Attachement 1 BLANK SANGAMON DD Price Schedule.xlsx
XLSX spreadsheet 30 KB Posted
- Attached to
- CGC SANGAMON DRYDOCK REPAIRS
- Solicitation number
- 70ZU0227QIBCT0007
- Issued by
- Not on record
About this file
This is a blank pricing schedule template for drydock repairs and maintenance of the USCGC SANGAMON (WLR-65B) during a FY2027 availability. The schedule itemizes 69 distinct work items across two primary work locations (Tender and Barge configurations), including hull plating inspections and preservation, propulsion system overhauls, tank cleaning and inspection, cathodic protection renewal, deck preservation, and technical compliance task orders (TCTOs) such as water mist fire protection system retrofit and compressed air supply installation. All line items currently show $0.00 unit prices, indicating this is an unfilled template awaiting contractor pricing submission.
The solicitation requires quotations by January 4, 2027 at 10:00 AM Eastern Time, with anticipated contract award by January 8, 2027 to support industrial performance from April 6, 2027 through June 14, 2027. Quotations must remain valid for 120 days and should be submitted via email to the identified USCG points of contact. The pricing schedule template includes a cost estimate breakdown section with fields for direct labor hours by trade category (engineering technician, machinist, electrician, shipfitter, welder, painter, and other labor categories), material and subcontract costs with associated G&A and profit factors, and geographic labor rate adjustments across 27 shipyard locations. The template references a composite labor rate of 55 hours with assumed 15% G&A and 10% profit factors, though specific rates remain to be populated by the responding contractor.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: |
| USCGC SANGAMON (WLR-65B) DRYDOCK AVAILABILITY FY2027 |
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Fire Prevention Requirements | NSP | NSP | 1 | NSP |
| D-002 | Hull Plating, U/W Body, Inspect - Tender | $0.00 | JOB | 1 | $0.00 |
| D-003 | Hull Plating, U/W Body, Ultrasonic Testing - Tender | $0.00 | JOB | 1 | $0.00 |
| D-004 | Hull Plating, Freeboard, Ultrasonic Testing - Tender | $0.00 | JOB | 1 | $0.00 |
| D-005 | U/W Body, Preserve, 100 percent - Tender | $0.00 | JOB | 1 | $0.00 |
| D-006 | Hull Plating Freeboard, Preserve, 100 Percent - Tender | $0.00 | JOB | 1 | $0.00 |
| D-007 | Appendages, U/W, Leak Test - Tender | $0.00 | JOB | 1 | $0.00 |
| D-008 | Propulsion Shaft Rope Guards, Inspect | $0.00 | JOB | 1 | $0.00 |
| D-009 | Appendages, U/W, Internal, Preserve - Tender | $0.00 | JOB | 1 | $0.00 |
| D-010 | Voids, Non-Accessible, Leak Test | $0.00 | JOB | 1 | $0.00 |
| O-011 | Voids, Non-Accessible, Internal Surfaces, Preserve | $0.00 | JOB | 1 | $0.00 |
| D-012 | Tanks, MP Fuel Service, Clean and Inspect - Tender | $0.00 | JOB | 1 | $0.00 |
| D-013 | Propulsion Shaft Seals, Mechanical Overhaul and Inflatable Renew | $0.00 | JOB | 1 | $0.00 |
| D-014 | Propulsion Shafting, Remove, Inspect, and Reinstall | $0.00 | JOB | 1 | $0.00 |
| D-015 | Propulsion Shaft Bearings (External), Renew | $0.00 | JOB | 1 | $0.00 |
| D-016 | Stern Tube Interior Surfaces, Preserve, 100 Percent | $0.00 | JOB | 1 | $0.00 |
| D-017 | Propeller, Perform Minor Repairs and Reconditioning | $0.00 | JOB | 1 | $0.00 |
| D-018 | Propellers, Remove, Inspect, and Reinstall | $0.00 | JOB | 1 | $0.00 |
| D-019 | Keel Coolers, Clean, Inspect and Hydro | $0.00 | JOB | 1 | $0.00 |
| D-020 | Fathometer Transducer, General Maintenance | $0.00 | JOB | 1 | $0.00 |
| D-021 | Sea Strainers, Duplex, All Sizes, Overhaul | $0.00 | JOB | 1 | $0.00 |
| D-022 | Rudder Assembly, Remove, Inspect And Reinstall | $0.00 | JOB | 1 | $0.00 |
| D-023 | Rudders, Preserve, 100 Percent | $0.00 | JOB | 1 | $0.00 |
| D-024 | Rudder Stock Housing, Lower, Renew | $0.00 | JOB | 1 | $0.00 |
| D-025 | Rudder Stock Housing, Upper, Renew | $0.00 | JOB | 1 | $0.00 |
| D-026 | Spuds, Overhaul - Tender | $0.00 | JOB | 1 | $0.00 |
| D-027 | Spud Wells, Preserve - Tender | $0.00 | JOB | 1 | $0.00 |
| D-028 | Spud Wells, Inspect - Tender | $0.00 | JOB | 1 | $0.00 |
| D-029 | Sewage Holding Tanks, Clean and Inspect - Tender | $0.00 | JOB | 1 | $0.00 |
| O-030 | Tanks, MP Fuel Service, Preserve, Partial - Tender | $0.00 | JOB | 1 | $0.00 |
| O-031 | Tanks, Potable Water, Preserve, Partial, - Tender | $0.00 | JOB | 1 | $0.00 |
| D-032 | Cathodic Protection, Magnesium Anodes, Renew, - Tender | $0.00 | JOB | 1 | $0.00 |
| D-033 | Drydock - Tender and Barge | $0.00 | JOB | 1 | $0.00 |
| D-034 | Temporary Services, Provide - Tender | $0.00 | JOB | 1 | $0.00 |
| D-035 | Sea Trial Performance, Support, Provide | $0.00 | JOB | 1 | $0.00 |
| D-036 | Hull Plating, U/W Body, Ultrasonic Testing - Barge | $0.00 | JOB | 1 | $0.00 |
| D-037 | Hull Plating, Freeboard, Ultrasonic Testing - Barge | $0.00 | JOB | 1 | $0.00 |
| D-038 | Tanks, MP Fuel Service, Clean and Inspect - Barge | $0.00 | JOB | 1 | $0.00 |
| D-039 | Tanks, Potable Water, Clean and Inspect - Barge | $0.00 | JOB | 1 | $0.00 |
| D-040 | Tanks, Ballast, Clean and Inspect - Barge | $0.00 | JOB | 1 | $0.00 |
| D-041 | Voids, Accessible, Clean and Inspect - Barge | $0.00 | JOB | 1 | $0.00 |
| D-042 | Fathometer Transducer, General Maintenance - Barge | $0.00 | JOB | 1 | $0.00 |
| O-043 | Tanks, Fuel, Preserve, Partial - Barge | $0.00 | JOB | 1 | $0.00 |
| O-044 | Tanks, Potable Water, Preserve, Partial - Barge | $0.00 | JOB | 1 | $0.00 |
| O-045 | Accessible Voids, Preserve, Partial - Barge | $0.00 | JOB | 1 | $0.00 |
| D-046 | Decks - Exterior, Preserve, Non-Skid Broadcast Grit System - Barge | $0.00 | JOB | 1 | $0.00 |
| D-047 | U/W Body, Preserve, 100 percent - Barge | $0.00 | JOB | 1 | $0.00 |
| D-048 | Hull Plating Freeboard, Preserve, 100 Percent - Barge | $0.00 | JOB | 1 | $0.00 |
| D-049 | Cathodic Protection, Magnesium Anodes, Renew - Barge | $0.00 | JOB | 1 | $0.00 |
| D-050 | Sea Trial Performance, Support, Provide - Barge | $0.00 | JOB | 1 | $0.00 |
| D-051 | Sea Strainers, Duplex, All Sizes, Overhaul - Barge | $0.00 | JOB | 1 | $0.00 |
| D-052 | Hull Fittings, Weight Handling Rigging Hardware, Inspect and Test - Barge | $0.00 | JOB | 1 | $0.00 |
| D-053 | Spuds, Overhaul - Barge | $0.00 | JOB | 1 | $0.00 |
| D-054 | Spud Wells, Preserve - Barge | $0.00 | JOB | 1 | $0.00 |
| D-055 | Spud Wells, Inspect - Barge | $0.00 | JOB | 1 | $0.00 |
| D-056 | Buoy And Cargo Crane, Inspect And Service - Barge | $0.00 | JOB | 1 | $0.00 |
| D-057 | Decks – Exterior (Buoy or Construction Deck), Preserve 100% | $0.00 | JOB | 1 | $0.00 |
| D-058 | Drydock - Barge | $0.00 | JOB | 1 | $0.00 |
| D-059 | Bilges, Preserve | $0.00 | JOB | 1 | $0.00 |
| D-060 | Boat Davit Winch, Shrink Wrap | $0.00 | JOB | 1 | $0.00 |
| D-061 | Buoy and Cargo Handling Crane, Shrink Wrap | $0.00 | JOB | 1 | $0.00 |
| D-062 | Deck Covering, Interior, Wet and Dry, Renew | $0.00 | JOB | 1 | $0.00 |
| D-063 | Sink or Toilet renew | $0.00 | JOB | 1 | $0.00 |
| O-064 | Hull and Structural Plating, 5/16” Steel Plate, Renew | $0.00 | JOB | 1 | $0.00 |
| O-065 | Hull and Structural Plating, General, Degraded Weld, Steel, Repair | $0.00 | JOB | 1 | $0.00 |
| D-066 | TCTO (TN3010.0) Water Mist Fire Protection System, Retrofit | $0.00 | JOB | 1 | $0.00 |
| D-067 | TCTO (TK33100.0) Compressed Air Supply to Propulsion Shaft Seals Installation | $0.00 | JOB | 1 | $0.00 |
| D-068 | Keel Cooler, Clean Inspect and Hrdr-Barge | $0.00 | JOB | 1 | $0.00 |
| D-069 | MDE Control Panel Power Supply Modification | $0.00 | JOB | $0.00 | |
| O-00A | Composite Labor Rate | ERROR:#REF! | Hour | ERROR:#VALUE! | ERROR:#REF! |
| D-00B | GFP Report | NSP | EA | NSP | |
| O-00Z | Laydays | ERROR:#REF! | Day | 5 | ERROR:#REF! |
| Total Price of Definite Items | ERROR:#REF! | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | ERROR:#REF! |
(6/12/2026)_x000D_ Draft-1 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
(09/28/2009)_x000D_ Page &P of &N
CostEstimateTemplate
File details come from the government source that posted it. Updated .