooling cycle;
i. Ambient conditions, when required by OEM procedure; and
j. Technician and quality-control inspector identification.
2. Cure temperatures, pressures, and cure times shall conform to the applicable OEM procedure and U.S. Coast Guard Technical Publication 4985. The contractor shall not substitute generic rubber-repair parameters for OEM-specific requirements.
3. Any interruption, out-of-tolerance condition, equipment malfunction, or deviation affecting the cure cycle shall be documented and immediately reported to the
Government technical representative. The contractor shall provide a proposed corrective action before continuing work.
5.4.4 Inspection and Testing
1. Following vulcanization and post-cure processing, the contractor shall conduct a 100-percent visual inspection of each repaired joint.
2. Visual inspection shall verify that the completed vulcanized joint is free from unacceptable defects, including:
a. Gaps;
b. Voids;
c. Delamination or bond separation;
d. Misalignment;
e. Blisters;
f. Cracks;
g. Scorching or evidence of thermal degradation;
h. Foreign-material contamination;
i. Excess adhesive, flashing, or surface irregularities that could impair installation or operation; and
j. Any other defect prohibited by the applicable OEM procedure or U.S. Coast Guard
Technical Publication 4985.
3. The contractor shall perform all dimensional inspections, pressure-retention tests, leak tests, and other nondestructive examinations required by U.S. Coast Guard Technical
Publication 4985 and applicable OEM technical data.
4. Test methods, test equipment, test pressures, hold times, allowable pressure loss, and acceptance criteria shall be in accordance with U.S. Coast Guard Technical Publication
4985 and applicable OEM procedures.
5. Test equipment used for acceptance testing shall be calibrated and traceable to an appropriate calibration standard. Calibration records shall be available to the Government upon request.
6. The contractor’s quality-assurance representative shall review and approve inspection and test results before release of the repaired items for shipment.
5.4.5 Nonconforming Work
1. The contractor shall identify, segregate, document, and control any nonconforming material or work.
2. The contractor shall not repair, rework, or accept a nonconforming condition without written Government authorization when the action could affect form, fit, function, material condition, or warranty coverage.
3. If the contractor determines that an item is beyond economical repair or cannot be restored to the required acceptance criteria, the contractor shall provide written notification that includes:
a. Description of the deficiency;
b. Supporting photographs and inspection results;
c. Assessment of repairability;
d. Recommended corrective action;
e. Estimated schedule impact; and
f. Any additional material or engineering support required.
5.5 Deliverables
The contractor shall provide the following deliverables with the returned items:
Deliverable Required Content Due Date
Receiving-Inspection
Report
As-received condition, photographs, observed deficiencies, and repairability concerns.
Upon completion of receipt inspection.
Certificate of
Conformance
Statement that work was completed in accordance with U.S.
Coast Guard Technical Publication 4985, applicable OEM procedures, and this Performance Work Statement. Signed by an authorized contractor quality-assurance representative.
With returned items.
Vulcanization
Process Record
Documentation of critical process parameters, including temperature, pressure, cure duration, fixture identification, material lots, and personnel.
With returned items.
Material Traceability
Record
Identification and lot traceability for all repair materials and consumables.
With returned items.
Final Inspection
Report Results of final visual and dimensional inspection.
With returned items.
Test Reports Pressure, leak, dimensional, and other required test results.
With returned items.
Calibration
Documentation
Calibration status or certification for test equipment used for acceptance testing, when requested by the Government.
Upon
Government request.
Completed-Joint
Photographs Photographs of the completed vulcanized joints.
With returned items.
Deliverable Required Content Due Date
Warranty Statement Warranty coverage, point of contact, and warranty claim procedures.
With returned items.
Packing List and
Return-Shipment
Information
Contents, quantity, package identification, and shipment tracking information when available.
At time of shipment.
The contractor shall retain repair, inspection, test, and material-traceability records for the industry standard after final acceptance, or longer if required by the resulting purchase order.
5.6 Packaging and Return Shipment
1. The contractor shall package the repaired inflatable seal and shaft-seal bellow to prevent deformation, contamination, ultraviolet exposure, moisture intrusion, abrasion, and shipping damage.
2. Packaging shall preserve the repaired joint and prevent bending, compression, kinking, or loading that could compromise the vulcanized bond.
3. The contractor shall coordinate return shipment with the U.S. Coast Guard Yard point of contact.
4. The contractor shall not ship the items until the final inspection package is complete and the Government has provided shipping instructions.
5. The contractor shall provide shipment tracking information to the Government point of contact immediately after shipment.
5.7 Acceptance Criteria
The Government will consider the work complete when:
a. Both Government-furnished items have been vulcanized in accordance with U.S.
Coast Guard Technical Publication 4985 and applicable OEM procedures;
b. Required inspection and testing have been completed successfully;
c. No unacceptable defects are present;
d. All required documentation has been delivered;
e. The contractor has provided the required warranty; and
f. The repaired items have been packaged and made available for return shipment.
Government acceptance does not relieve the contractor of responsibility for latent defects, nonconforming workmanship, or warranty obligations.
5.8 Warranty
1. The contractor shall warrant all vulcanization workmanship, materials furnished by the contractor, and the integrity of each vulcanized joint for a period of twelve months after installation aboard USCGC Eagle.
2. The warranty shall cover, at a minimum:
a. Bond separation;
b. Delamination;
c. Premature cracking;
d. Blistering;
e. Leakage;
f. Pressure-retention failure;
g. Material degradation attributable to the vulcanization process; and
h. Other failures of the vulcanized joint resulting from defective workmanship or materials.
3. If a warranty defect is identified, the contractor shall, at no additional cost to the
Government, provide all labor, engineering support, OEM technical-representative support, materials, specialized tooling, inspection, testing, and corrective action necessary to restore the affected item to compliance with this Performance Work Statement and applicable OEM requirements.
4. Corrective action under warranty shall not reduce or otherwise limit the Government’s rights under the purchase order or applicable law.
6. BASIS FOR AWARD
The Government intends to award a firm-fixed-price purchase order to the responsible quoter whose quotation is determined to be technically acceptable and offers the lowest evaluated total price.
Technical acceptability includes:
1. Demonstrated ability to perform the vulcanization services in accordance with the
Performance Work Statement;
2. Demonstrated use of OEM-approved procedures, materials, tooling, and qualified personnel;
3. Ability to meet the required performance schedule;
4. Ability to conduct and document all required inspections and testing;
5. Ability to provide the required warranty; and
6. Submission of all required quotation information.
7. INVOICING THROUGH THE INVOICE PROCESSING PLATFORM
1. The contractor shall submit invoices through the Invoice Processing Platform, when required by the resulting purchase order.
2. The Government will initiate IPP enrollment for vendors that require access to submit invoices.
3. Each invoice shall include, at a minimum:
a. Coast Guard purchase order number;
b. Contractor invoice number and invoice date;
c. Contractor legal business name, address, and CAGE code;
d. Contract line item number;
e. Description of services performed;
f. Period of performance covered by the invoice;
g. Quantity, unit of measure, unit price, and extended line-item price;
h. Total invoice amount; and
i. Contractor remit-to address.
4. The contractor shall not invoice for services until required services have been performed, required documentation has been provided, and the Government has accepted the services, unless otherwise authorized in writing by the Contracting Officer.
8. PROVISIONS AND CLAUSES
The following provisions and clauses, in effect through FAC 2026-01, are incorporated by reference or in full text, as applicable. The Contracting Officer shall verify applicability, complete all required fill-ins, and identify all applicable selections before release.
52.202-1 — Definitions
52.203-5 — Covenant Against Contingent Fees
52.203-6 — Restrictions on Subcontractor Sales to the Government
52.203-6 Alternate I
52.203-7 — Anti-Kickback Procedures
52.203-17 — Contractor Employee Whistleblower Rights
52.204-19 — Incorporation by Reference of Representations and Certifications
52.204-23 — Prohibition on Contracting for Hardware, Software, and Services Developed or
Provided by Kaspersky Lab Covered Entities
52.204-24 — Representation Regarding Certain Telecommunications and Video Surveillance
Services or Equipment
52.204-25 — Prohibition on Contracting for Certain Telecommunications and Video
Surveillance Services or Equipment
52.204-26 — Covered Telecommunications Equipment or Services—Representation
52.204-29 — Federal Acquisition Supply Chain Security Act Orders—Representation and
Disclosures
52.216-25 — Contract Definitization
52.216-25 Alternate I
52.222-50 — Combating Trafficking in Persons
52.222-50 Alternate I
52.225-25 — Prohibition on Contracting With Entities Engaging in Certain Activities or
Transactions Relating to Iran—Representation and Certifications
52.226-8 — Encouraging Contractor Policies to Ban Text Messaging While Driving
52.232-1 — Payments
52.232-39 — Unenforceability of Unauthorized Obligations
52.232-40 — Providing Accelerated Payments to Small Business Subcontractors
52.233-3 — Protest after Award
52.233-3 Alternate I
52.233-4 — Applicable Law for Breach of Contract Claim
52.240-1 — Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by
American Security Drone Act-Covered Foreign Entities
52.244-6 — Subcontracts for Commercial Products and Commercial Services
52.222-90 – Addressing DEI Discrimination by Federal Contractors
9. POINTS OF CONTACT
Contracting Officer:
SK1 Gabriel Jasbon
Gabriel.O.Jasbon@uscg.mil
Contract Specialist:
Chelsea L. Colson
Chelsea.L.Colson@uscg.mil
Government Technical Representative / U.S. Coast Guard Yard Point of Contact:
David Scharf david.j.scharf@uscg.mil
10. END OF SOLICITATION
mailto:Chelsea.L.Colson@uscg.mil mailto:david.j.scharf@uscg.mil
File details come from the government source that posted it. Updated .