This document is a detailed specification for dockside repairs to the USCGC OAK (WLB-225B), a 225-foot U.S. Coast Guard cutter homeported at Naval Station Newport, Rhode Island. The specification outlines 35 discrete work items to be performed during the FY2027 dockside availability, including fire prevention requirements, tank cleaning and inspection (fuel service, hydraulic oil, and potable water), equipment servicing (cargo hatch, winches, davits, cranes), exhaust piping cleaning, ventilation system maintenance, structural preservation, and miscellaneous replacements such as LED floodlights, weathertight doors, and deck coverings. The solicitation (70ZU0227QIBCT0004) requires quotations to be submitted by 12 December 2026 at 2:00 PM Eastern Time via email to Arlene.d.wright@uscg.mil and Sandra.a.martinez@uscg.mil.
The specification identifies government-furnished property with estimated costs totaling approximately $265,000, including specialized components such as davit overhaul kits, hydraulic motors, cylinder assemblies, wire rope assemblies, and various replacement parts for cargo handling and propulsion systems. Contractors must comply with extensive requirements established in Surface Forces Logistics Center (SFLC) Standard Specifications, including SFLC 0000 (General Requirements), SFLC 5550 (Fire Prevention and Response), SFLC 6310 (Preservation of Ship Structures), SFLC 5100 (Clean Shipboard Ventilation Systems), and SFLC 0740 (Welding and Allied Processes). Critical inspection items must be completed within the first 25 percent of the contract period, and the work must be performed in accordance with referenced Coast Guard drawings, technical publications, military standards, and applicable federal regulations including OSHA shipyard employment standards (29 CFR 1915) and environmental protection requirements specific to the U.S. Navy facility where work will be performed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATTACHMENT 4 Request for Clarification Form -CGC OAK FY27.docx | DOCX document | |
| ATTACHMENT 1 PRICING OAK (WLB 225B) BLANK.pdf | ||
| 70ZU0227QIBCT0004 FY-27 CGC OAK DOCKSIDE.pdf | ||
| ATTACHMENT 3 Past Performance Information Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC OAK (WLB 211)
SPECIFICATION FOR DOCKSIDE REPAIRS
FY2026
Developed By: Bryan G Wright
(Rev-0, 28 August 2026)
USCGC OAK (WLB-225B) DOCKSIDE AVAILABILITY FY2026
ii (Draft-0)
TABLE OF CONTENTS
Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property ................................................................................. ix Consolidated List of Critical Inspection Items ........................................................................................... xii Principal Characteristics ............................................................................................................................ xiii General Requirements WORK ITEM 1: Fire Prevention Requirements «Dockside» WORK ITEM 2: Tanks, MP Fuel Service, Clean and Inspect WORK ITEM 3: Tanks, Hydraulic Oil Stowage and Service, Clean and Inspect WORK ITEM 4: Tanks, Potable Water, Clean and Inspect WORK ITEM 5: Hydraulically Operated Cargo Hatch, Inspect and Service WORK ITEM 6: Main Diesel Engine, MDE, Exhaust Piping, Commercial Clean WORK ITEM 7: Ship Service Diesel Generator, SSDG, Exhaust Piping, Commercial Clean WORK ITEM 8: Vent Ducts, Engine And Motor Room, All, Commercial Cleaning WORK ITEM 9: Vent Ducts, Galley and Pantry Room, All, Commercial Cleaning WORK ITEM 10: Vent Ducts, Laundry Exhaust, Commercial Cleaning WORK ITEM 11: Vent Ducts, All Other, Commercial Cleaning WORK ITEM 12: Potable Water Pneumatic Tanks, Clean and Inspect WORK ITEM 13: Compressed Air Receivers and System Valves, All, Clean, Inspect, Hydro and Lift ... 56 WORK ITEM 14: Hydraulic Chain Stoppers, Inspect and Service WORK ITEM 15: Crossdeck Winches, Inspect and Service WORK ITEM 16: Hydraulic Inhaul Winch, Inspect And Service WORK ITEM 17: Mechanical Chain Stoppers, Inspect and Service WORK ITEM 18: Warping Capstan, Inspect and Service WORK ITEM 19: Single Point Davit, Inspect and Service WORK ITEM 20: Welin Lambie Dual Point Davit TWPIV 5.0B, Inspect, Test, and Overhaul WORK ITEM 21: Commissary Hoist, Inspect and Service WORK ITEM 22: Buoy Crane, Appleton EB600-60-40, Inspect and Service WORK ITEM 23: Grey Water Piping, Clean and Flush WORK ITEM 24: Sewage Piping, Clean and Flush WORK ITEM 25: Non-Buoy Weather Deck LED Flood Lights, Replace WORK ITEM 26: Weathertight Door and Quick Acting Watertight Hatch, Renew WORK ITEM 27: Galley Supply Fan and Pre-Heater, Renew WORK ITEM 28: Weather Deck Kickpipes, Renew WORK ITEM 29: Compartment Decks, Preserve WORK ITEM 30: Deck Covering (Interior Wet), Renew WORK ITEM 31: Main Mast and Jackstaff Guardline Staples, Renew WORK ITEM 32: Deck Covering (Carpeting), Renew WORK ITEM 33: Deck Covering (Wet/Dry), Seal WORK ITEM 34: Gooseneck Ventilation, Renew WORK ITEM 35: Temporary Services, Provide - Cutter iii (Draft-0)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iv (Rev-0)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Drawing 225 WLB 259-005, Rev C, Combustion Intake & Exhaust A&D Hull Block 940
Coast Guard Drawing 225 WLB 801-020, Rev B, Tank CAPACITY - 95% Curves
Coast Guard Drawing 225B WLB 541-007, Rev D; Incinerator Fuel Oil Service Tank
Coast Guard Drawing 225B WLB 573-001, Rev E, Buoy Handling System Arrangement
Coast Guard Drawing 225B WLB 259-001, Rev D, Combustion Intake & Exhaust Diagram
Coast Guard Drawing 225B WLB 259-005, Rev C, Combustion Intake & Exhaust A&D Hull Block 940
Coast Guard Drawing 225B WLB 259-006, Rev D, Combustion Intake & Exhaust A&D Hull Blocks 970
& 975
Coast Guard Drawing 225B WLB 512-001, Rev K, HVAC Diagram
Coast Guard Drawing 225B WLB 512-007, Rev B, HVAC A&D, Fr 66-92, Innerbttm & 1st Platform
Coast Guard Drawing 225B WLB 512-017, Rev B, MMA HVAC System Diagram
Coast Guard Drawing 225B WLB 512-002, Rev F, Ventilation Schedule
Coast Guard Drawing 225B WLB 512-009, Rev D, HVAC A & D Fr 57 Thru Fr 75 Mn Dk & Lvl 1 Hull
Block 960A
Coast Guard Drawing 225B WLB 528-001, Rev G, Plumbing and Interior Deck Drains
Coast Guard Drawing 225B WLB 528-002, Rev D, Weather Deck Drains Diagram
Coast Guard Drawing 225B WLB 532-002, Rev D, Potable Water Sys Dia
Coast Guard Drawing 225B WLB 541-001, Rev G; Fuel Oil System Diagram
Coast Guard Drawing 225B WLB 549-001, Rev A, Onboard Lubrication Requirements
Coast Guard Drawing 225B WLB 549-001, Rev C, Onboard Lubrication Requirements
Coast Guard Drawing 225B WLB 551-001, Rev G, Compressed Air System Diagram
Coast Guard Drawing 225B WLB 556-001, Rev F, Hydraulic System Diagram
Coast Guard Drawing 225B WLB 556-005, Rev D, Aft Hydraulic System A/D, Fr 66 Aft, Block 950, 970
Coast Guard Drawing 225B WLB 573-002, Rev -, Weight Handling System Arrangement
Coast Guard Drawing 225B WLB 573-009, Rev E, Bi-Dir Ch Stopper With Retractable Roller Stopper
Coast Guard Drawing 225B WLB 573-012, Rev -, Rising Sheave Chain Stopper Ripout Incidental to
Upgrade
Coast Guard Drawing 225B WLB 573-013, Rev B, Rising Sheave Chain Stopper Mechanical Mods
Incidental to Upgrade v (Rev-0)
Coast Guard Drawing 225B WLB 573-014, Rev -, Rising Sheave Chain Stopper Hydraulic Mods
Incidental to Upgrade
Coast Guard Drawing 225B WLB 593-001, Rev E, Sewage and Waste Water System
Coast Guard Drawing 225B WLB 601-001, Rev F, General Arrangement Inboard & Outboard Profiles
Coast Guard Drawing 225B WLB 601-001, Rev M; General Arrangement Inboard and Outboard Profiles
Coast Guard Drawing 225B WLB 601-002, Rev H, Booklet of General Drawings
Coast Guard Drawing 225B WLB 601-002, Rev N, Booklet of General Drawings
Coast Guard Drawing 225B WLB 801-005, Rev A Tank CAPACITY - 95% Curves
Coast Guard Drawing 225B-WLB 549-001, Rev -, Onboard Lubrication Requirements
Coast Guard Drawing 225B-WLB 556-001, Rev B, Hydraulic System Diagram
Coast Guard Drawing 225B-WLB 573-001, Rev -, Buoy Handling System Arrangement
Coast Guard Drawing 225B-WLB 573-002, Rev -, Weight Handling System Arrangement
Coast Guard Drawing 225B-WLB 583-002, Rev E, MMA Installation of Dual Point Davit
Coast Guard Drawing 225B-WLB 601-001, Rev J, General Arr Inboard and Outboard Profiles
Coast Guard Drawing 225B-WLB 601-001, Rev P, General Arr Inboard and Outboard Profiles
Coast Guard Drawing 225B-WLB 631-002, Rev G, Painting Schedule
Coast Guard Drawing 225B-WLB 634-001, Rev F, Deck Cover Schedule
Coast Guard Drawing 225B-WLB 320-001, Rev AK, Electrical One-Line Wiring Diagram
Coast Guard Drawing 225B-WLB 320-007, Rev Y, PWR SYS DK PLAN 02 LVL & ABV, HULL BLK
960B, 975 & 970
Coast Guard Drawing 225B-WLB 321-002, Rev._, Cableways Master Plan
Coast Guard Drawing 225B-WLB 330-002, Rev L, Lighting System Forward of FR. 30 Hill Block
910/901
Coast Guard Drawing 225B-WLB 330-006, Rev G, Lighting System, Main Dk & 01 LVL, FR 57-92, HULL BLK 960A/970
Coast Guard Drawing 225B-WLB 330-007, Rev P, Lighting System 02 Level & Above Hull Block
960B/975 & 970 Partial
Coast Guard Drawing 225B-WLB 330-007, Rev T, Lighting System, 02 LVL& Above HULL BLK
960B/975 & 970 Partial
Coast Guard Drawing 225B-WLB 601-001, Rev P, General Arrangements Inboard And Outboard Profiles
Coast Guard Drawing 225B-WLB-167-001, Rev W, Structural Closures
Coast Guard Drawing 225B-WLB-170-001, Rev J, Mast A&D
Coast Guard Drawing 225B-WLB-601-001, Rev P, General Arrangements, Inboard and Outboard
Profiles
Coast Guard Drawing 225-WLB 583-004, Rev D, MMA Installation of Dual Point Davit
Coast Guard Drawing 225-WLB 635-001, Rev J, Hull Thermal Acoustic Insulation Schedule
Coast Guard Drawing 225-WLB 330-002, Rev K, Lighting System Forward of FR. 30 Hill Block 910/901
Coast Guard Drawing 225-WLB 330-007, Rev V, Lighting System 02 Level & Above Hull Block
960B/975 & 970 Partial
Coast Guard Drawing FL 1602-89, Rev -, Fleet, 26” x 66” Weathertight Door
Coast Guard Drawing FL 2605-031, Rev D, Mechanical Chain Stopper, 1-7/8" Buoy Chain
Coast Guard Drawing FL 2605-034, Rev D, Mechanical Chain Stopper Repair Kit: 1-7/8", 1-5/8" & 1-
1/4" vi (Rev-0)
Coast Guard Drawing FL 7101-573, Rev L, Buoy Chain Winch Assy Model CW1
Coast Guard Drawing FL-1702-11, Rev -, Inspection of Sheaves
NAVSEA Drawing 167-7379842, Rev A, Procedure & Welding Sequence for Non-Ballistic, Watertight
& Airtight Quick Acting or Individually Dogged Personnel Doors
COAST GUARD PUBLICATIONS
«TECHPUBS»Coast Guard Technical Publication (TP) CP-H5-0001-V0, Twin Pivot Arm Davit - TYPE
TW.PIV 5.0B - Ref. No. 5558-l Thru 5558-15
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual
Coast Guard Technical Publication (TP) 10512, Section 573-A, July 2018, Buoy Handling Crane – Model
EB600-60-40
Coast Guard Technical Publication (TP) 11101, SWBS 583, Section A (SWBS 583A), Davit, Single Point
Slewing Arm Model - RAD30 - 15.5 (BMD-710)
Coast Guard Technical Publication (TP) 3498, Section A, Jul 2015, Buoy Chain Winch
Coast Guard Technical Publication (TP) 3558, Apr 2008, Manufacturer’s Instruction Book-SWBS
Group(s) 573, Section B, Cross Deck Winch – Model BMD-471
Coast Guard Technical Publication (TP) 3559, Section 582B, Apr 2009, Aft Capstan, 21” - Model BMD-
Coast Guard Technical Publication (TP) 3562, Sep 2013, SWBS 589, Section C, Dumbwaiter, Model –F-
WK-806
Coast Guard Technical Publication (TP) 3717, Jun 2003, Hydraulic Cargo Hatch
Coast Guard Technical Publication (TP) 3749, 26-APR-05, 1-7/8 Inch ATON Mechanical Chain Stopper
Coast Guard Technical Publication (TP) 3750, SWBS 573-A, Dec 2012, Rising Sheave Chain Stopper
Coast Guard Technical Publication (TP) 3796, Section A, Aug 2006, Galley Hood – Model NBDL-60
(13’-4”)
Fire Prevention and Response
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, 2022, General
Requirements
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 3041, 2022, Shipboard
Electrical Cable Test
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 3042, 2022, Shipboard
Electrical Cable Removal, Relocation, Splice, Repair, and Installation
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), 2022, Overhaul AC
Electrical Motors
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary
Machine Systems
Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2022, Clean
Shipboard Ventilation Systems
Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire
Prevention and Response
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures vii (Rev-0)
Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2022, Install New
Deck Covering Systems
Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2022, Temporary
Hull Accesses
OTHER REFERENCES
American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2011, Disinfection of Water-Storage Facilities
American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2019, Disinfection of Water-Storage Facilities
American National Standards Institute/NSF International (ANSI/NSF) 61, 2015, Drinking Water System
Components - Health Effects
American Society for Testing and Materials (ASTM) International F1508, 2021, Standard Specification for Angle Style, Pressure Relief Valves for Steam, Gas, and Liquid Services
American Society of Mechanical Engineers (ASME) B16.34, 2025, Valves-Flanged, Threaded, and
Welding End
ASTM International (ASTM) D1330, 2010, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D1330, 2015, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D5363, 2008, Standard Specification for Anaerobic Single Component
Adhesives (AN)
Code of Federal Regulations (CFR) Title 29, Part 1915, 2014, Occupational Safety and Health Standards for Shipyard Employment
Code of Federal Regulations (CFR) Title 29, Part 1915, 2022, Occupational Safety and Health Standards for Shipyard Employment
Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for
Shipyard Employment
Commercial Item Description (CID) A-A-59316, 2016, Abrasive Materials; for Blasting
Federal Specification (Fed Spec) DDD-C-95, Mar 1972, Carpets and Rugs, Wool, Nylon, Acrylic, Modacrylic
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2019 Edition, Pressure Testing Of Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2022 Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 2010 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2019 Edition, Bronze Gate, Globe, Angle and Check Valves
MIL-D-16791, Jan 1993, Detergents, General Purpose (Liquid, Nonionic)
MIL-D-3134, Sep 1989, Deck Covering Materials
MIL-I-3064, Mar 1991, Insulation, Electrical, Plastic-Sealer
Military Standard MIL-S-19622/17D, Dec 1992, Stuffing Tube, Nylon, and Packing Assemblies, General
Specification for
Military Standard MIL-STD-2003/3A (SH), Sep 2009, Electrical Plant Installation Standard Methods for
Surface Ships and Submarines
MIL-PRF-24176 , Oct 2004, Cement, Epoxy, Metal Repair And Hull Smoothing (Metric) viii (Rev-0)
MIL-PRF-24613, Dec 1990, Deck Covering Materials, Interior, Cosmetic Polymeric
MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant
MIL-STD-2003-3A, Sep 2009, Electric Plant Installation Standard Methods for Surface Ships &
Submarines (Penetrations)
NAVSEA Drawing 803-1385866, Rev E, Penetrations; Bulkhead and Deck
NAVSEA Drawing 803-1401892, Rev J, Scuttle, WT, Raised, Quick Acting, 21” Dia
NAVSEA Drawing 805-1624092, Rev E, Hatch, WT, Raised, Quick Acting, 30”x30” with Scuttle
NAVSEA Drawing 805-1624093, Quick Acting Watertight Scuttle
NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for
Fabrication, Welding, and Inspection of Submarine Structure
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2019, Cork and
Rubber Composition Sheet; for Aromatic Fuel and Oil Resistant Gaskets
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2019, Cork and
Rubber Composition Sheet; For Aromatic Fuel and Oil Resistant Gaskets
The Society for Protective Coatings (SSPC) Surface Preparation Standard No. 11 (SSPC-SP 11), 2013, Power-Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC)/NACE International (NACE) 2007, Joint Surface Preparation
Standard SSPC-SP 10/NACE No. 2, Near-White Metal Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 1 No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning ix (Rev-0)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM
DESCRIPTION
NSN/PN QTY ESTIMATED
COST
($/UNIT)
14 N Repair Kit, HYD
Chain Stopper
Rising Sheave (for
Para. 3.2, Tasks #2 and #3)
NSN: 2040-01-483-3947 2 ea. 2,631.46
14 N Cylinder, Actuating Linear
NSN: 3040-01-483-3373 4 ea. 1,777.71
15 N Hand Pump SS NSN: 4320-01-517-1444 1 ea 1,499.66
15 N Pressure Gauge -
Model BMD-471
NSN: 6685-01-437-2519 4 ea 43.79
15 N Wire Rope
Assembly
NSN: 4010-01-643-2077 4 ea 900.00
15 N Hydraulic Brake
Repair Kit - Model
BMD-471
NSN: 3950-01-526-9090 4 ea. 913.00
15 N Counterbalance
Valve - Model
BMD-471
NSN: 4810-01-353-0586 4 ea. 150.00
15 N Shuttle Valve -
Model BMD-471
NSN: 4820-01-317-2748 4 ea. 35.00
15 N Hydraulic Motor
Seal Kit - Model
BMD-471
NSN: 5330-01-475-4566 8 ea. 84.00
15 N Clutch Shoe -
Model BMD-471
NSN: 4910-01-475-4125 4 ea. 56.90
15 N Drum Bushing -
Model BMD-471
NSN: 3950-01-631-0884 8 ea. 272.00
15 N Shaft Bushing -
Model BMD-471
NSN: 3950-01-631-0771 4 ea. 298.00
15 N Gearbox Seal Kit
(For Winch
Gearbox
Assemblies) -
Model BMD-471
NIIN: XFC343225 PN:
YMD-8194-R
4 ea. 70.00
15 N Control Station
Repair Parts. Kit
NSN: 6110-01-644-9898 4 ea. 438.00
15 N Flag Block Pivot
Bearing
NSN: 3110-01-644-9905 4 ea. 675.00
15 N Flag Block Bearing
Cup, Sheave
NSN: 3110-01-644-9670 4 ea. 231.00
15 N Flag Block Bearing
Cone, Sheave
NSN: 3110-01-013-4036 4 ea. 182.00 x (Rev-0)
15 N Seal NSN: 5330-01-287-2826 4 ea. 104.00
15 N Manifold Repair
Kit
PN: YMD-8192-R 4 ea. 551.00
16 N Roller bearing Unit NSN: 3130-01-504-4363 2 ea. 4,012.00
16 N Grease seal NSN: 5330-01-462-5544 4 ea. 79.25
16 N Level wind pivot bushing
NSN: 3120-01-621-2293 1 ea. 1,139.00
16 N Level wind thrust bearing
NSN: 3120-01-621-2300 2 ea. 483.30
16 N Rexroth DCV NSN: 4810-01-507-0037 1 ea. 208.29
16 N Rexroth Sandwich
Flow Control
NSN: 4810-01-505-9289 1 ea. 250.00
16 N Sun Sandwich
Relief Valves
NSN: 4820-01-439-2451 2 ea. 900.00
16 Y Level Wind
Hydraulic Cylinder
NSN: 3040-01-441-3721 1 ea. 7,423.00
16 N 3:1 Pilot Ratio, Vented
Counterbalance
Valve Assembly
NSN: 4820-01-563-5841 1 ea 98.70
16 N Fully Adjustable
Needle Valve
NSN: 4820-01-416-0579 1 ea 48.75
16 N Wire Rope
Assembly
NSN: 4010-01-646-6972 1 ea. 500.00
16 Y **Hydraulic Motor NSN: 4320-01-445-2248 1 ea 23,998
16 N **Pump, Hydraulic
Ram, Hand Driven
NSN: 4320-01-286-4065 1 ea. 419.77
16 N **Cylinder Pin NSN: 5315-01-515-9847 1 ea 500.00
16 N **Cylinder Pin NSN: 5315-01-515-9912 1 ea 520.00
17 N Hardware Kit, Pins NSN: 2030-01-485-7209 2 ea. 528.47
17 N Hardware Kit, Mechanical
NSN: 2030-01-485-7215 2 ea. 538.91
19 N Swing Brake Seal
Kit
NSN: 5330-01-390-3514
PN: 90-016-2011
2 ea 68.45
19 N Swing Brake Disc
Kit
NSN: 3010-01-464-1040
PN: 90-016-2131
2 ea 187.20
19 N Swing Holding
Valve
NSN: 4820-01-466-4918
PN: CBEA-LHV-YHL
(Sun Hydraulics)
1 ea 251.50
19 N Wire Rope
Assembly
NSN: 4010-01-620-9604
PN: JWCG062100PL
1 ea 660.00
20 N 4 Year Davit In-
Place Overhaul Kit
NSN: 3950-01-F18-5354
P/N: 892-02053
1 ea. 130,816.35
20 Y Cylinder Assembly NSN: 3040-99-239-4845
P/N: 5727-1501
2 ea. 20,718.88
20 Y Hook, Release, Boat Davit
NSN: 4030-01-467-1005
P/N: APR-356-CBH
2 ea. 5,858.19
20 Y Accumulator, Complete
NSN: 3040-99-355-4929
P/N: 885-02012
2 ea. 13,750.83 xi (Rev-0)
Assembly
22 N Main Fall Wire
Rope
NSN: 4010-01-486-0047
PN: JWCG13001919PL
1 2,642.00
22 N Aux Fall Wire
Rope
NSN: 4010-01-594-2228
PN: JWCG75200637PL
1 805.32
25 N Floodlight, LED***
NSN: 6210-01-661-5675
PN: STL-HI-45-UNIV-
10CG
11 $619.00
26 N
DOOR- 26” X 66”
C.O., EAT, LH W/
14” X 18” C.O.
WINDOW W/
LEVER TYPE
KNOBS AND
MORTISE
LOCKS
PN 21 1 ea. $19, 800
26 N
HATCH- 30” X
30” C.O., RSD,
WTRTT, 8 DOG,
WITH A 21” DIA.
C.O., QA
PN 17
1 ea.
$16,500.00
26 N
SCUTTLE- 21”
DIA C.O., RSD,
QA, WTRTT
PN 6 1 ea.
$10,500.00
27 N Fan,Vaneaxial NIIN: 012530919 PN:
MA30AF
1 ea. $10,037.00
27 N Heater Duct NIIN:XFC094071 PN:
XFC094018
1 ea. $4,306.00
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xii (Rev-0)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5
(Inspection report particulars)):
Work
Item Title
14 Hydraulic Chain Stoppers, Inspect and Service
15 Crossdeck Winches, Inspect and Service
16 Hydraulic Inhaul Winch, Inspect And Service
17 Mechanical Chain Stoppers, Inspect and Service
18 Warping Capstan, Inspect and Service
19 Single Point Davit, Inspect and Service
20 Welin Lambie Dual Point Davit TWPIV 5.0B, Inspect, Test, and Overhaul
21 Commissary Hoist, Inspect and Service
22 Buoy Crane, Appleton EB600-60-40, Inspect and Service xiii (Rev-0)
PRINCIPAL CHARACTERISTICS
225' WLB (B-CLASS)
PHYSICAL
Length overall 225' 0"
Length between perpendiculars 206' 0"
Maximum beam 46'
Designed draft 13' 0"
Full load displacement 1905.6 Long Tons SW
Light ship displacement 1500.7 Long Tons SW
Minimum operating displacement 1869.2 Long Tons SW
Mast height (above 12' waterline) 67' 5"
Anchor Two 4000 lb standard Navy stockless anchors, 8 shots each, port and starboard, 1-3/8 die lock chain
HULL
Bilge keels (port & starboard) Frames 42-79
Frame spacing
FR 0 to 12 21"
FR 12 to 30 22"
FR 30 to 102 24"
MACHINERY
Main propulsion Diesel Reduction
Diesel engines Two Caterpillar 3608, TA, 3100 BHP each @ 900 RPM
Number of propellers 1
Number of blades 4
Diameter 10'
Pitch Controllable
RPM 254
Ship's service diesel generators Two Caterpillar 3508 TA, 450 KW
Emergency diesel generator One Caterpillar 3406 DITA, 280 KW
Shore tie Two 450 VAC, 400 Amp, 3-wire
Shaft bearing, forward Cooper Bearing 01-BCP-1400-EX-TL
Shaft bearing, aft Water Lubricated Cutless Bearing
TANK CAPACITIES
Diesel oil 76,498 gal.
Fresh water capacity 8056 gal.
Hydraulic oil capacity 2785 gal.
Lube oil storage 764 gal.
Grey water tank 2700 gal.
Sewage holding tank 1700 gal.
1 (Rev-0)
00000_0226_FLT
REC_00000_FLT_Commercial Project @ CG Facility (0121)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and
'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is
Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Latest Version, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Latest Version, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), Latest Version, Fire Prevention and Response
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), Latest Version, Requirements for Preservation of Ship Structures
OTHER REFERENCES
Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for
Shipyard Employment
NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for
Fabrication, Welding, and Inspection of Submarine Structure
2 (Rev-0)
3. REQUIREMENTS
3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements in this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.1.1 The Contractor must conform to all requirements specified in SFLC Std Spec 5550 and in the Fire
Protection and Response work item, as applicable, during the performance of this availability.
3.1.1.1 Fire Safety Plan submission. The Contractor must submit a copy of the CFR 1915, Subpart P, Fire Safety
Plan with the Contractor’s bid when work will be conducted in a Contractor–owned facility. Include any MOA(s) with local firefighting facilities.
3.1.1.2 Fire Plan submission. The Contractor must submit a copy of the developed availability specific fire plan as requested in the Fire Protection and Response work item, with the Contractor’s bid.
NOTE
NAVSEA drawings listed will be available FOR INSPECTION ONLY from the Coast
Guard Port Engineer post-award. SFLC will not redistribute NAVSEA documents.
Contractors can apply to NAVSEA headquarters directly for copies.
3.2 Fire watch requirements. The Contractor must refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec
0000, in accomplishing the following task:
• Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.
• Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.
3.3 Preservation requirements. The Contractor must accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec
6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. The Contractor must obtain a written KO authorization to deviate from any coatings required in SFLC Std Spec 6310 Appendix C before work.
3.3.3 In-process quality control measures. The Contractor must abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces”).
3.3.3.1 Quality control requirements. The Contractor must abide by the following when performing preservation related inspections. The following measurements must be randomly spaced throughout for the purposes of providing a representation of the entire prepared or coated surface.
3 (Rev-0)
3.3.3.1.1 Surface profile measurements. One surface profile measurement must be taken for every 200 square feet for the first 1000 square feet; for each additional 500 square feet or less, one profile measurement must be taken.
Profile measurements must be taken in accordance with SFLC Std Spec 6310, paragraph 3.1.8.3 (Surface profile measurements). A “measurement” for surface profile is defined as follows:
• ASTM D4417, Method B: One profile measurement is the average (mean) of 10 individual readings.
• ASTM D4417, Method C: One profile measurement is the average (mean) of 2 individual readings.
3.3.3.1.2 Soluble salt conductivity measurements. 5 conductivity measurements must be taken every 1000 square feet. For submerged (immersed) applications conductivity measurements must not exceed 30 microsiemens/cm.
For non-submerged (non-immersed) applications conductivity measurements must not exceed 70 microsiemens/cm. If a conductivity check fails, clean the surface in accordance with SFLC Std Spec 6310, paragraph 3.1.8.5 (Soluble salt removal).
3.3.3.1.3 Coating thickness measurements. Three area measurements must be taken for the first 1000 square feet;
for each additional 1000 square feet, perform an additional area measurement. A “measurement” for coating thickness is defined as follows:
• SSPC-PA 2 defines an area measurement as 5 separate spot measurements randomly spaced throughout a 100 square foot area.
• SSPC-PA 2 defines a spot measurement as 3 gage readings and each new gage reading the probe must be moved to a new location within a 1.5-inch diameter circle defining the spot.
3.4 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
3.4.1 HY-130 material substitution. The Contractor must be aware that HY-130 steel plating is no longer commercially available. For the purpose of performing flight deck repairs on US Coast Guard WMEC-270 “B-
Class” cutters, Strenx 900 steel plating has been approved as a replacement for HY-130. Due to the similarity in material properties and weldability of HY-130 and Strenx 900, all welding procedures and welder qualifications for welding Strenx 900 must be the same as those outlined in NAVSEA TP 1688 as applicable for welding HY-
130.
3.4.2 Standard spec modification. For any welding involving HY-130 on the flight deck of WMEC-270 “B-Class” cutters, perform all welding and allied processes, and non-destructive evaluation (NDE) in accordance with
NAVSEA TP 1688. The Contractor must be aware that the welding requirements specified in this document take precedence over paragraph 3.3.6 of SFLC Standard Spec 0000 for the purpose of welding involving HY-130.
3.4.3 Approval to weld HY-130. To obtain Coast Guard approval to weld on HY-130 steel for WMEC-270 “B-
Class” cutters, the Contractor must provide written Performance Qualification Records (PQR’s) for each process to be used. The PQR’s must be approved by one of the regulatory agencies affirming that the WPS meets the welding requirements of NAVSEA TP 1688. In addition, the Contractor must ensure that all subcontractors, prior to performing welding operations, have qualified procedures by meeting all the requirements set forth in this document.
NOTE
NAVSEA approval is NOT required for welding procedures submitted but the procedures must be reviewed and shown to satisfy the requirements set forth in
NAVSEA TP 1688, by a welding regulatory agency. The requirements for welding
Strenx 900 are considered the same as those for welding HY-130.
4 (Rev-0)
3.5 Environmental protection requirements. The Contractor must adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 USCG facilities. The Contractor must provide and maintain environmental protection as defined in SFLC
Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor must plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor must comply with applicable
Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item must not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is low.
3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:
• Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.
• National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an
NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.
• Air Emission Permit: Unit has an Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.
3.5.2 Test and procedures. The Contractor is required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work must be done by qualified laboratories; and where required by law, the laboratories must be certified.
3.5.3 Regulatory notifications. The Contractor is responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The
Contractor must submit copies of all regulatory notifications to the Contracting Officer and the local Facility
Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications must be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System
(NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor must appoint in writing an Environmental Manager for the project, who is responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager must ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’
Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out;
ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous
Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements
5 (Rev-0) and individual position requirements; coordinate removal of waste containers; and maintain the Environmental
Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor must comply with SFLC Std Spec 0000 Appendix B, Requirements For
Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).
3.5.6 Additional Requirements. The Contractor must be aware of the following:
3.5.6.1 No Contractor or Subcontractor must have the authority to sign a Hazardous Waste Manifest using the
Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast
Guard facility without COR or KO-approval.
3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor must prepare for and comply with local and state regulations.
3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor must furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.
3.6 Local Policy. The Contractor must refer to site (e.g., Base) Regulations and Instructions for details regarding local policies (e.g., crane services, parking, or facility usage).
3.6.1 This availability is to be conducted at an US Navy facility. The Contractor must comply with all US Naval facility instructions (e.g. NAVFAC P-307 for Weight Handling Program Management, etc.)
3.7 SFLC Standard Specification approved changes. Approved updates to the 2022 SFLC Standard Specifications will appear here.
3.7.1 SFLC Standard Specification 5550: Replace paragraph 3.11.3 to state, “Material supporting imminent work shall be brought on the cutter and stored where the work is being performed. Material that appreciably contributes to fire load shall be removed at the end of each work shift when personnel are not present. Trash, debris, and packaging materials shall be promptly removed from the vessel at the end of each work shift and not allowed to accumulate.” Advance the paragraph numbering of the Fire Prevention and Safety Inspection form to 3.11.4.
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
6 (Rev-0)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK
ITEM #
WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/AMPP INSPECTOR SIGNATURE CERT. # DATE / TIME
NAME OF CG REPRESENTATIVE SIGNATURE UNIT DATE/TIME
7 (Rev-0)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
VESSEL NAME HULL #
WORK
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER
COAT, BARRIER COAT, TOP
COAT, ETC…)
LOCATION (FRAME &
DECK, RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFAC
E
AMBIEN
T
ΔT
| DP -
SURFACE |
8 (Rev-0)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
VESSEL NAME HULL # WORK ITEM
LOCATION OF WORK (FRAME REFERENCES) AREA (SQFT)
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/AMPP No. 2
SSPC-SP WJ-2/AMPP WJ-2
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS
PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS
DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:
NAME OF QP-1/AMPP INSPECTOR SIGNATURE CERT. # DATE /
TIME
9 (Rev-0)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/AMPP No. 2
SSPC-SP WJ-2/AMPP WJ-2
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT
QA RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO
SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Mils Reading (IAW ASTM D4417-Method B for above 10 readings (by column):
Mean Reading
(mils)
10 (Rev-0)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
VESSEL NAME HULL # WORK
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.
DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)
11 (Rev-0)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
VESSEL NAME HULL #
WORK ITEM
COATING MFG PRODUCT NAME
BATC
H #
INDUCTI
ON TIME
COATING SYSTEM
SEQUENCE
(PRIMER/TOUCHUP/3RD
COAT, ETC.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.
SPOT 1 2 3 4 5
AVERAGE
VALUE
*BASE METAL READING
(BMR)
*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
APPLICATION METHOD (AIRLESS,
CONVENTIONAL SPRAY, ROLLED)
AVERAGE DFT
12 (Rev-0)
4.2 Tank and Void Assessment form.
13 (Rev-0)
14 (Rev-0)
55500_ACC_0323_IBCT
WORK ITEM 1: Fire Prevention Requirements «Dockside»
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to minimize shipboard fire risk and to clarify the Contractors’ role in fire prevention and response.
NOTE
This work item is not separately priced. Factor fire prevention and response costs into bid of affected work items.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements
Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire
Prevention and Response
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 Fire Plan. The Contractor must develop and implement a written fire plan in accordance SFLC Std
Spec 5550. The Contractors Fire Plan must address Fire Protection and Response specifics as required in this Work Item.
3.1.1 The availability’s specific Fire Plan must always address the following:
• material condition and fire protection boundary obstruction mitigations
• inoperable fittings log
15 (Rev-0)
• fire alarms
• firefighting equipment disposition
3.1.2 The Fire Plan must also address the following:
• fire protection system status
• communication links
• temporary services
• power disconnects
• fire prevention and safety inspections
3.2 Fire Prevention Responsible Party. The Contractor must appoint a Fire Prevention Responsible Party
(FPRP) who acts as the Contractor’s Responsible Person for fire prevention concerns during the entire availability.
3.3 Fire Prevention and Response Conference. The Contractor must participate in the Fire Prevention and
Response Conference as required in Std Spec 5550, paragraph 3.12. The participants must address the contents of SFLC Std Spec 5550, paragraph 3.12.1, as applicable.
3.4 Fire Responsibility Familiarization Tour and Initial Inspection. The Contractor must participate in the
Fire Responsibility Familiarization Tour and Initial Inspection as required in Std Spec 5550, paragraphs
3.12.2 through 3.12.4.
3.5 Material Condition and Fire Protection Boundary Obstruction Mitigation Requirements. The
Contractor must conform to all material condition and fire protection boundary obstruction mitigation requirements detailed in SFLC Std Spec 5550, paragraph 3.2.
3.6 Inoperable Fittings Log Requirements. The Contractor must conform to all inoperable fittings log requirements detailed in SFLC Std Spec 5550, paragraph 3.3.
3.6.1 The Contractor must maintain an Inoperable Fittings log. The logs must contain the same information as a Damage Control Closure Log found in Appendix A of SFLC Std Spec 5550. The log must remain at the access point of the vessel available for inspection or use by authorized personnel, i.e., casualty response. Deliver all logs to the CG when requested and at the end of the availability.
3.7 Fire Prevention Service Particulars. The Contractor must conform to the below listed fire prevention service requirements, in accordance with SFLC Std Spec 5550.
TABLE 1 – FIRE PREVENTION SERVICE SELECTION
*SUB-
PARAGRAPH
TITLE
Y/N
3.4 Fire prevention system status N
3.4.1 Temporary firefighting system proposal N
3.4.2 Emergent firefighting system inoperability
approval and notification
N
3.4.3 “Disabled equipment” signage for disabled initial responder equipment
N
3.4.4 Firefighting system inoperability allowance for
removed hazards
N
16 (Rev-0)
*SUB-
PARAGRAPH
TITLE
Y/N
3.4.5 Maintain sprinkling zone operability N
3.4.6 including all subparagaphs
Hazard mitigation for maintenance of fixed extinguishing systems
N
3.4.7 Procedure implementation for enabling/disabling
fire suppression systems
N
3.4.8 Portable water pumping requirement for vessels
w/o installed capability
N
3.4.9 Limitations on operation of major machinery
while firefighting systems are offline
N
3.4.10 Liquid fuel pumping requirement for operational
permanent or temporary firefighting systems
N
3.4.11 Mechanical AFFF equipment must be available
to initial responders in compartments with risk of flammable/combustible liquid spillage
N
3.4.12 including all subparagraphs
Portable fire extinguisher requirements N