This document is a Scope of Work for a U.S. Coast Guard dockside maintenance project. The United States Coast Guard will conduct an overhaul of the propulsion DC Main Motor assembly for Cutter MOBILE BAY from 30 November 2026 to 05 February 2027. The primary service required is the rental of a forklift with a minimum weight capacity of 20,000 pounds for the entire project duration. The contractor must provide delivery service (drop-off and pick-up) at the specified start and end dates, and ensure the equipment is fueled and ready for operations. The forklift will be utilized to adjust, position, and transfer engine components throughout the facility, with anticipated work occurring on concrete and pavement surfaces.

The work location is situated at USCGC MOBILE BAY, 36 South Neenah Avenue, Sturgeon Bay, Wisconsin 54235, with CWO Joshua Deisher serving as the base access point of contact. All inquiries regarding the scope of work should be directed to Project Manager Mr. Benjamin Mills at (412) 874-7583 or benjamin.m.mills@uscg.mil.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

U. S. COAST GUARD CUTTER MOBILE BAY

SECTION 1 – GENERAL INFORMATION

1.1 Purpose and Scope of Work

United States Coast Guard Cutter MOBILE BAY will be conducting a dockside project for overhauling the propulsion DC Main Motor assembly from 30 November 2026 to 05 February 2027.

1.2 Work Equipment Rental

Fork Truck Equipment. Contractors must provide a forklift rental (minimum weight requirement of 20,000 lb.

capacity) from 30 Nov, 2026 to 05 Feb, 2027. Contractor must provide delivery service (drop and pick-up) of rental equipment at start/end of specified dates. Contractor must ensure equipment is fueled and ready for operations.

1.3 Work Equipment Usage

Forklift will be used to adjust, position, and transfer engine components around the facility. Anticipated forklift working area is comprised of concrete/pavement.

1.4 Contact for questions

Any questions regarding scope of work must be directed to the Project Manager: Mr. Benjamin Mills @ (412) 874-

7583, benjamin.m.mills@uscg.mil.

1.5 Work Location Address & Base Access POC

Attn:

CWO Joshua Deisher

USCGC MOBILE BAY

36 South Neenah Ave

Sturgeon Bay, WI. 54235 mailto:benjamin.m.mills@uscg.mil