This is a specification document for dockside repairs to the USCGC HAMILTON (WMSL-753), a 418-foot U.S. Coast Guard cutter. The specification contains 13 work items covering fire prevention, tank cleaning and inspection, grey water lift station maintenance, stern ramp grating modification, stern boat launch and recovery system maintenance, dual point davit modification, oily water separator inspection, air conditioning plant grooming, insulation renewal, deck covering renewal, deck preservation, slip-resistant deck coating renewal, and flight deck tenting. Key repair work includes cleaning and inspecting fuel oil storage tanks and lift station tanks for structural integrity and corrosion using pit measurements and ultrasonic thickness testing; modifying the stern ramp grating from aluminum to fiberglass; performing Level II maintenance on the stern boat launch and recovery system including winch disassembly, inspection, gear oil refill, and wire rope replacement; and renewing insulation, deck coverings, and preservation coatings throughout the vessel. The specification references numerous Coast Guard drawings, technical publications, SFLC standard specifications, AWS welding standards, SSPC surface preparation standards, and NAVSEA technical publications for compliance.
The contract is a Request for Quote for FY27 Quarter 3 dockside repairs with a performance period of April 20, 2027 through August 20, 2027, conducted onboard the USCGC HAMILTON at its home port in North Charleston, South Carolina. The specification requires contractors to comply with comprehensive preservation, welding, electrical, and environmental protection requirements; submit critical inspection reports within the first 25 percent of the contract period for five designated work items; perform non-destructive examinations and quality assurance testing on coatings and welds; provide technical representatives for specialized equipment maintenance; and maintain fire prevention and environmental compliance throughout the availability. Government-furnished property includes springs, pins, washers, jacking bolts, hydraulic conversion kits, smart bilge monitors, resilient mounts, copper-nickel tubes, and relief valves. The specification requires touch-up preservation and coating work in accordance with SFLC Standard Specification 6310, with color matching to existing adjacent surfaces using authorized coating systems for marine environments.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC HAMILTON (WMSL 753)
SPECIFICATION FOR DOCKSIDE REPAIRS
FY2027
Developed By: Javon M Wingate
(Rev-0, 10 Sep 2026)
USCGC HAMILTON (WMSL-753) DOCKSIDE AVAILABILITY FY2027
ii (REV-0)
TABLE OF CONTENTS
Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property ................................................................................. ix Consolidated List of Critical Inspection Items .............................................................................................. x Principal Characteristics ............................................................................................................................... xi General Requirements WORK ITEM 1: Fire Prevention, Provide WORK ITEM 2: Tanks (MP Fuel Storage and Overflow), Clean and Inspect WORK ITEM 3: Grey Water Lift Stations, Clean and Inspect WORK ITEM 4: Stern Ramp Grating, Modify WORK ITEM 5: Stern Boat Launch and Recovery, Level II WORK ITEM 6: Dual Point Davit, Modify WORK ITEM 7: Oily Water Separator (OWS) System, Inspect and Groom WORK ITEM 8: Air Conditioning Plants, Groom WORK ITEM 9: Insulation, Renew WORK ITEM 10: Deck Covering (Carpet), Renew WORK ITEM 11: Decks, Preserve (Full) WORK ITEM 12: Deck Covering (Slip-Resistant), Renew WORK ITEM 13: Tenting (Flight Deck), Provide iii (REV-0)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iv (REV-0)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Drawing 418A-WMSL_100_1, Rev C, General Arrangements
Coast Guard Drawing 418A-WMSL_101_1, Rev C, Compartment & Access Drawing
Coast Guard Drawing 418A-WMSL_593_2, Rev B, Sewage System Diagram
Coast Guard Drawing 418A-WMSL_801_2, Rev (-), Booklet of General Plans
Coast Guard Drawing 418A-WMSL-100-001, Rev C, General Arrangements
Coast Guard Drawing 418A-WMSL-100-006, Rev B, Inboard and Outboard Profiles
Coast Guard Drawing 418A-WMSL-167-004, Rev B, Structural Door List, Ship Wide
Coast Guard Drawing 418A-WMSL-528-001, Rev B, Plumbing and Interior Deck Drain Diagram
Coast Guard Drawing 418A-WMSL-593-001, Rev A, Bilge & Oil Pollution Control System Diagram
Coast Guard Drawing 418A-WMSL-801-001, Rev A, Booklet of General Plans
Coast Guard Drawing 418-WMSL-100-001, Rev C. General Arrangements
Coast Guard Drawing 750-WMSL 085-025, Rev -, Compartment Areas & Volumes NSC3 and Follow
(ASC085012)
Coast Guard Drawing 750-WMSL 801-1, Rev A, Booklet of General Plans
Coast Guard Drawing 750-WMSL_100_23, Rev J, Unit 2120 Structure – 1st Pltf to 2nd Deck Fr 35 to Fr
44 (ASC100212)
Coast Guard Drawing 750-WMSL_167_1, Rev K, Manhole List Installation and Fabrication Details Ship
Wide (ASC167001)
Coast Guard Drawing 750-WMSL_593_27, Rev D, Sewage System Unit 2120
Coast Guard Drawing 750-WMSL_633_500, Rev H, Installation of Cathodic Protection
Coast Guard Drawing 750-WMSL-085-025, Rev -, Compartment Areas & Volumes NSC 3 & Follow
(AS3085012)
Coast Guard Drawing 750-WMSL-100-013, Rev M, Unit 1210 Structure - Innerbottom To 1st Platform -
Fr 10 to Fr 22 (ASC100121)
Coast Guard Drawing 750-WMSL-100-016, Rev J, Unit 1240 Structure - Main Deck to 01 Level - Fr 9 to
Fr 22 (ASC100124)
Coast Guard Drawing 750-WMSL-100-021, Rev F, Unit 2100 Struct – Inner Bottom – Fr 35 to Fr 44
(ASC100210)
Coast Guard Drawing 750-WMSL-100-023, Rev J, Unit 2120 Structure – 1st Platf to 2nd Deck Fr 35 to
Fr 44 (ASC100212) v (REV-0)
Coast Guard Drawing 750-WMSL-100-036, Rev P, Unit 3110 Structure 1st Platform and Below Frs 65-
77 (ASC100311)
Coast Guard Drawing 750-WMSL-100-037, Rev J, Unit 3120 Structure – 1st Platf to 2nd Dk- Fr 64 to Fr
76 (ASC100312)
Coast Guard Drawing 750-WMSL-100-039, Rev N, Unit 3140 Structure Mn Dk to 01 Lvl - Fr 64 to Fr 76
(ASC100314)
Coast Guard Drawing 750-WMSL-100-043, Rev M, Unit 3240 - Main Deck to 01 Level - Fr 76 to Fr 82
(ASC100324)
Coast Guard Drawing 750-WMSL-100-051, Rev K, Unit 4310 Structure 01 Level to 02 Level - Fr 44 to
Fr 52 (ASC100431)
Coast Guard Drawing 750-WMSL-100-073, Rev -, Topside Configuration for NSC 4 Only
Coast Guard Drawing 750-WMSL-100-083 Rev A, General Arrangements NSC5 & Follow (AS5100001)
Coast Guard Drawing 750-WMSL-100-530 Rev G, Modifications Incidental to the
Coast Guard Drawing 750-WMSL-167-001, Rev K, Manhole List Installation and Fabrication Details
Ship Wide (ASC167001)
Coast Guard Drawing 750-WMSL-167-007, Rev D, Hatch & Scuttle List Ship Wide, NSC 3 and Follow
(AS3167003)
Coast Guard Drawing 750-WMSL-167-504, Rev E, Hatch & Scuttle List Ship Wide, NSC 3 and Follow
(AS3167003)
Coast Guard Drawing 750-WMSL-436-011, Rev F, Fire Detection Sys Deck Plan (ASC436009)
Coast Guard Drawing 750-WMSL-436-013, Rev D, Fire Detection Sys Cable Running Sheets
(ASC436010)
Coast Guard Drawing 750-WMSL-436-014, Rev A -, Fire Detection and Control System Schematic
(ASC436028)
Coast Guard Drawing 750-WMSL-501-004, Rev D, Misc Independent Tanks Design and Details and
L/M (ASC501004)
Coast Guard Drawing 750-WMSL-508-001, Rev C, Piping and Machinery Insulation Schedule and L/M
Coast Guard Drawing 750-WMSL-520-001, Rev H, Seawater Cooling System Diagram
Coast Guard Drawing 750-WMSL-520-506, Rev F, Auxiliary Seawater Piping Mods FWD of FR 52
Coast Guard Drawing 750-WMSL-572-002, Rev D, Elevator Arr & Instl (ASC572002)
Coast Guard Drawing 750-WMSL-583-004, Rev K, Stern Launch & Recovery Arrangement & Details
(ASC583004)
Coast Guard Drawing 750-WMSL-600-500, Rev H, Installation of Cathodic Protection
Coast Guard Drawing 750-WMSL-612-003, Rev D, Helo Landing Area Safety Nets & Wheel Stops Arr and Details (ASC612003)
Coast Guard Drawing 750-WMSL-633-500, Rev H, Installation of Cathodic Protection
Coast Guard Drawing 750-WMSL-635-002, Rev K, Insulation Arr & Details Thermal, Acoustic, & Fire
(ASC635002)
Coast Guard Drawing 750-WMSL-635-502, Rev A -, Insulation Arr & Details Thermal, Acoustic, & Fire
(WMSL-754 & Follow)
Coast Guard Drawing FL-1702-11, Rev -, Inspection Of Sheaves
Installation of Allied Dual Point Davit
NAVAIR Drawing 627927, Rev D, Visual Landing Aids Installation and Clearance Requirements vi (REV-0)
NAVSEA Drawing 167-7379842, Rev A, Procedure & Welding Sequence for Non-Ballistic, Watertight
& Airtight Quick Acting or Individually Dogged Personnel Doors
NAVSEA Drawing 803-1385828, Rev P, Nozzles AFFF and Washdown Systems
NAVSEA Drawing 803-1401890, Rev G, Scuttle, WT, Raised, Quick Acting, 18 Dia 15 psi-Arrangement
NAVSEA Drawing 803-5184182, Rev B, Insulation, Passive Fire Protection- Installation Details
NAVSEA Drawing 803-6397268, Rev B, Doors Watertight, Quick Acting Arrangement
NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation for Compartments Installation
Details
COAST GUARD PUBLICATIONS
American Society for Nondestructive Testing (ASNT), Recommended Practice No. SNT-TC-1A, 2024, Personnel Qualification and Certification in Nondestructive Testing
American Society for Nondestructive Testing (ASNT), Standard No. ANSI/ASNT CP-189-2024, 2024, ASNT Standard for Qualification and Certification of Nondestructive Testing Personnel
American Welding Society (AWS) B1.10M/ B1.10, 2016, Guide for Nondestructive Examination of
Welds
American Welding Society (AWS) B1.11M/B1.11, 2015, Guide for the Visual Examination of Welds
American Welding Society (AWS) D1.1/D1.1M, 2025, Structural Welding Code – Steel
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors
Manual
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (Series), Coatings and Color Manual
Coast Guard Technical Publication (TP) 7108A, SWBS 573, Jan 2022, Stores Elevator - Model 20833
Coast Guard Technical Publication (TP) 7184, SWBS 593, 01 Jun 2025, Vacuum Sewage System –
Operation, Maintenance & Parts List
Coast Guard Technical Publication (TP) 7346A, SWBS 593, Mar 2022, Bilge Water Separator Ultra-Sep
Coast Guard Technical Publication (TP) 7809, SWBS 583, Apr 2021, Boat Retrieval Equipment – Boat
Hoist, Centerline & Carriage Winches
Coast Guard Technical Publication (TP) 9619, SWBS 583, 06 Dec 2016, Boat Davit - Models
DDP11000CTS & SP2200 (S/N: 2348) (Hull 754)
Coast Guard Technical Publication (TP) 9919, SWBS 436, Feb 2022, Fire and Smoke Detection System
(For Hull 757)
Coast Guard Technical Publication (TP) S9514-F1-MMA-010, SWBS 514, Jun 2020, Air Conditioning
Plant - 130-Ton Capacity, HFC-134A - Description, Operation & Maintenance - REV 2
Code of Federal Regulations (CFR) Title 29, Part 1910, 2017, Occupational Safety and Health Standards
Code of Federal Regulations (CFR) Title 29, Part 1915, 2013, Occupational Safety and Health Standards for Shipyard Employment
Fire Prevention and Response
Mafo Document C9402709, 2022, Parts List
Mafo Drawing C9402709, Rev B, Mafo Door : W=52” x H=66” (W=1320 x H=1676)
Mafo Process Guide 013, 2022, Mafo Installation Instruction, Double Door
MIL-DTL-32585A w/ Amendment 1, 2023, Insulation, Thermal and Acoustic, Fibrous Glass
MIL-DTL-32585A, 2021, Insulation, Thermal and Acoustic, Fibrous Glass
MIL-PRF-1149E, 2019, Gasket Materials, Synthetic Rubber, 50 and 65 Durometer Hardness
MIL-PRF-32482A, 2020, Watertight Door, Quick-Acting, Interior vii (REV-0)
MIL-PRF-900, 2020, Rubber Gasket Material, 45 Durometer Hardness
MIL-STD-1689A, 1990, Fabrication, Welding, and Inspection of Ships Structure
Naval Sea Systems Command (NAVSEA) 0640-LP-119-0175, 2019, NAVSEA OP 4 Rev 12, Ammunition and Explosives Safety Afloat
NOTE
OTHER REFERENCES
Base Charleston Instruction 11000.1, Latest Version, Base Charleston Safety and Environmental
Compliance
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Latest Version, General Requirements
Surface Forces Logistics Center Standard Specification 0450 (SFLC Std Spec 0450), Latest Version, Electrical Power for Contractor’s Tools and Equipment
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Latest Version, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2022, Shipboard
Electrical Cable Test
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2022, Shipboard
Electrical Cable Removal, Relocation, Splice, Repair, and Installation
Surface Forces Logistics Center Standard Specification 3100 (SFLC Std Spec 3100), 2022, Inspect, Test and Recondition AC Synchronous Machines In-Place
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary
Machine Systems
Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), Latest Version, Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), Latest Version, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2022, Install Interior
Deck Covering Systems
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2020, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2024, Power Tool Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE), Joint Surface Preparation
Standard SSPC-SP 10/NACE No. 2, 2024, Near-White Metal Blast Cleaning
OTHER REFERENCES
Allied Systems Company ASC DWG# 93031, Individual CT HYD Conversion
Allied Systems Company ASC DWG# 93034, Hydraulic Schematic
Allied Systems Company ASC DWG# 94081, Kit, Individual CT Control System
Allied Systems Company ASC DWG# 94861, Chart, Splicing Connector
American Society for Nondestructive Testing (ASNT), Recommended Practice No. SNT-TC-1A, 2024, Personnel Qualification and Certification in Nondestructive Testing
American Society for Nondestructive Testing (ASNT), Standard No. ANSI/ASNT CP-189-2024, 2024, ASNT Standard for Qualification and Certification of Nondestructive Testing Personnel
American Society of Mechanical Engineers (ASME) A17.2, Guide for the Inspection of Elevators, Escalators and Moving Walks.
viii (REV-0)
American Welding Society (AWS) B1.10M/ B1.10, 2016, Guide for Nondestructive Examination of
Welds
American Welding Society (AWS) B1.11M/B1.11, 2015, Guide for the Visual Examination of Welds
American Welding Society (AWS) D1.1/D1.1M, 2025, Structural Welding Code – Steel
ASTM International (ASTM) D3359-23, 2023, Standard Test Methods for Measuring Adhesion by Tape
Test
ASTM Internationals (ASTM) G46-21, 2021, Standard Guide for Examination and Evaluation of Pitting
Corrosion
Code of Federal Regulations (CFR) Title 29, Part 1910, 2017, Occupational Safety and Health Standards
Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for
Shipyard Employment
Code of Federal Regulations (CFR) Title 40, 2013, Protection of the Environment
International Maritime Organization (IMO) International Convention for the Safety of Life At Sea
(SOLAS), 2009 as amended in 2010 and 2011.
International Maritime Organization (IMO) International Life Saving Appliances Code (LSA), 2010 edition.
MIL-C-24757, Nov 1990, Cloth, Fiberglass, Coated
MIL-PRF-24176C, 2020, Cement, Epoxy, Metal Repair and Hull Smoothing
MIL-PRF-24176C, Oct 2004, Cement, Epoxy, Metal Repair and Hull Smoothing
MIL-PRF-24667C, May 2008, Coating System, Non-Skid, for Roll, Spray, or Self-Adhering Application
MIL-PRF-24667D, 2021, Coating System, Non-Skid, for Roll, Spray, or Self-Adhering Application
MIL-STD-1689A, 1990, Fabrication, Welding, and Inspection of Ships Structure
National Fire Protection Association (NFPA) 72, 2022 Edition, National Fire Alarm and Signaling Code
NAVAIR ENGCEN Bulletin 1, Rev J; Air Capable Ship Aviation Facilities Resume
NAVAIR SI-ACS-AFB-1P, 2020, Air Capable Ship Aviation Facility Certification No. 1P
NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for
Fabrication, Welding, and Inspection of Submarine Structure
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2016, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2020, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2024, Power Tool Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 10 (WAB)/NACE WAB-2, 2015, Near-White Metal Wet Abrasive Blast
Cleaning
US Environmental Protection Agency Method 1664, Feb 1999, N-Hexane Extractable Material and Silica
Gel Treated N-Hexane Extractable Material by Extraction and Gravimetry.
ix (Draft-00)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
5 N Spring, Sheave NSN: 5360-01-672-8829 PN:
P2-965-0024
8 ea. 185.00
5 N Pins, Spring NSN: 5315-01-672-8220 PN:
B2-066-0056
8 ea. 400.00
5 N Pins, Cotter NSN: 5315-01-672-8187 PN:
81-E-0628
8 ea. 1.50
5 N Flat Washer, 2 ½”
Nominal, TY
A 5”OD x 2 5/8” ID x
0.238” THK
NSN: 5310-01-672-8737 PN:
61-E-16
8 ea. 1.50
5 N Jacking Bolt, Sheave NSN: 5306-01-672-9033 PN:
B2-033-0026
8 ea. 275.00
5 Y *CB-OTH Mark IV N/A 1 ea. N/A
5 Y *Long Range
Interceptor II
N/A 1 ea. N/A
6 Y CB-OTH Mark IV
(Coast Guard Drawing
26B-CB-IV-801-001)
1 ea 300,000
6 N Individual CT
Hydraulic Conversion
93031 1 25,000
6 N Camera System Install
Kit
94033 1 5,000
6 N Splicing Connector Kit 93861 1 950
6 N Kit, Individual CT
Control System
94981 1 5,000
7 Y Monitor, Smart Bilge NSN: 2040-01-600-0112Â 1 ea. 4,700.00
N Resilient mount type
6E2000 Mil Spec MIL-
M-17508, Barry
Controls 3114-4Â
NSN: 5342-00-598-8825Â 18 ea 460.00
8 Y 90/10 Cu/Ni -3/4” x 96 enhanced tubes
PN: 0034948 100 ea 200.00
8 N Relief Valves NSN: 015616471 9 *Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter x (REV-0)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5
(Inspection report particulars)):
Work
Item Title
2 Tanks (MP Fuel Storage and Overflow), Clean and Inspect
3 Grey Water Lift Stations, Clean and Inspect
7 Oily Water Separator (OWS) System, Inspect and Groom
8 Air Conditioning Plants, Groom
13 Deck Covering (Slip-Resistant) Flight Deck, Renew xi (REV-0)
PRINCIPAL CHARACTERISTICS
418' WMSL
PHYSICAL
Length overall 418' 0"
Length between perpendiculars 390' 0"
Maximum beam 54' 0"
Beam @ 01 level 47' 9-1/8"
Depth (01 level @ side to baseline) 39' 2-3/4"
01 deck camber foredeck 1/4" in 1'-0"
Minimum berth depth 20' 0"
Height of highest projection Approximately 119'
Draft, design 14.40'
Design displacement 3925 long tons
MACHINERY
Two diesel engines MTU 20V, 20-cylinder 9,730 SHP each
One gas turbine General Electric LM2500; 29,500 SHP
Type of propulsion CODAG
Electrical system 24 Volt DC
Two controllable pitch propellers Rolls-Royce 5 blade, 14' 0" diameter; 229 RPM max
Two reduction gears RENK
One cross connect gear RENK
HULL
Hull material 5086 Aluminum
HSLA-80 Steel
ABS EH 36 Steel
ABS AH 36
Frame spacing
FWD of FR 9 2' 3"
FR 9 to FR 10 6' 9"
FR 10 to FR 98 4' 1"
FR 98 to FR 99 3'-8"
ELECTRICAL
Power Three 1360 kW, 450 V, 60 Hz, 3 Phase, 1800 RPM Caterpillar 3512B diesel engines with Baylor ship service generators
Shore tie cable Seven MIL-C-24368/2 (NATO) shore power receptacles, 400 A each
TANK CAPACITIES
Diesel oil 220,359 gal
Fresh water 12,454 gal
JP-5 Fuel 35,182 gal
1 (REV-0)
00000_0226_FLT
REC_00000_FLT_Commercial Project @ Contractor’ Facility (0121)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed at a commercial contractor’s facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and
'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is
Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Latest Version, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Latest Version, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), Latest Version, Fire Prevention and Response
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), Latest Version, Requirements for Preservation of Ship Structures
OTHER REFERENCES
Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for
Shipyard Employment
NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for
Fabrication, Welding, and Inspection of Submarine Structure
2 (REV-0)
3. REQUIREMENTS
3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements in this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.1.1 The Contractor must conform to all requirements specified in SFLC Std Spec 5550 and in the Fire
Protection and Response work item, as applicable, during the performance of this availability.
3.1.1.1 Fire Safety Plan submission. The Contractor must submit a copy of the CFR 1915, Subpart P, Fire Safety
Plan with the Contractor’s bid when work will be conducted in a Contractor–owned facility. Include any MOA(s) with local firefighting facilities.
3.1.1.2 Fire Plan submission. The Contractor must submit a copy of the developed availability specific fire plan as requested in the Fire Protection and Response work item, with the Contractor’s bid.
NOTE
NAVSEA drawings listed will be available FOR INSPECTION ONLY from the Coast
Guard Port Engineer post-award. SFLC will not redistribute NAVSEA documents.
Contractors can apply to NAVSEA headquarters directly for copies.
3.20 Contractor-provided fire watch personnel. The Contractor must provide fire watch personnel and equipment.
3.21 Contractor-provided fire extinguishers. The Contractor must provide portable fire extinguishers.
3.3 Preservation requirements. The Contractor must accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec
6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. The Contractor must obtain a written KO authorization to deviate from any coatings required in SFLC Std Spec 6310 Appendix C before work.
3.3.3 In-process quality control measures. The Contractor must abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces”).
3.3.3.1 Quality control requirements. The Contractor must abide by the following when performing preservation related inspections. The following measurements must be randomly spaced throughout for the purposes of providing a representation of the entire prepared or coated surface.
3.3.3.1.1 Surface profile measurements. One surface profile measurement must be taken for every 200 square feet for the first 1000 square feet; for each additional 500 square feet or less, one profile measurement must be taken.
Profile measurements must be taken in accordance with SFLC Std Spec 6310, paragraph 3.1.8.3 (Surface profile measurements). A “measurement” for surface profile is defined as follows:
• ASTM D4417, Method B: One profile measurement is the average (mean) of 10 individual readings.
3 (REV-0)
• ASTM D4417, Method C: One profile measurement is the average (mean) of 2 individual readings.
3.3.3.1.2 Soluble salt conductivity measurements. 5 conductivity measurements must be taken every 1000 square feet. For submerged (immersed) applications conductivity measurements must not exceed 30 microsiemens/cm.
For non-submerged (non-immersed) applications conductivity measurements must not exceed 70 microsiemens/cm. If a conductivity check fails, clean the surface in accordance with SFLC Std Spec 6310, paragraph 3.1.8.5 (Soluble salt removal).
3.3.3.1.3 Coating thickness measurements. Three area measurements must be taken for the first 1000 square feet;
for each additional 1000 square feet, perform an additional area measurement. A “measurement” for coating thickness is defined as follows:
• SSPC-PA 2 defines an area measurement as 5 separate spot measurements randomly spaced throughout a 100 square foot area.
• SSPC-PA 2 defines a spot measurement as 3 gage readings and each new gage reading the probe must be moved to a new location within a 1.5-inch diameter circle defining the spot.
3.4 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
The following subparagraphs (3.4.1-3.4.3) are applicable to 270B class cutters only. If this availability is not for a 270B class cutter, than paragraphs 3.4.1, 3.4.2, and 3.4.3 must be removed along with the
NAVSEA reference TP 1688 from the list of references and the NOTE immediately following these paragraphs.
3.4.1 HY-130 material substitution. The Contractor must be aware that HY-130 steel plating is no longer commercially available. For the purpose of performing flight deck repairs on US Coast Guard WMEC-270 “B-
Class” cutters, Strenx 900 steel plating has been approved as a replacement for HY-130. Due to the similarity in material properties and weldability of HY-130 and Strenx 900, all welding procedures and welder qualifications for welding Strenx 900 must be the same as those outlined in NAVSEA TP 1688 as applicable for welding HY-
130.
3.4.2 Standard spec modification. For any welding involving HY-130 on the flight deck of WMEC-270 “B-Class” cutters, perform all welding and allied processes, and non-destructive evaluation (NDE) in accordance with
NAVSEA TP 1688. The Contractor must be aware that the welding requirements specified in this document take precedence over paragraph 3.3.6 of SFLC Standard Spec 0000 for the purpose of welding involving HY-130.
3.4.3 Approval to weld HY-130. To obtain Coast Guard approval to weld on HY-130 steel for WMEC-270 “B-
Class” cutters, the Contractor must provide written Performance Qualification Records (PQR’s) for each process to be used. The PQR’s must be approved by one of the regulatory agencies affirming that the WPS meets the welding requirements of NAVSEA TP 1688. In addition, the Contractor must ensure that all subcontractors, prior to performing welding operations, have qualified procedures by meeting all the requirements set forth in this document.
NOTE
NAVSEA approval is NOT required for welding procedures submitted but the procedures must be reviewed and shown to satisfy the requirements set forth in
NAVSEA TP 1688, by a welding regulatory agency. The requirements for welding
Strenx 900 are considered the same as those for welding HY-130.
3.5 Environmental protection requirements. The Contractor must adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
4 (REV-0)
3.5.1 USCG facilities. The Contractor must provide and maintain environmental protection as defined in SFLC
Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor must plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor must comply with applicable
Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item must not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.1.1 USCG HAZMAT Generator Status. The activity Generator Status for the Coast Guard Facility is a Small
Quantity Generator (SQG).
3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:
• Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.
• National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an
NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.
• Air Emission Permit: Unit has an Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.
3.5.2 Test and procedures. The Contractor is required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work must be done by qualified laboratories; and where required by law, the laboratories must be certified.
3.5.3 Regulatory notifications. The Contractor is responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The
Contractor must submit copies of all regulatory notifications to the Contracting Officer and the local Facility
Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications must be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System
(NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor must appoint in writing an Environmental Manager for the project, who is responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager must ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’
Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out;
ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous
Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental
Records binder and required documentation, including environmental permits compliance and close-out.
5 (REV-0)
3.5.5 HW disposal. Contractor must comply with SFLC Std Spec 0000 Appendix A, Requirements For
Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.
3.6 Local Policy. The Contractor must refer to site (e.g., Base) Regulations and Instructions for details regarding local policies (e.g., crane services, parking, or facility usage).
3.7 SFLC Standard Specification approved changes. Approved updates to the 2022 SFLC Standard Specifications will appear here.
3.7.1 SFLC Standard Specification 5550: Replace paragraph 3.11.3 to state, “Material supporting imminent work shall be brought on the cutter and stored where the work is being performed. Material that appreciably contributes to fire load shall be removed at the end of each work shift when personnel are not present. Trash, debris, and packaging materials shall be promptly removed from the vessel at the end of each work shift and not allowed to accumulate.” Advance the paragraph numbering of the Fire Prevention and Safety Inspection form to 3.11.4.
3.7.2 SFLC Standard Specification 0000:Add paragraph 3.2.3.1.2 to state, “Severe Inclement Weather. The
Contractor must include a definition for “Severe Inclement Weather” in their plan covering, at minimum, Sustained Wind Speed, Duration, and Gust Strength”.
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
6 (REV-0)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK
ITEM #
WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/AMPP INSPECTOR SIGNATURE CERT. # DATE / TIME
NAME OF CG REPRESENTATIVE SIGNATURE UNIT DATE/TIME
7 (REV-0)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
VESSEL NAME HULL #
WORK
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER
COAT, BARRIER COAT, TOP
COAT, ETC…)
LOCATION (FRAME &
DECK, RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFAC
E
AMBIEN
T
ΔT
| DP -
SURFACE |
8 (REV-0)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
VESSEL NAME HULL # WORK ITEM
LOCATION OF WORK (FRAME REFERENCES) AREA (SQFT)
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/AMPP No. 2
SSPC-SP WJ-2/AMPP WJ-2
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS
PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS
DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:
NAME OF QP-1/AMPP INSPECTOR SIGNATURE CERT. # DATE /
TIME
9 (REV-0)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/AMPP No. 2
SSPC-SP WJ-2/AMPP WJ-2
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT
QA RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO
SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Mils Reading (IAW ASTM D4417-Method B for above 10 readings (by column):
Mean Reading
(mils)
10 (REV-0)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
VESSEL NAME HULL # WORK
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.
DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)
11 (REV-0)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
VESSEL NAME HULL #
WORK ITEM
COATING MFG PRODUCT NAME
BATC
H #
INDUCTI
ON TIME
COATING SYSTEM
SEQUENCE
(PRIMER/TOUCHUP/3RD
COAT, ETC.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.
SPOT 1 2 3 4 5
AVERAGE
VALUE
*BASE METAL READING
(BMR)
*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
APPLICATION METHOD (AIRLESS,
CONVENTIONAL SPRAY, ROLLED)
AVERAGE DFT
12 (REV-0)
4.2 Tank and Void Assessment form.
13 (REV-0)
14 (REV-0)
55500_0426_BJA_753
WORK ITEM 1: Fire Prevention, Provide
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to provide a fire plan, discuss fire safety procedures, maintain fire boundaries and fittings, conduct inspections and keep firefighting systems in a ready condition to address fires.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire
Prevention and Response
OTHER REFERENCES
MIL-C-24757, Nov 1990, Cloth, Fiberglass, Coated
3. REQUIREMENTS
3.1 Fire Plan. The Contractor must develop and implement a written fire plan in accordance with
Paragraph 3.1 of SFLC Std Spec 5550, including Paragraph 3.1.3.
3. 1.1 Fire Prevention Responsible Party. The Contractor must appoint a Fire Prevention Responsible
Party (FPRP) in accordance with Paragraph 3.1.4 of SFLC Std Spec 5550.
3.1.1.1. Any item in SFLC Std Spec 5550 that requires FPRP approval, also requires COR approval.
3.1.1.2. The Contractor must designate the FPRP in the Fire Plan and submit a CFR if the designated
FPRP changes.
3.1.1.3. In addition to responsibilities listed in SFLC Std Spec 5550, the FPRP is responsible for the
15 (REV-0)
following tasks:
• Conduct all inspections per paragraph 3.7 of this work item. The FPRP may designate a representative to conduct these inspections on their behalf.
• Ensuring that contractor employees and sub-contractors understand the Fire Plan and all other requirements of this work item. This includes (but is not limited to) informing contractor/subcontractor employees of danger signals and egress procedures aboard the ship.
3.2 Fire Prevention and Response Conference. The Contractor must participate in the Fire Prevention and
Response Conference as detailed in Paragraph 3.12 of SFLC Std Spec 5550.
3.2.1 At a minimum, the following personnel from the Contractor must attend the Fire Prevention and
Response conference, the Fire Familiarization Tour and the Initial Inspection:
• Ship availability superintendent
• FPRP
3.2.2 The Fire Prevention and Response Conference, the Fire Responsibility Familiarization tour and the
Initial Inspection must occur before the start of work on board the ship. Coordinate schedule with the
COR.
3.2.3. If the work is being performed at the Contractor’s facility, then the Contractor must invite their fire response personnel for the familiarization tour in accordance with Paragraph 3.12.2.1 of SFLC Standard
Spec 5550.
NOTE
Requirements for the Initial Inspection are covered in Paragraph 3.7 of this work item
3.3 Fire Zones. The Contractor must comply with the fire zone requirements from Paragraph 3.2 of SFLC
Std Spec 5550.
3.3.1 Paragraph 3.2.3 of SFLC Std Spec 5550 is only applicable if the requirements of Paragraph 3.2.2 of
SFLC Std Spec 5550 cannot be accomplished.
3.3.2 All material boundaries must be treated as fire boundaries.
3.3.3 All fire curtains must meet the requirements of MIL-C-24757. Disregard the NFPA 105 requirement in Paragraph 3.2.2 of SFLC Std Spec 5550.
3.4 Inoperable Fittings Log. The Contractor must inform the COR via CFR of fittings that are blocked or made inoperable per Paragraph 3.3 of SFLC Std Spec 5550. The Contractor does not need to maintain a separate Inoperable Fittings Log.
3.5. Firefighting systems. The Contractor must maintain fire protection systems per Paragraph 3.4 of
SFLC Std Spec 5550.
16 (REV-0)
3.5.1 Contractor personnel are NOT authorized to operate fixed firefighting systems per Paragraph
3.4.6.6.1 of SFLC Std Spec 5550
3.5.2 The existing arrangement of AFFF equipment meets the requirements of Paragraph 3.4.11 of SFLC
Std. Spec 5550. This paragraph is only applicable if the Contractor blocks or moves AFFF material or equipment.
3.5.3 The existing arrangement of portable fire extinguishers meets the 50-foot requirement of Paragraph
3.4.12.1 of SFLC Std Spec 5550. This paragraph is only applicable if the Contractor blocks or moves fire extinguishers.
3.6. Fire Alarm. The Contractor must comply with the requirements of Paragraph 3.7 of SFLC Std Spec
5550 if the fire alarm system will be manipulated. The “additional personnel” mentioned in Paragraph
3.7.1 of SFLC Std Spec 5550 must be provided by the Contractor.
3.7 Fire Prevention Inspections. The Contractor must conduct inspections in accordance with SFLC Std
Spec 5550 Paragraph 3.11.
3.7.1 All inspections in paragraph 3.11 of SFLC Standard Spec 5550 must be conducted in the presence of a Coast Guard Inspector.
3.7.2 Disregard paragraph 3.11.1 of SFLC Std Spec 5550 and replace with the following:
Initial Inspection. The FPRP, along with the COR (or a designated representative), must conduct an initial inspection to evaluate potential fire hazards in all areas with scheduled work. This inspection must note the existing status of all items in Paragraph 3.11.2 of SFLC Standard Spec 5550. Submit the results of the initial inspection to the COR via a CFR. This inspection must occur before commencing contract work.
4. NOTES
None
17 (REV-0)
12300_MLA_0426_753
WORK ITEM 2: Tanks (MP Fuel Storage and Overflow), Clean and Inspect
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the following tank(s):
TABLE 1 – LIST OF TANKS
TYPE OF
TANK
LOCATION CAPACITY
- 95%
(GALLONS)
TANK
CONTENT
DISPOSAL
(GALLONS)
PAINTED *REQUIRED
MEASUREMENT
OF PITS/UT
FAIRING
COMPOUND KITS
Fuel Oil
Storage
5-52-0-F 13,869 700 N Pits - 75
UT - 300
Fairing Compound – 1
Fuel Oil
Storage
5-64-0-F 10,563 600 N Pits - 75
UT - 300
Fairing Compound – 1
* For Bidding Purposes
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 418A-WMSL-801-002, Rev (-), Booklet of General Plans
Coast Guard Drawing 750-WMSL-100-028, Rev J, Unit 2220 Structure – 1st Platf to 2nd Deck –
Fr 44 to Fr 52 (ASC100222)
Coast Guard Drawing 750-WMSL-100-036, Rev P, Unit 3110 Structure 1st Platform and Below
Frs 65-77 (ASC100311)
Coast Guard Drawing 750-WMSL-167-001, Rev K, Manhole List Installation and Fabrication
Details Ship Wide (ASC167001)
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements
18 (REV-0)
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor must submit a CIR for the inspections listed in the following paragraph(s):
• 3.7 Inspection
3.1.2 Tech Rep.
None.
3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).
3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:
• TLIs
• Piping
• Residual tank contents/fluids
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.2 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.
3.2.1 Perform an initial operational test of each tank TLIs to demonstrate that each radar head/sensor is functional (i.e., Digital readout is displayed).
3.2.2 Ensure that there is interface/communication between the TLI sensor and the Machinery Control and Monitoring System (i.e. Digital readout at the TLI is identical to that displayed).
3.3 Tank opening. The Contractor must remove the tank manhole cover(s) and ventilate the confined spaces in accordance with SFLC Std Spec 0000, Paragraphs 3.3.1.1 and 3.3.1.2. The Contractor must provide fall protection to tank manhole cover when opened for ventilation/work. The Contractor must matchmark the manhole cover lid(s) to the flange prior to removal for proper reinstallation.
19 (REV-0)
WARNING
Do not use the Fuel Service or Transfer systems to drain any water from the tank. Excessive fuel contamination will result.
3.4 Tank content and waste disposal. The Contractor must dispose of residual tank contents listed in
Table 1 and any cleaning fluids in compliance with all applicable Federal, state, and local laws, ordinances…