Polar Star Generator Rental SOW.pdf

PDF 135 KB Posted

Download PDF, 135 KB

Attached to
USCGC Polar Star 1000KW Generator Rental
Solicitation number
70ZU0227Q0001264
Issued by
Not on record

About this file

Statement of Work Summary

This Statement of Work (SOW) describes rental services for a 1,000 kW portable generator required by the United States Coast Guard to support the USCGC POLAR STAR during an unavailability of its primary Ship Service Diesel Generator. The contractor shall deliver one portable generator package meeting specified electrical and mechanical requirements to Pearl Harbor, HI (Joint Base Pearl Harbor-Hickam, 850 Ticonderoga St) by December 10, 2026, and retrieve it by June 30, 2027, with an anticipated rental period of approximately six months. The generator must have a minimum power rating of 750 kW (prime) and maximum 1,000 kW at 450/480 VAC, 3-phase, 3-wire configuration, capable of withstanding 1.5 times rated current for up to 30 seconds. The generator must include an electrically operated circuit breaker with electronic trip unit rated for minimum 45 kA asymmetric interrupt rating, with protection settings configured per American Bureau of Shipping Marine Vessel Rules 2025 (overload, short-circuit, thermal damage, reverse power, prime mover shutdown, and undervoltage protection). The package must include 300 feet of marine-grade cable rated for 115 percent of maximum generator current and be enclosed in a standard 30-foot or 40-foot shipping container suitable for marine use with radiant cooling capability, internal lighting, control systems, electrical start capability with sufficient battery capacity for at least 10 starts, and protection against rain, salt spray, low-level flooding, snow, ice, and operating angles up to 15 degrees.

Additional requirements include a fuel tank capable of supporting 24-hour operation at 50 percent prime rated power without refueling, heaters enabling operation within 15 minutes in ambient temperatures from 15 degrees Fahrenheit to 100 degrees Fahrenheit, an excitation system requiring no external power source or field flashing, an exhaust system with spark arrestor and silencer, and total harmonic distortion less than 3 percent. The contractor shall provide operator and maintenance instructions, filter kits, and consumables necessary for Government-performed routine maintenance but is not responsible for routine operation, fueling, hookup, or maintenance unless separately stated in the contract. The Government will provide crane support, place the generator aboard the cutter, perform hookup and grounding, provide fuel, and perform operation and routine maintenance. Acceptance criteria require delivery to the specified pier location by the required date, conformance to stated electrical and physical characteristics, provision of required cables and connectors with operating/maintenance instructions, and delivery in serviceable condition free of visible shipping damage.

View the file

On GovTribe

Work with this file

  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RENTAL SERVICES FOR 1,000Kw GENREATOR

Background USCGC POLAR STAR is preparing to get underway while a Ship Service Diesel

Generator is unavailable. To sustain required cutter capability, the United States Coast Guard requires temporary portable electrical-generation capability, including the equipment and accessories necessary to connect the generator to the cutter's Viking International shore-tie connections. The rented generator will be placed aboard the cutter and used as temporary shipboard electrical generation during the rental period.

1. Scope.

Provide rental and delivery of one portable generator package meeting the requirements below to the delivery location identified in this SOW for an anticipated rental period of approximately six months. The contractor shall also retrieve the generator package from the pier at the end of the rental period.

Minimum power rating 750 kW (prime), maximum 1000 kW, 450/480 VAC, 3-phase, 3-wire power. Generator must be able to withstand 1.5 times rated current for up to 30 seconds.

Minimum generator insulation class F.

Electrically operated generator circuit breaker, of either insulated-case or power circuit breaker type, must be installed for protection of the generator and the connecting power cable, with electronic trip unit capable of long-, short-, and instantaneous tripping. Circuit breaker must be rated for minimum 45 kA asymmetric interrupt rating.

Protection settings must be set for generator protection in accordance with American Bureau of

Shipping (ABS) Marine Vessel Rules (MVR) 2025 Part 4, Chapter 8, Section 2, Paragraph 9.11

(4-8-2/9.11). Specifically:

• Overload protection

• Short-circuit protection

• Thermal damage protection

• Reverse power protection

• Prime mover shutdown

• Undervoltage protection

300’ of cable rated for 115% of generator maximum current in 40 deg C ambient, minimum 90 deg C rated cable. Cable must be rated for flexible service, single conductors no larger than 4/0 for purposes of installation on the ship.

Generator must be enclosed in a standard 30-foot or 40-foot shipping container. Exact specifications and dimensions must be provided in the proposal.

Internal lighting, and all necessary control systems for operators to manage the system inside the container must be installed.

Generator engine must be electrically started. Battery capacity must be sufficient when fully charged for at least 10 starts.

Switchgear and bus bar must be braced for asymmetric short-circuit carrying capacity of the generator.

The container must include a radiant cooling system capable of maintaining generator temperature in a range of ambient temperatures. The generator must be capable of operation in ambient temperatures of 15 degrees F to 100 degrees F.

The generator fuel system must be capable of being refueled while on-line, may be connected to ship’s power for heaters and battery chargers, but must not require any other fluid or system inputs from the ship.

The generator and container must be suitable for marine use on board a ship, and the container must have suitable protection from rain, salt spray, low-level flooding from waves, snow, ice, and operating angles up to 15 degrees. It must have physical connections for attachment on deck, and external grounding points for grounding container to the hull.

Generator must not have neutral grounding, and any installed ground protection features must be disabled. Grounding of the container will be installed by the Government.

Fuel tank must be suitable for generator operation at 50% prime rated power without refueling for

24 hours.

Excitation system must not require external power source or field flashing prior to operation.

Heaters must be provided to support generator operation within 15 minutes.

Exhaust system must include suitably sized spark arrestor and silencer.

Generator total harmonic distortion must be less than 3%.

2. Tasks. The contractor shall provide operator and maintenance instructions necessary for the

Government to operate and maintain the generator during the rental period. The contractor shall also provide any filter kits and consumables included in the rental package for routine

Government-performed maintenance during the rental period, if applicable. The contractor is not responsible for performing routine operation, fueling, hookup, or maintenance during the rental period unless separately stated in the contract.

3. Delivery To/ Place of Performance: USCGC POLAR STAR will be located in Pearl

Harbor, HI, Joint Base Pearl Harbor-Hickam, 850 Ticonderoga St, JBPHH.

The contractor’s responsibility is limited to delivery of the generator package to the pier adjacent to the cutter and retrieval of the generator package from the pier at the end of the rental period. The Government will provide crane support, place the generator aboard the cutter, perform hookup and grounding, provide fuel, and perform operation and routine maintenance.

4. Period of performance- 10 December 2026 through 30 June 2027.

5. Acceptance. The generator rental will be accepted when the contractor has:

• delivered the generator package to the specified pier location by the required delivery date;

• provided a unit that conforms to the electrical and physical characteristics stated in this

SOW;

• provided the required cables, connectors, and operating/maintenance instructions; and

• delivered the unit in serviceable condition, free of visible shipping damage.

6. Points of Contact.

• USCG-SFLC-LRE PL Asset Management: CWO Matthew Temple, matthew.temple@uscg.mil, (510) 460-8195

• USCG-SFLC-LRE PL Asset Management: LCDR Andrew Constant, Andrew.S.Constant@uscg.mil

• USCGC POLAR STAR Engineering Officer: Joshua Herring, Joshua.C.Herring@uscg.mil