Attachment 1 - ANVIL (WLIC 75A) DD Blank Pricing Sheet.xlsx
XLSX spreadsheet 37 KB Posted
- Attached to
- CGC ANVIL DRYDOCK
- Solicitation number
- 70ZU0227QIBCT0006
- Issued by
- Not on record
About this file
This file is a blank pricing sheet and cost estimate template for a 70-day drydock availability for the USCGC ANVIL (WLIC-75A) in Fiscal Year 2027. The pricing template contains 70 line items (D-001 through D-070 and O-00A through O-00Z) covering comprehensive drydock maintenance and repair work, including hull plating inspection and preservation, propulsion system maintenance (shafting, seals, bearings, stern tubes, and propellers), rudder assembly work, cathodic protection, deck repairs, watertight door renewal, lead-based paint and asbestos abatement, sea trial support, and temporary services. The template distinguishes between definite items (marked "D") and optional items (marked "O"), with all unit prices currently blank at $0.00. Labor cost estimation assumes a composite rate of $55 per hour with a 15% G&A factor and 10% profit factor, broken down by specific trades including engineers, technicians, machinists, pipe fitters, electricians, shipfitters, welders, painters, and general laborers. The template includes geographic labor rate variations across multiple U.S. locations and identifies possible work locations including Baltimore, Biloxi, Boston, Charleston, Corpus Christi, Hampton Roads, Houston, Los Angeles, Miami, New Orleans, Philadelphia, San Diego, and other major shipyard areas. Only one line item (D-026, Drydock-Tender) contains a sample price entry of $13,075.00 for 140 labor hours with $4,300.00 in material costs and an optional laydays charge of $500.00 per day for 5 days totaling $2,500.00. Quotations must be submitted by December 4, 2026 at 4:00 p.m. Eastern Time to delarue.s.shelton@uscg.mil and Sandra.a.martinez@uscg.mil, with an anticipated award date on or before December 27, 2026, and an industrial start date of February 23, 2027, concluding May 4, 2027.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| GOVERNMENT ESTIMATE FOR: | 70 DAYS |
| USCGC ANVIL (WLIC-75A) DRYDOCK AVAILABILITY FY2027 |
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Fire Prevention Requirements | NSP | NSP | NSP | |
| D-002 | Hull Plating, U/W Body, Inspect - Tender | $0.00 | JOB | 1 | $0.00 |
| D-003 | Hull Plating, U/W Body, Ultrasonic Testing - Tender | $0.00 | JOB | 1 | $0.00 |
| O-004 | Hull and Structural Plating, Steel Plate, Renew | $0.00 | SQFT | 1 | $0.00 |
| O-005 | U/W Body, Preserve, 100 percent - Tender | $0.00 | JOB | 1 | $0.00 |
| O-006 | U/W Body, Preserve, Partial, Condition A | $0.00 | JOB | 1 | $0.00 |
| O-007 | U/W Body, Preserve, Partial, Condition B - Tender | $0.00 | JOB | 1 | $0.00 |
| O-008 | U/W Body, Preserve, Partial, Condition C - Tender | $0.00 | JOB | 1 | $0.00 |
| O-009 | Superstructure, Preserve, 100 Percent - Tender | $0.00 | JOB | 1 | $0.00 |
| O-010 | Superstructure, Preserve, Partial - Tender | $0.00 | JOB | 1 | $0.00 |
| O-011 | Hull Plating Freeboard, Preserve, 100 Percent - Tender | $0.00 | JOB | 1 | $0.00 |
| O-012 | Hull Plating Freeboard, Preserve, Partial - Tender | $0.00 | JOB | 1 | $0.00 |
| D-013 | Propulsion Shaft Rope Guards, Inspect | $0.00 | JOB | 1 | $0.00 |
| D-014 | Voids, Non-Accessible, Leak Test - Tender | $0.00 | JOB | 1 | $0.00 |
| O-015 | Voids, Non-Accessible, Internal Surfaces, Preserve | $0.00 | JOB | 1 | $0.00 |
| D-016 | Propulsion Shafting; Remove, Inspect, and Reinstall | $0.00 | JOB | 1 | $0.00 |
| D-017 | Propulsion Shaft Seals, Mechanical Overhaul and Inflatable Renew | $0.00 | JOB | 1 | $0.00 |
| D-018 | Propulsion Shaft Bearings, External, Check Clearances | $0.00 | JOB | 1 | $0.00 |
| D-019 | Propulsion Shaft Bearings, External, Renew | $0.00 | JOB | 1 | $0.00 |
| D-020 | Stern Tubes, Replace | $0.00 | JOB | 1 | $0.00 |
| D-021 | Stern Tube Interior Surfaces, Preserve, 100 Percent | $0.00 | JOB | 1 | $0.00 |
| D-022 | Propeller s, Remove, Inspect, and Reinstall | $0.00 | JOB | 1 | $0.00 |
| D-023 | Keel Coolers, Clean, Inspect and Hydro | $0.00 | JOB | 1 | $0.00 |
| D-024 | Fathometer Transducer, General Maintenance | $0.00 | JOB | 1 | $0.00 |
| D-025 | Sea Valves and Waster Pieces, Overhaul Or Renew | $0.00 | JOB | 1 | $0.00 |
| D-026 | Sea Strainers, All Sizes, Renew | $0.00 | JOB | 1 | $0.00 |
| D-027 | Rudder Assembly, Remove, Inspect And Reinstall | $0.00 | JOB | 1 | $0.00 |
| O-028 | Rudders, Preserve, 100 Percent | $0.00 | JOB | 1 | $0.00 |
| D-029 | Rudder Stock Bearings Clearances, Check | $0.00 | JOB | 1 | $0.00 |
| D-030 | Cathodic Protection, Zinc Anodes, Renew, - Tender | $0.00 | JOB | 1 | $0.00 |
| D-031 | Drydock - Tender | $0.00 | JOB | 1 | $0.00 |
| D-032 | Temporary Services, Provide - Tender | $0.00 | JOB | 1 | $0.00 |
| D-033 | Hull Plating, U/W Body, Ultrasonic Testing - Barge | $0.00 | JOB | 1 | $0.00 |
| O-034 | U/W Body, Preserve, 100 percent - Barge | $0.00 | JOB | 1 | $0.00 |
| O-035 | U/W Body, Preserve, Partial, Condition A - Barge | $0.00 | JOB | 1 | $0.00 |
| O-036 | U/W Body, Preserve, Partial, Condition B - Barge | $0.00 | JOB | 1 | $0.00 |
| O-037 | Hull Plating Freeboard, Preserve, Partial - Barge | $0.00 | JOB | 1 | $0.00 |
| O-038 | Hull Plating Freeboard, Preserve, 100 Percent - Barge | $0.00 | JOB | 1 | $0.00 |
| D-039 | Decks – Exterior (Buoy or Construction Deck), Preserve 100% | $0.00 | JOB | 1 | $0.00 |
| D-040 | Appendages, U/W, Leak Test - Barge | $0.00 | JOB | 1 | $0.00 |
| O-041 | Appendages, U/W, Internal, Preserve - Barge | $0.00 | JOB | 1 | $0.00 |
| D-042 | Voids, Non-Accessible, Leak Test - Barge | $0.00 | JOB | 1 | $0.00 |
| O-043 | Voids, Non-Accessible, Internal Surfaces, Preserve - Barge | $0.00 | JOB | 1 | $0.00 |
| D-044 | Spud Wells, Inspect - Barge | $0.00 | JOB | 1 | $0.00 |
| O-045 | Spud Wells, Preserve - Barge | $0.00 | JOB | 1 | $0.00 |
| D-046 | Buoy and Cargo Handling Crane, Shrink Wrap | $0.00 | JOB | 1 | $0.00 |
| D-047 | Fathometer Transducer, General Maintenance - Barge | $0.00 | JOB | 1 | $0.00 |
| D-048 | Superstructure, Preserve, Partial - Barge | $0.00 | JOB | 1 | $0.00 |
| D-049 | Watertight Doors and Scuttles, External, Renew | $0.00 | JOB | 1 | $0.00 |
| D-050 | Drydock - Barge | $0.00 | JOB | 1 | $0.00 |
| O-051 | Temporary Services, Provide - Barge | $0.00 | JOB | 1 | $0.00 |
| D-052 | Non-Machinery Space(s), Preserve Bilges – Partial | $0.00 | JOB | 1 | $0.00 |
| D-053 | Wheelhouse Deck, Repair | $0.00 | JOB | 1 | $0.00 |
| D-054 | Closed Chock Renew | $0.00 | JOB | 1 | $0.00 |
| D-055 | Ship’s Office Deck Plating, Repair | $0.00 | JOB | 1 | $0.00 |
| D-056 | Port Handrail and Bulwark, Renew | $0.00 | JOB | 1 | $0.00 |
| D-057 | Deck Covering (Interior Wet/Dry), Renew | $0.00 | JOB | 1 | $0.00 |
| D-058 | Ceiling, Replace | $0.00 | JOB | 1 | $0.00 |
| D-059 | Officer's Shower Pan Renew | $0.00 | JOB | 1 | $0.00 |
| D-060 | Engine Room Ventilation Flange, Renew | $0.00 | JOB | 1 | $0.00 |
| D-061 | Gooseneck Ventilation, Renew | $0.00 | JOB | 1 | $0.00 |
| O-062 | Lead-Based Paint and Asbestos-Containing Material, Perform Partial Abatement | $0.00 | SQFT | 1 | $0.00 |
| D-063 | Independent NACE Inspector (Level 3), Provide | $0.00 | NSP | 1 | $0.00 |
| D-064 | Tenting, Provide | $0.00 | NSP | 1 | $0.00 |
| D-065 | Sea Trial Performance, Support, Provide | $0.00 | JOB | 1 | $0.00 |
| D-066 | Decks - Exterior, Preserve, Non-Skid Broadcast Grit System | $0.00 | JOB | 1 | $0.00 |
| D-067 | Trim Tank Vent, Replace | $0.00 | JOB | 1 | $0.00 |
| D-068 | Cradle Support Tabs, Crop and Renew | $0.00 | JOB | 1 | $0.00 |
| D-069 | External Deck Drains, Renew | $0.00 | JOB | 1 | $0.00 |
| D-070 | Bilge Piping, Renewal | $0.00 | JOB | 1 | $0.00 |
| O-00A | Composite Labor Rate | $0.00 | Hour | 500 | 0 |
| D-00Z | Laydays | $0.00 | Day | 5 | $0.00 |
| O-00Z | Laydays | $500.00 | Day | 5 | $2,500.00 |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
(6/2/2026)_x000D_ Draft-3 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| D-001 | Fire Prevention Requirements «TYPE» | $ - 0 | 0 | 0 | 62 | Baltimore, MD | 11293 | 1 | 72 | |||||||||||||||
| D-002 | Hull Plating, Side Scan, Ultrasonic Testing - Tender | $ - 0 | 0 | 0 | 52 | Biloxi, MS | 3998 | 1 | 31 | |||||||||||||||
| D-003 | Hull Plating, U/W Body, Inspect - Tender | $ - 0 | 0 | 0 | 56 | Boston, MA | 5089 | 1 | WLIC 75A | |||||||||||||||
| D-004 | Hull Plating, U/W Body, Ultrasonic Testing - Tender | $ - 0 | 0 | 0 | 50 | Charleston, SC | 23 | 1 | 61 | |||||||||||||||
| D-005 | U/W Body, Preserve, 100 percent - Tender | $ - 0 | 0 | 0 | 60 | Corpus Christi, TX | 1705 | 1 | 13 | |||||||||||||||
| D-006 | Hull Plating Freeboard, Preserve, Partial - Tender | $ - 0 | 0 | 0 | 51 | Hampton Roads | 5236 | 1 | 70 | |||||||||||||||
| D-007 | Hull Plating Freeboard, Preserve, 100 Percent - Tender | $ - 0 | 0 | 0 | 64 | Honolulu, HI | 5404 | 1 | FY2027 | |||||||||||||||
| D-008 | Appendages, U/W, Leak Test - Tender | $ - 0 | 0 | 0 | 55 | Houston, TX | 5158 | 1 | DD | |||||||||||||||
| D-009 | Propulsion Shaft Rope Guards, Inspect | $ - 0 | 0 | 0 | 56 | Los Angeles, CA | 10051 | 1 | cutter | |||||||||||||||
| D-010 | Appendages, U/W, Internal, Preserve - Tender | $ - 0 | 0 | 0 | 55 | Median Rate | 42 | 1 | ANVIL (WLIC 75A) DD FQ2 ARH 27D3.doc | |||||||||||||||
| D-011 | Voids, Non-Accessible, Leak Test - Tender | $ - 0 | 0 | 0 | 49 | Miami | 54 | 1 | ||||||||||||||||
| D-012 | Voids, Non-Accessible, Internal Surfaces, Preserve | $ - 0 | 0 | 0 | 50 | Narragansett Bay, RI | 67 | 1 | ||||||||||||||||
| D-013 | Propulsion Shafting; Remove, Inspect, and Reinstall | $ - 0 | 0 | 0 | 55 | New London, CN | 144 | 1 | ||||||||||||||||
| D-014 | Propulsion Shaft Seals, Mechanical Overhaul and Inflatable Renew | $ - 0 | 0 | 0 | 45 | New Orleans | 9799 | 1 | ||||||||||||||||
| D-015 | Propulsion Shaft Bearings, External, Check Clearances | $ - 0 | 0 | 0 | 62 | NYNY | 186 | 1 | ||||||||||||||||
| D-016 | Propulsion Shaft Bearings, External, Renew | $ - 0 | 0 | 0 | 49 | Panama City, FL | 194 | 1 | ||||||||||||||||
| D-017 | Stern Tube Interior Surfaces, Preserve, 100 Percent | $ - 0 | 0 | 0 | 60 | Philadelphia, PA | 526 | 1 | ||||||||||||||||
| D-018 | Propeller s, Remove, Inspect, and Reinstall | $ - 0 | 0 | 0 | 51 | Portland, ME | 212 | 1 | ||||||||||||||||
| D-019 | Keel Coolers, Clean, Inspect and Hydro | $ - 0 | 0 | 0 | 57 | Portland, OR | 247 | 1 | ||||||||||||||||
| D-020 | Fathometer Transducer, General Maintenance | $ - 0 | 0 | 0 | 55 | San Diego, CA | 10101 | 1 | ||||||||||||||||
| D-021 | Sea Valves and Waster Pieces, Overhaul Or Renew | $ - 0 | 0 | 0 | 67 | San Francisco, CA | 2065 | 1 | ||||||||||||||||
| D-022 | Sea Strainers, All Sizes, Renew | $ - 0 | 0 | 0 | 55 | Santa Barbara, CA | 312 | 1 | ||||||||||||||||
| D-023 | Rudder Assembly, Remove, Inspect And Reinstall | $ - 0 | 0 | 0 | 55 | SE North Carolina | 376 | 1 | ||||||||||||||||
| D-024 | Rudders, Preserve, 100 Percent | $ - 0 | 0 | 0 | 65 | Seattle, WA | 1869 | 1 | ||||||||||||||||
| D-025 | Cathodic Protection, Zinc Anodes, Renew, - Tender | $ - 0 | 0 | 0 | 48 | Tampa-St. Petersburg | 542 | 1 | ||||||||||||||||
| D-026 | Drydock - Tender | $ 13,075.00 | 140 | 5375 | $140.00 | $4,300.00 | 60 | Wilmington, DE | 555 | 1 | ||||||||||||||
| D-027 | Temporary Services, Provide - Tender | $ - 0 | 0 | 0 | 556 | 1 | ||||||||||||||||||
| D-028 | Sea Trial Performance, Support, Provide | $ - 0 | 0 | 0 | 563 | 1 | ||||||||||||||||||
| D-029 | Hull Plating, Side Scan, Ultrasonic Testing, Barge - Barge | $ - 0 | 0 | 0 | 10819 | 3 | ||||||||||||||||||
| D-030 | Hull Plating, U/W Body, Ultrasonic Testing - Barge | $ - 0 | 0 | 0 | 10824 | 3 | ||||||||||||||||||
| D-031 | Appendages, U/W, Leak Test - Barge | $ - 0 | 0 | 0 | 10835 | 3 | ||||||||||||||||||
| D-032 | Voids, Non-Accessible, Leak Test - Barge | $ - 0 | 0 | 0 | 10839 | 3 | ||||||||||||||||||
| D-033 | Voids, Non-Accessible, Internal Surfaces, Preserve - Barge | $ - 0 | 0 | 0 | 10840 | 3 | ||||||||||||||||||
| D-034 | Engine, Overhaul, Tender/Barge, Crane, Center Section - Barge | $ - 0 | 0 | 0 | 10853 | 3 | ||||||||||||||||||
| D-035 | Fathometer Transducer, General Maintenance - Barge | $ - 0 | 0 | 0 | 10862 | 3 | ||||||||||||||||||
| D-036 | Spud Wells, Inspect - Barge | $ - 0 | 0 | 0 | 2830 | 3 | ||||||||||||||||||
| D-037 | Decks – Exterior (Buoy or Construction Deck), Preserve 100% | $ - 0 | 0 | 0 | 2865 | 3 | ||||||||||||||||||
| D-038 | Drydock - Barge | $ - 0 | 0 | 0 | 10909 | 3 | ||||||||||||||||||
| D-039 | Buoy and Cargo Handling Crane, Shrink Wrap | $ - 0 | 0 | 0 | 765 | 22 | ||||||||||||||||||
| D-040 | Lead-Based Paint and Asbestos-Containing Material, Perform Partial Abatement | $ - 0 | 0 | 0 | 5192 | 1 | ||||||||||||||||||
| D-041 | Appendages, U/W, Internal, Preserve - Barge | $ - 0 | 0 | 0 | 10836 | 3 | ||||||||||||||||||
| D-042 | Hull and Structural Plating, General, 10.2 lbs. Steel, Renew - Tender | $ - 0 | 0 | 0 | 1762 | 1 | ||||||||||||||||||
| D-043 | Hull and Structural Plating, General, 12.75 lbs. Steel Plate, Renew - Tender | $ - 0 | 0 | 0 | 1763 | 1 | ||||||||||||||||||
| D-044 | Hull and Structural Plating, General, 15.3 lbs. Steel Plate, Renew - Tender | $ - 0 | 0 | 0 | 1764 | 1 | ||||||||||||||||||
| D-045 | Hull And Structural Plating, General, 20.4 lbs. Steel Plate, Renew - Tender | $ - 0 | 0 | 0 | 1765 | 1 | ||||||||||||||||||
| D-046 | Hull and Structural Plating, General, 7.5 lbs., 3/16 in. Steel Plate, Renew - Tender | $ - 0 | 0 | 0 | 750 | 1 | ||||||||||||||||||
| D-047 | Hull and Structural Plating, General, 7.65 lbs. Steel Plate, Renew - Tender | $ - 0 | 0 | 0 | 2494 | 1 | ||||||||||||||||||
| D-048 | Hull And Structural Plating, General, Cracked Steel Welds, Repairs - Tender | $ - 0 | 0 | 0 | 2442 | 1 | ||||||||||||||||||
| D-049 | Hull and Structural Plating, General, Degraded Weld, Steel, Repair - Tender | $ - 0 | 0 | 0 | 1212 | 1 | ||||||||||||||||||
| D-050 | Superstructure, Preserve, 100 Percent | $ - 0 | 0 | 0 | 5044 | 1 | ||||||||||||||||||
| D-051 | Superstructure, Preserve, Partial | $ - 0 | 0 | 0 | 5045 | 1 | ||||||||||||||||||
| D-052 | Spud Wells, Preserve - Barge | $ - 0 | 0 | 0 | 5265 | 3 | ||||||||||||||||||
| D-053 | Stern Tubes, Replace | $ - 0 | 0 | 0 | 6654 | 24 | ||||||||||||||||||
| D-054 | Watertight Doors and Scuttles, External, Renew | $ - 0 | 0 | 0 | 665 | 1 | ||||||||||||||||||
| D-055 | Non-Machinery Space(s), Preserve Bilges – Partial | $ - 0 | 0 | 0 | 10000 | 0 | ||||||||||||||||||
| D-056 | Wheelhouse Deck, Repair | $ - 0 | 0 | 0 | 10000 | 0 | ||||||||||||||||||
| D-057 | Closed Chock Renew | $ - 0 | 0 | 0 | 10000 | 0 | ||||||||||||||||||
| D-058 | Ship’s Office Deck Plating, Repair | $ - 0 | 0 | 0 | 10000 | 0 | ||||||||||||||||||
| D-059 | Port Handrail and Bulwark, Renew | $ - 0 | 0 | 0 | 10000 | 0 | ||||||||||||||||||
| D-060 | Deck Covering (Interior Wet/Dry), Renew | $ - 0 | 0 | 0 | 10000 | 0 | ||||||||||||||||||
| D-061 | Ceiling, Replace | $ - 0 | 0 | 0 | 10000 | 0 | ||||||||||||||||||
| D-062 | Officer's Shower Pan Renew | $ - 0 | 0 | 0 | 10000 | 0 | ||||||||||||||||||
| D-063 | Engine Room Ventilation Flange, Renew | $ - 0 | 0 | 0 | 10000 | 0 | ||||||||||||||||||
| D-064 | Gooseneck Ventilation, Renew | $ - 0 | 0 | 0 | 10000 | 0 | ||||||||||||||||||
| D-065 | Hull and Structural Plating, General, 10.2 lbs. Steel, Renew - Barge | $ - 0 | 0 | 0 | 10826 | 3 | ||||||||||||||||||
| D-066 | Hull and Structural Plating, General, 12.75 lbs. Steel Plate, Renew - Barge | $ - 0 | 0 | 0 | 10827 | 3 | ||||||||||||||||||
| D-067 | Hull and Structural Plating, General, 15.3 lbs. Steel Plate, Renew - Barge | $ - 0 | 0 | 0 | 10830 | 3 | ||||||||||||||||||
| D-068 | Hull And Structural Plating, General, 20.4 lbs. Steel Plate, Renew - Barge | $ - 0 | 0 | 0 | 10831 | 3 | ||||||||||||||||||
| D-069 | Hull and Structural Plating, General, 7.5 lbs., 3/16 in. Steel Plate, Renew - Barge | $ - 0 | 0 | 0 | 10828 | 3 | ||||||||||||||||||
| D-070 | Hull and Structural Plating, General, 7.65 lbs. Steel Plate, Renew - Barge | $ - 0 | 0 | 0 | 10829 | 3 | ||||||||||||||||||
| D-071 | Hull And Structural Plating, General, Cracked Steel Welds, Repairs - Barge | $ - 0 | 0 | 0 | 10832 | 3 | ||||||||||||||||||
| D-072 | Hull and Structural Plating, General, Degraded Weld, Steel, Repair - Barge | $ - 0 | 0 | 0 | 10834 | 3 |
(09/28/2009)_x000D_ Page &P of &N
Sheet1
CostEstimateTemplate
| Composite Labor Rate | 55 | ||||||||||||||||
| Assumed G&A Factor | 15% | ||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | ||||||||||||||
| Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | |||||
| DESCRIPTION | UNIT PRICE | Lab Rate | Area | ||||||||||||||
| $0 | 0 | $0 | 62 | Baltimore, MD | |||||||||||||
| $0 | 0 | $0 | 52 | Biloxi, MS | |||||||||||||
| $0 | 0 | $0 | 56 | Boston, MA | |||||||||||||
| $0 | 0 | $0 | 50 | Charleston, SC | |||||||||||||
| $0 | 0 | $0 | 60 | Corpus Christi, TX | |||||||||||||
| $0 | 0 | $0 | 64 | Honolulu, HI | |||||||||||||
| $0 | 0 | $0 | 55 | Houston, TX | |||||||||||||
| $0 | 0 | $0 | 56 | Los Angeles, CA | |||||||||||||
| $0 | 0 | $0 | 55 | Median Rate | |||||||||||||
| $0 | 0 | $0 | 55 | Median Rate | |||||||||||||
| $0 | 0 | $0 | 50 | Narragansett Bay, RI | |||||||||||||
| 55 | New London, CN | ||||||||||||||||
| 45 | New Orleans | ||||||||||||||||
| 62 | NYNY | ||||||||||||||||
| 49 | Panama City, FL | ||||||||||||||||
| 60 | Philadelphia, PA | ||||||||||||||||
| 51 | Portland, ME | ||||||||||||||||
| 57 | Portland, OR | ||||||||||||||||
| 55 | San Diego, CA | ||||||||||||||||
| 67 | San Francisco, CA | ||||||||||||||||
| 55 | Santa Barbara, CA | ||||||||||||||||
| 55 | SE North Carolina | ||||||||||||||||
| 65 | Seattle, WA | ||||||||||||||||
| 48 | Tampa-St. Petersburg | ||||||||||||||||
| 60 | Wilmington, DE |
File details come from the government source that posted it. Updated .